TOYO NASICT ARIQ G LASS I NDUSTRIES L TD .
1
MANAGEMENT INFORMATION SYSTEM (MIS)
SUBMITTED TO:
CHAIRMAN,
D EPT . O F B USINESS A DMINISTRATION
SUBMITTED BY:
NADIA SHAHID
ROLL #. P-541991 REG #. 02PLE3648 254-STANTON ROAD RAILWAY COLONY NEAR P.RHIGH SCHOOL FOR BOYS LAHORE. TEL #. 042-6857213 MOB #. 0300-4328773
DEPARTMENT OF BUSINESS ADMINISTRATION
ALLAMA IQBAL OPEN UNIVERSITY, ISLAMABAD.
I
BY THE GRACE OF ALLAH ALMIGHTY
II
By the grace of ALLAH ALMIGHTY, the most merciful, this is
LORD of this world, who though Man what he know not.
Above all we are indebted to ALMIGHTY ALLAH, LORD of our
lives and every thing in this universe and His Prophet HAZRAT
MUHAMMAD (peace be upon Him), whose blessings enabled us
to pursuit higher ideas of life.
MESSAGE OF THE QUAID
MUHAMMAD ALI JINNAH
III
Education does not merely means academic
education, and even that appears to be of a
very poor type. What we have to do is to
mobilize our people and build up the
character of our future generation.
There is immediate and urgent need for
training of our people in the scientific and
technical education in order to build up our
economic life and we should see that our
people undertake science, commerce, trade
and particularly well-planed industries.
But do not forget that we have to
compete with the world, which is
moving very fast in this direction.
Also I must emphasize that greater
attention should be paid to technical
and vocational education.
ALL PAKISTAN EDUCATIONAL CONFERENCE, KARACHI. NOVEMBER 27, 1947.
THIS REPORT IS DEDICATED TO MY BELOVEDMOTHER, MY
FAMILY, MY RESPECTABLE TEACHERS, MY FRIENDS & ALL OF
IV
THOSE WHO ARE WITH ME AND GUIDE MEIN ALL TIME
WHEN EVER I FACE PROBLEMS DURING THE WHOLE OF MY
STUDY PERIOD.. THEIR PRAYERS AND LOVE GAVE ME THE
COURAGE SO THAT I AM ABLE TO COMPLETE THIS REPORT
ACCORDINGLY WHICH HELPS ME TO REACH MY
DESTINATION (I.E. MBA-IT VIVA VOICE)
FINAL APPROVAL
V
This is to certify that we have read the report submitted by M ISS N ADIA S HAHID
Roll No. P-541991 and It is our judgment that this is of sufficient standard to
warrant its acceptance by A LLAMA I QBAL O PEN U NIVERSITY , I SLAMABAD , for MBA-
IT degree.
REPORT EXAMINING COMMITTEE
S IGNATURES : S TAMP
ACKNOWLEDGEMENT
VI
I want to acknowledge my deep thanks to our all the Teachers and company
Officials who helped me make my final report.
I am deeply indebted and also express my gratitude to my respected teachers at
A LLAMA I QBAL O PEN U NIVERSITY , I SLAMABAD specially M R . S ANA U LLAH for their
support. Their guidance and support was always instrumental in setting the track
right for preparation of this report.
I am very thankful to Mr.Ahsan Majeed for providing me the opportunity to have
an excellent learning experience during my internship at TOYO NASIC TARIQ
G LASS I NDUSTRIES L IMITED and to all the experienced staff at for their guidance
and cooperation.
Preparation of this report has been an unusually enjoyable and exciting experience
for me. Perhaps the most memorable aspects of the project has been the opportunity
to know better a number of people who have provided information for various
portion of the work in the course of the research, I started to collect data from the
very first day, when I start working on this report. The person to whom I would like
to give my regards is the MIS Manager Mr.Ahsan Majeed of TOYO NASIC T ARIQ
G LASS I NDUSTRIES L IMITED who gave me very useful tips and information.
I am sure that my report will prove to be work in advance for the people to study
later on. I wish all the successes from the core of my heart to all.
CHAPTER # 1. -
CHAPTER # 2. -
CHAPTER # 3. -
CHAPTER # 4. -
CHAPTER # 5. -
CHAPTER # 6. -
CHAPTER # 7. -
CONTENTS:-
INTRODUCTION TO ORGANIZATION
INTRODUCTION TO ORGANIZATION’S MIS DEPT
SYSTEM DEVELOPMENT PROCESS
SWOT ANALYSIS
CONCLUSIONS
RECOMMENDATIONS
BIBLIOGRAPHY
VII
01 - 21
22 - 37
38 - 82
83 - 89
90 - 90
91 - 92
93 - 94
ANNEXURE / APPENDICES
C HAPTER # 1.
BRIEF CONTENTS
I NTRODUCTION
VIII
01 - 21
1.1. MAIN OBJECTIVE OF SELECTING THIS ORGANIZATION.
1.2. INTRODUCTION OF ORGANIZATION.
1.2.1. PRODUCTION CAPACITY.
1.2.2. DECORATING FACILITIES.
1.2.3. WAREHOUSING.
1.2.4. QUALITY.
1.2.5. QUALITY ASSURANCE.
1.3. OBJECTIVE OF THE ORGANIZATION.
1.4. MISSION OF THE ORGANIZATION.
1.5. PRODUCT LINES.
1.5.1. PRESSWARE.
1.5.2. PRINT RANGE.
1.6. BUSINESS VOLUME.
1.6.1. PROFIT VOLUME DURING LAST FIVE YEARS.
1.6.2. SALES VOLUME DURING LAST FIVE YEARS.
1.6.3. PROFIT OF EMPLOYEES.
1.7. ORGANIZATIONAL STRUCTURE.
1.7.1. ORGANIZATIONAL STRUCTURE CHART.
1.7.2. MARKETING DEPARTMENT’S STRUCTURE.
1.7.3. PRODUCTION DEPARTMENT’S STRUCTURE.
1.7.4. COORDINATION, PR & HR DEPARTMENTS STRUCTURE.
1.7.5. MIS DEPARTMENT’S STRUCTURE.
02
03
05
05
06
07
07
07
07
08
08
13
15
15
16
16
17
17
18
19
20
21
C HAPTER # 2. I NTRODUCTION TO MIS D EPT 22 - 37
2.1
2.2
2.3
INTRODUCTION TO MANAGEMENT INFORMATION SYSTEM.
2.1.1 MANAGEMENT INFORMATION SYSTEM.
STRUCTURE OF ORGANIZATION’S MIS DEPARTMENT.
2.2.1 STRUCTURE OF MIS DEPARTMENT.
MIS EMPLOYEES DETAILS & THEIR JOB TASKS.
2.3.1 DIRECTOR MIS.
2.3.2 MANAGER MIS.
23
23
24
24
24
25
25
2.3.3
2.3.4
2.3.5
2.3.6
NETWORK ADMINISTRATOR.
DATABASE ADMINISTRATOR.
SENIOR PROGRAMMER.
PROGRAMMER.
IX
26
27
28
29
2.4
2.5
2.6
FUNCTIONS OF THE MIS DEPARTMENT.
2.4.1 MAJOR FUNCTIONS.
MIS OPERATIONS.
2.5.1 SALES MODULE.
2.5.2 PRODUCTION MODULE.
2.5.3 PURCHASING MODULE.
2.5.4 FINANCE AND ACCOUNTING MODULE.
2.5.5 PLANNING & MARKETING MODULE.
2.5.6 PAY ROLL CONSIDERATION MODULE.
2.5.6.1 BASIC PAY ROLL PROCESSING.
2.5.7 LEAVE DATA.
2.5.8 MAINTENANCE MANAGEMENT.
2.5.9 OPERATIONS MANAGEMENT.
2.5.10 SOFTWARE SECURITY.
MIS SUPPORT TO THE OTHER DEPARTMENTS.
2.6.1 MARKETING.
2.6.2 ADMINISTRATION.
2.6.3 ACCOUNTS.
2.6.4 TIME OFFICE & HR DEPARTMENT.
2.6.4.1 BASIC PAY ROLL INFORMATION.
2.6.5 PRODUCTION DEPARTMENT.
30
30
31
31
31
32
32
33
33
33
33
33
34
34
35
35
35
35
36
36
37
CHAPTER # 3. S YSTEM D EVELOPMENT P ROCESS 38 - 82
3.1
3.2
SYSTEM DEVELOPMENT PROCESS.
3.1.1 SYSTEM.
3.1.2 INFORMATION SYSTEM.
PRELIMINARY INVESTIGATION & PROBLEM ANALYSIS.
3.2.1 OBJECTIVE OF PRELIMINARY INVESTIGATION.
3.2.2 SCOPE.
3.2.3 CONSTRAINS.
3.2.4 EXISTING MIS SETUP.
39
39
40
40
41
41
42
42
3.3
3.4
3.5
3.2.5 CRITICAL ANALYSIS.
3.2.5.1 EXISTING SYSTEM.
3.2.5.2 PROBLEM STATEMENT.
3.2.5.3 STAKEHOLDER AND USER DESCRIPTION.
3.2.5.4 PRODUCT OVERVIEW.
3.2.5.5 PRODUCT PERSPECTIVE.
3.2.6 DFD’S AND RISK ANALYSIS.
REQUIREMENTS ANALYSIS PHASE.
3.3.1 PROCESS DIAGRAM.
3.3.2 EXISTING SYSTEMS REQUIREMENTS ANALYSIS.
FEASIBILITY STUDY.
3.4.1 TECHNICAL FEASIBILITY.
3.4.2 OPERATIONAL FEASIBILITY.
3.4.3 ECONOMICAL FEASIBILITY.
3.4.4 SCHEDULED FEASIBILITY.
SYSTEM DESIGN PHASE.
3.5.1 RISK ANALYSIS.
3.5.2 SYSTEM DESIGN.
3.5.3 GUIDELINES FOR IDEAL MIS SYSTEM DEVELOPMENT.
3.5.3.1 DATA SOURCES.
3.5.3.2 METRICS.
3.5.3.3 ANALYSIS
3.5.3.4 PRESENTATION.
3.5.3.5 CONTROL.
3.5.4 BENEFITS OF THE APPROACH.
3.5.5 DFD’S OF SYSTEM DESIGN.
3.5.5.1 LOGIN.
3.5.5.2 CREATE GRN.
3.5.5.3 HANDLE CATEGORY.
3.5.5.4 UPDATE ITEM INVENTORY.
3.5.5.5 UPDATE PRODUCT INVENTORY.
3.5.5.6 HANDLE SUPPLIERS.
3.5.5.7 HANDLE TRANSFER OF ITEMS.
3.5.5.8 CREATE WAREHOUSE
3.5.5.9 CREATE ISSUE VOUCHER
3.5.5.10 CHECK REPORTS.
X
43
43
43
44
44
44
45
45
46
47
48
48
48
49
50
50
50
52
53
53
54
54
54
54
55
56
56
56
57
57
58
58
59
59
59
60
3.6
3.7
3.5.6 DESIGNING SYSTEM OUTPUTS.
3.5.6.1 CONTENT
3.5.6.2 FORMS.
3.5.6.3 VOLUME.
3.5.6.4 TIMELINES.
3.5.6.5 MEDIA.
3.5.6.6 FORMAT.
3.5.7 DESIGNING SYSTEM INPUTS.
3.5.7.1 CONTENT
3.5.7.2 TIMELINES.
3.5.7.3 MEDIA.
3.5.7.4 FORMAT.
3.5.7.5 VOLUME.
3.5.8 ENTITY RELATIONSHIP DIAGRAMS.
3.5.9 DETERMINING PROCESSING REQUIREMENTS.
3.5.9.1 APPLICATION SOFTWARE.
3.5.10 DETERMINING STORAGE REQUIREMENTS.
3.5.10.1 ACCESS THE ORGANIZATION.
3.5.10.2 STORAGE VOLUME.
3.5.10.3 MEDIA.
3.5.11 DEVELOPING PROCEDURE FOR USING SYSTEM.
3.5.11.1 WORK PROCEDURE.
3.5.11.2 CONTROL PROCEDURE.
3.5.12 DETERMINING PERSONAL REQUIREMENTS.
3.5.1.1 WORK DESCRIPTION.
3.5.1.2 PERSONAL QUALIFICATION.
3.5.1.3 TRAINING.
END USER DEVELOPMENT.
3.6.1 FAVORING CIRCUMSTANCES OF PROTOTYPING APPROACH.
3.6.2 SYSTEM IMPLEMENTATION.
3.6.2.1 SCHEDULING.
3.6.2.2 PROGRAM COADING, DEBUGGING & TESTING.
3.6.2.3 TRAINING.
3.6.2.4 CONVERSION.
SYSTEM EVALUATION.
3.7.1 PERIODIC PERFORMANCE REPORTS.
XI
60
61
61
61
61
62
62
62
62
63
63
63
63
64
65
65
66
66
66
67
67
67
68
68
69
69
69
70
70
71
71
72
73
74
75
75
3.8
3.7.1.1 USER SURVEY.
3.7.1.2 SYSTEM PERFORMANCE.
3.7.1.3 EARLY WARNING SIGNALS.
3.7.1.4 OVERALL EFFECTIVENESS.
USER INTERFACES.
3.8.1 LOGIN SCREEN.
3.8.2 CHANGE PASSWORD SCREEN.
3.8.3 GRN SCREEN.
3.8.4 ISSUE VOUCHER SCREEN.
3.8.5 DPR SCREEN.
3.8.6 CATEGORY.
3.8.7 NEW ITEM.
3.8.8 NEW UOM.
3.8.9 NEW SUPPLIER.
3.8.10 TRANSFER OF ITEM.
3.8.11 NEW TYPE.
3.8.12 NEW UOM.
3.8.13 VIEW CATEGORY.
3.8.14 VIEW ITEM.
3.8.15 WAREHOUSE.
3.8.16 WORKSHOP.
XII
75
75
75
75
76
76
76
77
77
78
78
79
79
80
80
81
81
81
82
82
82
C HAPTER # 4. SWOT ANALYSIS 83 - 89
4.1
4.2
SWOT ANALYSIS.
4.1.1 STRENGTHS.
4.1.1.1 STRENGTHS OF THE COMPANY.
4.1.1.2 STRENGTHS OF THE MIS DEPARTMENTS.
4.1.2 WEAKNESSES.
4.1.3 OPPORTUNITIES.
4.1.4 THREATS.
WEAKNESSES OF THE MIS DEPARTMENT.
84
85
85
86
87
88
88
89
C HAPTER # 5.
5.1 CONCLUSIONS.
CONCLUSIONS 90 - 90
90
C HAPTER # 6. RECOMMENDATIONS
XIII
91 - 92
6.1 RECOMMENDATIONS. 91
C HAPTER # 7. BIBLIOGRAPHY 93 - 94
7.1 REFERENCES & SOURCES USED.
7.1.1 FROM ORGANIZATION.
7.1.2 WEB PORTALS.
7.1.3 BOOKS
94
94
94
94
ANNEXURE / APPENDICES
PRODUCTION FACILITY
DECORATING FACILITIES
WAREHOUSING
QUALITY
QUALITY ASSURANCE
PRESSWARE PRODUCTS
PRINT RANGE PRODUCTS
PROFIT VOLUME DURING LAST FIVE YEARS.
SALES VOLUME DURING LAST FIVE YEARS.
PROFIT OF EMPLOYEES
ORGANIZATIONAL STRUCTURE CHART
MARKETING DEPARTMENT’S STRUCTURE
PRODUCTION DEPARTMENT STRUCTURE
COORDINATION, PERSONAL RELATIONS & HR DEPARTMENT’S STRUCTURE
CHART. STRUCTURE OF MIS DEPARTMENT
INTRODUCTION TO MANAGEMENT INFORMATION SYSTEM
STRUCTURE OF MIS DEPARTMENT
INFORMATION SYSTEM
ORGANIZATIONAL EXISTING MIS SYSTEM.
PROBLEM STATEMENT.
DFD’S & RISK ANALYSIS.
REQUIREMENTS ANALYSIS
PROCESS DIAGRAM
05
05
06
06
07
08
13
15
16
16
17
18
19
21
21
23
24
40
42
43
45
46
47
GUIDELINE FOR IDEAL MIS SYSTEM DEVELOPMENT.
DFD OF LOGIN.
DFD OF CREATE GRN.
DFD OF HANDLE CATEGORY.
DFD OF UPDATE ITEM INVENTORY.
DFD OF UPDATE PRODUCT INVENTORY.
DFD OF HANDLE SUPPLIERS.
DFD OF HANDLE TRANSFER OF ITEMS.
DFD OF CREATE WAREHOUSE
DFD OF CREATE ISSUE VOUCHER
DFD OF CHECK REPORTS.
ENTITY RELATIONSHIP DIAGRAMS.
TRADITIONAL DEVELOPMENT APPROACH FOR SYSTEM DESIGN &
DEVELOPMENT
PROTOTYPING APPROACH FOR SYSTEM DEVELOPMENT.
USER INTERFACE LOGIN SCREEN.
USER INTERFACE CHANGE PASSWORD SCREEN.
USER INTERFACE GRN SCREEN.
USER INTERFACE ISSUE VOUCHER SCREEN.
USER INTERFACE DPR SCREEN.
USER INTERFACE CATEGORY.
USER INTERFACE NEW ITEM.
USER INTERFACE NEW UOM.
USER INTERFACE NEW SUPPLIER.
USER INTERFACE TRANSFER OF ITEM.
USER INTERFACE NEW TYPE.
USER INTERFACE NEW UOM.
USER INTERFACE VIEW CATEGORY.
USER INTERFACE VIEW ITEM.
USER INTERFACE WAREHOUSE.
USER INTERFACE WORKSHOP.
XIV
53
56
56
57
57
58
58
59
59
59
60
64
69
70
76
76
77
77
78
78
79
79
80
80
81
81
81
82
82
82
EXECUTIVE SUMMARY
XV
T ARIQ G LASS I NDUSTRIES L IMITED is formerly known as N ASIR S IDDIQUE
C ORPORATION OF P AKISTAN L IMITED and more properly known as TOYO NASIC is
located at 33 kilometer, Lahore Sheikhupura Road Sheikhupura.
The company was established in 1981 as a Public Limited Company. The project
was set up with the Technical Assistance of TOYO NASIC GLASS OF JAPAN is
one of the leading manufacturers of Glass ware in the Pakistan. The entire plant was
designed, erected and commissioned by TOYO NASIC GLASS OF JAPAN on
turnkey basis.
Due to great efforts of the management and staff, the TOYO NASIC T ARIQ G LASS
C OMPANY getting its ISO 9001 2000 certification on the M AY 15, 2001, which
reflects the company product quality. Now the management plans to increase its
exports of tableware products to a large number of E UROPEAN C OUNTRIES .
Over the last twenty years, T ARIQ G LASS I NDUSTRIES L TD has excelled in the art of
glass manufacturing. Under the popular brand names of TOYO NASIC, OMROC
and NOVA , T ARIQ GLASS INDUSTRIES LTD have become a reliable house hold name
in Pakistan and now the market leader in Pakistan. The backbone of T ARIQ G LASS
I NDUSTRIES L TD .' S is a team of qualified, experienced and dedicated professionals.
T ARIQ G LASS I NDUSTRIES capture 90% share of the local market in Pakistan and
now exporting its product to other countries. Today TOYO NASIC produces up to
170 TONS of glass per day. The company management hopes to increase its export
of tableware products to number of other E UROPEAN C OUNTRIES .
The plant boasts a production capacity of almost 200 METRIC TONS of glass
tableware per day, having a combination of single and double gob press machines
as well as H-28 press and blow machines for light weight product ranges.
TOYO NASIC T ARIQ G LASS I NDUSTRIES L IMITED is one of the most successful
glass industries in Pakistan I enjoyed my internship period at TOYO NASIC T ARIQ
XVI
G LASS I NDUSTRIES L IMITED Ferozepur Road Branch. The staff members are very
cooperative and supporting.
M R . A HSAN M AJEED is the Manager MIS and looks after all the functions of the
MIS Department and its activities. Currently a simple database system in Visual
FoxPro is working in the MIS Department of TOYONASIC T ARIQ G LASS
I NDUSTRIES , which handle accounts department and store department. I apply the
business intelligence rules on this database by creating a data warehouse for the
existing data. The production department of appliances division is handled
manually and there is computerized database management system for the
department. Therefore, there is problem in handling the data and quality check.
MY ROLE & PARTICIPATION:
XVII
As I know that with the theoretical knowledge, the practical knowledge about the
field also has much more importance that’s why the A LLAMA I QBAL O PEN
U NIVERSITY , I SLAMABAD has given the project to students in which the practical
work is included so that the students can get the knowledge about their relating field
beside the bookish knowledge.
This type of research program is basically to broaden the vision of practical
experiences with theoretical knowledge as it increases one’s capabilities to handle
problems at various stages and the ability of decision.
I have chosen T ARIQ G LASS I NDUSTRIES L IMITED for my final report and emphasis
on one of its factory named TOYO NASIC. I did my level best to analyze the TOYO
NASIC T ARIQ G LASS I NDUSTRIES L IMITED in order to examine its true position in
the market. I analyzed the various products offered TOYO NASIC T ARIQ G LASS
I NDUSTRIES L IMITED and I got the information about it that it is improving quickly
from its past position.
TOYO NASIC TARIQ GLASS INDUSTRIES LIMITED is one of the most successful
glass industries in Pakistan I enjoyed my internship period at TOYO NASIC T ARIQ
G LASS I NDUSTRIES L IMITED Ferozepur Road Branch. The staff members are very
cooperative and supporting. I worked in the MIS Department with M R . A HSAN
M AJEED (M ANAGER MIS) and assisting him. I chose MIS Department because of
the requirement of my degree. I thoroughly study different departments their
functions and specifically focus on the functionalities of the MIS Department as per
my requirement for this report I thoroughly study their system and proposed a
system for the betterment of their system. As well as implement that system in their
MIS department.
Currently a simple database system in Visual FoxPro is working in the MIS
Department of TOYO NASIC T ARIQ G LASS I NDUSTRIES , which handle accounts
department and store department. I apply the business intelligence rules on this
XVIII
database by creating a data warehouse for the existing data. The production
department of appliances division is handled manually and there is computerized
database management system for the department. Therefore, there is problem in
handling the data and quality check.
The system will provide services to the higher administration and management of
the departments of the TOYO NASIC T ARIQ G LASS I NDUSTRIES . The manager or
administrator will put a query and system will automatically execute and display the
reports in more descriptive and comprehensive form. He can also execute the
hidden queries in the queries.
System will facilitate the strategic level management of TOYO NASIC T ARIQ
G LASS I NDUSTRIES to make decisions, forecasting and better strategies. This system
will also provide the help to the operational level management to entertain queries
generate reporting and maintain stock status.
I had a very learning experience during my internship I had the practical exposure
of the MIS Functions I had been taught at University by the respected teachers &
their guidance and morel support was very helpful for me during all my study
tenure. During my internship I learned a lot about the MIS department and its needs
in the current new era of information technology of the company.
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 1: -
CHAPTER
I NTRODUCTION
- 1 -
This chapter presents an over view of the organization. The history, nature of
organization, vision, mission and objectives, products/services, business volume,
organizational structure, departments, their functions and activities etc.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 1: - - 2 -
1.1. M AIN O BJECTIVE OF S ELECT ING T HIS O RGANIZATION
In the new era of intranet, extranet and internet in the enterprise and their trading
partners become the primary information technology in fracture of many
organizations. Intranet, extranet and other type of networks enables managers, end
users, teams and work groups to electronically exchange data and information in any
past of the global village. Such technology enables managers for quick decision and
supervises in the new era fast business competition, without such network any
organization cannot survive in the global village.
The main objective of the studying this organization is that how the managers make
daily decision making and handle the organization affairs in routine and how much
theoretical knowledge helps the managers. Practical experience is the first step
towards the attainment.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 1: -
1.2 I NTRODUCTION :-
- 3 -
T ARIQ G LASS I NDUSTRIES L IMITED is formerly known as N ASIR S IDDIQUE
C ORPORATION OF P AKISTAN L IMITED and more properly known as TOYO NASIC is
located at 33 kilometer, Lahore Sheikhupura Road Sheikhupura.
The company was established in 1981 as a Public Limited Company with the Prime
objective of producing quality Glass Tableware and Glass Containers (Bottles etc) for
beverages and food industries.( The production facility is spread over and area of 29
acres.) The project was set up with the Technical Assistance of TOYO NASIC
GLASS OF JAPAN is one of the leading manufacturers of Glass ware in thePakistan. The entire plant was designed, erected and commissioned by TOYO NASIC
GLASS OF JAPAN on turnkey basis.
Due to great efforts of the management and staff, the TOYO NASIC T ARIQ G LASS
C OMPANY getting its ISO 9001 2000 certification on the M AY 15, 2001, which reflects
the company product quality.
Turning closed down industry around into a viable economic unit is not a small
achievement. Management’s and T ARIQ B AIG ’ S knowledge of glass industry, have
helped TOYO NASIC to come back on its feet and to blossom into the leading glass
manufacturers of the country. Now TOYO NASIC has commenced production of very
high quality thin walled tumblers with this machine and will soon be marketing
stemware products as well.
Now the management plans to further increase its exports of tableware products to a
large number of E UROPEAN C OUNTRIES .
Over the last twenty years, T ARIQ G LASS I NDUSTRIES L TD . has excelled in the art of
glass manufacturing. Under the popular brand names of TOYO NASIC, OMROC and
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 1: - - 4 -
NOVA, T ARIQ G LASS I NDUSTRIES L TD . has become a reliable house hold name in
Pakistan. By fulfilling the needs of quality glass tableware and nurturing the basic
ingredients of Quality, Variety, Reliability and above all having a Competitive Edge,
T ARIQ G LASS I NDUSTRIES L TD . is now the market leader in Pakistan. This success is
now fast spreading to international markets across Europe, Middle East, Africa, Asia
and the Far East. The backbone of T ARIQ G LASS I NDUSTRIES L TD .' S is a team of
qualified, experienced and dedicated professionals with a proven expertise along with
a staunch backing through technical collaboration with TOYO GLASS OF JAPAN.
T ARIQ G LASS I NDUSTRIES basically produce two types of line products in Pakistan.
1. Tableware Product
2. Container (Beverage and Food Product Jar)
T ARIQ G LASS I NDUSTRIES capture 90% share of the local market in Pakistan and now
exporting its product to other countries. Today TOYO NASIC produces up to 170
TONS of glass per day.TOYO NASIC has commenced production of very high
quality thin walled tumblers with this machine and will soon be marketing stemware
products as well. The company management hopes to increase its export of tableware
products to number of other E UROPEAN C OUNTRIES .
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 1: -
1.2.1 P RODUCTION C APACITY :-
- 5 -
The plant boasts a production capacity of almost 200 METRIC TONS of glass tableware
per day, having a combination of single and double gob press machines as well as H - 28 press and blow machines for light weight product ranges.
1.2.2 D ECORATING F ACILITIES :-
For the creative and decorative needs of the clients, T ARIQ G LASS I NDU STRIES L TD . has the facility of a fully automated, state-of-the-art printing machine, with the
capability of printing six color simultaneously, including quality gold and silver
banding.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 1: -
1.2.3 W AREHOUSING :-
- 6 -
To ensure uninterrupted and consistent supply of goods to the valued clientele, an all
weather warehousing facility caters for raw materials, packing goods as well as
finished products storage.
1.2.4 Q UALITY :-
T ARIQ G LASS I NDUSTRIES L TD . stands committed as a team to manufacture quality
glass tableware products through dedication, creativity, experience and technology.
Their focus is striving not only to meet the expectations of their clientele, but also
their imaginations. Their journey continues towards excellence.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 1: -
1.2.5 Q UALITY A SSURANCE :-
- 7 -
At T ARIQ G LASS I NDUSTRIE S L TD . assuring quality starts with a careful selection of
indigenously available raw materials, which are processed through a most modern
and fully automated plant. Quality Assurance at every step is constantly monitored by
their experts through a fully equipped on site laboratory.
1.3 O BJECTIVE OF THE O RGANIZATION :-
The main objective of TOYO NASIC T ARIQ G LASS I NDUSTRIES L IMITED is to
produce quality, reliability and variety of Glass products for home users and
industries.
1.4 M ISSION OF THE O RGANIZATION :-
T AR IQ G LASS I NDUSTRIES L TD stands committed as a team to manufacture quality
glass tableware products through dedication, creativity, experience and technology.
Their journey continues towards excellence.
At T ARIQ G LASS I NDUSTRIES L TD assuring quality starts with a careful selection of
indigenously available raw materials, which are processed through a most modern
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 1: - - 8 -
and fully automated plant. Quality Assurance at every step is constantly monitored to
achieve the company’s objective.
The main mission of the company is to capture the maximum market share of the
glass industry. Currently T ARIQ G LASS I NDUSTRIES L TD capture
90%share of the
local market in Pakistan and now exporting its product to other countries. Today
TOYO NASIC produces up to 170 TONS of glass per d a y .
TOYO NASIC has
commenced production of very high quality thin walled tumblers with this machine
and will soon be marketing stemware products as well.
1.5 P RODUCT L INES :-
TOYO NASIC T ARIQ G LASS I NDUSTRIES L IMITED offers the vast range of the glass
products to full fill the customer needs. Following are the product line:
1.5.1 P RESSWARE
1. Accessories
1.1 Jubilee Candy Box.
2. Ash Trays
2.1 Diamond.
2.3 Silky.
2.2 Dimple.
2.4 Sohni.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 1: -
2.5 Sparkle.
3. Fruit Sets
3.1 Crown. 3.2 IVY.
3.3 Jasmine. 3.4 Orient.
3.5 Shalimar. 3.6 Thumb.
4. Ice Cream Sets & Cups.
4.1 Crown. 4.2 Jasmine.
4.3 Pansy. 4.4 Silky.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
- 9 -
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 1: -
4.5 Simba.
5. Jars.
5.1 Jars
6. Jugs.
6.1 Fancy,6.2 Flora, Pine.
Mehran.
6.3 Galaxy,6.4 Petal, Silky.
Thumb.
6.5 Tulip,
Chandani.
7. Mugs.
7.1 IRIS. 7.2 Fine.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
- 10 -
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 1: -
7.3 F i e s t a T e a 7.4 Milano.
Mug
7.6 Orient
7.5 Ocean. Jasmine TeaMug.
7.7 Palace. 7.8 Royal.
8. Plates & Bowls.
8.2 Crown Carry8.1 Crown Bowl.
Bowl Set.
8.3 Crown 8.4 L a s e S o u p
Plates. Plate.
8.5 Orient Bowl. 8.6 Orient Plates.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
- 11 -
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 1: -
8.8 Silky Curry8.7 Silky Bowl.
Bowl Set.
9. Tea Cups and Saucers.
9.2 Daisy,9.1 Star.
Omega.
10. Tumblers.
10.1 Alpha. 10.2 Anarkali.
10.3 Aqua. 10.4 Atlantic.
10.5 Chandni. 10.6 Classic.
10.7 Diamond. 10.8 Duke.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
- 12 -
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 1: -
11. Water Sets.
11.1 Flora.
1.5.2 P RINT R ANGE
1. Custom Prints.
2. Mugs.
2.1 Blue Tulip. 2.2 Daisy.
2.3 Happy2.4 Leemun.
Dolphins.
3. Tumblers.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
- 13 -
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 1: -
3.1 Blue3.2 Daisy.
Flowers.
3.3 Dots. 3.4 Fresh.
3.5 Fruit. 3.6 Oranges.
3.7 Terrace. 3.8 Tulip.
4. Water Sets.
4.1 Citrus. 4.2 Leaves.
4.3 Lemons. 4.4 Pinki.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
- 14 -
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 1: -
4.5 Strawberry. 4.6 Trim.
1.6 B USINESS V OLUME :-
- 15 -
The project was set up with the technical assistance of TOYO NASIC GLASS OFJAPAN one of the leading manufacturers of Glassware in the Pakistan. The entire
plant was designed, erected and commissioned by TOYO NASIC GLASS OF JAPAN
on turnkey basis.
In 1993 M R . T ARIQ B AIG , Managing Director of T ARIQ G LASS I NDUSTRIES L TD , not
only rehabilitated the closed project with massive Financial, Technical and Marketing
approach as well as started a balancing modernization and restructuring program. Due
to his great efforts, TOYO NASIC T ARIQ G LASS I NDUSTRIES got ISO 9001 2000
certification on M AY 15, 2001, which reflects the product quality of the company.
Since 1993, T ARIQ G LASS I NDUSTRIES has made tremendous growth and increase in
its business volume day by day. In this new era of information technology and
competition T ARIQ G LASS I NDUSTRIES introduced the quality products. Due to this
matter the net sales volume increases year to year. In 2001 the record profit earned by
T ARI Q G LASS I NDUSTRIES amounted to 42.468 MILLION and achieving the highest
production capacity level of 87 MILLION TONS per year. The profit in 2006 was R S . 96.123 MILLION . T ARIQ G LASS I NDUSTRIES L TD has captured 90% OF LOCAL MARKET
share in Pakistan. In 2006 the earned profit per share was R S . 6.24.
1.6.1 P ROFIT V OLUME D URING L AST F IVE Y EARS
YEAR2006
PROFIT96.123 Million
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 1: -
2005 95.237 Million 2004 91.803 Million 2003 75.220 Million 2002 42.468 Million
1.6.2 S ALES V OLUME D URING L AST F IVE Y EARS
YEAR PROFIT2006 Rs. 799,213,506 2005 Rs. 705,112,327 2004 Rs. 632,054,567 2003 Rs. 568,607,309 2002 Rs. 395,290,863
1.6.3 P ROFIT O F E MPLOYEES
- 16 -
The profit of employees in the different departments of TOYO NASICis outlinedbelow:
FI FII TOTALDEPARTMENT SANCTIONED SANCTIONED SANCTIONED Administrative Division General Office Production (I-S) Production (H-28) Production (M.D.P) Workshop (I.S) Workshop (H-28) Workshop (M.D.P) Glass Division Maintenance Division Management InformationSystem TOTAL
73 12 0 0
107 28 0
37 349 66 09
681
4 0 53 34 0 0 16 0
254 13 06
380
77 12 53 34 107 28 16 37 603 79 15
1061
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 1: -
1.7 O RGANIZATIONAL S TRUCTURE :-
- 17 -
Organizational structure of TOYO NASIC T ARIQ G LASS I NDUSTRIES is being carried
out for making the company more responsive, competitive and capable of facing
global and domestic market challenges.
The main areas focus would be Marketing, Human Resources, ManagementInformation System and Product Operations. Appropriate changes have also been
brought through in Quality Control department. So that ensure its quality product,
which is now exported to the other countries, Human Resource Management on the
other hand ensures recruitment process and system has been adequately developed by
appropriate new era HR Policies.
Production department of Glass division adopting new era technical advancement, so
that increase the product output, currently new H-28 machine is erected this machine
is only in the Asia which produce the light and thin wall glass products.
Management Information System monitoring the whole organizational department’s
efficiency day by day and report the Managing Director, which facilitate in decision
making.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 1: -
1.7.1 M ARKETING D EPARTMENT ’ S F UNCTIONS & S TRUCTURE :-
- 18 -
The marketing department of TOYO NASIC T ARIQ G LASS I NDUSTRIES is responsible
for creating, preparing, and establishing marketing strategies and policies for each
product by coordinating the efforts of publicity, promotion, advertising, online and
sales. The marketing department o f TOYO NASIC T ARIQ G LASS
I NDUSTRIES i s
responsible for the following functions:
Preparing all sales presentation materials: audio recordings, fact sheet
collation, and promotions
Creating and producing additional account-specific presentation materials.
Creating pricing strategies.
Researching and establishing relations with new markets.
Planning and maintaining sales and marketing schedules, including title
launch and planning meetings.
Measuring the effectiveness of strategies once completed
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 1: -
1.7.2 P RODUCTION D EPARTMENT ’ S F UNCTIONS & S TRUCTURE :-
- 19 -
The production department of TOYO NASIC T ARIQ G LASS I NDUSTRIES coordinates
the production and manufacturing of each product line. Production acts as a liaison
between editorial, managing editorial, design, production, and outside vendors to
create and distribute the final product. Daily activities for the department include:
Trafficking of all materials between design and editorial/managing editorial.
Following up on late and/or special schedules.
Estimating of paper quantities and production costs.
Negotiating with suppliers.
Assisting on special projects as necessary
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 1: - - 20 -
1.7.3 C OORDINATION . PR & HR D EPARTMENT ’ S F UNCTIONS &S TRUCTURE :-
The coordination, PR and HR department of TOYO NASIC T ARIQ G LASS I NDUSTRIES
have different activities. The coordination unit of TOYO NASIC T ARIQ
G LASS
I NDUSTRIES has performed the tasks given below:
MEDIA RELATIONS (Press, Electronic Media and Liaison with Media
Monitoring, Press and Media visits.)
PUBLICATION AND PRODUCTION (1: Advertisements, Notifications.
2: Brochure and Publicity material. 3: Annual Reports etc.)
EXHIBITIONS AND TRADE FAIRS ( Participation in Exhibitions, Trade
Fairs, Preparation of Audio Visuals, Documentaries and Photo and Video
graphy.)
SEMINARS, CONFERENCES, WORKSHOPS AND OTHER
IMPORTANT EVENTS.
The human resources unit of TOYO NASIC T ARIQ G LASS I NDUSTRIES works closely
with all departments to ensure the health and happiness of their employees through
benefits administration, rewards and recognition, facilitation of company-wide
events, and the recruitment of new employees. They also act as a liaison between the
employee and the employer.
The promotions unit of TOYO NASIC T ARIQ G LASS I NDUSTRIES works as a primary
liaison with marketing and publicity directors, by creating effective campaigns to
encourage the sales force, buyers, and consumers. Promotions departments are
responsible for overseeing the creation of all catalogs, point-of-purchase, and
promotional/sales materials.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 1: - - 21 -
The publicity unit of TOYO NASIC T ARIQ G LASS I NDUSTRIES is responsible forpromoting each title and author in the media without direct payment to the media
communications.
1.7.4 MIS D EPARTMENT ’ S F UNCTIONS & S TRUCTURE :-
The MIS Department of TOYO NASIC T ARIQ G LASS I NDUSTRIES is responsible for
all the company’s technological services, computers, company web site, networking
and data management as well as the everyday technical support of the company
personnel.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 2: -
CHAPTER
I NTRODUCTION TO O RGANIZATIONS MIS D EPT
- 22 -
This chapter presents an over view of the organization’s MIS department. In this
chapter we focus on the introduction to MIS department, what actually the MIS
department is, its structure, functions/activities, staff, staff’s responsibilities, MIS
operations, resources & funds allocation and etc.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 2: - - 23 -
2.1 I N T R O D U C T I O N T O M ANAGEMENT I NFORMATION S YSTEM :-
Management Information System (MIS) has become a serious field of study largely
because of the development of computer and computer related technologies. MIS like
many other computer terms represents an evolving concept.
Information Systems
TransactionProcessing
Systems
ProcessingBusiness
Transactions
Operations Support Systems
Processcontrolsystems
Control ofindustrialprocesses
Enterprisecollaboration systems
Team and workgroup
collaboration
Managementinformation
systems
Pre specifiedreporting for
managers
Management Support Systems
DecisionSupportsystems
Interactivedecisionreport
Executiveinformation systems
Informationtailored forexecutives
2.1.1 M ANAGEMENT I NFORMATION S YSTEM (MIS) : -
A system to convert data from internal and external sources into information
and to communicate that information, in an appropriate form, to managers at all
levels in all functions to enable them to make timely and effective decisions or
planning, directing and controlling the activates for which they are responsible.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 2: - - 24 -
A system which may perform routine commercial processing functions, but
which is designed so that such processing will also produce information that
will be presented to that the results will be produced speedily… to enable
management to ascertain the progress of the organization in terms of satisfying
its major objectives.
2.2 S TRUCTURE OF O RGANIZATION ’ S MIS D EPARTMENT :-
Information technology is more important in all organizations in this new era ofinformation technology and competition. In this new era, managers make fast
decisions, collaborate with other staff to develop the skills of the future. Every
organization demands quick and updated information. Information systems provide
support to its decision and enable to make accurate decision. Director MIS is the head
of Information System in T ARIQ G LASS I NDUSTRIES , who supervises the whole system.
The director of MIS Department is responsible of all activities of information system in
the organization.
2.3 MIS E MPLOYEES D ETAILS & T HEIR J OB T ASKS :-
The total strength of MIS Department in TOYO NASIC T ARIQ G LASS I NDUSTRIES is 15
in morning phase, the management personal strength is 09 and in the evening phase the
strength is 06.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 2: -
2.3.1 D IRECTOR MIS: -
- 25 -
Recommends various personnel actions including, but not limited to, hiring,
performance appraisals, promotions, transfers and vacation schedules.
Performs liaison duties in coordinating activities with other department’s
regarding user groups, hardware and software problems and solutions, time
scheduling and technical assistance.
Assigns, supervises and schedules work load of assigned staff, discusses and
evaluates progress of assignments, problems and changes daily with employees,
recommends employee disciplinary actions to the Board of directors when
necessary.
Plans and schedules the long-range work flow to provide the best possible
services, works with other departments to determine their long-rangeinformation systems needs.
Attends meetings, conferences and training sessions to keep informed of
changes in hardware and software problems and legislative changes that affect
the operation of the company.
Develops overall designs to implement user requests, generates conceptual flow
charts, designs user/operator interface and determines how design canefficiently make use of existing data base structures.
Develops and prepares the annual budget for the department.
2.3.2 M ANAGER MIS:-
Ensures the analytics and technical team members are focused on the right set
of projects that are approved and prioritized by senior management as necessary
to drive key business decisions.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 2: - - 26 -
Manages projects and staff to develop strategies, which provide end- users with
an easy-to- use structure containing the strategic information necessary to do
complex analysis, modeling and segmentation.
Manages all aspects of development process, including business requirements
gathering, database design, coding, testing, documentation, implementation and
end-user training.
Leads resolution of system- related issues with internal technology and systemproviders. Drive accountability to ensure appropriate resources are secured to
execute the necessary tasks. Analyze issues and recommend
technologysolutions as appropriate.
Engage and direct process improvement activities to ensure department isworking at an optimal level. Oversees the development of departmental policies
and procedures. Ensures processes are documented and approved as
appropriate. Ensures areas of concern are addressed and procedures/ controls
are implemented to identify and mitigate future/ current risks.
Administers departmental budget, ensure expense/revenue targets are met.Monitors staffing and volume levels to ensure appropriate resources are
allocated.
2.3.3 N ETWORK A DMINISTRATOR :-
Full life-cycle management (define, design, develop, deploy) for variousprojects relating to the upgrade and ongoing maintenance of the corporate data
network infrastructure.
Serve as a liaison with other IS teams and other company departments to define
requirements for and carry out various inter-team projects.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 2: - - 27 -
Provides r egular management reports to direct supervisor relating to network
health/maintenance/uptime/etc.
Directs responsibility for maintaining systems and support service level
agreements for systems uptime and support service levels.
Develops options, recommendations and associated cost benefits and
implements cost effective solutions.
Works with network engineers, technical staff, and vendors to develop andimplement network projects.
Oversees the development and execution of analytical strategies withinServicing Operations.
2.3.4 D ATABASE A DMINISTRATOR :-
Develops data model describing data elements and how they are used,following procedures and using pen, template or computer software.
Develops standards and guidelines to guide the use and acquisition of software
and to protect vulnerable information.
Plans, coordinates and implements security measures to safeguard information
in computer files against accidental or unauthorized damage, modification or
disclosure.
Reviews procedures in database management system manuals for making
changes to database.
Reviews workflow charts developed by programmer analyst to understand tasks
computer will perform, such as updating records.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 2: - - 28 -
Writes and codes logical and physical databases descriptions and specify
identifiers of database to management system or direct others in coding
descriptions.
Approves, schedules, plans and supervises the installation and testing of new
products and improvements to computer systems, such as the installation of
new databases.
Develops methods for integrating different products so they work properly
together, such as customizing commercial databases to fit specific needs.
Identifies and evaluates industry trends in database systems to serve as a source
of information and advices for upper management.
2.3.5 S ENIOR P ROGRAMMER :-
Analyzes designs, supervises and coordinates the development of software
systems to form a basis for the solution of information processing problems
through the use of electronic data processing machines.
Designs and develops programming systems making specific determinationsabout system performance. Defines functional specifications of the system for
the appropriate hardware.
Analyzes total system specifications and translates system requirements to task
specifications for computer programmers. Develops training programs to
promote staff development within departments affected by utilization or
revision of computer systems.
Maintains liaison with representatives of other company data processingoperations, professional organizations and equipment manufacturers to ensure
utilization of current principles and techniques.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 2: - - 29 -
Reviews and analyzes system specifications to determine whether all required
elements have been included. Consults with clients to gather information about
program needs, objectives, functions, features, and input and output
requirements.
Analyzes, defines, and documents requirements for data, workflow, logical
processes, hardware and operating system environment, interfaces with other
systems, internal and external checks and controls, and outputs.
Advises and works with user departments to resolve specific problems or make
changes in programs, computer applications, capabilities, alternative
programming approaches, limitations, etc.
2.3.6 P ROGRAMMER :-
Writes programs creating a logical series of instructions the computer canfollow, applying knowledge of computer capabilities, subject matter and
symbolic logic.
Code instructions into programming languages and test and debug programs to
get intended results.
Converts detailed logical flow charts to language that computers can process.
Prepares flow charts and block diagrams and encode resultant equations for
processing.
Develops programs from workflow charts or diagrams, considering computer
storage capacity, speed, and intended use of output data.
Prepares detailed workflow charts and diagrams from programs to illustrate
sequence of steps to describe input, output, and logical operation.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 2: - - 30 -
Revises or directs revision of existing programs to increase operating efficiency
or adapt to new requirements.
Consults with managerial and engineering and technical personnel to clarify
program intent, identify problems and suggest changes.
Writes instructions to guide operating personnel during production runs.
Prepares records and reports.
Collaborates with computer manufacturers and other users to develop new
programming methods.
2.4 F UNCTIONS OF THE MIS D EPARTMENT :
MIS department of TOYO NASIC T ARIQ G LASS I NDUSTRIES
L IMITED plays atremendous role in the growth of the firm. MIS department involves a great deal in
expanding or automating the data gathering process. MIS Department processed the
required information demanded by the executive in short time for quick decisions.
2.4.1 M AJOR F UNCTIONS :
Following are the major functions of MIS department of TOYO NASIC T ARIQ G LASS
I NDUSTRIES L IMITED :
Determination of Information needs.
Information processing.
Information gathering
Information utilization.
Find out the requirements of the system to enhance the system ability.
Ensure new system installed on the required place.
Updates the information.
Ensures the data cant access by the unauthorized person.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 2: -
Ensures the information flow smoothly.
- 31 -
Provide the actual information required by the different departments of the
organization in right time, including monthly, quarterly, annually and by
annually reports.
2.5 MIS O PERATIONS :-
The Management Information System in TOYO NASIC T ARIQ G LASS I NDUSTRIES hasdeveloped its own application software which consists of different modules i.e. sales,
marketing, production, finance, accounts, planning and marketing time office (basic
payroll consideration), maintenance etc which are briefly described below:
2.5.1 S ALES M ODULE : -
Module is the part of the application software which performs the unique purpose. It
consists of:
Pre-sales activity, planning and availability support for the sales personal.
The actual entry of the sales order done by the salesperson at the point of sales.
Determining where the most efficient source of the ordered product is ininventory and shipping it.
Delivery.
Customer billing.
Customer payment.
2.5.2 P RODUCTION M ODULE :
Sales and operations planning SOP where the sales forecasts are used in a
production-planning model to check feasibility.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 2: - - 32 -
Master Production Scheduling MPS – The actual plan for the whole production
process.
Material Requirements Planning MRP – Where the production plan is actually
converted into raw materials input requirements.
Warehouse Control where the actual production takes place and is registered
into the system as finished goods.
2.5.3 P URCHASING M ODULE :
When the production manager plans to manufacture something, a requisition for
the raw materials is prepared.
Purchase order sent.
Goods receipt inventory.
Payment to vendor.
2.5.4 F INANCE & A CCOUNTING M ODULE :
Sales events are entered at the proper time in the ledger system.
Inventory to match goods shipped.
Inventory to match raw materials received.
Inventory to move values from raw materials to work in process.
Accounts Payable are set up for purchases.
Accounts Receivables reflects goods billed but not yet paid for.
Time Keeping.
Accounts Payable.
Revenue Management.
Accounts Receivables.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 2: -
2.5.5 P LANNING AND M ARKETING M ODULE :
Records.
Data Collection & Analysis.
Customer Information System.
Geographic Information System.
2.5.6 P AYROLL C ONSIDERATION M O DULE :
- 33 -
This is the real overview look at the specifications on the sheets to see the wide range
of available features.
2.5.6.1 B ASIC P AYROLL P ROCESSING :
Get valid time information
Get each employee’s information.
Get YTD (year to date) information.
Calculate pay information.
Update employee information and YTD information.
Produce payback, pay stub and payroll reports.
2.5.6.2 L EAVE S D ATA :
Accumulated Vacation.
Vacation used by each individual.
Accumulated sick leave.
Individual sick leave used.
Accumulated personal time.
Individual personal time.
2.5.7 M AINTENANCE M ANAGEMENT :
Preventative Maintenance.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 2: -
Work Order Processing.
Maintenance History.
Cost Reporting.
2.5.8 O PERATIONS M ANAGEMENT :
Production Scheduling.
Daily Production.
Equipment Utilization.
Production Reporting.
2.5.9 S OFTWARE S EC URITY :
- 34 -
In TOYO NASIC T ARIQ G LASS I NDUSTRIES L IMITED all the employees of the MISDepartment and other interlinked departments have an identified user name one the
operating system level. Following are the main precautionary measures to secure the
data from the illegal user.
Every software module has a different user name defined along with thepassword, which can be changed daily. Such precautions make sure that the
authorized person only accesses the data.
Secondly one can only takes the data in the database but can’t edit the data. The
MIS manager only edits the data.
In each system, antivirus is installed to prevent the virus from the network and
systems.
Backup of the database is made to recover the lost data if any occurs.
In server room only authorize person can enters.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 2: -
2.6 MIS S UPPORT TO THE O THER D EPARTMENTS :
- 35 -
MIS department extends all the departments and provide the updated information to
other departments which support for effective decision- making and helping to establish
effective plans. Now we narrate briefly how the MIS department supports to the other
departments.
2.6.1 M ARKETING :
MIS Department provides the feed back on the effectiveness of the past
marketing strategies such as product planning, placing planning, promotion of
the product and price of the product.
The main function of the Marketing Department is to deal with the customers.
The MIS Department provides the customers data for effective decision
making.
2.6.2 A DMINISTRATION :
The main task of the Administration Department is to attain the objectives and
goals. The MIS Department provides the periodic and monthly reports to the
Administration / Top Management appraise the organizational performance and
can easily know strengths and weaknesses.
MIS Department provides each employees bio data and their performance and
all the other relevant information about the employees.
Provides accurate and current operation performance of the production
department.
Provides daily reports of the other departments.
2.6.3 A CCOUNTS :
Prepares the financial statements and balance sheets of the organization.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 2: - - 36 -
MIS Department also helps the Accounts Department in keeping the accounting
of the business transactions.
Provides the details of actual receipts and payment transactions to the
Managing Director.
2.6.4 T IME O FFICE & HR D EPARTMENT :
MIS Department provides information about the employee’s attendance and the record
of the each employee which is briefly explained below:
2.6.4.1 B ASIC P AYROLL I NFORMATION :
a. Personal Data.
b. Employee.
c. Employee Name.
d. Employee Address.
e. Address and Phone.
f. Sex, Birth Date, Marital Status.
g. Date Started Employee.
h. Department Code.
i. Job Codes.
j. Number of Tax Exemptions.
k. Exempt Status (eligibility / non eligibility for overtime).
l. Type of Employee (Salaried, Hourly etc.).
m. Salary or Wages if hourly etc.
n. Overtime Rate.
o. Vacation Accumulation Rate.
p. Sick Leave Accumulation Rate.
q. Leave Data.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 2: -
r. Accumulates Vacation.
s. Vacation Used This Year.
t. Accumulated Sick Leave Used This Year.
u. Accumulated Personal Time.
v. Personal Time Used This Year.
2.6.5 P RODUCTION D EPARTMENT :
MIS Department facilitates the production department in the following ways:
- 37 -
Provides the information of phase of raw material and the date when reach in
the organization.
Provides the actual information of the new material in hand.
Provides information about the finished products, which pass the quality
standards and take place in the warehouse.
Directs the faults of the product occurs during the operation.
Provides the machine efficiency and best way to expand its production.
Daily report to the operation director about the production efficiency.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
CHAPTER
S YSTEM D EVELOPMENT
P ROCESS .
- 38 -
This chapter focuses on the System Development Process. What System Development
Process Means, analysis of the current process which is used in the selectedorganization, its problems, techniques, problem analysis, requirements analysis, system
design phase as well as its implementations and evaluations & etc.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
3.1 S YSTEM D EVELOPMENT P ROCESS :-
- 39 -
System Development Process is a set of activities, methods, best practices andautomated tools that are used to develop and continuously improve information
systems and software.
3.1.1 S YSTEM
A system is an orderly grouping of interdependent components linked together
according to a plan to achieve a specific objective. Its main characteristics are
organization, interaction, interdependence, integration and a central objective.
It is an entity which consists of interdependent parts so that system theory is
concerned with the attributes and relationships of these interacting parts.
A definition which applies to business systems is a collection of men, machines
and methods organized to accomplish a set of specific functions.
Any group of components (functions, people, activities, events, and so on) that
interface with and complement one another to achieve one or more predefined
goals.
A system is a set of interrelated elements that collectively work together to
achieve some common purpose or goal.
The term system is derived form the Greek word systems, which means anorganized relationship among functioning units or components exists because it
is designed to achieve one or more objectives.
A regular or orderly arrangement of components or parts in a connected and
interrelated series or whole; a series or group of components necessary to some
operation.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
3.1.2 I NFORMATION S YSTEM
Data Resources
People Resources
Data and knowledge
- 40 -
End users and ISspecialist
Programs and procedures
Software resources
Inputof
dataresources
Control ofSystem
ProcessingData intoinformation
Storage of DataResources
Bases
Output ofinformationproducts
Machines andMedia
HardwareResources
Communications media and network support
Network Resources
3.2 P RELIMINARY I NVESTIGATION & P ROBLEM A NALYSIS
In the TOYO NASIC T ARIQ G LASS I NDUSTRIES Inquiry of limited scope undertaken to
verify whether or not an allegation merits further inquiry as a full investigation.
If we conclude that the idea is interesting, on the basis of the initial material in the
TOYO NASIC T ARIQ G LASS I NDUSTRIES , we will initiate a more thorough analysis in
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :- - 41 -
order to provide the best basis for a decision about a possible investment. Suchpreliminary investigation comprises, among other things:
Examination of novelty in patent and scientific literature
Technical analysis
Marketing analysis
Evaluation of development costs
Identification of business partners
Need for additional expertise
Definition of business goals company or sale of rights
Preparation of plans and budgets for an initial project, if appropriate.
We discuss the outcome of the preliminary investigation in the TOYO NASIC T ARIQ
G LASS I NDUSTRIES and decide whether idea has the potential or should be sold to a
third party. If so, we proceed with the so-called initial project within the framework.
3.2.1 O BJECTIVE O F P RELIMINARY I NVESTIGATION :
The objective is to develop Loan Management System which will maintain the total
system in computerized way and generate required report that is very essential in every
single manner.
3.2.2 S COPE :
Providing security to the loan information data.
Minimizing the large documentation.
Making calculations easy.
Easy maintains of Data
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
Reducing the extra manpower and overhead work.
3.2.3 C ONSTRAINS :
- 42 -
As the current system is completely manual, making it automated need lot of
time by realizing the existing system. The time limitation is one of the greatest
problems in this regard.
The system will process lots of transaction. So the calculation part must be
reliable as much as possible.
In this organization, there are so many senior employee, who are not familiar
with computerized system and they are not interested to develop a
computerized system.
Most of the employee does not have good knowledge about computer. That’s
why some of there expectations are unrealistic.
3.2.4 E XISTING MIS S ETUP :
The MIS setup which is currently used in TOYO NASIC is summarized in this figure
below:
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
3.2.5 C RITICAL A NALYSIS :
- 43 -
In TOYO NASIC T ARIQ G LASS I NDUSTRIES L IMITED system development normally
start when a manager and other functional areas personal feel that the current system is
outdated and not meeting the new trends of automation and era specifications.
Preliminary investigation is conducted when manager and other users submit the
request to the MIS department for new system and then such task is assigned to the
analyst to make a preliminary investigation.
3.2.5.1 E XISTING S YSTEM
Currently a simple database system in Visual FoxPro is working in the MISDepartment of TOYO NASIC T ARIQ G LASS I NDUSTRIES , which
handle accounts
department and store department. I apply the business intelligence rules on this
database by creating a data warehouse for the existing data. The production department
of appliances division is handled manually and there is computerized database
management system for the department. Therefore, there is problem in handling the
data and quality check.
3.2.5.2 P ROBLEM S TATEMENT
Generating reports, static query, database management system,The Problem of
data structure of simple transaction.
The impact of which
is
A successful
solution would be
Imperfect decisions, inconsistent behavior of the database, slow
processing, duplication, poor strategies, inaccurate reordering,
Enterprise Intelligent System which is based on the OLAP and
Data Warehousing (based on star schema) technique helpful in
decision making, generating reports against dynamic queries,
nested queries and ad hoc queries.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
3.2.5.3 S TAKEHOLDER AND U SER D ESCRIPTIONS
- 44 -
The system will provide services to the higher administration and management of the
departments of the TOYO NASIC T ARIQ G LASS I NDUSTRIES . The manager or
administrator will put a query and system will automatically execute and display the
reports in more descriptive and comprehensive form. He can also execute the hidden
queries in the queries.
3.2.5.4 P RODUCT O VERVIEW
System will facilitate the strategic level management of TOYO NASIC T ARIQ G LASS
I NDUSTRIES to make decisions, forecasting and better strategies. This system will also
provide the help to the operational level management to entertain queries generate
reporting and maintain stock status.
3.2.5.5 P RODUCT P ERSPECTIVE
It is a computing environment where users can find strategic information, put
directly in touch with the data they need to make better decisions.
It can provide an integrated and total view of the products.
It can make the current and historical information easily available for decision
making.
It can make decision support transactions possible without hinderingoperational system.
System can render the organizational information consistent.
System can present a flexible and interactive source of strategic information.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES
L TD
C HAPTER N O . 3 :-
3.2.6 DFD’ S AND R ISK A NALYSIS
Login DPR
Issue
- 45 -
Enter data
Reports
TOYONASIC’S
TransactionProcessing
Fig Context Level
DFD
Department
vouchercreation
MaterialTransfer
GRN
Warehouse
3.3 R EQUIREMENT A NALYSIS P HASE :-
The development of a solid foundation is the key to implementing a successful system.
A well-designed system maintains flexibility to accommodate new technologies and
changing user needs over time.
This approach puts significant emphasis of TOYO NASIC T ARIQ G LASS I NDUSTRIES on
understanding and interpreting the user needs and then carefully managing those needs
with management perspective and budgetary requirements.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
Mission Analysis
Requirements Analysis
Function Analysis
Function Allocation
Design
Verification
- 46 -
Define the system's functional architecture in terms of the operations / events that must
be performed in order to meet the mission goals of the system. This proceeds in a top-
down hierarchical nature and is independent of allocation to hardware, software, or
humans. The goal of the function analysis is to assist in defining and allocating
functions to the human that are best suited to their capabilities and limitations.
3.3.1 PROCESS DIAGRAM
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
3.3.2 E XISTING S YSTEM ’ S R EQUIREMENTS A NALYSIS
- 47 -
Requirements analysis beings when management of the TOYO NASIC T ARIQ G LASS
I NDUSTRIES L IMITED decides to continue developing the new system on the report of
the analyst. In requirements analysis phase of development of the new proposed
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :- - 48 -
system, traditional approach focusing is on the determining user needs, studying the
application area in depth, assessing the strength and weaknesses of the current system
and work methods and reporting results to the management.
3.4 F EASIBILITY S TUDY :
3.4.1 T ECHNICAL F EASIBILITY
In this report, I shall provide the solution to the running system of the organization
named as TOYO NASIC T ARIQ G LASS I NDUSTRIES L IMITED . This system uses the data
warehousing techniques and models.
A periodic reporting system on the basis of previous data to higher management will
also be a part of the system, which will helpful to them in strategic decision- making. I
have the basic knowledge of Dot NET framework but advance technologies of database
i.e. OLAP, Data warehousing, Data mining and BI are explored and worked on during
the internship progress.
3.4.2 O PERATIONAL F EASIBILITY
In the project all the database technologies regarding Business intelligence and front-
end development will explore and implemented:
S TEP 1: OLTP
Analysis of Store department
Design of Store department
Implementation of Store department
S TEP 2: OLAP & D ATA W AREHOUSING
Analysis of Store department
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
Design of Store department
Implementation of Store department
S TEP 3: B USINESS I NTELLIGENCE (U SING .NET)
Analysis of Store department
Design of Store department
Implementation of Store department
Testing and deployment of BI system
3.4.3 E CONOMICAL F EASIBILITY
- 49 -
The main concern here is on the system of the MIS Department of TOYO NASIC
T ARIQ G LASS I NDUSTRIES L IMITED . B y going computerized, TOYO NASIC canachieve more reliability and accuracy.
A . M AINTAINABILITY
Since I am using .Net Technology therefore it is easy to maintain the whole system
whenever required.
B . C OST B ENEFIT A NALYSIS
Economic feasibility has been defined as a cost benefit analysis. How do you estimate
the costs and benefits? And how do you compare those costs and benefits to determine
economic feasibility?
C . C OSTS FOR D EVELOPING THE S YSTEM
The cost for developing the information system can be classified according to the
phase in which they occur. Systesm development costs are usually applied once.
D . C OSTS F OR O PERATING T HE S YSTEM
These costs may be fixed (after regular interval but have relatively fixed rates or one
time costs & variable costs occur in proportion to some usage).
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
3.4.4 S CHEDULED F EASIBILITY
- 50 -
However the scope is flexible and can be extended. Because it is an industrial project
and TOYO NASIC T ARIQ G LASS I NDUSTRIES L IMITED is such a large company, which
has many departments where we can also implement Business Systems. But we will
meet all the basic requirements of BS in store and production from which a further
useful work is continuing able.
3.5 S YSTEM D ESIGN P HASE :-
System design represents how a proposed information system will meet theinformation needs of the users, including logical and physical design activities, user
interface, data and process design activities that produce system specifications satisfy
the customer requirements in the system analysis stage.
In TOYO NASIC T ARIQ G LASS I NDUSTRIES L IMITED designing phase begins, theanalyst and system development team determines how manual software & hardware
components will perform at logical and physical levels in each of the following areas:
Output Requirements.
Input requirements.
Processing Requirements.
Storage Requirements.
Procedure Requirements.
Personnel Requirements.
3.5.1 R ISK A NALYSIS
In developing new projects it is common that risks or uncertainties always exist,
especially in the development of industrial type projects. Our mission is to minimize
the risks up to a possible limit in TOYO NASIC T ARIQ G LASS I NDUSTRIES L IMITED .Principal sources of risks include random variations in components and subsystem
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :- - 51 -
performance, inaccurate or inadequate data, wrong information about work flow of
organization, integrity rules, problems in schemas and the inability to forecast things
about project development due to lack of prior experience.
Mitigation Strategy &Risk Name
R-1
Requirements
gathering.
R-2
Technology
awareness
R-3
Database
failures
R-4
Hardware
Failures
R-5
Unawareness
of BI
Risk Description
Requirement gathering is the
most important risk inindustrial projects. The
organizations are not ready to
give or share their data with
any other organization or
person due to their privacy.
New technology creates asituation in which End users
and Stakeholders cannot have
understanding with the new
technology. This may cause a
delay or failures of our
project.
Database Server or theoperating system on which it
is installed may be failed.
If any of the hardware failure
occur system crashes.
As the BI technology is newin the field of database so its
implementation may be
Contingency Plan
Arrange regular meetings with theusers and stakeholders of theconcerning people of departments. It
is also necessary to get information
about their current working of MIS
department. So that this risk can be
minimized.
End Users and Stakeholders must understand this technology as soon
as possible.
We must keep data as a backup, sothat database data can be recovered
back from failure.
We must replace old or corrupted
component by new one.
We have started the implementation
of the BI on small scale.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
technology complex. .
3.5.2 S YSTEM D ESIGN :-
- 52 -
Organizations may develop a system in many ways. One single ideal systemmethodology is not working properly in all situations. Because some approaches are
better suite for developing small systems then large ones. During my internship in
TOYO NASIC T ARIQ G LASS I NDUSTRIES L IMITED the prototyping approach was used.
Basically TOYO NASIC I NFORMATION S YSTEM is small in nature due to the expansion
of its business plant, now they needs medium sized Information System which will
develop soon. The MIS Director of TOYO NASIC says, because the company is not in
such a position to develop a system at once so they use Prototyping approach and the
required modifications are made when required. The main benefit of Prototyping
Approach is that you can develop appropriate system in short time without bear heavy
expense. However the main motive of all good approaches is that,
High level of interaction with user’s involvement throughout the development
process.
Conscientious attempts to minimize development time and costs.
A loyal concern for improving system quality.
The use of rigorous and disciplined approach to system development.
Production of complete and perfect design specification and documentation.
Implementation of system that satisfies the user requirements and is easy to
maintain.
If any one keep in such issues for the development or modification of system ensure
that it reach in its goals.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
3.5.3 G UIDELINES FOR I DEAL MIS S YSTEM D EVELOPMENT : -
- 53 -
The main and basic purpose of the Management Information System is to collate,summarize and present data / information accurately that enables the managers to the
company to control its operations efficiently.
In the perspective of data gathering the ideal Management Information System has five
layers.
3.5.3.1 D ATA S OURCES :
Data sources provide the three main sets of data to be considered.
A. O PERATIONAL :
This provides the actual values of the metrics that you measure to determine the
success of your business.
B. B UDGETS :
Represents short term estimates of the future values of the metrics.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
C. F ORECASTS :
Represents short term estimates of the future values of the metrics.
3.5.3.2 M ETRICS .
- 54 -
Define the things that you will measure to monitor the performance of your company.
The values you collect for operations, budget and forecasts provide the raw metric for
the analysis layer of your MIS.
3.5.3.3 A NALYSIS .
Defines how you will transform the raw metric data before presenting it to yourcompany’s employees. Employees at the lower levels of management in your company
are likely to need access to small subsets of the raw metric data that pertain to their
specific duties. As you move up through the management levels you will need to
summarize a wider range of metric data.
3.5.3.4 P RESENTATION .
Defines how you will present the transformed data to your company’s employees. Most
employees will need a simple dashboard that reflects the scope of their duties. The
dashboard should provide an easy to read display of the values of the key performance
indicators (KPI) for that person. It should be possible for the person to drill down
through any KPI to see the underlying data that determined the displayed value.
3.5.3.5 C ONTROL .
Control provides the mechanism by which the employees of the company attempt to
manage the values of the KPLs.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :- - 55 -
Metric analysis component that provides templates and wizards to help you with the
following:
M ETRICS :
Defining the metrics that will help you measure the operational performance ofyour company.
Collecting raw metric data (including operational budgets and forecasts.)
C ONTROLS :
Defining management controls on the values of the metrics.
Providing workflow automation mechanism for managing metric values.
We can also build pilot management information system to meet your company’s
needs as part of a comprehensive business management solution. Constructing such a
system would include:
Automation of links to your operational data sources to gather raw metric data.
Automation of links to your budgets and forecasts data sourced to gather rawmetric data.
Creating a tailored analysis suite for your metrics.
Creating a tailored presentation suite including employee dashboards.
3.5.4 B ENEFITS OF THE A PPROACH :-
Helps you focus management attention on those things that affect the success of
your company and are subject to your control.
Helps you focus the attention of management on appropriate key performance
indicators across the company sending a message to all of your company’s
employees – it tells them what is important and what is expected!
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :- - 56 -
Use of the budgets and forecasts services to set realistic targets helps to
improve the performance and morals of all of your company’s employees.
3.5.5 D FD’ S OF S YSTEM D ESIGN :-
UC 1:
LOGIN
Manager Login
<<Include>>
Identification
<<Communicate>>Database
Server(From Use Cases)
UC 2:
Fig 5.1 Login Use Case
CREATE GRN
Enter WareHouse
<<include>>
<<include>>
<<Update>>
<<Update>> Database Server(from Use-Case Model)
Manager GRN
<<include>>
Enter Supplier
Enter Items
<<Update>>
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
UC 3: H ANDLE C ATEGORY
Handle Category
- 57 -
Manager
<<include>>
<<Update>>Database Server
(from Use Cases)
UC 4:
Enter Category
UPDATE ITEM INVENTORY
Handle InventoryManager
View Item
<<include>>
Enter Item Enter Category
<<include>>
Enter UOM
<<include>>
<<include>>Edit Item
<<include>>
Edit UOM
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
UC 5: U PDATE P RODUCT I NVENTORY
Handle Product
- 58 -
Manager
<<include>>
<<include>>
Enter Product
<<include>>
View Product
Enter Color
Enter Model
Enter Type
<<include>>
<<include>>
<<include>>
Edit Product
UC 6: HANDLE SUPPLIER
Handle SupplierNewClass3
<<include>>
Enter Supplier
<<Updates>> Database Server
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
UC 7: H ANDLE T RANSFER OF I TEMS
Handle Transfer of ItemsManager
<<include>>
Database Server
- 59 -
UC 8:
Update Inventory
CREATE WAREHOUSE
<<Update>>
ManagerHandle Warehouse
<<include>>
<<Updates>>
Enter New Warehouse
Database Server
UC 9: CREATING ISSUE VOUCHER
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
Handling Issue VoucherManager
- 60 -
<<include>>
Enter Item
<<Updates>>
UC 10: C HECK R EPORTS
Manager
Database Server(from Use Cases)
Check Reports
<<include>>
Enter Warehouse
<<Updates>>
Director
Finished Goods Reports
3.5.6 D ESIGNING S YSTEM O UTPUTS : -
In TOYO NASICT ARIQ G LASS I NDUSTRIES L IMITED six important factors areconsidered in Designing System Output.
Content.
Form.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
Volume.
Timelines
Media.
Format.
3.5.6.1 C ONTENT :
- 61 -
Content refers to the actual pieces of data included among outputs provided to users.
System designers generally put too much content into managerial reports instead of too
little. Too much content can waste a lot of time of the managers by making then isolate
from the information that they need, it also diminishes the impact of truly important
information.
3.5.6.2 F ORM :
Form refers to the way that content is presented to the users. Content can be presented
in various forms “quantitative” and “non-quantitative”, text, graphics, audio and video.
The reason behind is that managers prefer to the summary and detailed information in
relative rather than absolute form or in charts from such as pie charts, pie lines or bar
charts.
3.5.6.3 V OLUME :
The term volume is commonly used in technology t measure the amount of activity
taking place at a given time. The amount of data output required at any one time is
known as output volume. Heavy volume often suggest a fast frequently used output
device such as a high speed printer or a rapid retrieval display unit.
3.5.6.4 T IMELINES :
Timelines refers to when users needs outputs. Some outputs are required on regular,
periodic basis (weekly, monthly, quarterly or annually). Manager requires the out put
& get it when they need.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
3.5.6.5 M EDIA :
Input output media refers to the physical substance or device used for:
Inputs.
Storage.
Outputs.
Output media choices include Paper, Video, Microfilms, Tape, Disk and Voice.
3.5.6.6 F ORMAT :
- 62 -
The method or manner in which data are physically arranged is called a format. Such
arrangements are called output format when referring to data output on printed report
or on a display screen.
3.5.7 D ESIGNING S YSTEM I NPUTS :-
In TOYO NASIC T ARI Q G LASS I NDUSTRIES L IMITED five important factors areconsidered in Designing System input.
Content.
Timelines
Media.
Format.
Volume
3.5.7.1 C ONTENT :
Firstly the analyst considers the types of data that need to be gathered to generate user
inputs. This is a complicated process because new proposed system means the new
information and the new information often requires new source of data, which can be
expensive. Sometimes the data needed for new proposed system are not available
within the organization but a close substitute might be.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
3.5.7.2 T IMELINES :
- 63 -
Exactly when inputs are entered the system is critical because outputs cannot be
produced until certain inputs are available. So a plan is established regarding different
types of inputs entering the system. Timing logistics are usually most complex in
transaction processing and information reporting system.
3.5.7.3 M EDIA :
Another most important input consideration includes the choices of input media and
subsequently, the device on which to enter the data. Such user input alternatives
includes:
Workstations.
Magnetic Disks.
Keyboards.
Pen Based Computers.
And Voice.
3.5.7.4 F ORMAT :
After the data content and the media requirements are determined, input formats are
considered. When specifying record formats the type and length of each data field, as
well as any other special characteristics are defined and avoid any error.
3.5.7.5 V OLUME :
Input volume refers to the amount of data that is entered in the computer system at any
time. And it is also considered important to determine the size of the input volume such
as light or heavy.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
3.5.8 E NTITY R ELATION D IAGRAMS
ER Model consists of 31 tables. Here 14 tables are shown in figure below
Here other 12 tables shown from the ER Model
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
- 64 -
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
Last 4 tables of ER Model are viewing in this figure
3.5.9 D ETERMINING P ROCESSING R EQUIREMENTS :-
- 65 -
In this phase the project team decides which types of application software products are
needed and consequently which of the degree of processing the system needs to be
handled. This leads the system developers to decision regarding the system software
and computer hardware that most effectively get output for users.
3.5.9.1 A PPLICATION S OFTWARE :
Application software’s are the programs that specify the information processingactivities required for the completion of specific tasks of computer users. The analyst
of the output and input usually suggests numerous processing requirements for
application software. These requirements normally address such issues as the basic
functions and capabilities that the software must possess. In TOYO NASIC T ARI Q
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :- - 66 -
G LASS I NDUSTRIES L IMITED application software’s are developed according to the
organizations transaction activities, mostly the medium size information system is
developed.
3.5.10 D ETERMINING S TORAGE R EQUIREMENTS :-
In the specification of storage requirements, accessing and organizing data are
considered. We also discuss need storage capacity and physical storage media options
which are identified.
Access the Organization.
Storage Volume.
Media.
3.5.10.1 A CCESS THE O RGANIZATION :
In this phase TOYO NASIC T ARIQ G LASS I NDUS TRIES
L IMITED project teamdetermines in what way the users will need access stored data sequentially, directly or
both. User access requirements then help determine appropriate data and fileorganization methods. In some cases online order or billing require only sequential
access. Mostly business data are organized logically into records. However physical
data placement both file oriented and data processing methods are also organized
sequentially.
3.5.10.2 S TORAGE V OLUME :
Storage volume relates t the aggregate of the:
Number of Data.
Records.
Strengths.
Sets.
Or all such matters are accessible to the users at any time.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :- - 67 -
Generally system developers determine the total bytes required for the number ofrecords expected to be stored that byte requirement is double or triple to arrive at total
secondary storage requirements.
3.5.10.3 M EDIA :
Finally the system developers determine the storage media according to the size of
transaction which are as follows:
Diskette.
Hard Drive.
Tape.
Optical Disk / USB etc.
Normally for huge volume data storage the media optical disk is more feasible for ruse.
But in TOYO NASIC T ARIQ G LASS I NDUSTRIES L IMITED the hard drive is used for the
data storage.
3.5.11 D EVELOPING P ROCEDURE FOR USING S YSTEM :-
In TOYO NASIC T ARIQ G LASS I NDUSTRIES L IMITED the system design is incomplete
until the procedures for using the system are finished. We define the procedure in this
way “A procedure is set of rules” procedure fall into two major categories:
Work Procedure.
Control Procedure.
3.5.11.1 W ORK P ROCEDURE :
This complies several procedures / ways under which it is inducted as the work should
be performed. These are call work procedures.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
3.5.11.2 C ONTROL P ROCEDURE :
- 68 -
In TOYO NASIC T ARIQ G LASS I NDUSTRIES L IMITED control procedure indicates how
work should be controlled. In computerized information system several controls must
be implemented to ensure the secrecy and security and accuracy of the data.
S ECURITY C ONTROL :-
Security control ensuring to eliminate the risk of unauthorized access of data, for
eliminating such risk we use the password, protection, mechanism etc.
A CCURACY C ONTROL :-
In TOYO NASIC T ARIQ G LASS I NDUSTRIES L IMITED computer information system
used the audit trail for the accuracy of the data so that accurate complete information is
stored. Audit is used to certify both the correctness of account balances and adherence
to a set of procedures or standards. Audit trails are used to trace the computer system
outputs back to original source documents.
P RIVACY C ONTROL :-
Regarding technology, privacy control ensures the protection of people’s rights
regarding how information about them is suppressed or used.
3.5.12 D ETERMINE P ERSONAL R EQUIREMENTS : -
In this phase we discuss personal specification for the personnel involve:
Work Description.
Personal Qualification.
Training.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
3.5.12.1 W ORK D ESCRIPTION :
- 69 -
In TOYO NASIC T ARIQ G LASS I NDUSTRIES L IMITED the most critical personal related
specification involves the work that people perform during their job. Total business
operations are divided into well defined goals and then those tasks are combined into
job. Each job must be feasible from the organization point of view as well asresponsible in accordance with the individual’s capabilities.
3.5.12.2 Q UALIFICATIONS :
When jobs are defined qualification is another taster for individual who fill those jobs.
For example, for the post of data entry operator the keyboard skill is necessary, etc.
3.5.12.3 T RAINING :
Training of the personnel is a major ongoing cost that is considered when the system is
being designed. For the new system software and hardware the training of the personal
is done for the purpose of getting desired results from the software.
T RADITIONAL D EVELOPMENT A PPROACH FOR S YSTEM D ESIGN &I MPLEMENTATION :-
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
P ROTOTYPING A PPROACH FOR S YSTEM D EVELOPMENT :-
3.6 E ND U SER D EVELOPMENT :-
- 70 -
With the increase availability of low cost technology, end user end user development
on of them. In TOYO NASIC T ARIQ G LASS I NDUSTRIES L IMITED the end user
development, it is the end user not the computer professional who is responsible for
systems development. The number and nature of systems development activities
followed by the end user often differ from those found in more formal approaches.
Three way in which end user development might be implemented, “Traditional
Approach”, “Prototyping” and an intuitive approach”.
3.6.1 F AVORING C IRCUMSTANCES OF P ROTOTYPE A PPROACH :
A system under development is local rather than enterprise wide.
The system under development is inexpensive.
A suitable environment of end user development tools and professional
expertise is available.
Standards exist to maximize divergent efforts by the end users and other danger
to the organization.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
High levels of security are not necessary for the system being developed.
- 71 -
The system under development involves numerous customized queries and
reports.
The system under development can easily be built and supported by the end
user.
The system under development does not involve high volume transaction
processing.
The development time is short and cannot be accommodated by the MIS
department.
The user must be heavily involved in the development process.
3.6.2 S YSTEM I MPLEMENTATION :
In TOYO NASIC T ARIQ G LASS I NDUSTRIES L IMITED after data gathering and choosing
the hardware, software and services necessary to operate the system, the system
implementation phase of development begins. Implementation phase consists of the
following activities:
Scheduling.
Program Coding, Debugging and Testing.
Training.
Conversion.
3.6.2.1 S CHEDULING :-
In TOYO NASIC T ARIQ G LASS I NDUSTRIES L IMITED to ensure that the system will
work by a certain date the analyst must prepare an implementation timetable. In this
time table, all the activities are desirable as how the implementation must start and
finished.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :- - 72 -
In TOYO NASICT ARIQ G LASS I NDUSTRIES L IMITED a detailed implementationtimetable is often essential to develop management confidence in the installation plan
and to ensure uninterrupted operations during the implementation period.
3.6.2.2 P ROGRAM C ODING , D EBUGGING AND T ESTING :-
P ROGRAM C ODING . Coding is the process of writing that can run the computerHardware.
C ODING & D ESIGN T OOLS . Three coding and design tools are widely recognized as
potentially making programmers more productive are:
I. Structure Programming Techniques.
II. Software Prototype.
III. Object Oriented Programming.
I. S TRUCTURE P ROGRAMMING T ECHNIQUES .
“A set of program design and coding tools developed throughout in 1970 whichprovide programmers with a well defined and familiar set of structure.”
Using structure techniques, programs can be written in a systematic, standard style,
thereby reducing development time and errors plus making programs moremaintainable.
II. S OFTWARE P ROTOTYPE .
The quickly coded 4GL program is called prototype software. The 4Gl product that
facilitates creation of software prototypes is an application generator. Application
generators and software prototypes are useful when users are not exactly sure what
they want and what time is a limiting factor in software development.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
III. O BJECT O RIENTED P ROGRAMMING .
- 73 -
An object oriented programming used to developed programs that create and use
objects to perform information processing tasks.
P ROGRAM D EBUGGING . Debugging is a methodical process of finding and reducing the
number of bugs, or defects, in a computer program or a piece of electronic hardware
thus making it behave as expected. Debugging tends to be harder when various
subsystems are tightly coupled, as changes in one may cause bugs to emerge in
another.
PROGRAM TESTING. Testing (sometimes called compliance testing) is that part of an
internal control review which assesses whether actual practice follows, or complies
with, prescribed policies and procedures. The assessment is made by interviewing or
observing staff, following a transaction through the process, or sampling
documentation of transactions to determine if required steps are executed.
3.6.2.3 T RAINING :
In TOYO NASIC T ARIQ G LASS I NDUSTRIES L IMITED meteorology, training is when a
successive series of showers or thunderstorms moves repeatedly over the same area,
usually causing some form of flooding, especially flash floods. Often, this happens
when a line of rain or storms forms along a stationary front, and moves down the
length of the front, while the front is stalled. It is named so because this is similar to the
way train cars move down a track in a line, over and over the same point, without the
track moving.
In TOYO NASIC T ARIQ G LASS I NDUSTRIES L IMITED with the burst of activity in end
user computing and the appearance of new tools for computer professional, training is
becoming a major component of implementation sector.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :- - 74 -
The main object of training is that the users are well known to operate the program
according to the specification.
3.6.2.4 C ONVERSION :
The initial operation of a new computer based system can be a difficult task. Such
operation is usually a conversion process in which the Hardware, Software, People,
Network and data Resources of an old information system must be converted to the
requirements of a new information system. This usually involves a Parallel, Phased,
Pilot or Plunge conversion process from the old to new system. Four major forms of
conversion are as follows:
I. Parallel Conversion.
II. Phased Conversion.
III. Pilot Conversion.
IV. Plunge or Direct Cutover.
I. P ARALLEL C ONVERSION .
Conversion can be done on a Parallel basis, whereby the old and new system are
operated until the project development team and end user management agree to switch
completely over to the new system. During this time the operation and result of both
systems are compared and evaluated. Errors can be identified and corrected and the
operating problems can be solved before the old system is abandoned.
II. P HASED C ONVERSION .
The phase conversion can be allows a gradual implementation processes to take place
with an organization.
III. P ILOT C ONVERSION .
In pilot conversion where one department or other serves as test site. A new system can
be tried out at this site until developers feel it can be implemented throughout the
organization.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
IV. P LUNGE OR D IRECT C ONVERSION .
- 75 -
The installation of the new system can be accomplishes by a direct cutover plunge to
the new developed system.
3.7 S YSTEM E VALUATION :-
In TOYO NASIC T ARIQ G LASS I NDUSTRIES L IMITED the performance and worth of the
MIS department is assessed in the following ways:
3.7.1 P ERIODIC P ERFORMANCE R EPORTS :
Periodic reports describes how much the MIS department performed with respect to staying
within planned spending limits.
3.7.1.1 U SER S URVEY :
The user surveys such as questioner and interviews indicate about the performance of the MIS
department. So in this way head of the department knows about the feed back of the system.
And if any problem is found he tries to resolve it.
3.7.1.2 S YSTEM P ERFORMANCE :
The main object of the system performance is that is the workstation working properly or not?
Is the system performing task or not? If not, then remedial action is taken to victory.
3.7.1.3 E ARLY W ARNING S IGNALS :
Early warning signals means that some thing is seriously wrong. In this way the MIS staff
evaluates the system & removes the miss-happening / errors on the spot.
3.7.1.4 O VERALL E FFECTIVENESS :
If MIS is performing in commensurate plan it means the system is running effectively.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
3.8 U SER I NTERFACES
3.8.1 L OGIN S CREEN
3.8.2 C HANGE P ASSWORD S CREEN
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
- 76 -
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
3.8.3 GRN S CREEN
3.8.4 I SSUE V OUCHER S CREEN
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
- 77 -
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
3.8.5 DPR S CREEN
3.8.6 C ATEGORY
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
- 78 -
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
3.8.7 N EW I TEM
3.8.8 N EW UOM
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
- 79 -
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
3.8.9 N EW S UPPLIER
3.8.10 T RANSFER OF I TEMS
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
- 80 -
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
3.8.11 N EW T YPE
3.8.12 UOM
3.8.13 V IEW C ATEGORY
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
- 81 -
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 3 :-
3.8.14 V IEW I TEM
3.8.15 W AREHOUSE
3.8.16 W ORKSHOP
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
- 82 -
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 4 :-
CHAPTER
SWOT A NALYSIS .
- 83 -
In this chapter the System Design, SWOT (Strengths, Weaknesses, opportunities and
Threats) Analysis of TOYO NASIC T ARIQ G LASS I NDUSTRIES L IMITED .
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 4 :-
4.1 SWOT A NALYSIS :-
- 84 -
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD is the leading organization of Glassproducts in P AKISTAN . T ARIQ G LASS I NDUSTRIES is the only organization in A SIA
which has H - 28 latest glass manufacturing machine which produces thin wall light
tableware products.
Over the last twenty years, T ARIQ G LASS I NDUSTRIES L TD . has excelled in the art of
glass manufacturing. Under the popular brand names of TOYO NASIC, OMROCand
NOVA, T ARIQ G LASS I NDUSTRIES L TD . has become a reliable house hold name
in
Pakistan. By fulfilling the needs of quality glass tableware and nurturing the basic
ingredients of Quality, Variety, Reliability and above all having a Competitive Edge,
T ARIQ G LASS I NDUSTRIES L TD . is now the market leader in Pakistan. This success is
now fast spreading to international markets across Europe, Middle East, Africa, Asia
and the Far East. The backbone of T ARIQ G LASS I NDUSTRIES L TD ' S is a
team of
qualified, experienced and dedicated professionals with a proven expertise along with a
staunch backing through technical collaboration with TOYO GLASS OF JAPAN.
Now if we have a critical look on all the situation and circumstances then we came to
know that this industry has a Monopoly in the Pakistani glass market. No other
company is there who can be able to become a challenge for TOYO NASIC T ARIQ
G LASS I NDUSTRIES L TD in the market. According to this we can say that TOYO NASIC
T ARIQ G LASS I NDUSTRIES L TD just has opportunities and strengths in the glass market
of Pakistan and to some extent have the weaknesses & threats as well. But most of
times these type of industries that have the monopoly in the market create hurdles for
upcoming related industries. In this context we can say that TOYO NASIC
T ARIQ
G LASS I NDUSTRIES L TD currently have no fear of loosing the market share in its current
position in the market.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 4 :-
4.1.1 S TRENGTHS :-
- 85 -
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD is financially strong and it owns largest
assets in Pakistan as compared to others and has earned 96.123 MILLION of profit last
year.
The service of transferring products either with in the country or outside the country is
the fastest as compared to others. Almost 15000 employees are working in the
organization.
4.1.1.1 S TRENGTHS OF THE C OMPANY :-
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD is captures 90% OF LOCAL GLASS
MARKET share in the Pakistani market.
TOYO NASIC T ARIQ G LASS I NDUSTRIES got ISO 9001 2000 certification on
M AY 15, 2001,
Since 1993, T ARIQ G LASS I NDUSTRIES has made tremendous growth andincrease in its business volume day by day.
Only TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD is captures H-28 machine is
erected this machine is only in the Asia which produce the light and thin wall
glass products.
Three main glass production company’s of Pakistani market are running under
the name of T ARIQ G LASS I NDUSTRIES L TD .
Now the management of T ARIQ G LASS I NDUSTRIES plans to further increase its
exports of tableware products to a large number of E UROPEAN C OUNTRIES .
Now days TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD produces up to
170
TONS of glass per day.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 4 :- - 86 -
The plant of TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD boasts a production
capacity of almost 200 METRIC TONS of glass tableware per day.
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD is the only
industry which
produces the world class level glass in the Asian countries and have capture the
maximum share in the Asian market.
4.1.1.2 S TRENGTHS OF THE MIS D EPARTMENT :-
MIS Department of TOYO NASIC T ARIQ G LASS I NDUSTRIES
L TD has theExtensive network and large database, allows the departments as well as the
staff to access to a stable and low cost database.
The ongoing up graduation of technological infrastructure is expected toenhance the efficiency of information system, there by strengthening,monitoring procedures and expediting decision- making. Further automation of
front-end activities will enable the TOYO NASIC T ARIQ G LASS I NDUSTRIES
L TD to improve customer service.
Given the scope of the TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD activities
and the existing level of impairment in assets, capital base of the company
requires further strengthening.
A good system of communication flow is a great advantage to TOYO NASIC
T ARIQ G LASS I NDUSTRIES L TD .
The department of MIS is handling all kind of software’s as per the TOYO
NASIC T ARIQ G LASS I NDUSTRIES L TD departmentsal reuirements.
Major staff of the TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD is experienced.
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD extensive network
and large
customer base allows the access to a stable and low cost product base.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 4 :-
4.1.2 W EAKNESSES :-
Over burden on staff.
Not highly qualified staff.
- 87 -
Unionism, centralization of authority, favoritism and nepotism has worked in
and few employees are gaining undo advantage that tarnish the image of TOYO
NASIC T ARIQ G LASS I NDUSTRIES L TD .
Employee’s turnover is higher.
There is lack of proper advertising like sponsoring of any festival or any event
like sports etc.
The role of personal and relationship managers may increase its market share.
Lack of resources.
Lack of volunteers.
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD has third class infrastructure like
furniture fixture etc.
There is no customer relation officer in TOYO NASIC T ARIQ G LASS
I NDUSTRIES L TD .
There is lack of coordination among different departments in TOYO NASIC
T ARIQ G LASS I NDUSTRIES L TD .
There is a lack of discipline in each department and employee of TOYO NASIC
T ARIQ G LASS I NDUSTRIES L TD .
A bad system of communication flow is a lowest advantage to TOYO NASIC
T ARIQ G LASS I NDUSTRIES L TD .
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 4 :-
4.1.3 O PPORTUNITIES : -
- 88 -
“The Future belongs to those who see the possibilities before they become obvious”
With renewed focus towards expanding the portfolio, efforts have been directed
towards consumer.
Both these areas particularly consumer financing remains largely unexplored
territories for the local sector and require a high level of risk surveillance.
High skilled labors force should be employed.
Online order placement facilities should be enhanced.
Employees having professional thinking and attitude toward their work as well
as having good industry experience should be hired by giving them special
salaries.
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD should try to increase their
branches in foreign countries.
4.1.4 T HREATS :-
The main threat which TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD has t o
face now days that is the products of china. China has a much enhanced
industry and growing day by day. Chinas capture all the markets of the world
due to the low cost and high quality. Now in these days the major competitor of
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD is China which provides the high
quality products in a very low price as compare to the market.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 4 :-
4.2 W EAKNESSES OF THE MIS D EPARTMENT :-
- 89 -
Although MIS department of TOYO NASIC T ARIQ G LASS I NDUSTRIES L IMITED is
trying to perform good job and supporting other departments yet there are some short
falls which I observe during my internship program and described them below:
The main short fall is that the information system processed the information
very slowly due to overloading.
The information system is based on COBOL so it’s very difficult to end users
to retrieve the required data easily as they are not receiving proper training.
Delay between transaction and output.
Information gathering will always be out of date.
Information from master file is not easily available.
Lack of speeding printer such as laser jet currently the organization uses the
Dot matrix printers.
Complaint about the trouble shooting is rectifying slowly.
Duplication of the data occurring in information system.
Lack of training facility.
Poor quality of computer such as Pentium I & II.
MIS department is facing overload of work.
Insufficient coordination of information among the departments.
The trouble shooting complaints are increased day by day.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 5 :-
CHAPTER
C ONCLUSION
- 90 -
TOYO NASIC T ARIQ G LASS I NDUSTRIES L IMITED is the monopolistic organization of
Glass products in Pakistan launches versatile glass products in local market and export
to the other countries and now exports its glass products to European countries. TOYO
NASIC T ARIQ G LASS I NDUSTRIES L IMITED launches the aggressive market strategies to
increase its sales volume.
TOYO NASIC T ARIQ G LASS I NDUSTRIES L IMITED has still some short falls in its
system. The Managing Director of the firm is determined to overcome such short
comes and develop the organization as MODEL ORGANIZATION. Employees
believe that management takes action in span time for job satisfaction. The channel of
the communication and other information are not followed properly by different
departments which is the main cause of reducing the end user’s productivity.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 6 :-
CHAPTER
R ECOMMENDATIONS
- 91 -
Following are the suggestions to further enhance and update the quality of the MIS
department of TOYO NASIC T ARIQ G LASS I NDUSTRIES L IMITED .
The immediate need is to modify or develop the new system as per demand of
the time so that further requirements are met accordingly.
Made the system easy and end user friendly.
Provide high quality services and system documentation for all end users.
Improve the user interface and user training program in order to enhance end
user productivity.
Improve the sharing of data among the departments.
Close down plug- in the communication gaps between different departments.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 6 :-
Increase the latest Pc’s on the job.
- 92 -
Recruit new and trained employees to decrease the work load on current
employees.
Proper maintenance of the system.
Use the high speed technology which is basic need of a good information
system.
The staff must be properly trained and skilled. Secondly, the right personshould be put to the right job so that the customer may be satisfied with the
conduct and performance of the staff.
Appointment on key post should not be made on political basis because people
appointed in this way are not only capricious minded but they also cast bad
reflection upon the reputation of the organization.
Maximum incentive in the form of profit and counter services should be offered
to the customers. Consequently, such incentives would bring more and more
business in return.
Customer satisfied with the counter service proves an asset to the organization.
Therefore, utmost care should be taken while dealing with the customers at the
counter. The staff at the counter must be highly skilled and trained according to
the changing trends of the world.
Fair appraisal system must be introduced. Equality appeals to everyone while
injustice discourages every qualified, hardworking and conscientious employee.
Every eligible employee should be rewarded according to his merit. All the
above suggestions will earn a good reputation and goodwill for the
organization.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 7 :-
CHAPTER
B IBLIOGRAPHY .
- 93 -
In this chapter all sources are mentioned through which all the data for the preparation
of this internship report is gathered for the MIS department of TOYO NASIC T ARIQ
G LASS I NDUSTRIES L IMITED . All of the sources, web sites, books are mentioned.
.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 7 :-
7.1 R EFERENCES & S OURCES U SED :-
- 94 -
All of the references and sources from where the data gathered for this report are
mentioned herewith for your kind concern.
7.1.1 O RGANIZATION
Annual Reports of TOYO NASIC T ARIQ G LASS I NDUSTR IES L IMITED .
www.tariqglass.com
Management of the Organization.
7.1.2 W EB P ORTALS
http://dictionary.reference.com
www.m - w.com/cgi - bin/dictionary
Penguin, Dictionary of Computers.
7.1.3 B OOKS
Management Information System by Charles Parker and Thomas.
Management Information System by James A.O “Brian.”
Management Development by Joseph Prokopenko.
System Analysis & Design Methods by Whitten, Bentley, Barlow.
Management Information System By Charles Poker.
Management Information System by Kenneth C. Laudon.
Information System INFORMATION SYSTEM ACCA 2.1 PBP 2.1 PBP.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
TOYO NASIC T ARIQ G LASS I NDUSTRIES L TD
C HAPTER N O . 7 :-
Introduction to Information Technology CA B6 PBP.
Information Technology 2 CA D13 PBP.
System Analysis and Design 2nd Edition Elias M Awad GAL GOTIA.
Computer Fundamental P .K. Sinha.
A+ Certification Michael Meyers.
Software Engineering Charles S. Pressman.
Computers Larry Long Nancy Long.
New Horizon in Information Technology 3rd Edition Jamshed A Khattak.
ALLAMA IQBAL OPEN UNIVERSITY H 8 ISLAMABAD
- 95 -