InterCor Amsterdam Group / CODECS
Fred Verweij
Amsterdam, 14/2/2017
Contents
• InterCor and C-ROADS
• InterCor: linking Corridors
• Key project information
• Objectives
• Services
• Structure of the project
• TestFest
InterCor and C-ROADS
C-ROADS Platform
WG1 WG2-TF3 WG3 WG2-TF1 WG2-TF2
C-ROADS Action: InterCor
A1 A3 A4 A2
Germany Belgium/
Flanders
Slovenia
France
Austria Netherlands United
Kingdom
Czech Rep. ........
linking Corridors
linking Corridors
London – Dover (M2-A2)
linking Corridors
SCOOP@F
linking Corridors
Cooperative ITS Corridor
linking Corridors
Key info
• CEF proposal accepted on 17/6/2016
• Budget: 30M Euro (50% grant)
• Duration: 36 months, start 1/9/2016
• Co-ordinator: Rijkswaterstaat − support: ERTICO
• Project partners: − UK: Department for Transport
− BE: Flemish Department of Mobility and Public Works
− FR: Ministère de l'Environnement, de l’Energie et de la Mer, GEOLOC SYSTEMS, IFSTTAR, Institut Mines-Telecom, l-Trans, Keynectis, MGI, SANEF, Université de Reims Champagne Ardenne, Université de Valenciennes et du Hainaut-Cambrésis
− NL: Provincie Noord-Brabant, Provincie Utrecht
Objectives
InterCor is about:
1. Harmonizing for interoperability • sustainable set of specifications
• TESTFESTs
2. Making a step from theory to practice • pilots based on interoperable specs
3. Learning by doing • evaluating pilots
• adapting specs based on lessons learnt
Services
Service The
Netherlands
France Belgium UK
In Vehicle Signage x x (x) x
Probe Data x x x
Road Works Warning x x x x
GLOSA x x x x
Multimodal cargo
transport optimisation
x x x
(freight slots
for ports)
Truck Parking x x x
Tunnel logistics x x x
Project Management
Pilot Preparation
Pilot Operation
Pilot Evaluation
Project Structure
Project Management
Pilot Preparation
Pilot Operation
Pilot Evaluation
Pilot Preparation
ITS-G5
Hybrid
Security
C-ITS Services
Validation
Activity 2.1a: ITS-G5 service consistency - input specs from SCOOP@F - input specs from C-ITS Corridor
Activity 2.1b: Hybrid Communication - services delivered via different / multiple communication channels
Activity 2.1c: Security - considering ETSI standards, C2C CC models, C-ITS platform recommendations
Activity 2.1d: C-ITS Services - common set of specifications, adding also logistic services
Activity 2.2: Validation of specifications − “TESTFEST” ITS-G5 services (NL) − “TESTFEST” Hybrid communication (UK?) − “TESTFEST” Security (FR?) − “TESTFEST” C-ITS Services (BE?)
TestFest
• First InterCor-TestFest in the Netherlands
• TestFest not limited to InterCor partners
• Validation of ITS-G5 services − Roadworks Warning (RWW) − Probe Vehicle Data (CAM aggregation) − In Vehicle Signage (using IVI) − GLOSA
• Pilot area − 10 – 20 km of motorway south of Rotterdam − Traffic Lights in Noord-Brabant − RSUs installed as forseen for (final) roll-out
• Organisation: RWS + Province of N-Brabant
TestFest
Fred Verweij, Rijkswaterstaat [email protected]