Facilities’ Energy Challenges from an
Intelligent Perspective
Intelligent Facility Management &
Energy Efficiency Systems
SATCHNET ELECTRONIC SYSTEMSLocal Systems’ Integration Experts
Firas Obeido CEM
Who We Are?
A Leading Facility Automation Systems’ Integrators with A Major Vision to Step In & Change the
Local Perception of Energy Management Solutions
Power Monitoring
& Management
Metering and Monitoring
Variable Speed Drives
Power Quality (UPS)
LightingSchedule Based Lighting Control
Facility AutomationHVACWater & PumpingEnergy Management
SecurityDigital Video ManagementAccess ControlIntrusion Detection
Design
&
Installation
Operations
&
Maintenance
Evaluation
&
Retrofit
Single Source Solutions throughout the Facility Life Cycle
Fire and Life Safety
Service & Maintenance (CMMS)
Complete Facility Solutions
For All Phases of your
Facility
The Challenge
The life cycle cost of a Facility
A Peek at the Solution
Measure it
Control It
Manage it
Oth
ers
..
Security
&
Fire
Fuel
Managem
en
t
Wate
r
Lig
hting
Pow
er
Managem
en
t
HV
AC
Contr
ols
Integrated Facility Management System
High Performance Green
Facility
Fault Detection and
Diagnostics (FDD)
Automated Demand
Response (ADR)
Automated Measurement
& Verification (M&V)
Energy Information
Systems (EIS)
Energy Information
Systems
Facility Owners,
Developers,
Occupants,
Consultants
Facility Managers, Operators, Financial Managers
Energy Efficiency Service
Providers &
Suppliers
Government Utilities, Policy
Makers
Intelligent Energy
Management Triangle
Visualization
Performance Indicators
Energy Saving Through BMS
ECM # 1 : Occupancy Time
Scheduling
10-20%
Case Study: Packaging Industrial Company
(PIC)
Operations & Actual Energy Savings
Boiler Stop
after 1000
second
Pump Stop
after 1800
second
Shut down timers
are user
adjustable
System start the
most energy
efficient chiller first
Chiller plant will start
if only one film
machine is working
Petra chiller start when
water temperature more
than 16 (14+2)
And stop when water
temperature less than
12 (14-2)
All these value are
user adjustable
Only when it needed
Hiross chiller (less
efficient chiller ) start
only Petra chiller can't
keep cold enough water
temperature
The schedule
weekly plan
This time
schedule start at
Saturday at 09:00
AM
And stop at
Thursday 11:00
PM
Special event
configured for
next Thursday
Since it will be
labor day holiday
Weekly schedule
remain as it is
except May
2,2013 it will be
stop
List of trend logs
One or more
value can be
display at once
Depending on
the purpose of
the report
There are several
type of the output
report
Se the period of
the data
Set the report title
The data can be
saved
Exported data
can be viewed
and formatted in
common program
All data in one page
Make it easy to monitor the
operation
Energy Saving Report
88,831.00 87,457.40
March - Dec. 2011 March - Dec. 2012
Energy (MWH) 1,354.84 1,333.89
Production TON 2,856.72 3,821.73
.KWH/Ton 474.26 349.03
1,3
54
.8
1,3
33
.9
2,8
56
.7
3,8
21
.7
474.3 349.0 -
500.00
1,000.00
1,500.00
2,000.00
2,500.00
3,000.00
3,500.00
4,000.00
4,500.00
Electricity for PIC SAVING = 32,555.6 = 27%
JO
D 2
60
,26
1.0
0
JO
D 3
15,9
21.1
6
JO
D 2
57
,80
7.3
1
JO
D 5
8,1
13
.85
JO
D 3
0,0
00
.00
JOD -
JOD 50,000.00
JOD 100,000.00
JOD 150,000.00
JOD 200,000.00
JOD 250,000.00
JOD 300,000.00
JOD 350,000.00
2011 ActualCost Before
BMS
2012 ExpectedCost Before
BMS
2012 ActualAfter BMS
Saving BMSInstallation
Cost
2011 Actual Cost BeforeBMS2012 Expected CostBefore BMS2012 Actual After BMS
Saving
Simple Payback (ROI) = 6.2
Months
Saving = 58,113.85 JOD = 18.4
%
Intelligence Out of the
Data
0
5
10
15
20
25
30
35
0
100000
200000
300000
400000
500000
600000
-367 1978 4521 1878 2052 3089 4428 3507 5691 5778
Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12
Variables Analysis
Sum of KWH Sum of KG Sum of Average Tempe (°C)
Thank You
Firas Obeido
Questions??