+ All Categories
Home > Documents > Integrated Information Management - The Fruits of Convergence Brenda Helminen, Director Dan...

Integrated Information Management - The Fruits of Convergence Brenda Helminen, Director Dan...

Date post: 21-Dec-2015
Category:
View: 219 times
Download: 0 times
Share this document with a friend
Popular Tags:
36
Integrated Information Management - The Fruits of Convergence Brenda Helminen, Director Dan deBeaubien, Sr Telecommunications Engineer Telecommunication Engineering Michigan Technological University ACUTA Winter 1999 Seminars
Transcript

Integrated Information Management - The Fruits of Convergence

Brenda Helminen, DirectorDan deBeaubien, Sr Telecommunications Engineer

Telecommunication EngineeringMichigan Technological University

ACUTA Winter 1999 Seminars

ACUTA Winter Seminar 1999

Outline Introducing Michigan Tech Telecommunications at Michigan Tech

Organization Service Offerings

Automated Workflow Infrastructure Examples Conclusion

ACUTA Winter Seminar 1999

Michigan Tech Facts Public University Total Enrollment: 6,302 Graduate Enrollment: 628 Carnegie Foundation Doctoral II status 400 Faculty, 1000 staff Ranked programs in Environmental,

Mechanical, and Metallurgical Engineering

ACUTA Winter Seminar 1999

Where the heck is Michigan Tech? U.P. of Michigan Lots and lots of

snow Far from

everywhere

ACUTA Winter Seminar 1999

MTU Telcom OrganizationEngineering Staff Customer Service Staff

Director Director

Vice Provost for IT

ACUTA Winter Seminar 1999

MTU Telcom Infrastructure Data Network Centrex Telephone Network PBX Telephone Network CATV Broadband Network Wideband Network for EDS, video distribution Remote sites (ISDN, Wireless) Satellite Earth Station Radio Facilities

ACUTA Winter Seminar 1999

MTU Telcom Services Network connections, including ResNet Telephone equipment lease Telephone lines (Centrex, PBX) Toll and local calling Pagers Cellular phones

ACUTA Winter Seminar 1999

MTU Telcom Services (continued) Dial-in modem connections Voicemail Equipment sales (NIC cards, cables, hubs) Computer maintenance

ACUTA Winter Seminar 1999

MTU Telcom FUNDING Supplies and Services funded through fees Salaries (majority) centrally-funded Salaries (customer service representatives

and technicians) funded through service fees Regardless of funding source, positions are

managed at the University level

ACUTA Winter Seminar 1999

Automated Workflow ConceptAutomated workflow is the ability to directly modify subscriber information, service characteristics and device settings from a workorder-driven telemanagement system.

ACUTA Winter Seminar 1999

(mostly) Centralized data

Open Systems

Standard Protocols SNMP LDAP SQL ODBC*

Provides feedback

Automated Workflow Pieces

ACUTA Winter Seminar 1999

Automated Workflow Feedback Bad data causes

non-functional equipment

Guarantees consistency across system records

Forces work-order-driven changes

Cross reference between facilities documentation and billing records

ACUTA Winter Seminar 1999

Automated Workflow Benefits Reduction in technician labor Reduction in redundant (possibly inconsistent) data (much) Reduction in work order completion time Increase in data accuracy Increase in data accessibility (mostly) Eliminates the ability for ‘short cuts’

ACUTA Winter Seminar 1999

Automated Workflow Examples

ACUTA Winter Seminar 1999

MTU Kiosk Distribute access passwords Verify directory information Data from the LDAP server Simple Visual Basic app. Microsoft PowerPoint front end Maintenance free*

ACUTA Winter Seminar 1999

MTU Kiosk Dataflow

ACUTA Winter Seminar 1999

MTU SNMP Gateway - ResNet

1100 dorm rooms - approx. 2000 connections 85-90% requests received within the first two

weeks of fall term All are 10Mbps Ethernet Telcom provides cables, hubs, and NIC cards

ACUTA Winter Seminar 1999

MTU SNMP TMS MAC Form

ACUTA Winter Seminar 1999

MTU SNMP TMS Assigned Inventory

ACUTA Winter Seminar 1999

MTU SNMP TMS Billing Record

ACUTA Winter Seminar 1999

MTU SNMP TMS Path Detail (pre-close)

ACUTA Winter Seminar 1999

MTU SNMP TMS ResNet Asset

ACUTA Winter Seminar 1999

MTU SNMP TMS Final Path Detail

ACUTA Winter Seminar 1999

MTU SNMP TMS Assigned Subscribers

ACUTA Winter Seminar 1999

MTU SNMP TMS Path Report

ACUTA Winter Seminar 1999

MTU SNMP Process Description All information about connection contained within

telemanagement system’s subscriber, facilities, asset and inventory modules

Jobs run every 10 minutes to check for work order closures or device resets

Delinquent accounts have service suspended automatically*

Technicians rarely needed (jacks are pre-connected) Supports any SNMP-compliant device

ACUTA Winter Seminar 1999

MTU SNMP Process Results Automated process has handled the “beginning

of year rush” for the last 2 years Average time-to-service reduced from two weeks

to minutes DNS/DHCP configuration is automated Security level raised significantly Customer service staff can reset ports (again) Service data records MUST be correct!!!

ACUTA Winter Seminar 1999

Media Access Points - MAP Project Address several issues

Customer confusion Horizontal cable management Service location management 911 IP Telephony Accurate campus jack inventory

ACUTA Winter Seminar 1999

Project MAP Scope Project scope limited

to horizontal cabling Documents

service location #jacks jack/wire type termination block

Data designed to drop into telemanagement system

ACUTA Winter Seminar 1999

Project MAP Specifics Database “connects”

block positions with specific jacks

Manages well defined list of buildings, closets, floors and rooms

Emphasis placed on high level of database referential integrity

ACUTA Winter Seminar 1999

Project MAP Outputs Jack labels Block tags Maps Web apps

ACUTA Winter Seminar 1999

Project MAP Progress Project started mid May ‘99 To date

17 of 80 buildings* Total of 84 floors 130 Telcom closets 4136 jack locations 16,500 individual jacks 44,575 pairs of wire 1786 cross connect blocks

ACUTA Winter Seminar 1999

Project MAP Resources 3-5 Students (mostly MET’s) totaling 40-60

hours/wk (950 work hours)

Very fast PC

RNPC*

Bob

ACUTA Winter Seminar 1999

Automated Workflow Next Steps Visual work request web form Full asset and inventory integration Deal with Point Of Sales functionality Streamline work notification and completion

process (workorder routing) Visual service information web forms

ACUTA Winter Seminar 1999

Other Automated Projects Automated Directory IVR PBX Directory PH/Finger Servers Class Rosters Grades by Phone E911 CAD system

ACUTA Winter Seminar 1999

Questions?

For more info contact: [email protected]

presentation available at: www.tc.mtu.edu/telcom/acuta99/index.htm


Recommended