Date post: | 05-Jul-2015 |
Category: |
Technology |
Upload: | lahcen-afif |
View: | 1,099 times |
Download: | 3 times |
Lahcen AFIFM : +32 499 96 64 72E : [email protected] : http://lahcen.afif.be
Gestion de ProjetScrum & Agile Training
Web Strategy
An Introductionto Scrum
Lahcen AFIF29/03/2012
mardi 24 avril 12
MarshmallowThe
Challenge
Tom WujecAutodesk
Monday, March 15, 2010
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Surprising lessons
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
We’re losing the relay race
Hirotaka Takeuchi and Ikujiro Nonaka, “The New New Product Development Game”, Harvard Business Review, January 1986.
“The… ‘relay race’ approach to product development…may conflict with the goals of maximum speed and flexibility. Instead a holistic or ‘rugby’ approach—where a team tries to go the distance as a unit, passing the ball back and forth—may better serve today’s competitive requirements.”
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Predictive methods : 4 phases
one shot
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Predictive methods : 4 phases
iteration 1 iteration 2
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Which requirement ?
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Plan or Value ?
Value Driven Project
42%
17%
17%
12%12%
Rates of functionalities used in a system-type
Never Rarely sometimes often Always
(c) Agilbee 2011. All right reserved. - 60 -
t
80%
50%
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Plan or Value ?
Exemple de Contrat Agile
0
500
1000
1500
2000
1 11 21
AgileWaterfall
0
2000
4000
6000
1
A 50% du temps et une BV > 80%,Stopper le Projet
20% du budget => Team
Attention ! Résultat à maitriser avant d’appliquer!
> 80%K€
K€ La Qualité n’est pas négociable
50% 40%
61(c) Agilbee 2011. All right reserved.
source : Agilebee (Patrice Petit)
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Plan or Value ?
Waterfall Agile
fixed
variable
scope
timebudget scope
timebudget
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
•Scrum is an agile process that allows us to focus on delivering the highest business value in the shortest time.
•It allows us to rapidly and repeatedly inspect actual working software (every two weeks to one month).
•The business sets the priorities. Teams self-organize to determine the best way to deliver the highest priority features.
•Every two weeks to a month anyone can see real working software and decide to release it as is or continue to enhance it for another sprint.
Scrum in 100 words
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Scrum origins• Jeff Sutherland
• Initial scrums at Easel Corp in 1993
• IDX and 500+ people doing Scrum
• Ken Schwaber• ADM
• Scrum presented at OOPSLA 96 with Sutherland
• Author of three books on Scrum
• Mike Beedle• Scrum patterns in PLOPD4
• Ken Schwaber and Mike Cohn• Co-founded Scrum Alliance in 2002, initially
within the Agile Alliance
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Scrum has been used by:
•Microsoft•Yahoo•Google•Electronic Arts•High Moon Studios•Lockheed Martin•Philips•Siemens•Nokia•Capital One•BBC
•Intuit•Nielsen Media•First American Real Estate•BMC Software•Ipswitch•Lexis Nexis•Sabre•Salesforce.com•Time Warner•Turner Broadcasting•Oce
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Scrum has been used for:
• Video game development• FDA-approved, life-critical systems• Satellite-control software• Websites• Handheld software• Mobile phones• Network switching applications• ISV applications• Some of the largest applications in
use
• Commercial software• In-house development• Contract development• Fixed-price projects• Financial applications• ISO 9001-certified applications• Embedded systems• 24x7 systems with 99.999% uptime
requirements• the Joint Strike Fighter
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Characteristics
• Self-organizing teams
• Product progresses in a series of month-long “sprints”
• Requirements are captured as items in a list of “product backlog”
• No specific engineering practices prescribed
• Uses generative rules to create an agile environment for delivering projects
• One of the “agile processes”
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
The Agile Manifestoa statement of values
Process and toolsIndividuals and interactions
over
Source: www.agilemanifesto.org
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
The Agile Manifestoa statement of values
Process and toolsIndividuals and interactions
over
Source: www.agilemanifesto.org
Comprehensive documentationWorking software over
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
The Agile Manifestoa statement of values
Process and toolsIndividuals and interactions
over
Source: www.agilemanifesto.org
Comprehensive documentationWorking software over
Contract negotiationCustomer collaboration over
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
The Agile Manifestoa statement of values
Process and toolsIndividuals and interactions
over
Following a planResponding to change over
Source: www.agilemanifesto.org
Comprehensive documentationWorking software over
Contract negotiationCustomer collaboration over
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Let people “grab the tasks”
Macro-management rather than micro-management
Why ?
To get more “committed” people and less “involved” people
Self organised team
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Project noise level
Source: Strategic Management and Organizational Dynamics by Ralph Stacey in Agile Software Development with Scrum by Ken Schwaber and Mike Beedle.
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Scrum
Cancel
Gift wrap
Return
Productbacklog
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Scrum
Cancel
Gift wrap
Return
Sprint2-4 weeks
Productbacklog
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Scrum
Cancel
Gift wrap
Sprint2-4 weeks
Return
Sprint goal
Productbacklog
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Scrum
Cancel
Gift wrap
Sprint2-4 weeks
Return
Sprint goal
Sprint backlog
Productbacklog
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Scrum
Cancel
Gift wrap
Sprint2-4 weeks
Return
Sprint goal
Sprint backlog Potentially shippableproduct increment
Productbacklog
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Scrum
Cancel
Gift wrap
Sprint2-4 weeks
Return
Sprint goal
Sprint backlog Potentially shippableproduct increment
Productbacklog
Coupons
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Scrum
Sprint2-4 weeks
Return
Sprint goal
Sprint backlog Potentially shippableproduct increment
Productbacklog
Gift wrap
Coupons
Cancel
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Scrum
Sprint2-4 weeks
Return
Sprint goal
Sprint backlog Potentially shippableproduct increment
Productbacklog
Gift wrap
Coupons
Cancel
24 hours
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Putting it all together
Image available at www.mountaingoatsoftware.com/scrum
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Sprints
• Scrum projects make progress in a series of “sprints”
• Typical duration is 2–4 weeks or a calendar month at most
• A constant duration leads to a better rhythm
• Product is designed, coded, and tested during the sprint
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Sequential vs. overlapping development
Source: “The New New Product Development Game” by Takeuchi and Nonaka. Harvard Business Review, January 1986.
Rather than doing all of one thing at a time...
...Scrum teams do a little of everything all the time
Requirements Design Code Test
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
No changes during
Change
Plan sprint durations around how long you can commit to keeping change out of the sprint
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Scrum framework
•Product owner•ScrumMaster•Team
Roles
•Sprint planning•Sprint review•Sprint retrospective•Daily scrum meeting
Ceremonies
•Product backlog•Sprint backlog•Burndown charts
Artifacts
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Scrum framework
•Sprint planning•Sprint review•Sprint retrospective•Daily scrum meeting
Ceremonies
•Product backlog•Sprint backlog•Burndown charts
Artifacts
•Product owner•ScrumMaster•Team
Roles
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
• Define the features of the product
• Decide on release date and content
• Be responsible for the profitability of the product (ROI)
• Prioritize features according to market value
• Adjust features and priority every iteration, as needed
• Accept or reject work results
Product owner
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
• Represents management to the project
• Responsible for enacting Scrum values and practices
• Removes impediments
• Ensure that the team is fully functional and productive
• Enable close cooperation across all roles and functions
• Shield the team from external interferences
The ScrumMaster
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
• Typically 5-9 people
• Cross-functional (Programmers, testers, user experience designers, etc...)
• Members should be full-time
• May be exceptions (e.g., database administrator)
• Teams are self-organizing
• Ideally, no titles but rarely a possibility
• Membership should change only between sprints
The team
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
•Product owner•ScrumMaster•Team
Roles
Scrum framework
•Product backlog•Sprint backlog•Burndown charts
Artifacts
•Sprint planning•Sprint review•Sprint retrospective•Daily scrum meeting
Ceremonies
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Sprint planning meeting
Business conditions
Team capacity
Product backlog
Technology
Current product
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Sprint planning meeting
Sprint prioritization
• Analyze and evaluate product backlog
• Select sprint goal
Business conditions
Team capacity
Product backlog
Technology
Current product
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Sprint planning meeting
Sprint prioritization
• Analyze and evaluate product backlog
• Select sprint goal
Sprintgoal
Business conditions
Team capacity
Product backlog
Technology
Current product
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Sprint planning meeting
Sprint prioritization
• Analyze and evaluate product backlog
• Select sprint goal
Sprint planning
• Decide how to achieve sprint goal (design)
• Create sprint backlog (tasks) from product backlog items (user stories / features)
• Estimate sprint backlog in hours
Sprintgoal
Business conditions
Team capacity
Product backlog
Technology
Current product
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Sprint planning meeting
Sprint prioritization
• Analyze and evaluate product backlog
• Select sprint goal
Sprint planning
• Decide how to achieve sprint goal (design)
• Create sprint backlog (tasks) from product backlog items (user stories / features)
• Estimate sprint backlog in hours
Sprintgoal
Sprintbacklog
Business conditions
Team capacity
Product backlog
Technology
Current product
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Sprint planning
As a vacation planner, I want to see photos of the hotels.
Code the middle tier (8 hours)Code the user interface (4)Write test fixtures (4)Code the foo class (6)Update performance tests (4)
• Team selects items from the product backlog they can commit to completing
• Sprint backlog is created
• Tasks are identified and each is estimated (1-16 hours)
• Collaboratively, not done alone by the ScrumMaster
• High-level design is considered
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
The daily scrum• Parameters
• Daily
• 15-minutes
• Stand-up
• Not for problem solving
• Whole world is invited
• Only team members, ScrumMaster, product owner, can talk
• Helps avoid other unnecessary meetings
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Everyone answers3 questions
What did you do yesterday?1
What will you do today?2
Is anything in your way?3
These are not status for the ScrumMasterThey are commitments in front of peers
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
The sprint review• Team presents what it
accomplished during the sprint
• Typically takes the form of a demo of new features or underlying architecture
• Informal
• 2-hour prep time rule
• No slides
• Whole team participates
• Invite the world
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Sprint retrospective
• Periodically take a look at what is and is not working
• Typically 15–30 minutes
• Done after every sprint
• Whole team participates
• ScrumMaster
• Product owner
• Team
• Possibly customers and others
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Start / Stop / Continue
Start doing
Stop doing
Continue doingThis is just one of many ways to
do a sprint retrospective.
Whole team gathers and discusses what they’d like to:
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
•Product owner•ScrumMaster•Team
Roles
Scrum framework
•Sprint planning•Sprint review•Sprint retrospective•Daily scrum meeting
Ceremonies
•Product backlog•Sprint backlog•Burndown charts
Artifacts
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Product backlog
This is the product backlog
•The requirements
•A list of all desired work on the project
•Ideally expressed such that each item has value to the users or customers of the product
•Prioritized by the product owner
•Reprioritized at the start of each sprint
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
A sample product backlog
voir exemple : fichier XLS
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
The sprint goal
Database Application
Financial services
Life Sciences
Support features necessary for population genetics studies.
Support more technical indicators than company ABC with real-time, streaming data.
Make the application run on SQL Server in addition to Oracle.
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Managing the sprint backlog
• Individuals sign up for work of their own choosing
• Work is never assigned
• Estimated work remaining is updated daily
• Any team member can add, delete or change the sprint backlog
• Work for the sprint emerges
• If work is unclear, define a sprint backlog item with a larger amount of time and break it down later
• Update work remaining as more becomes known
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
A sprint backlog
voir exemple : fichier XLS
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
A sprint burndown chart
0
200
400
600
800
1.000
Hou
rs
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Scalability
• Typical individual team is 7 ± 2 people
• Scalability comes from teams of teams
• Factors in scaling
• Type of application
• Team size
• Team dispersion
• Project duration
• Scrum has been used on multiple 500+ person projects
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Scaling through the Scrum of scrums
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Scaling through the Scrum of scrums
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Scrum of scrums of scrums
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Scrum of scrums of scrums
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Scrum of scrums of scrums
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
Where to go next
• www.mountaingoatsoftware.com/scrum
• www.scrumalliance.org
• www.controlchaos.com
mardi 24 avril 12
Lahcen Afif - IT Consultant - Chef de Projet - PRINCE2® & SCRUM - http://lahcen.afif.be
A Scrum reading list
• Agile and Iterative Development: A Manager’s Guide by Craig Larman
• Agile Estimating and Planning by Mike Cohn
• Agile Project Management with Scrum by Ken Schwaber
• Agile Retrospectives by Esther Derby and Diana Larsen
• Agile Software Development Ecosystems by Jim Highsmith
• Agile Software Development with Scrum by Ken Schwaber and Mike Beedle
• Scrum and The Enterprise by Ken Schwaber
• Succeeding with Agile by Mike Cohn
• User Stories Applied for Agile Software Development by Mike Cohn
mardi 24 avril 12
Lahcen AFIFM : +32 499 96 64 72E : [email protected] : http://lahcen.afif.be
Gestion de ProjetScrum & Agile Training
Web Strategy
MerciRetrouvez toutes les ressources de cette présentation
sur mon bookmark à l’adresse suivante :
http://delicious.com/lahcen_afif/agile
Mountain Goat Software, LLC!
portions of this presentation are from
mardi 24 avril 12