+ All Categories
Home > Documents > Integrated Water Supply Planning for Human Needs and ......SGA Cur s Well Field 10 MGD (Total 44...

Integrated Water Supply Planning for Human Needs and ......SGA Cur s Well Field 10 MGD (Total 44...

Date post: 22-Jul-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
21
Integrated Water Supply Planning for Human Needs and Instream Flows Integrated Water Supply Planning for Human Needs and Instream Flows Doug Quinn, Clark Public Utilities May 1, 2015
Transcript
Page 1: Integrated Water Supply Planning for Human Needs and ......SGA Cur s Well Field 10 MGD (Total 44 MGD) Paradise Point Well Field 14.4 MGD (Total 58.4 MGD) Maximum Water Right 94.4 MGD

Integrated Water Supply Planning for Human Needs and Instream Flows

Integrated Water Supply Planning for Human Needs and Instream Flows Doug Quinn, Clark Public Utilities

May 1, 2015

Page 2: Integrated Water Supply Planning for Human Needs and ......SGA Cur s Well Field 10 MGD (Total 44 MGD) Paradise Point Well Field 14.4 MGD (Total 58.4 MGD) Maximum Water Right 94.4 MGD

Planning & CPU

Service Areas

Planning & CPU

Service Areas

Page 3: Integrated Water Supply Planning for Human Needs and ......SGA Cur s Well Field 10 MGD (Total 44 MGD) Paradise Point Well Field 14.4 MGD (Total 58.4 MGD) Maximum Water Right 94.4 MGD

Forecasted Water

Demands Through

2060

0

20

40

60

80

100

Dem

and

[MGD

]

City of Ridgefield MDD

City of Ba le Ground MDD

Clark Public U li es MDD

July 2008 Water System Water Rights (34 MGD)

SGA Cur s Well Field 10 MGD (Total 44 MGD)

Paradise Point Well Field 14.4 MGD (Total 58.4 MGD)

Maximum Water Right 94.4 MGD PAA Cur s Well Field 36 MGD (Total 94.4 MGD)

2020 20302010 2040 2050 2060

Page 4: Integrated Water Supply Planning for Human Needs and ......SGA Cur s Well Field 10 MGD (Total 44 MGD) Paradise Point Well Field 14.4 MGD (Total 58.4 MGD) Maximum Water Right 94.4 MGD

ESA and Salmon

Recovery

Page 5: Integrated Water Supply Planning for Human Needs and ......SGA Cur s Well Field 10 MGD (Total 44 MGD) Paradise Point Well Field 14.4 MGD (Total 58.4 MGD) Maximum Water Right 94.4 MGD

Watershed Planning Act

Page 6: Integrated Water Supply Planning for Human Needs and ......SGA Cur s Well Field 10 MGD (Total 44 MGD) Paradise Point Well Field 14.4 MGD (Total 58.4 MGD) Maximum Water Right 94.4 MGD

Planning Participants

Page 7: Integrated Water Supply Planning for Human Needs and ......SGA Cur s Well Field 10 MGD (Total 44 MGD) Paradise Point Well Field 14.4 MGD (Total 58.4 MGD) Maximum Water Right 94.4 MGD

Natural Context

Page 8: Integrated Water Supply Planning for Human Needs and ......SGA Cur s Well Field 10 MGD (Total 44 MGD) Paradise Point Well Field 14.4 MGD (Total 58.4 MGD) Maximum Water Right 94.4 MGD

The Process in Theory

The Process in Theory

1. Organize the planning unit2. Make priorities + identify

efficiencies3. Gather and digest available data4. Assess strengths + constraints5. Establish issue sideboards and

approach6. Achieve consensus7. Sign the plan

Page 9: Integrated Water Supply Planning for Human Needs and ......SGA Cur s Well Field 10 MGD (Total 44 MGD) Paradise Point Well Field 14.4 MGD (Total 58.4 MGD) Maximum Water Right 94.4 MGD

Technical understanding of issues

Connectivity between aquifers & base flow

Myths and conspiracies Planning fatigue Approach to planning

solution

Some Real Problems

Page 10: Integrated Water Supply Planning for Human Needs and ......SGA Cur s Well Field 10 MGD (Total 44 MGD) Paradise Point Well Field 14.4 MGD (Total 58.4 MGD) Maximum Water Right 94.4 MGD

Technical understanding of issues

Connectivity between aquifers & base flow

Myths and conspiracies Planning fatigue Approach to planning

solution

Some Real Problems

Page 11: Integrated Water Supply Planning for Human Needs and ......SGA Cur s Well Field 10 MGD (Total 44 MGD) Paradise Point Well Field 14.4 MGD (Total 58.4 MGD) Maximum Water Right 94.4 MGD

Technical understanding of issues

Connectivity between aquifers & base flow

Myths and conspiracies Planning fatigue Approach to planning

solution

Some Real Problems

Page 12: Integrated Water Supply Planning for Human Needs and ......SGA Cur s Well Field 10 MGD (Total 44 MGD) Paradise Point Well Field 14.4 MGD (Total 58.4 MGD) Maximum Water Right 94.4 MGD

Technical understanding of issues

Connectivity between aquifers & base flow

Myths and conspiracies Planning fatigue Approach to planning

solution

Some Real Problems

Page 13: Integrated Water Supply Planning for Human Needs and ......SGA Cur s Well Field 10 MGD (Total 44 MGD) Paradise Point Well Field 14.4 MGD (Total 58.4 MGD) Maximum Water Right 94.4 MGD

13

OVER

70

MEETINGS

Page 14: Integrated Water Supply Planning for Human Needs and ......SGA Cur s Well Field 10 MGD (Total 44 MGD) Paradise Point Well Field 14.4 MGD (Total 58.4 MGD) Maximum Water Right 94.4 MGD

Technical understanding of issues

Connectivity between aquifers & base flow

Myths and conspiracies Planning fatigue Approach to planning

solution

Some Real Problems

Balance Interests

Adopt Plan

Page 15: Integrated Water Supply Planning for Human Needs and ......SGA Cur s Well Field 10 MGD (Total 44 MGD) Paradise Point Well Field 14.4 MGD (Total 58.4 MGD) Maximum Water Right 94.4 MGD

Trust among planners

Build upon strengths

Develop science

Identifying a common denominator among interests

Solutions

Page 16: Integrated Water Supply Planning for Human Needs and ......SGA Cur s Well Field 10 MGD (Total 44 MGD) Paradise Point Well Field 14.4 MGD (Total 58.4 MGD) Maximum Water Right 94.4 MGD

Implement the regional supply systemReserve supplies not served by regional systemStepwise strategy for use/access to reservesClose watershed to additional withdrawals

Building Certainty

Page 17: Integrated Water Supply Planning for Human Needs and ......SGA Cur s Well Field 10 MGD (Total 44 MGD) Paradise Point Well Field 14.4 MGD (Total 58.4 MGD) Maximum Water Right 94.4 MGD

Regional Wellfields

under Tidal Influence

Page 18: Integrated Water Supply Planning for Human Needs and ......SGA Cur s Well Field 10 MGD (Total 44 MGD) Paradise Point Well Field 14.4 MGD (Total 58.4 MGD) Maximum Water Right 94.4 MGD

Summing it Up

• Plan provides water supply through 2060

• Instream flows are protected and enhanced

• Stronger relationships with Ecology and partners

• Funding assistance from Ecology

Page 19: Integrated Water Supply Planning for Human Needs and ......SGA Cur s Well Field 10 MGD (Total 44 MGD) Paradise Point Well Field 14.4 MGD (Total 58.4 MGD) Maximum Water Right 94.4 MGD

Results

Page 20: Integrated Water Supply Planning for Human Needs and ......SGA Cur s Well Field 10 MGD (Total 44 MGD) Paradise Point Well Field 14.4 MGD (Total 58.4 MGD) Maximum Water Right 94.4 MGD

Paradise Point

Regional Supply

Transmission Line Tour.kml 2 Miles

Page 21: Integrated Water Supply Planning for Human Needs and ......SGA Cur s Well Field 10 MGD (Total 44 MGD) Paradise Point Well Field 14.4 MGD (Total 58.4 MGD) Maximum Water Right 94.4 MGD

Questions?