Speaker: Richard Kell AM FTSE BE(Hons) HonFIEAust CPEng, Director, Cardno International Pty Ltd
BILATERAL EXPERIENCE WITH MDB CONTRACT
AusAID
Note: These comments are offered by way of personal observations by the author who is not an AusAID employee, and thus they do not represent an official AusAID position.
FIDIC MDB Harmonised Construction Contract Conference
AusAID
• AusAID holds a FIDIC MDB licence.• Executing Agencies managing projects funded
by AusAID are free to make their own selection of the form of Contract.
• Executing Agencies are increasingly turning to the FIDIC MDB contract. AusAID supports such a choice.
AusAID
• AusAID enters into co-funding arrangements with MDBs, and in such cases, the policy of the MDB with respect to the form of contract will prevail, e.g. ADB requires the FIDIC MDB Version
• AusAID has been entering into contracts where the Consultant undertakes Construction Management: The Consultant would be advised to adopt FIDIC MDB
AusAID and Infrastructure
• * Infrastructure contracts: Covering: roads, water and sanitation, disaster mitigation, rail, schools, health clinics, etc.
• * AusAID expenditure on infrastructure projected for FY 2012-13 at A$374 million
• * AusAID focus for infrastructure is in the East Asia and PNG and Pacific Regions.
AusAID- ISSUES I
AusAID Contracts Issues II
• Failure to Understand and/or Apply the Rules.– Employer interferes on details, overrules Engineer;– Lack of compliance by Contractor is accepted;Recommended action by FIDIC:• Standard, separate Agreement between Employer
and Engineer, which empowers Engineer.• Guide for reduced payments to Contractor for
non-compliance;• FIDIC Seminars in the Region (at modest cost).
AusAID
Low Level Bridges - Precast Concrete