+ All Categories
Home > Documents > Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out...

Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out...

Date post: 25-Aug-2018
Category:
Upload: ngothuy
View: 216 times
Download: 0 times
Share this document with a friend
75
21 22 February 2018 Houston, TX Copyright 2018, Letton Hall Group. This paper was developed for the UPM Forum, 21 – 22 February 2018, Houston, Texas, U.S.A., and is subject to correction by the author(s). The contents of the paper may not necessarily reflect the views of the UPM Forum sponsors or administrator. Reproduction, distribution, or storage of any part of this paper for commercial purposes without the written consent of the Letton Hall Group is prohibited. Non-commercial reproduction or distribution may be permitted, provided conspicuous acknowledgment of the UPM Forum and the author(s) is made. For more i nformation, see www.upmforum.com. Intelligent Energy: The Synergy between Computers and Oil & Gas Michael Nikolaou
Transcript
Page 1: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

21 – 22 February 2018 Houston, TX

Copyright 2018, Letton Hall Group. This paper was developed for the UPM Forum, 21 – 22 February 2018, Houston, Texas, U.S.A., and is subject to correction by the author(s). The contents of the paper may not necessarily reflect the views of the UPM Forum sponsors or administrator. Reproduction,distribution, or s torage of any part of this paper for commercial purposes without the written consent of the Letton Hall Group is prohibited. Non-commercial reproduction or distribution may be permitted, provided conspicuous acknowledgment of the UPM Forum and the author(s) is made. For moreinformation, see www.upmforum.com.

Intelligent Energy: The Synergy between Computers and Oil & Gas

Michael Nikolaou

Page 2: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Intelligent Energy?

Page 3: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Need to Spend Energy to Get EnergyUS

Domestic Oil

1930

US Domestic

Oil 1970

US Domestic

Oil 2005

US Imported

Oil 1970

US Imported Oil

2005

Natural Gas

Nuclear

Coal

Hyd

ro

Firewood

Ener

gy R

etu

rn o

n In

vest

me

nt

(ER

OI)

100

80

60

40

20

0

Wind

PV-solar

Biodiesel

Tar Sands

10 20 30 100

Total Energy(Quad Btu)

Source: C.A.S. Hall, http://www.theoildrum.com/node/3810US

Domestic Oil

1930

US Domestic

Oil 1970

US Domestic

Oil 2005

Page 4: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Pivotal Technologies for Oil & Gas

• Key technologies:– 3D seismic– Horizontal drilling– Hydraulic fracturing

• A key supporting enabler:– Computers

Page 5: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Intelligent Energy

• Upstream– Drilling:

• Managed pressure drilling (MPD)

– Cementing: • Reverse-circulation cementing• Avoid natural gas leaks (Zonal isolation)

– Fracturing: • Optimal geometry and placement

– Production:• Abnormal situation detection, diagnosis, and correction

• Midstream– Transportation of natural gas as CNG

Page 6: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Intelligent Energy

• Upstream– Drilling:

• Managed pressure drilling (MPD)

– Cementing: • Reverse-circulation cementing• Avoid natural gas leaks (Zonal isolation)

– Fracturing: • Optimal geometry and placement

– Production:• Abnormal situation detection, diagnosis, and correction

• Midstream– Transportation of natural gas as CNG

Page 7: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Managed Pressure Drilling (MPD)

Riser

Rock

Annulus

Page 8: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Maintain Downhole Pressure When Drilling

Page 9: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

What Could Go Wrong?

Page 10: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

MPD and the Need for Automation

Extraction pump

(variable-speed)

Trip tank

Choke

(variable-

opening)

Check

valve

Kill tank

Kill pump

(variable-speed) Blow-out

preventer

(BOP)

On/Off

Variable

opening

Well control line

Main pump

(variable-speed)

On/Off

Stand pipe

On/Off

Back-pressure

pump (variable-

speed)

Drain

On/Off

Return pump

(variable-speed)

Supply

tank

Injection pump

(variable-speed)

Isolate pump

(variable-speed)

On/Off

Additives

Page 11: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Model Predictive Control (MPC)

Time

Target

History Matching (?)

Target

Target

Target

Page 12: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

MPD Case Study:Dual-Gradient Drilling

Page 13: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Model-Predictive Control for Managed Pressure Drilling: MPC for MPD

• Manipulated inputs:

𝐮 =

𝑢1𝑢2𝑢3

=

𝑞pump

𝑞sub𝑣ds

=

𝑞pump

𝑞sub𝑣ds

• Controlled outputs – Keep at setpoint:

𝐲 =𝑦1𝑦2

=BHP

Hook position

• Additional objective – Keep at setpoint:𝑞pump = 𝑞pump

SP

• Constraints:𝑦1,min ≤ 𝑦1 ≤ 𝑦1,max

𝑦2,min ≤ 𝑦2 ≤ 𝑦2,max

Δ𝑦2,min ≤ Δ𝑦2 ≤ Δ𝑦2,max

Δ𝐮min ≤ Δ𝐮 ≤ Δ𝐮max

Page 14: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Operating Scenarios

Symbol Mode Observed maximum

drill string velocity

No MPC

1 pump 1000 / minˆu q l

ds 12 [m/min]

ds 19 [m/min]

ds 24 [m/min]

ds 28 [m/min]

MPC

set set

1 pump 1000 / minˆu q l

ds 12 [m/min]

ds 19 [m/min]

ds 24 [m/min]

ds 28 [m/min]

Page 15: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Drill String Velocity(Tripping into the well)

Page 16: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Hook Position

Page 17: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Main Mud Pump Flow Rate

Page 18: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Subsea Pump Flow Rate

Page 19: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Bottomhole Pressure (BHP)

Page 20: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Insight

• Computers and automation can improve long entrenched practices

• …as long as 𝑠𝑖𝑡𝑢𝑎𝑡𝑖𝑜𝑛𝑎𝑙 𝑎𝑤𝑎𝑟𝑒𝑛𝑒𝑠𝑠 is maintained

Page 21: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Intelligent Energy

• Upstream– Drilling:

• Managed pressure drilling (MPD)

– Cementing: • Reverse-circulation cementing• Avoid natural gas leaks (Zonal isolation)

– Fracturing: • Optimal geometry and placement

– Production:• Abnormal situation detection, diagnosis, and correction

• Midstream– Transportation of natural gas as CNG

Page 22: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Reverse-Circulation Primary Cementing (RCPC)

Page 23: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Drilling Offshore Wells

Riser

Rock

Annulus

Page 24: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Offshore RCPC

Page 25: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

RCPC Simulator Development

• Visualize T, P

• Develop simulator in COMSOL

Page 26: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

RCPC Simulator Development

Page 27: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Insight

Page 28: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Intelligent Energy

• Upstream– Drilling:

• Managed pressure drilling (MPD)

– Cementing: • Reverse-circulation cementing• Avoid natural gas leaks (Zonal isolation)

– Fracturing: • Optimal geometry and placement

– Production:• Abnormal situation detection, diagnosis, and correction

• Midstream– Transportation of natural gas as CNG

Page 29: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Natural Gas: A “Bridge” Fuel

Page 30: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Avoiding Natural Gas Leaks

Data Source: Howarth RW, R Santoro, and A Ingraffea, Climatic Change (2011) 106:679–690

Page 31: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Ingredients for Recipes to Cement a Well Well

Casing design

• Internal casing diameter

• Casing weight/length

• Centralization

• Casing and hole diameters ratio

Cement design

• Slurry density

• Free water content

• Spacer

• Cement flow rates

• Cement additives: i.e. accelerator, retarder, fluid loss, gas migration etc.

Rheological Properties

• Gel strength

• Plastic viscosity

• Yield stress

Other Factors

• Bottom hole circulation temperature (BHCT)

• Bottom hole static temperature (BHST)

Page 32: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

How to Model Outcomes of Recipes?

• Cement job evaluation (45 wells)

– Sustained casing pressure (SCP)

• Categorical data: Leak/No-Leak (19/26 wells)

• Classification Model: PLS/DA

• Cross-validated correct classification: 81%

– Estimates of conclusive or inconclusive cases

– Ranking of variables in order of importance

Page 33: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Ranking of Variables

Page 34: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Similar and Different Wells

Page 35: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Insight: How to Avoid Leaks

Page 36: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Insight

• Recipes and Rules-of-Thumb:– Cold water leads to poor mixing

– High gel-strength development in short time span desirable for good a cementing job

– High volume of mixing water not good for a cementing job

– Use of extenders in case of high water to cement ratio

– Use of fluid loss cement additive to reduce fluid losses from cement slurry

– Low (but not too low) mud-weight to cement density ratio for better mud displacement

Page 37: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Intelligent Energy

• Upstream– Drilling:

• Managed pressure drilling (MPD)

– Cementing: • Reverse-circulation cementing• Avoid natural gas leaks (Zonal isolation)

– Fracturing: • Optimal geometry and placement

– Production:• Abnormal situation detection, diagnosis, and correction

• Midstream– Transportation of natural gas as CNG

Page 38: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Fracture Design for Horizontal Wells in Low-Permeability Reservoirs

Page 39: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

The Unified Fracture Design Method

• Given– Proppant mass, 𝑀𝑝

– Formation permeability, 𝑘– Pay-zone thickness, ℎ– Fracture height, ℎ𝑓– Fracture volume, 2𝑉𝑓

• Define

– Dimensionless fracture conductivity: 𝐶𝑓𝐷 ≜𝑘𝑓𝑤𝑓

𝑘𝑥𝑓

– Proppant number: 𝑁𝑝 ≜4𝑘𝑓𝑉𝑓

𝑘ℎ𝑓𝑥𝑒𝑦𝑒

– Drainage area aspect ratio: 𝑦𝑒𝐷 ≜𝑦𝑒

𝑥𝑒

– Penetration ratio: 𝐼𝑥 ≜2𝑥𝑓

𝑥𝑒

Optimal fracture:

𝑥𝑓,opt =𝑘𝑓𝑉𝑓

𝐶𝑓𝐷,opt𝑘ℎ𝑓

𝑤𝑓,opt =𝐶𝑓𝐷,opt𝑘𝑉𝑓

𝑘𝑓ℎ𝑓

𝐶𝑓𝐷,opt = 𝜙(𝑦𝑒𝐷 , 𝑁𝑝)

Page 40: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Optimal Fracture Designs

Page 41: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Insight

Drained

region

Undrained

region

Low pN

Fracture

High pN

Low eDy

High eDy

Page 42: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Extended to Economic Optimization

Production Estimation

Module

( ), ( )q t Q t

Objective Function

NPV

Input Variables:

Reservoir/ Well Properties

Fluid properties

Proppant type

Outer

(Economic)

Optimization

Optimal Design opt

wn , opt

fn , opt

pM , opt opt opt

, ,f f fh x w

Fracture Design Module

UFD + PKN + P3D

, , ,f f f treath x w p

Design Variables:

No. of wells, w

n

No. of fractures, fn

Mass of Proppant, pM

Bounds on

wn , fn , pM

Design

Constraints

Inner

(Physical)

Optimization

GLOBAL

Page 43: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Intelligent Energy

• Upstream– Drilling:

• Managed pressure drilling (MPD)

– Cementing: • Reverse-circulation cementing• Avoid natural gas leaks (Zonal isolation)

– Fracturing: • Optimal geometry and placement

– Production:• Abnormal situation detection, diagnosis, and correction

• Midstream– Transportation of natural gas as CNG

Page 44: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Electric Submersible Pumps (ESP): Key for Artificial Lift

• ESP– Second most common artificial-lift

technology– Biggest market share in cost

• Most common ESP concerns:– High workover costs – Low system run life

Image Sources: Spears & Associates, 2009; http://www.chemtech-online.com/O&G/Priyanka_april_may12.html

Page 45: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

What Could Go Wrong?

• Causes

• Failures

Design related

Equipment capacity

Material selection

System configuration

Leaking Failed pressure test Stuck Burst Bent Broken Disconnected

Mechanical

Burn Corroded Worn Melted Overheated

Material

Plugged with solids Contaminated fluid

Others

Short circuit Open circuit Faulty power

Electrical

Fabrication

Manufacturing problem

Improper quality control

Reservoir

Reservoir fluids Reservoir

performance

Operational

Normal wear and tear

Inadequate training

Installation

Assembly procedure Installation

procedure

Storage/ Transport

Improper storage Improper

transportation

Source: GE

Page 46: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Standard ESP Monitoring vs. Data-Driven

• Limited to Δpower due to

– Fluid density

– Flow rate

Real-Time Decision Variables

Flowline Pressure

Wellhead Pressure

Wellhead Temp

Motor Current A

Motor Current B

Motor Current C

Discharge Pressure

Intake Pressure

Intake Temperature

Leakage Current

Motor Temperature

Vibration

Water Cut

P Pump

P Choke

P ESP to Wellhead

Free Gas Intake

Overall System Efficiency

Pump Fluid Density

Pump Head

Total Liquid Flowrate

Total Pump Head

Page 47: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

ESP Analytics Workflow

Prescription of Preventive action

Determine stable operation range

Reset variables based on ranking

Compute statistics and match patterns

Diagnosis of Potential Cause

Ranking of Variables Plot Contribution Charts

Prediction of Failures

Determine Decision Variables Robust PCA Modeling Pattern Recognition

1

2

3

Page 48: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Case Study

• Major oil-field in Middle-East

• Data from downhole and surface gauges

• Analysis for five events

• Data over 2 years

– Data frequency: 1 minute

• Analysis performed on Matlab

Page 49: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Development of Monitoring System

Page 50: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

ESP Health Detection

Principal Component 1 Principal Component 1

Prin

cip

al C

om

po

nen

t 2

Prin

cip

al C

om

po

nen

t 2

Prin

cip

al C

om

po

nen

t 2

Prin

cip

al C

om

po

nen

t 2

Page 51: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

ESP Health Prediction Patterns

Page 52: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

ESP Health Diagnosis

0.000

0.200

0.400

0.600

0.800

1.000

1.200

1.400

Co

ntr

ibu

tio

n

Decision variables

Trip 1

Page 53: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

ESP Health Correction

0

50

100

150

200

250

Op

erat

ing

Val

ue

(%)

Decision Variables

Parameter behavior identification

Stable Zone Trip 1 Trip 2

Page 54: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

ESP Health Correction

Page 55: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

ESP Analytics in a Nutshell

Page 56: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Intelligent Energy

• Upstream– Drilling:

• Managed pressure drilling (MPD)

– Cementing: • Reverse-circulation cementing• Avoid natural gas leaks (Zonal isolation)

– Fracturing: • Optimal geometry and placement

– Production:• Abnormal situation detection, diagnosis, and correction

• Midstream– Transportation of natural gas as CNG

Page 57: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Monetizing Natural Gas:Conversion Strategies

• Gas to wire (GTW)

• Gas to liquids (GTL)– Chemical reactions– 10 bcf/d ~ 1MMb/d

• Liquefied natural gas (LNG)– Freezing (-162ºC, -260ºF)

• Compressed natural gas (CNG) – Compression (150-250 atm)– Possibly chilling

Page 58: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

LNG or CNG?

Page 59: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

LNG or CNG?

• Cost structure difference– LNG

– CNG

Fleet Terminals

0% 100%40%

Term.Fleet

0% 100%80%

Page 60: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Conclusions

• Marine LNG or CNG?

– Key factor: Distance, L• Short distance: CNG

• Long distance: LNG

– Secondary factor: Amount of gas transported, q

– Gas price not important (for choice between the two)

– Composite CNG containers have economic merits

0 2 4 6 8 100

100

200

300

400

500

Distance , L kmiles

Gas

rate

,q

Bcf

y

Lines of NPVCNG NPVLNG

Page 61: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Liquefied Natural Gas (LNG): Established International Trade

Source: BP Statistical Review (2011)

Page 62: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Potential Marine CNG Markets

Page 63: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Insight

• CNG distribution patterns:

– Hub and spoke

– Milk run

Page 64: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

CNG for the Caribbean: The Big Four

Page 65: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

CNG for the Caribbean: The Small Ones

Page 66: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Insight

• Marine CNG: "𝑆𝑚𝑎𝑙𝑙 𝑖𝑠 𝑏𝑒𝑎𝑢𝑡𝑖𝑓𝑢𝑙"

Page 67: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Insight

• LNG vs. CNG

– Primary differentiator: Distance, L

CNG Metal LNGCNG Metal LNG CNG Composite LNG

Page 68: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Quick Look Under the Hood

Page 69: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Quick Look Under the Hood

Page 70: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Quick Look Under the Hood

Page 71: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Quick Look Under the Hood

Page 72: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Quick Look Under the Hood

Page 73: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

At the End of the Day…

Page 74: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Closing Thoughts

• Computers for both number crunching and insight

• Data is key, but no longer the bottleneck

– “Without data you’re just a person with an opinion.”W. Edwards Deming, perennial

– “Without An Opinion, You're Just Another Person With Data”Milo Jones and Philippe Silberzahn, Forbes, 2016

• Cross-fertilization from related industries

Page 75: Intelligent Energy: The Synergy between Computers … · 2/28/2018 · (variable-speed) Blow-out preventer (BOP) On/Off Variable opening Well control line Main pump (variable-speed)

Acknowledgements

• Funding– IRIS, Statoil– RPSEA– Anadarko, Weatherford, Chesapeake– Halliburton– XGas

• Collaborators– MPC for MPD

• Drs. Gerhard Nygaard, Oeyvind Breyholtz, Jan-Einar Gravdal(IRIS/University of Stavanger)

• Dr. John-Morten Godhavn (Statoil)

– Cementing Well(s)• Kyle Macfarlan (UH, Sim2TheMax)• Shyam Panjwani, Shobhit Misra (UH)• Jessica McDaniel (CSI)• Crystal Wreden, Matt Schinnell (Weatherford)

– Hydraulic Fracturing Design• Dr. Srimoyee Bhattacharya (UH, Shell)

– ESP Monitoring• Supriya Gupta (UH)• Dr. Luigi Saputelli (UH, Frontender)• Dr. Cesar Bravo (Halliburton)

– Marine CNG• Dr. Xiuli Wang (UH, XGas)

• Prof. Michael Economides


Recommended