+ All Categories
Home > Documents > International ISO standardization seminar for the ... · Failure modes: ISO14224 vs OREDA vs SAP...

International ISO standardization seminar for the ... · Failure modes: ISO14224 vs OREDA vs SAP...

Date post: 13-May-2020
Category:
Upload: others
View: 14 times
Download: 1 times
Share this document with a friend
17
26 April 2016 International ISO standardization seminar for the reliability technology and cost area International ISO standardization seminar for the reliability technology and cost area Statoil Business Centre, Stavanger – Norway Offshore & Onshore reliability data (OREDA) collection – Snapshots from an OREDA JIP member company in Brazil 1 26 April 2016 Everton Nogueira Lima, M.Sc. – PETROBRAS Guilherme da Silva Telles Naegeli, M.Sc. – PETROBRAS
Transcript

26 April 2016

International ISO standardization seminar for the reliability technology and cost areaInternational ISO standardization seminar for the reliability technology and cost area

Statoil Business Centre, Stavanger – Norway

Offshore & Onshore reliability data (OREDA) collection –Snapshots from an OREDA JIP member company in Brazil

1

26 April 2016

Everton Nogueira Lima, M.Sc. – PETROBRASGuilherme da Silva Telles Naegeli, M.Sc. – PETROBRAS

26 April 2016

Introduction

Objective:

Development and Implementation ofa Reliability Databank for Petrobras

2

• Present some highlights in the developmentand implementation of a reliability data bankfor the process equipment and productionsystems;

• Present the first results from data collectedfrom Downstream and Upstream areas;

26 April 2016

Development and Implementation ofa Reliability Databank for Petrobras

3Source: https://www.oreda.com

26 April 2016

ISO-14224 - Indústrias de petróleo e gás natural - Coleta e intercâmbio de dados de confiabilidade e manutenção para equipamentos

1. Overview

Source: ABNT NBR ISO 14224:2011 4

26 April 2016

2. Definition

Source: ABNT NBR ISO 14224:2011 5

26 April 2016

Exercise for Pre-Qualification for OREDA -2010

3. Pilot

Source: ABNT NBR ISO 14224:2011 6

26 April 2016

Exercise for Pre-Qualification for OREDA -2010

3. Pilot

7

26 April 2016

P-A P-B P-C Total Equip. Class

17 18 16 51 HE15 15 13 43 VE8 6 3 17 PU8 6 3 17 EM

21 20 41 VA

48 66 55 169

Upstream: August/2011 – April/2012

4. Data Collection – Phase X

8

26 April 2016

Upstream: Analysis of Water Injection Pumps and its Electrical Motors.

Failure modes: ISO14224 vs OREDA vs SAP for Centrifugal Pumps

4. Data Collection – Phase X

9

26 April 2016

Upstream: Analysis of Water Injection Pumps and its Electrical Motors.

Operational time: Counting from PI – Plant Information System

4. Data Collection – Phase X

10

26 April 2016

Upstream: Analysis of Water Injection Pumps and its Electrical Motors.

Demand: Counting from PI – Plant Information System

4. Data Collection – Phase X

11

26 April 2016

Upstream: Analysis of Water Injection Pumps and its Electrical Motors.

Overview: Work orders, notes, maintenance records and addressing

4. Data Collection – Phase X

12

26 April 2016

Upstream: Distribution of corrective and preventive maintenance

Upstream: Analysis of Water Injection Pumps and its Electrical Motors.

4. Data Collection – Phase X

13

26 April 2016

Upstream: Analysis of Water Injection Pumps and its Electrical Motors.

Upstream: Distribution of corrective maintenance by failure modes

4. Data Collection – Phase X

14

26 April 2016

Upstream: Work orders and maintenance plans – Maintenance criticality

Upstream: Analysis of Water Injection Pumps and its Electrical Motors.

4. Data Collection – Phase X

15

26 April 2016

� Data collection showed the need to adequate the equipment borders according to the ISO-14224 in the hierarchical trees in the SAP;

� SAP Failure Catalogue is 85% in compliance with ISO Failure Modes for the equipment class;

� Identified difficulties for the opening and closure of “Failure“ work orders.

� Around 50% of the work orders were opened as “Service” instead of “Failure”

� Identified the pointing of the w.o. to many different locals, instead of the equipment unit.

� Identified the need of recording or updating the inventory information in theSAP. (missing data)

� The Downstream and Midstream business areas have organized the SAPhierarchical trees.

� Upstream areas are using the data in RAM analysis.

Upstream : Analysis of Water Injection Pumps and its Electrical Mot ors.

5. Data Collection – Phase X - RESULTS

16

26 April 2016

Everton Nogueira Lima Guilherme da Silva Telles Nae [email protected] [email protected]: +55 (21) 2162-1777 Phone: +55 (21) 2162-7084PETROBRAS/CENPES PETROBRAS/CENPESRio de Janeiro – RJ Rio de Janeiro – RJ

Thanks!