+ All Categories
Home > Documents > INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9 th June 2006, Athens OIL SEA HARVESTER...

INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9 th June 2006, Athens OIL SEA HARVESTER...

Date post: 31-Mar-2015
Category:
Upload: philip-keer
View: 213 times
Download: 1 times
Share this document with a friend
Popular Tags:
14
INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9 th June 2006, Athens OIL SEA HARVESTER TST4-CT-2004- 516230 ww.osh-project.org Oil Recovery Systems on the OSH WORK PACKAGES 4 and 6 Oil Recovery Tools Tools Carriage Interface of the Tool Carriage to the Vessel Testing of the Recovery Tools
Transcript
Page 1: INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9 th June 2006, Athens OIL SEA HARVESTER TST4-CT-2004-516230 ww.osh-project.org Oil Recovery Systems.

INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9th June 2006, Athens

OIL SEA HARVESTER

TST4-CT-2004-516230

ww.osh-project.org

Oil Recovery Systems on the OSH

WORK PACKAGES 4 and 6

Oil Recovery ToolsTools Carriage

Interface of the Tool Carriage to the VesselTesting of the Recovery Tools

Page 2: INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9 th June 2006, Athens OIL SEA HARVESTER TST4-CT-2004-516230 ww.osh-project.org Oil Recovery Systems.

INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9th June 2006, Athens

OIL SEA HARVESTER

TST4-CT-2004-516230

ww.osh-project.org

WORK PACKAGES 4 and 6

Recovery of 1 m3 oil costs 100 to 1000 times more on the shore than at sea

Page 3: INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9 th June 2006, Athens OIL SEA HARVESTER TST4-CT-2004-516230 ww.osh-project.org Oil Recovery Systems.

INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9th June 2006, Athens

OIL SEA HARVESTER

TST4-CT-2004-516230

ww.osh-project.org

Flexible and efficient design

• Lamor stiff brush technology is produced in different sizes and configurations to meet all operational requirements. Lamor skimmers are suitable for use in ponds, rivers, harbors, and offshore environments.

Brush WheelBrush Belt

1990 “Volgoneft”, Karlskrona, SwedenBuilt-in LORS-5 on 3 Swedish Coast Guard vessels recovered together 60 % (630 m3) of the whole spill

2001 “Pipeline”, Siberia, Russia

Lamor MM12, MM20 and MM30 Recovered 300.000 tons of oil during 3 months operation.

2002 “Harbour spill”, Finland

Lamor 3 x MM12, Recovered 250 tons of oil diesel fuel in ice conditions.

2002“Bitumen test”, Porvoo, Finland

Lamor brush skimmer and pump passed the extreme viscose test (3 million cSt)

Page 4: INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9 th June 2006, Athens OIL SEA HARVESTER TST4-CT-2004-516230 ww.osh-project.org Oil Recovery Systems.

INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9th June 2006, Athens

OIL SEA HARVESTER

TST4-CT-2004-516230

ww.osh-project.org

Oil Recovery Systems on the OSH

How Lamor got involved in 2004:

First proposal for Mr. Gaudín

1 Lamor Stiff-Brush Conveyor Belt in Transport/Storage Position

2 Lamor Stiff-Brush Conveyor Belt in

Skimming Position

3 Conveyor belt lowered 1.2 m under the water surface

4 Oil transfer pumps

5 Hydraulic control panel

6 Electric remote control panel (option)

7 Electric control panel on bridge (option)

Page 5: INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9 th June 2006, Athens OIL SEA HARVESTER TST4-CT-2004-516230 ww.osh-project.org Oil Recovery Systems.

INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9th June 2006, Athens

OIL SEA HARVESTER

TST4-CT-2004-516230

ww.osh-project.org

Oil Recovery Systems on the OSH

How Lamor got involved in 2004:

First proposal for Mr. Gaudin

1 Lamor Stiff-Brush Conveyor Belt in

Transport/Storage Position

2 Lamor Stiff-Brush Conveyor Belt in skimming Position

3 Conveyor belt lowered 1.2 m under the water surface

4 Oil transfer pumps

5 Hydraulic control panel

6 Electric remote control panel (option)

7 Electric control panel on bridge (option)

Page 6: INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9 th June 2006, Athens OIL SEA HARVESTER TST4-CT-2004-516230 ww.osh-project.org Oil Recovery Systems.

INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9th June 2006, Athens

OIL SEA HARVESTER

TST4-CT-2004-516230

ww.osh-project.org

Oil Recovery Systems on the OSH

Stiff-Brush Technology

• the basis of Lamor’s skimmer range

• in use on more than 450 vessels around the world

• recovers all types of oils and debris

• flexibility of design

• certified by independent tests and proven in hundreds of recovery operations globally

Page 7: INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9 th June 2006, Athens OIL SEA HARVESTER TST4-CT-2004-516230 ww.osh-project.org Oil Recovery Systems.

INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9th June 2006, Athens

OIL SEA HARVESTER

TST4-CT-2004-516230

ww.osh-project.org

Oil Recovery Systems on the OSH

Stiff-Brush Technology

• the brush conveyor belt for OSH was developed from the existing technology to meet the requirements of the project

Page 8: INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9 th June 2006, Athens OIL SEA HARVESTER TST4-CT-2004-516230 ww.osh-project.org Oil Recovery Systems.

INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9th June 2006, Athens

OIL SEA HARVESTER

TST4-CT-2004-516230

ww.osh-project.org

Oil Recovery Systems on the OSH

Stiff-Brush Technology

• new brush sections to be fitted on 1” chain and stronger structure of the brush frame was developed

Supporting bars added to the conveyor belt. Standard brush section on the left.

Hydraulic motors moved to the lower end. New brush core for stronger chain on the right.

Page 9: INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9 th June 2006, Athens OIL SEA HARVESTER TST4-CT-2004-516230 ww.osh-project.org Oil Recovery Systems.

INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9th June 2006, Athens

OIL SEA HARVESTER

TST4-CT-2004-516230

ww.osh-project.org

Oil Recovery Systems on the OSH

Skimmer Carriage

• the skimmer carriage is fitted on both sides of the OSH in the trimaran hulls

Both skimming systems; brush conveyor for heavy oils and Weir type skimmer for light oils attached to the skimmer carriage

Page 10: INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9 th June 2006, Athens OIL SEA HARVESTER TST4-CT-2004-516230 ww.osh-project.org Oil Recovery Systems.

INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9th June 2006, Athens

OIL SEA HARVESTER

TST4-CT-2004-516230

ww.osh-project.org

Similar Oil Recovery Systems than on the OSH

Stiff-Brush Technology

• Smaller scale skimmer suitable e.g for EU-MOP

• The Brush Skimming Systems enable high recovery speed for max. encounter rate. The Built-In system equipped vessels can operate at up to 4 knots

•Safe to deploy, stored in the vessel hull

•Deck remains clean during the operation

Page 11: INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9 th June 2006, Athens OIL SEA HARVESTER TST4-CT-2004-516230 ww.osh-project.org Oil Recovery Systems.

INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9th June 2006, Athens

OIL SEA HARVESTER

TST4-CT-2004-516230

ww.osh-project.org

Similar Oil Recovery Systems than on the OSH

Some examples of the delivered >450 systems in use

Page 12: INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9 th June 2006, Athens OIL SEA HARVESTER TST4-CT-2004-516230 ww.osh-project.org Oil Recovery Systems.

INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9th June 2006, Athens

OIL SEA HARVESTER

TST4-CT-2004-516230

ww.osh-project.org

Oil Recovery Systems on the OSH

Recovered oil pumping

• the brush conveyor belt is able recover extremely high viscous oils, emulsions and tar balls (> 2 mill cSt).

• Lamor PDAS (Positive Displacement Archimedes Screw type) pumps include many design features to enhance performance with extremely high viscosity oil.

• pumping of the recovered oil is part of the work package 4

Page 13: INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9 th June 2006, Athens OIL SEA HARVESTER TST4-CT-2004-516230 ww.osh-project.org Oil Recovery Systems.

INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9th June 2006, Athens

OIL SEA HARVESTER

TST4-CT-2004-516230

ww.osh-project.org

Oil Recovery Systems on the OSH

Recovered oil pumping

• The annular water injection is an essential property to enable the highest viscosity oil pumping.

Water injection facts:

• outlet 4% of total flow, 12 bar

Can be cold or hot water

• inlet 4 % of total flow, warm

water 80 to 100 ºC, 3 bar

Page 14: INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9 th June 2006, Athens OIL SEA HARVESTER TST4-CT-2004-516230 ww.osh-project.org Oil Recovery Systems.

INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 9th June 2006, Athens

OIL SEA HARVESTER

TST4-CT-2004-516230

ww.osh-project.org

Lamor Corporation Ab

Mestarintie 25

FIN-06150 Porvoo

FINLAND

Tel: +358 19 5767 400

Fax: +358 19 5767 450

E-mail: [email protected]

www.lamor.com

Lamor Corporation LLC

28045 Ranney Parkway

Unit G

Cleveland, OH 44145

USA

Tel: +1 440 871 8000

Fax: + 1 440 871 8104

E-mail: [email protected]

Lamor Corporation UK Ltd

3 Medina Court, Arctic Road

Cowes,

Isle of Wight PO31 7XD

UK

Tel: +44 1983 280 185

Fax: +44 1983 280 056

E-mail: [email protected]

Lamor Asia Co. Ltd

A 601, Hongyuan Apartment,

4 Jiuxianqiao Road

Beijing 100015

CHINA

Tel: +86 10 8456 0303

Fax: +86 10 6431 2075

E-mail: [email protected]

Thank you !


Recommended