+ All Categories
Home > Documents > International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions...

International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions...

Date post: 04-Jan-2016
Category:
Upload: dora-wade
View: 212 times
Download: 0 times
Share this document with a friend
Popular Tags:
32
International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy Officer http://www.intspei.com
Transcript
Page 1: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.

International Software & Productivity Engineering Institute

Today’s and Tomorrow’s ALM Solutions

Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy Officer

http://www.intspei.com

Page 2: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.

2http://www.intspei.com

Agenda

Global Demand for Productivity

• How does it impact software companies?

INTSPEI P-Modeling Framework

• INTSPEI P-Modeling Framework integrated with MSF

Page 3: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.

G500 Rank Company Name Revenue (USD B) Profit (USD B) Employees (K) Impact (K) Productivity (K)

1 Wal-Mart 351 11 1900 185 6

2 Exxon Mobil 347 40 106 3264 371

5 General Motors 207 -2 280 741 -7

6 Toyota 205 14 299 684 47

11 General Electric 168 21 319 528 65

12 Ford 160 -13 283 566 -45

14 Citigroup 147 22 332 442 65

39 Verizon 93 6 242 385 26

41 HP 92 6 156 588 40

42 IBM 91 9 356 257 27

87 Boeing 62 2 154 400 14

95 Vodafone 60 -10 66 906 -155

108 CNP Assurances 56 1 3 17118 443

119 Nokia 52 5 68 753 79

139 Microsoft 44 13 71 624 177

143 Motorola 44 4 66 663 55

183 Intel 35 5 94 376 54

184 PepsiCo 35 6 168 209 34

232 Cisco Systems 28 6 50 571 112

285 Coca-Cola 24 5 71 339 72

431 EnCana 17 6 5 3651 1208

Page 4: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.

4http://www.intspei.com

Let’s Benchmark

Average in Global 500

Revenue , B USD 41.8

Profit , M USD 700

Employees , K 104

Impact, K USD 1160

Productivity, K USD 59

Page 5: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.

5http://www.intspei.com

Global 500 Companies

2005 2006 20070

200000

400000

600000

800000

1000000

1200000

Average Impact, USD

2005 2006 20070

10000

20000

30000

40000

50000

60000

Average Productivity, USD

29%21%

Page 6: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.

6http://www.intspei.com

Ideally …

People should focus on three key things:Making decisions

Innovating

Expressing themselves emotionally and artistically

All the rest should be "outsourced" to computers

Page 7: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.

http://www.intspei.com

Productivity Strategies for a Software Company

Partner Ecosystem’s Productivity

Clients’ Productivity

Employees’ Productivity

7

Decrease Spending

Increase Outcome

Page 8: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.

http://www.intspei.com

Three Types of SDLCs

Agile• XP• SCRUM• MSF-Agile

Semantics-focused• P-Modeling

Framework

Formal• SSADM• RUP• MSF-CMMi

8

Page 9: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.

9http://www.intspei.com

INTSPEI P-Modeling Framework

The most important decisions (and most expensive mistakes) are done at the beginning of the project

The initial amount of quality control is minimal and then grows as development moves forward.

This results in a costly rework (often hidden) on the late stages of the project

INTSPEI P-Modeling Framework addresses this problem. We enable our clients to reduce delays between bug insertions and bug fixes

With INTSPEI P-Modeling Framework, engineers start discovering and fixing critical mistakes virtually immediately - when introduced - not at the late phases where they are the most expensive to resolve

Requirements

Requirements

Architecture

Architecture Detailed Design

Detailed Design

• Construction

Construction

Maintenance

Phase That a Defect is Corrected

Phase That a Defect is Created

Cost to Correct

Cost to correct a defect greatly depends on how early it was introduced and revealed

Page 10: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.
Page 11: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.
Page 12: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.
Page 13: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.
Page 14: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.
Page 15: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.
Page 16: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.
Page 17: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.
Page 18: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.
Page 19: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.
Page 20: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.
Page 21: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.
Page 22: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.
Page 23: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.

23http://www.intspei.com

Next Steps

http://www.umljokes.com

http://www.bayviewinnovations.com

Research software development projects

Baylor I5 project

http://www.vlpavlov.com

Page 24: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.

International Software & Productivity Engineering Institute

http://www.intspei.com

29%Thank You

Page 25: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.

International Software & Productivity Engineering Institute

This presentation was delivered on October 18, 2007, in Yalta (Ukraine) on the Microsoft Academic Days conference. It is

available for download from http://www.vlpavlov.com

http://www.intspei.com

Backup Slides

Page 26: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.

Country GDP (B USD) Population, M Labor Force M GDP Per Capita, K USD Impact, K USDArmenia 7 3.0 1.2 5.7 5.5Australia 645 20.4 10.7 33.3 60.5Austria 310 8.2 3.9 34.6 79.9Belarus 29 9.7 4.3 8.1 6.7Belgium 370 10.4 4.9 33.0 75.6

Brazil 967 190.0 96.3 8.8 10.0Canada 1088 33.4 17.6 35.6 61.9China 2518 1321.9 798.0 7.7 3.2

Denmark 257 5.5 2.9 37.0 88.4Finland 199 5.2 2.6 33.7 76.0France 2149 63.7 27.9 31.1 77.1

Germany 2872 82.4 43.7 31.9 65.8India 804 1129.9 509.3 3.8 1.6

Ireland 204 4.1 2.1 44.0 96.4Japan 4883 127.4 66.4 33.1 73.5

Netherlands 613 16.6 7.6 32.1 80.6Poland 337 38.5 17.3 14.3 19.5

Portugal 177 10.6 5.6 19.8 31.7Romania 80 22.3 9.3 9.1 8.6

Russia 734 141.4 73.9 12.2 9.9Sweden 373 9.0 4.6 32.2 81.3Ukraine 82 46.3 22.3 7.8 3.7

UK 2346 60.8 31.1 31.8 75.4USA 13210 301.1 151.4 44.0 87.3

Page 27: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.

IBM Rational Unified ProcessPhases

ManagementEnvironment

Business Modeling

Implementation

Test

Analysis & Design

Preliminary Iteration(s)

Iter.#1

Disciplines

Iterations

Iter.#2

Iter.#n

Iter.#n+1

Iter.#n+2

Iter.#m

Iter.#m+1

Deployment

Configuration Mgmt

Requirements

Elaboration TransitionInception Construction

Page 28: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.

Microsoft Solutions Framework

Page 29: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.

eXtreme Programming

Page 30: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.

Itera

tive

Dev

elop

men

t

Page 31: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.

Tra

ceab

ility

Man

agem

ent

Page 32: International Software & Productivity Engineering Institute Today’s and Tomorrow’s ALM Solutions Vladimir L Pavlov, INTSPEI Chairman and Chief Strategy.

32http://www.intspei.com

SDLC Fine Tuning: The Process

Defining Scope Of Work Client and INTSPEI agree on the scope of service2-4 hours, pre-audit interviews with the key stakeholder(s)

Improvement Design We design improvement proposals for client’s SDLC to make it more efficient1 +day(s), individual work

Improvement Implementation• W

e teach client’s staff how to eliminate bottlenecks identified on the first stage

• 2-7 or more days, training/coaching for the key people


Recommended