Integrated Engineering Deployment in a New Engineering Office

Date post: 22-Mar-2017
Category:
Upload: aveva-group-plc
View: 105 times
Download: 4 times
Share this document with a friend
21
Transcript
Page 1: Integrated Engineering Deployment in a New Engineering Office
Page 2: Integrated Engineering Deployment in a New Engineering Office

© 2017 McDermott International, Inc. All rights reserved

AVEVA User ConferenceIntegrated Engineering Deployment in a

New Engineering Office

Jeff Stroh

Director of Engineering, AEA

January, 2017

Engineering | Procurement | Construction | Installation

Page 3: Integrated Engineering Deployment in a New Engineering Office

© 2017 McDermott International, Inc. All rights reserved

Agenda• Intro to McDermott

• Why Integrated Tools?

• Implementation Plan

• The Future

Page 4: Integrated Engineering Deployment in a New Engineering Office

© 2017 McDermott International, Inc. All rights reserved

• vertically integrated

• industry leading

• seafloor to shore

• concept to commissioning

• locally focused and globally integrated

• extensive experience

• strategic partner

• committed to deliver

• superior safety records

McDermott

Page 5: Integrated Engineering Deployment in a New Engineering Office

© 2017 McDermott International, Inc. All rights reserved

Page 6: Integrated Engineering Deployment in a New Engineering Office

© 2017 McDermott International, Inc. All rights reserved

So where are we today?

Page 7: Integrated Engineering Deployment in a New Engineering Office

© 2017 McDermott International, Inc. All rights reserved

What We Do Now

Specialized Tool

Manual processesLots of handovers and interfacesNo “single source of truth”

Page 8: Integrated Engineering Deployment in a New Engineering Office

© 2017 McDermott International, Inc. All rights reserved

What’s Offered

Page 9: Integrated Engineering Deployment in a New Engineering Office

© 2017 McDermott International, Inc. All rights reserved

E3D/PDMS Only70%

Integrated 2D & 3D15%

Integrated 2D, 3D, and Engineering

10%

Integrated Tools with AVEVA NET

5%

State of the Industry

Page 10: Integrated Engineering Deployment in a New Engineering Office

© 2017 McDermott International, Inc. All rights reserved

Why Not?

$$$

“We need to re-train everybody”

“It’ll take too long to implement”

“We couldn’t make it work when we tried it before”

“My schedule is too short and I can’t risk it”

“The way we do projects works, so why change”

“What is my ROI for integrated tools?”

Page 11: Integrated Engineering Deployment in a New Engineering Office

© 2017 McDermott International, Inc. All rights reserved

• Need a project

• Need a Client who understands (or better requires) integrated tools

• Need to be realistic about implementation phases

• Need sufficient time to implement

• Need implementation support

• Need Organizational Change Management

How?

Page 12: Integrated Engineering Deployment in a New Engineering Office

© 2017 McDermott International, Inc. All rights reserved

• Fast Track EPCIC

• Client – PEMEX

• Started in June of 2016

• 30 Month Schedule – Award to Handover

• Execution Model – start in KL, move to Mexico City

NRF-107 – MODELOS ELETRONICOS BIDIMENSIONALES Y TRIDIMENSIONALES INTELEGENTES PARA INSTALACIONES

“2D and 3D Intelligent Electronic Models for Installations”

• Interconnected 2D & 3D Drawings

• Set hierarchy

• Linked Documents

Abkatun A-2

Page 13: Integrated Engineering Deployment in a New Engineering Office

© 2017 McDermott International, Inc. All rights reserved

Address “easy wins” and pain points for consistency

• AVEVA P&ID, Electrical, Instrumentation

• Model and P&ID Integration

• Schematic Model Manager

• Schematic 3D Integrator

• List Generation & Data Consistency

• AVEVA Engineering

Things Not Addressed

• Data Sheets – already had Client format & not enough time

• Structural Detailing – start of fabrication too fast to change systems, already partially integrated with PDMS

Implementation Goals

Page 14: Integrated Engineering Deployment in a New Engineering Office

© 2017 McDermott International, Inc. All rights reserved

AVEVA Clash

Manager

Tag

Data

Third Party

(FEED) DataETAP

Third Party

P&ID

Packages

Pipe Stress/

Structural

Analysis

Interface

AVEVA

Instrumentation

AVEVA

Electrical

DIGITAL INFORMATION HUB (AVEVA NET)

Enterprise Asset

Management/CMMS

Project

Performance

Tools

ERP

Systems

Third Party

Engineering &

Design Tools

P&IDs

PFDs

Ducting Diagrams

Reports

Deliverable Publish to DIHWork / Data Flow

ISM

Information

Standard

Manager

AVEVA

Solution

Instrument Datasheets

Instrument Indexes

Loop Diagrams

Termination Drawings

Junction Box Diagrams

Hookup Diagrams

Cable Schedules

Bills of Material

Cable Block Diagrams

Electrical Datasheets

Load Lists

Single Line Diagrams

Schematic Diagrams

Termination Drawings

Electrical Installation

Diagrams

Cable Drumming

Cable Schedules

Cable Block Diagrams

Bills of Material

Reports

Datasheets

Line Lists

Equipment Lists

Consistency Checks

Reports

Construction Drawings

Isometrics

Gas

Reports

3D

Geometry

and DataAVEVA

REVIEW and

ReviewShare

(3rd

Party Access)

Laser

Data

ERM

Data

Third Party

Scheduling

Tools

SAP, Oracle,

BaaN, IFS

Third Party

Time Clocking

Services

ERP

Data

AVEVA ENGAGE

LFM

Laser

Survey

Data

Clash Reports

Trend Information

Clash Status

AVEVA Global

AVEVA

Engineering

Tagged Items

& Attributes

AVEVA P&ID

AVEVA Everything

3D

AVEVA

Bocad

m

PR

OC

UR

EM

EN

T

PLA

NN

ING

&

CO

NTR

OL

CO

NS

TR

UC

TIO

N

& C

ON

TR

OL

WORKPACK

MANAGEMENT

MATERIAL

MANAGEMENT

ERM

Sequencing (4D)

Status Visualization

Multi-Project

Equipment

Sizing

Calculations

Standards

Management

PROCON

AVEVA

E3D

Insight

AVEVA Catalog

Manager

Integrated Tools Deployment

Page 15: Integrated Engineering Deployment in a New Engineering Office

© 2017 McDermott International, Inc. All rights reserved

Page 16: Integrated Engineering Deployment in a New Engineering Office

© 2017 McDermott International, Inc. All rights reserved

Our Approach:

• Strong Senior Leadership Support

• Deploy in New Office – less organizational resistance

• Leverage support from existing office SMEs for carry-over tools and expose them to the new tools

• Get the SMEs and front-line managers onboard with the new tools

From Here:

• Communications Plan

• Why, What, and How

• Posters, Demos, Online Videos

• Updated Procedures and Training

Organizational Change Management

Page 17: Integrated Engineering Deployment in a New Engineering Office

© 2017 McDermott International, Inc. All rights reserved

• ROI can be difficult to calculate

o Every project is different

o Clients are different

o Companies guard their information – not a lot of sharing

• Our approach to ROI is in the interfaces

o Reduce waste & misordering of materials

o Increase engineering productivity and reduce engineering manhours

Expected ROI

Page 18: Integrated Engineering Deployment in a New Engineering Office

© 2017 McDermott International, Inc. All rights reserved

Discrete Tools

McDermott’s Roadmap

Integrated Engineering

Tools

Process

Mechanical

Electrical

InstrumentPiping

Structural

Safety

Safety

Process

Mechanical

Electrical

Instrument

Piping

Structural

Page 19: Integrated Engineering Deployment in a New Engineering Office

© 2017 McDermott International, Inc. All rights reserved

The Future – PLM

INTEGRATED ENGINEERING TOOLS

Process Mechanical Piping Electrical Instrument

Structural Naval CSE Pipelines Commissioning

Project Lifecycle Management (PLM)Engineering Data

ManagementDocument Control

Project Status & Progress

Multi-CAD 3D Model

Cross-Function Change

Management

NON-ENGINEERING SOFTWAREERP

Project Cost Control

PlanningFabrication

ManagementWork Packaging

Page 20: Integrated Engineering Deployment in a New Engineering Office

© 2017 McDermott International, Inc. All rights reserved

There is a bit of a light at the end of the tunnel; however the industry still has a long way to go as a whole to unlock the potential of integrated engineering tools.

Success factors for integrated tools revolves around addressing organizational change management – without your people onboard, you won’t succeed.

Future state for the industry must revolve around data re-use which is enabled through Integrated Engineering Tools.

Summary

Page 21: Integrated Engineering Deployment in a New Engineering Office

© 2017 McDermott International, Inc. All rights reserved

Do you want to explore how the latest AVEVA technology can drive efficiency improvements within your organization? Click here to contact the team today!