14
INTERREG IIIB CADSES „PlanCoast“ Objectives and expected results by Bernhard Heinrichs Ministry for Transport, Building and Regional Development M-V, Germany PlanCoast Lead Partner
Transcript
Page 1: INTERREG IIIB CADSES PlanCoast Objectives and expected results by Bernhard Heinrichs Ministry for Transport, Building and Regional Development M-V, Germany.

INTERREG IIIB CADSES „PlanCoast“

Objectives and expected results

by Bernhard Heinrichs

Ministry for Transport, Building and Regional Development M-V, Germany

PlanCoast Lead Partner

Page 2: INTERREG IIIB CADSES PlanCoast Objectives and expected results by Bernhard Heinrichs Ministry for Transport, Building and Regional Development M-V, Germany.

ContentContent

1. The challenges

2. Overall Objectives

3. PlanCoast Project Area

4. PlanCoast Structure and Tasks

5. Conclusions so far

Page 3: INTERREG IIIB CADSES PlanCoast Objectives and expected results by Bernhard Heinrichs Ministry for Transport, Building and Regional Development M-V, Germany.

1. The challenges

• Growing conflicts among seaside activities

• Urgent need for spatial co-ordination of offshore uses

Page 4: INTERREG IIIB CADSES PlanCoast Objectives and expected results by Bernhard Heinrichs Ministry for Transport, Building and Regional Development M-V, Germany.

2. Overall Objective2. Overall Objective

• Strengthen ICZM through spatial planning

• Integrate land- and sea-side planning • Exchange experience between

Adriatic Sea, Baltic Sea, Black Sea

• Support EU maritime strategy

Page 5: INTERREG IIIB CADSES PlanCoast Objectives and expected results by Bernhard Heinrichs Ministry for Transport, Building and Regional Development M-V, Germany.

3. PlanCoast Project Area

Page 6: INTERREG IIIB CADSES PlanCoast Objectives and expected results by Bernhard Heinrichs Ministry for Transport, Building and Regional Development M-V, Germany.
Page 7: INTERREG IIIB CADSES PlanCoast Objectives and expected results by Bernhard Heinrichs Ministry for Transport, Building and Regional Development M-V, Germany.

WP 1 „Strengthening the role of WP 1 „Strengthening the role of Spatial planning in ICZM“Spatial planning in ICZM“

• Assessment of status QuoNational reports on current ICZM/Sea Use

Planning preconditionsTransnational, comparative study on the

role of Spatial Planning in ICZM in the Adriatic, Baltic and Black Sea

Page 8: INTERREG IIIB CADSES PlanCoast Objectives and expected results by Bernhard Heinrichs Ministry for Transport, Building and Regional Development M-V, Germany.

WP 2 „Geographical information WP 2 „Geographical information systems“systems“

• Agreement on common technical basics and set of data

• Creation of update of GIS databases

Page 9: INTERREG IIIB CADSES PlanCoast Objectives and expected results by Bernhard Heinrichs Ministry for Transport, Building and Regional Development M-V, Germany.

WP 3 „Sea-Use-Planning in Action“WP 3 „Sea-Use-Planning in Action“

• Preparation of Sea-Use-Plans for several 12 –sm-zone

• Sea-Use-Planning training programme for spatial planners from participating countries

Page 10: INTERREG IIIB CADSES PlanCoast Objectives and expected results by Bernhard Heinrichs Ministry for Transport, Building and Regional Development M-V, Germany.

Sea Use Planning of the German Baltic SeaSea Use Planning of the German Baltic Sea

Page 11: INTERREG IIIB CADSES PlanCoast Objectives and expected results by Bernhard Heinrichs Ministry for Transport, Building and Regional Development M-V, Germany.

WP 4 „ICZM in Action“WP 4 „ICZM in Action“

• Preparation or update of several spatial plans according to ICZM principles

Page 12: INTERREG IIIB CADSES PlanCoast Objectives and expected results by Bernhard Heinrichs Ministry for Transport, Building and Regional Development M-V, Germany.

WP 5 „Transnational WP 5 „Transnational Dissemination“Dissemination“

• Exchange of ICZM Best Practice

• Information and lobbying for ICZM

Page 13: INTERREG IIIB CADSES PlanCoast Objectives and expected results by Bernhard Heinrichs Ministry for Transport, Building and Regional Development M-V, Germany.

FinancingFinancing

• EFRE 595.000 EUR• CARDS 493.678 EUR• PHARE 334.200 EUR • TACIS 120.600 EUR • EU Financing 1.488.478

EUR • EU Co-Financing + 317.000 EUR • Non EU Co-Financing + 173.542

EUR • Total 1.979.020 EUR

Page 14: INTERREG IIIB CADSES PlanCoast Objectives and expected results by Bernhard Heinrichs Ministry for Transport, Building and Regional Development M-V, Germany.

5. Conclusions so far

• Spatial Planning cannot substitute the ICZM-process - but forms an essential part

• Spatial planning of the sea should become an integral part of ICZM