Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair
Transcript
Page 1: Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.

Interchange Scheduling and Accounting Subcommittee

Update

October 2008

Gary NolanISAS Vice-Chair

Page 2: Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.

Interchange Scheduling and Accounting Subcommittee

• OC Approval Item – WECC-INT-BPS-014 Identification of Contingency Reserve Responsibilities on e-Tags

• Mid-Hour Curtailment Standards Authorization Request Update

• Coordinate Interchange Timing Table Permanent Standard

• WECC Interchange Tool/Electronic Scheduling Work Group (ESWG)

• After-the-Fact Work Group (ATFWG)

• Real-time Scheduling Work Group (RTWG)

• Business Practice Work Group (BPWG)

Page 3: Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.

OC Approval Item – Rescind BPS-014

WECC-INT-BPS-014 Identification of Contingency Reserve Responsibilities on tags

Purpose: Identify in the e-Tag the Reliability Entity responsible for carrying contingency reserves and the obligation amount so that all parties to the e-Tag have a mutual understanding of contingency reserve responsibilities and obligations for every interchange transaction.

Page 4: Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.

WECC-INT-BPS-014

•WR1. When both the Source and Sink Balancing Authorities (BAs) are within the Western

interconnection, e-Tag Authors will identifythe Balancing Authority (BA) or Reserve

Sharing Group (RSG) member responsible for including the transaction in their calculation of Contingency Reserve requirements.

• This entity will be referred to as the “Responsible Entity”.

• Only one selection can be made.

Page 5: Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.

OC Approval Item Vote

Motion: Rescind WECC-INT-BPS-014 concurrent with WECC-BAL-002 Standard Implementation

• A Yes Vote will indicate all reserve responsibilities will be identified strictly by the requirements in BAL-002

• A No Vote will indicate at the least WECC-INT-BPS-014 would be remanded back to ISAS for modification

Page 6: Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.

Mid-Hour Curtailment SAR

• Mid-Hour Curtailment Standards Authorization Request was sent to NERC• Goal is to ensure the East does not

automatically deny and Curtailment requests are processed correctly

• NERC assigned to the team working on reviewing and revamping the current Coordinate Interchange Standards•West is invited to participate in revamping via

the NERC IS • Addressing wrongful denials of curtailments within

WECC requires enforcement of Regional Criteria •BPS-010 is to be reviewed

Page 7: Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.

Coordinate Interchange Timing Tables (Permanent) Standard

• WECC Urgent Action SAR for modified Timing Tables was replaced with permanent changes to the Coordinate Interchange Timing Tables and 3 affected Standards

• Vote quorum 79.74%

• Vote 100% in favor of adopting the changes

Page 8: Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.

WECC Interchange Tool (WIT)/Electronic Scheduling Work Group (ESWG) Update Phase II

WIT Survey Purpose:

•Encourage BA’s to verify Net Actual Interchange and Net Schedule Interchange are correct

•Multiple BA’s adjacency validation now available

• WIT is being loaded with inadvertent values from August to ensure calculations work correctly going forward

• WECC and CERTS have worked out a solution to

automate Monthly Inadvertent Reporting Data

Page 9: Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.

Electronic Scheduling Work Group (ESWG) – WIT to CERTS (Inadvertent Report)

Timeline:• Nov. 3rd – Initial Upload to NERC CERTS• Nov. 3rd-7th BAs cross check data and identify

changes for WIT NSI or NAI Nov. 10th Notify WECC of needed schedule changes

in WIT Nov. 11th WECC makes changes to WIT

Nov. 12th WIT Final Monthly Inadvertent uploaded to CERTSNov. 13th BAs perform final Cross-Checks of data in CERTSNov. 14th BAs notify WECC of discrepancies between WIT/CERTS dataNov. 15th Remaining disputes due to WECC via e-mail to [email protected]

Page 10: Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.

ISAS– After-the-Fact Work Group (ATFWG)

• Inadvertent Reporting is completed through September 2008

• Creation of ATF Tagging Protocols Regional Criteria• Conference Call held 10/20/08• Developing Rules

•ATF Tags•ATF Changes to WIT•Responding to Comments

• Implementing ATF Tagging Protocols

Page 11: Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.

ISAS– Real Time Scheduling Work Group (RTSWG)• Denial of Curtailments continues

• Creation of Real Time Intra-Hour Tagging Protocols Regional Criteria• Developing Rules

•Intra-Hour Tags•Transmission •Tag Processing

•Responding to Comments• Implementing Intra-Hour Tagging Processing

• Firm Energy cuts without intra-hour replacement

Page 12: Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.

ISAS– Business Practice Work Group (BPWG)

• BPWG will be submitting SAR to modify INT-BPS-010 to restrict curtailment requests to only start in the future and remove unconditional approval

• Purpose is belief that curtailments issued in the past may be a violation of NERC Standard INT-003-2 and BAL-006-1.

• Agreeing to changes to interchange prior to implementation.

• ATF corrections only as needed to reflect actual operating conditions.

• Provide feedback to SRRC regarding validity of request and/or suggestions for direction it should take.

Page 13: Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.

Next ISAS Meeting:

January 2009 

Page 14: Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.

Questions 