Welcome Introduction and Overview Felix Sefkow CALICE AHCAL Main Meeting DESY, Hamburg, Dec 13, 2017
Transcript

Welcome

Introduction and Overview

Felix Sefkow

CALICE AHCAL Main Meeting

DESY, Hamburg, Dec 13, 2017

Welcome

Introduction and Overview

Felix Sefkow

CALICE AHCAL Main Meeting

DESY, Hamburg, Dec 13, 2017

Mathias Reinecke | AHCAL group meeting | Nov 28th, 2017 | Page 2

Module 1

> First detector Layer has arrived from Mainz.

> Commissioning ongoing.

| Welcome | Felix Sefkow, 13.12.2017 2

Content

LC status

Look back at 2017

Look ahead

| Welcome | Felix Sefkow, 13.12.2017 3

Linear Collider Status

• Initial stage 250 GeV - 40% cost reduction • Still impressive physics potential • Supported by ICFA

• MEXT: “We will seriously deliberate.” • Expert committees and Scientific Council • We hear that Japan has understood that a positive

signal is needed in 2018 in order to have an impact on the European Strategy update

• CLIC, ILD etc also preparing input documents for ESU on 2018 time scale • then P5, international negotiations,…

• Optimistic time-line: experiment LoI 2023, data 2034 • gap opening after HL-LHC detector upgrades

Political agenda

| Welcome | Felix Sefkow, 13.12.2017 4

ICFA statement

TheInterna*onalLinearCollider(ILC)opera*ngat250GeVcenter-of-massenergywillprovideexcellentsciencefromprecisionstudiesoftheHiggsboson.Therefore,ICFAconsiderstheILCakeyscienceprojectcomplementarytotheLHCanditsupgrade.

ICFAwelcomestheeffortsbytheLinearColliderCollabora*ononcostreduc4onsfortheILC,whichindicatethatupto40%costreduc*onrela*vetothe2013TechnicalDesignReport(500GeVILC)ispossiblefora250GeVcollider.

ICFAemphasisestheextendibilityoftheILCtohigherenergiesandnotesthatthereislargediscoverypoten*alwithimportantaddi*onalmeasurementsaccessibleatenergiesbeyond250GeV.

ICFAthussupportstheconclusionsoftheLinearColliderBoard(LCB)intheirreportpresentedatthismee*ngandverystronglyencouragesJapantorealisetheILCina4melyfashionasaHiggsbosonfactorywithacenter-of-massenergyof250GeVasaninterna4onalproject1,ledbyJapaneseini4a4ve.1IntheLCBreporttheEuropeanXFELandFAIRaremen*onedasrecentexamplesforinterna*onalprojects.

Ottawa, November 2017

| Welcome | Felix Sefkow, 13.12.2017 5

Work flowPrototype construction

SiPMs SiPM sample tests

ASICs ASIC tests

ASIC test board

PCBs

Tiles

Interfaces

Cassetes

Stack

HBU soldering

HBU tiling

Cosmic tests

LED tests

e beam calibration

HCAL integration

Reflector wrapping

Cassette assembly

Cooling

software data base analysis

Heidelberg

Wuppertal

Palaiseau

Moskau Uni Hamburg

Mainz

MPP Munich

excellent opportunities

for young scientists

!5

| Welcome | Felix Sefkow, 13.12.2017 6

Time plan

• Most things worked out as planned • But not all…

• Should have finished calibration of all modules by now and start system tests

Est. end 2016

0 AHCAL-ILC 1 Jan 2017

1 Stack modifiations

2 Cooling

3 Design

4 Components 3

5 Integration 1; 4

6 Power

7 purchase 3+2 more pods

8 sofwtare integration 7

9 Layer

10 Cassettes

11 Interfaces

12 10 spare CIB series 1

13 20+10 CIB series 2

14 30 piggy backs

15 SIB proto

16 25 + 25 SIBs 15

17 HBU with tiles

18 SiPMs

19 600

20 delievery 1 Jan 2017

21 sample tests 20

22 11400

23 delivery 17 Apr 2017

24 sample tests 23

25 12000

26 delivery 15/5/17

27 sample tests 26

28 ASICs

29 packaging

30 ASIC test board

31 hardware

32 software

33 ASIC tests 1 29; 31; 32

34 ASIC tests 2 33

35 HBUs

36 HBU Prototype 1 1 Jan 2017 21

37 PCBs series 1 36

38 LEDs

39 Connectors (series 2)

40 HBU Porototype 2

41 layout

42 production 41

43 test 42

44 PCB series 2 43

45 Soldering 1 5 June 2017 24; 33; 36;…

46 Soldering 2 27; 33; 34;…

47 HBU test with LEDs 45

48 Tiles

49 molding

50 wrapping 1 49

51 wrapping 2 50

52 Tile placement 1 47; 50

53 Tile placement 2 46; 51

54 Cosmic tests 1 52

55 Cosmic tests 2 53

56 Layer assembly

57 mechanical integration 10; 11; 12;…

58 tests 57

59 Layer calibration 58

60 Layer integration 5; 8; 59

61 HCAL system test 60

# Traits Title Given Work Given Earliest Start

Resources Predecessors

AHCAL-ILC

Stack modifiations

Cooling

Design

Components

Integration

Power

purchase 3+2 more pods

sofwtare integration

Layer

Cassettes

Interfaces

10 spare CIB series 1

20+10 CIB series 2

30 piggy backs

SIB proto

25 + 25 SIBs

HBU with tiles

SiPMs

600

delievery

sample tests

11400

delivery

sample tests

12000

delivery

sample tests

ASICs

packaging

ASIC test board

hardware

software

ASIC tests 1

ASIC tests 2

HBUs

HBU Prototype 1

PCBs series 1

LEDs

Connectors (series 2)

HBU Porototype 2

layout

production

test

PCB series 2

Soldering 1

Soldering 2

HBU test with LEDs

Tiles

molding

wrapping 1

wrapping 2

Tile placement 1

Tile placement 2

Cosmic tests 1

Cosmic tests 2

Layer assembly

mechanical integration

tests

Layer calibration

Layer integration

HCAL system test

Q4 / 2016 Q1 / 2017 Q2 / 2017 Q3 / 2017 Q4 / 2017 Q1 / 201810 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3

| Welcome | Felix Sefkow, 13.12.2017 7

Score board

• MPPCs delivered ahead of time ✔ • and so were the tests, excellent quality ✔

• ASICs in time, but low yield, additional production just finished ✔

• ASIC tests on time, remaining ASICs in January (✔) • PCBs (HBUs and interfaces) on time, remaining (25%) in January (✔)

• Tiles delivered on time and within specs ✔

• Tile wrapping more challenging than anticipated, finish in December — (✔) • Tile module assembly started 4 months late — (✔)

• Stack modifications and new cassettes on time ✔ • Beam test and stack integration about 4 months late —

• Cooling late, start in January —

Status end of 2017

| Welcome | Felix Sefkow, 13.12.2017 7

Score board

• MPPCs delivered ahead of time ✔ • and so were the tests, excellent quality ✔

• ASICs in time, but low yield, additional production just finished ✔

• ASIC tests on time, remaining ASICs in January (✔) • PCBs (HBUs and interfaces) on time, remaining (25%) in January (✔)

• Tiles delivered on time and within specs ✔

• Tile wrapping more challenging than anticipated, finish in December — (✔) • Tile module assembly started 4 months late — (✔)

• Stack modifications and new cassettes on time ✔ • Beam test and stack integration about 4 months late —

• Cooling late, start in January —

Status end of 2017

Overall not too bad so far but

Commissioning time drastically reduced

| Welcome | Felix Sefkow, 13.12.2017 8

The next months

• Current SPS plan (draft, tentative) • May 16 - 23 • June 27 - July 4

• Install May 7 • Ship April 16 • DAQ commissioning (full system) start early March • DESY calibration runs 12.2., 12.3. (1 week each)

• In parallel: software • Analysis of calibration data • Preparation of reconstruction, simulation

• Core software, data base structure & maintenance • Scripting for real-time calibration • On-line Monitoring

• Production of Monte Carlo samples

Count-down

| Welcome | Felix Sefkow, 13.12.2017 8

The next months

• Current SPS plan (draft, tentative) • May 16 - 23 • June 27 - July 4

• Install May 7 • Ship April 16 • DAQ commissioning (full system) start early March • DESY calibration runs 12.2., 12.3. (1 week each)

• In parallel: software • Analysis of calibration data • Preparation of reconstruction, simulation

• Core software, data base structure & maintenance • Scripting for real-time calibration • On-line Monitoring

• Production of Monte Carlo samples

Count-down

you are here

| Welcome | Felix Sefkow, 13.12.2017 8

The next months

• Current SPS plan (draft, tentative) • May 16 - 23 • June 27 - July 4

• Install May 7 • Ship April 16 • DAQ commissioning (full system) start early March • DESY calibration runs 12.2., 12.3. (1 week each)

• In parallel: software • Analysis of calibration data • Preparation of reconstruction, simulation

• Core software, data base structure & maintenance • Scripting for real-time calibration • On-line Monitoring

• Production of Monte Carlo samples

Count-down

you are here

• No chance for further beam time in fall • No beam at CERN in 2019-2020 • More demanding conditions at Fermilab

| Welcome | Felix Sefkow, 13.12.2017 9

Where we are

• Tremendous challenge • Not achievable with existing team configuration

From cell to layer to calorimeter

plan: 8 months actual: 11 months

plan: 6 months left: 3 months

| Welcome | Felix Sefkow, 13.12.2017 9

Where we are

• Tremendous challenge • Not achievable with existing team configuration

From cell to layer to calorimeter

Mathias Reinecke | AHCAL group meeting | Nov 28th, 2017 | Page 2

Module 1

> First detector Layer has arrived from Mainz.

> Commissioning ongoing.

plan: 8 months actual: 11 months

plan: 6 months left: 3 months

| Welcome | Felix Sefkow, 13.12.2017 10

Small-scale beam tests 2017

• Test in a high magnetic field • nominally 3T, in practice 1.5T • power pulsing OK

• Combined with CMS HGCAL • active temperature compensation • works - well, in principle

Important system checks

CALICE AHCAL in H2@SPS

Katja Krüger PS/SPS User Meeting01 June 2017

Katja Krüger | CALICE AHCAL Testbeam at SPS | 01 June 2017 | Page 4/6

Data Taking

> impossible to operate magnet at nominal field, could only run at half field> data taken without B field, and with 1.5 T

! muons for calibration! energy scan for electrons: 10 – 60 GeV

> very clean beams, very stable SPS conditions, well-working and stable detector

work in progress

Katja Krüger | CALICE AHCAL Testbeam at SPS | 01 June 2017 | Page 3/6

Data Taking

> impossible to operate magnet at nominal field, could only run at half field> data taken without B field, and with 1.5 T

! muons for calibration! energy scan for electrons: 10 – 60 GeV

> very clean beams, very stable SPS conditions, well-working and stable detector

120 GeVmuon

60 GeVelectron

HGCAL + AHCAL testbeam in H2@SPS

Katja Krüger AHCAL group meeting25 July 2017

AHCAL(BH)

FH

EE

Reminder

2

• resolution of HV adjustment ~37mV/DAC • dDAC/dT (dV/dT) MPPC (HPK) DAC/0.84 ̊C on HBU4 SiPM (SensL) DAC/2.4 ̊C on HBU3 MPPC dMIP/dV is ~1.1%/DAC dGain/dT ~ -0.7%/ ̊C dGain/dV ~ 0.6%/DAC

dMIP/dV is ~1.1%/DAC

MIP

con

stan

t (A

DC)

V (DAC)

dG/dT dG/dV

dGain/dT ~ -0.7%/ C̊

dGain/dV ~ 0.6%/DAC

| Welcome | Felix Sefkow, 13.12.2017 11

Analysis

• Physics prototype • combined all-scintillator (Oskar): in EB • combined Si-scintillator (Yasmine): preliminary • semi-digital studies (Coralie): preliminary

• DHCAL results to compare within are in EB • tungsten (Marina), e-iD (Mathias): work in progress

• New data • B field effects, , T-comp validation (Yuji) • timing correlation's: first look (Ambra, Anna,

Christian, Eldwan, Sascha, …?) • New algorithms:

• Pandora with software compensation published • ready for semi-digital

Old and new data

• Data to come • performance (resolution, linearity) • shower shapes (4-dimensional): movies • particle flow analysis • leakage estimation, particle ID • your new ideas…

• Further possibilities • tungsten (CERN 2021) • combination with 2nd generation ECAL

| Welcome | Felix Sefkow, 13.12.2017 12

R&D continues

• Klaus chip: first results today • Mega-tiles • Scintillator materials and technologies • Talks today

• HL-LHC: CMS HGCAL • radiation hardness, high rates, low T • new ASICs

• Neutrino physics (accelerator driven) • Scintillator-SiPM based detector concepts

• Talks tomorrow

Linear Collider and other applications Megatile: 2nd prototype

• 2nd megatile prototype: scintillator plate– Geometry: full 3×3 megatile (trenches tilted by 30°)– PVT-based scintillator: intrinsic light yield comparable to BC412– Better surface treatment

• Most probable response: 31.4 p.e./MIP– Good S/N ratio achieved– Performance comparable to individually wrapped tiles

25.09.2017 CALICE Collaboration Meeting at UTokyo ([email protected]) 8

Central cell:31.4 p.e./MIP

DF2000MA foil on top surface and 4 sides

| Welcome | Felix Sefkow, 13.12.2017 13

Outlook:

• Intensive months ahead • finish construction / demonstration • software in focus

• CALICE meeting in Mainz: March 7-9, 2017

• Test beam in May and June

• Dinner tonight • 1930 Panetteria

Near-term

| Welcome | Felix Sefkow, 13.12.2017 13

Outlook:

• Intensive months ahead • finish construction / demonstration • software in focus

• CALICE meeting in Mainz: March 7-9, 2017

• Test beam in May and June

• Dinner tonight • 1930 Panetteria