Running Long Trains in Difficult Geographic Environments
Michael Roney General Manager Technical Standards
Agenda
Overview of Canadian Pacific
Operational Challenges of Difficult Geography
Making Long Trains More Productive and Less Destructive
Technologies That Can Help
1
2
Canadian Pacific
Track kms. 26,800 Total employees: 16,097 Annual revenue tonne-km: 195,544 Million
2012 Revenues: $5.2 Billion 2012 Net income: $570 Million 2012 Adj. EPS: $3.34
Global reach through ports of Vancouver, Montreal, Philadelphia
and New York Prime connections to all Class I US railways
Vision: To be the safest, most fluid railway in North America
3
Canadian Pacific’s Network
Geographic Challenges
4
Extreme curvature and grades
Extreme cold
Extreme heat
Service outages
Heavy Haul Long Trains and Axle Loads Worldwide
Railway Axle Load (tonnes)
Standard Train Length (wagons)
Future standard train length (wagons)/axle loads (tonnes)
USA (coal) 33 135 wagons
Canada 33 129-140 152-170
Australia (Pilbara iron ore)
• BHPBilliton • Rio Tinto • FMG
37 36 40
204 wagons 236 240
333 wagon
South Africa • Iron ore • Coal
30 26
216 wagons 200
332 wagons
Brazil • Vale iron ore
33
330 wagons
37 tonnes
China • Daquin
25
210 wagons
36 tonnes
Russia 20 30 tonnes
Sweden • LKAB Iron Ore
30
68 wagons
Train Design CP’s long train strategy is underway
Train Type 2008 2010 2012
Export coal 124 129 152
Export potash
124 142 170
Merchandise 86 105 115
Intermodal 63 90 105
6
CP has taken a scientific approach to maximizing use of distributed power in an extreme geography
Locomotives: - AC locos: high HP, tractive & retarding capabilities - Driving axles = 12 … highest rating in industry - Low HP/T strategy results in high tractive effort on grades … up to 800 kN (180k) & then 930 kN
(210k) with HTE - Inability to mix lower HP into DP configs & unable to use 36 driving axles due to drawbar/knuckle
limits & track fastening limitations … 30 driving axles sub-optimizes haulage … so robotize with 3-loco tonnage
Geography/Track: - Very challenging geography, grades up to 2.4%, curves up to 11-degrees (150m radius) - Locations where heavy unit trains exhibit repetitive run-in/run-out events, which inflict a
cumulative toll on equipment and infrastructure, weakening both … DP designs mitigate forces - Timber sleepers with elastic fastening on curves sharper than 300m radius
»
DP placement is both an enabler and neutralizer for the impact of long, heavy trains, operated with AC power on challenging geography with a tight HP/tonne
7
CP has used experience, science and technology to safely increase train lengths in difficult geography …
Work with industry leading suppliers such as TTCI, Wabtec, GE and Rail Sciences to ensure best possible technology
CP’s approach progresses from design to simulation, then field testing before train models are approved - This approach, along with proactive regulator communications was key to avoiding
regulatory intervention on train marshaling in Canada - Result is standard bulk models, plus a variety of base designs for intermodal and
manifest trains to suit operational needs from conventional to 4,300m (powered by 5 locomotives in 4 locations)
2 AC locomotives can be run conventional head end but this caps train size and 3 or more AC locomotives need to be distributed
8
Long Trains with distributed power benefit all aspects of railway operations
Lower lateral forces
Reduced friction
Enhanced locomotive and labour productivity
Improved safety
Responds to volume variability
9
Lower lateral forces
Lateral force distribution with locomotive placement
10
11
Lateral Force Detector Strategy
Initiated in 2007 … 6 sites in operation
Objective was to validate & quantify field results of design changes
AEI match process electronically links train symbol
Multi-year data base, with thousands of train records
“Gold-mine” of data to confidently implement more productive & less destructive trains … invaluable with regulators as well
Science of locomotive placement can preserve track infrastructure
12
Long Intermodal Trains Ascending Albert Canyon
Multiple-remote trains are up to 80% longer/heavier, but have lower destructive lateral forces in curves
»
Train 110 at Albert Canyon: 14k @ 2-1-1-1-0 vs 7k @ 2-0-1
-60%
-40%
-20%
0%
20%
40%
60%
80%
100%
Weight Length LR Lat.Force HR Lat.Force
14k vs 7k
What is TrAM (Train Area Marshalling) ?
- Permits distributed power in intermodal & merchandise designs, beyond traditional use in bulks
- Condenses a lot of science and complexity down to simple field application: • “Pre-build” function allows validation of marshalling, by track or by train, prior to any build activities, to reduce
switching and rework
• “TrAM Check” function is used to verify marshalling for enroute trains that perform work … again, proactive verification checks, results in placement instructions to crews to avoid re-work
• Any TrAM Alerts generated must be have restrictions issued to trains and corrective actions required
• CP has not experienced a train accident due to poor train marshalling since implementation of TrAM in 2005.
TrAM automates & simplifies complex marshaling rules that were formerly more restrictive as they needed to apply to all trains generically
13
Train marshalling factors reviewed by TrAM
1. Trailing tonnage - Flags cars for which draft forces behind wagon could produce an excessive L/V ratio based on
physical characteristics of track (grade and curvature) - Based on wagon length, wagon type, and gross weight of car or platform - Separate results for each TrAM area - Reason for this check – prevents derailments caused by excessive L/V ratios
2. Draft forces - Calculates maximum draft forces behind each locomotive position in train - Flags those locations in train where maximum allowable draft forces are exceeded (>2AC’s) - Reason for this check – prevents train separations (broken knuckle, broken drawbar) caused by
excessive draft forces, as well as excessive forces on the track structure (lateral forces) 3. Buff forces
- Calculates maximum buff forces ahead of each remote locomotive position in train - Flags those locations in train where maximum allowable buff forces are exceeded (>1AC) - Reason for this check – prevents excessive forces on the track structure and prevents
derailments caused by excessive buff forces acting on very light wagons surrounded by heavier wagons (jackknifing derailments)
4. Remote Zone - Reviews weight of a group of wagons ahead of each remote locomotive position in a mixed train - Size of group of wagons depends on number of remote locomotives at that location - Flags those wagons which do not meet minimum weight requirements for this position in the train - Reason for this check – prevents derailments caused by buff forces acting on very light wagons
immediately ahead of the remote locomotive(s) (jackknifing derailments)
Remote Zone Remote Zone
14
Train marshalling factors reviewed by TrAM
5. Cushioned drawbars - Reviews train make-up based on number of wagons with cushioned drawbars in train, and where they are
located in the train relative to wagons without cushioned drawbars - Flags trains for which a speed restriction is required in certain locations with undulating track
characteristics, or which must be remarshalled - Reason for this check – prevents derailments and lading damage due to excessive in-train buff and
draft forces caused by added slack action generated by cars with cushioned drawbars
6. Maximum train length to last remote locomotive - Calculates train length to last remote locomotive, and flags trains which exceed the maximum length - Reason for this check – ensures that in a situation of loss of communication between the controlling
locomotive and the last remote locomotive, a 20 lb brake pipe reduction will cause the remote locomotive to return to idle
7. Dynamic brake - In a train with DP, calculates the maximum allowable dynamic brake that the locomotive engineer may
use to ensure that the additive effect of dynamic brake between sections of the train does not cause the retarding force to exceed 890 kN (200,000 lbs) anywhere in the train
- Reason for this check – prevents excessive forces on the track structure, and excessive buff forces in the train that may lead to derailments
15
Train marshalling factors reviewed by TrAM
8. Ascending grade weight zone - Reviews head end of a conventional train and determines if the head end cars on a train meet the
minimum weight requirements for an ascending grade weight zone - Flags conventional trains for which locomotive consist is restricted at certain locations because head end
cars do not meet minimum weight requirements for an ascending grade weight zone - Reason for this check – prevents stringline type derailments in certain areas of ascending grades and
high curvature
9. Maximum locomotive haulage - Calculates locomotive haulage capacity at each location on a DP train - Flags those locations on a train where maximum locomotive haulage is exceeded - Reason for this check – prevents excessive forces on the track structure
10. Long/short car combination - Compares length of each car or platform with adjacent car or platform - Flags locations where the difference in length between cars coupled together exceeds maximum
permitted - Also reviews any short 2-axle scale test cars for correct placement at rear of train - Reason for this check – prevents derailments on curves caused by excessive lateral forces introduced
by a long car/short car combination
16
17
Modular and easily adapts to origin traffic requirements
Long Intermodal Train Strategy
»Long trains are a cornerstone operating strategy for CPR
Smart Railway Technologies enhancing CP’s safety and service reliability with long trains
Equipment and track infrastructure health - Equipment Health Monitoring System
(EHMS) - Technology Driven Train Inspection
(TDTI) - Automated track inspection - Winter gauge restraint track
measurement
Operational Efficiency - Distributed Power (DP) - TrAM 2 - Electronically Controlled Pneumatic
Brakes (ECP) - Trip Optimizer technology - Use of hot and cold wheel detectors in
place of manual brake inspections
18
Enhanced locomotive, crew and train slot productivity, as well as fuel consumption
Improved train handling, air flow and brake propagation
Reduced buff and draft forces, lowering risk of train separation or accident
Reduced average and peak forces on infrastructure, lowering risk of geometry loss and reducing maintenance expense
Extending life of rail, ties, ballast and equipment, lowering replacement capital
Creates safer operations
Distributed Power & Proper Long Train Design
»
AC power, locotrol, wayside monitoring and TrAM are all integrated components that have unlocked bigger, safer trains with multiple benefits:
19
20
Other Technologies that Improve Long Train Service Reliability
Modernized and standardized motive power Networked wayside detectors with trending Micro-alloyed wheels and rails Preventive rail grinding to conformal wheel/rail profiles Setting train speeds with consistent HP/tonne and running
at 10% underbalanced cant deficiency. Maintain rail friction at < 0.4 Maintain traffic density at no greater than 80% of line
capacity, or 70% in extreme weather conditions. Implement driver advisory systems with intermediate
timing points Run at 10% underbalanced superelevation Automated brake shoe measurement and management
systems. Address optimal weight to tare ratio ahead of axle load
increase. Address rail weld quality, bridges and weak embankment
locations before increasing axle loads.
Running Long Trains in Difficult Geographic Environments
Michael Roney General Manager Technical Standards