INTRODUCTIONUNDER IMPLEMENTATION IN PETROCHEMICAL SPECIAL ECONOMIC ZONE

Preface

Butene-1 Jam Petrochemical Co. (Private Joint Stock)

11th Olefin kavyan Petrochemical Co. (Private Joint Stock)

Assaluyeh ethylene glycol Morvarid Petrochemical Co. (Private Joint Stock)

Assaluyeh Centralized Utility Expansion Damavand Petrochemical Co. (Private Joint Stock)

12th Olefin Under Privatization

16th Olefin & Metanol Bushehr Petrochemical Co. (Private Joint Stock)

Metanol Veniran Petrochemical Co.

Indonesia ammonia / urea (JV) Hengam Petrochemical Co. (Private Joint Stock)

8th Ammonia / Urea Lavan Petrochemical Co. (Private Joint Stock)

7th Metanol Marjan Petrochemical Co. (Private Joint Stock)

Hormoz Ammonia /Urea (13th Ammonia / Urea) Hormoz Petrochemical Co. (Private Joint Stock)

Styrene Park

Styrene Park (SBS/SB/LCBR, ABS) Jam Petrochemical Co. (Private Joint Stock)

Styrene Park (ESBR) Sadaf Chemical Assaluyeh Company (Private Joint Stock)

Styrene Park (EPS) Dalahoo Kimiya Industry Company

Styrene Park - Polystyrene Project Under Privatization

Preface

Porojects under Implementation in petrochemical special economic zone

Isocyanates-Phase 2 Karoon Petrochemical Co. (Private Joint Stock)

Chlor Alkali & PVC Arvand Petrochemical Co. (Private Joint Stock)

Bandar Imam 3rd NF PIDMCO (Private Joint Stock)

Propane De Hydrogenation (PDH) Salman-e-Farsi Petrochemical Co. (Private Joint Stock)

Centralized Utility (Fajr, Phase2) Fajr Petrochemical Co. (Private Joint Stock)

Acrylonitrile Arg Petrochemical Company (Private Joint Stock)

Acrylates Ofogh Polymer Petro-Technology Company (Private Joint Stock)

Maleic Anhydride (MAH), Butandiol (BDO) and Polybutylene Terephthalate (PBT) Ibn-e- Sina PetroKimiya Company (Private Joint Stock)

2nd Liquid Products Jetty Petrochemical Special Economic Zone Organization

Maleic Anhydride (MAH) Modabberan Shimi Company

Methyl Ethyl Ketone Arya Shimitex Company (Private Joint Stock)

7

9

10

12

14

15

16

17

18

19

20

21

22

25

26

27

28

30

31

32

3334

35

36

3738

39

40

41

42

UNDER IMPLEMENTATION IN PARS SPECIAL ECONOMIC/ENERGY ZONE

Sabalan Methanol (Joint venture with Petkim of Turkey) Sabalan Petrochemical Company (Private Joint Stock)

Dena Methanol (Joint venture with Eurokim of Singapore) Dena Petrochemical Co. (Private Joint Stock)

Di Polymer Aryan Methanol Di Polymer Aryan Petrochemical Co. (Private Joint Stock)

Middle East Kimiya Pars Methanol Middle East Kimiya Pars Company

Arman Methanol Arman Methanol Company (Private Joint Stock)

Parsa Arg Shimi Ammonia / Methanol Parsa Arg Shimi Company (Private Joint Stock)

Ethylene Glycols Pars Phenol Company (Public Joint Stock)

Propane De Hydrogenation (PDH) Mehr Petrokimiya Company (Private Joint Stock)

Assaluyeh Centralized Stronge Tanks (for export) Under Privatization

2nd Ammonia/Methanol Lavan Development Industry

43

44

45

46

4748

49

50

51

52

54

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

13th Olefin Ilam Petrochemical Co. (Private Joint Stock)

Hamedan PVC Hegmataneh Petrochemical Industry Co.(Private Joint Stock)

7th Ammonia / Urea (Marvdasht Martyrs)* Petrochemical Industries Development Management Co. (PIDMCO)

West Ethylene Pipeline & Dena Region Petrochemical Industries Development Management Co. (Private Joint Stock)

Map of West Ethylene Pipeline & Dena Region

Bakhtar Petrochemical Co. (Holding)

Kermanshah HDPE* Kermanshah Polymer Co. (Private Joint Stock)

Lorestan HDPE / LLDPE* Lorestan Petrochemical Co. (Private Joint Stock)

Kordestan LDPE* Kordestan Petrochemical Co. (Private Joint Stock)

Mahabad HDPE / LLDPE* Mahabad Petrochemical Co. (Private Joint Stock)

Miandoab HDPE* Miandoab Petrochemical Co. (Private Joint Stock)

Andimeshk LDPE* Andimeshk Petrochemical Co. (Private Joint Stock)

Hamedan Ethylene Oxide* Ibn-e-Sina Hamedan Petrochemical Co. (Private Joint Stock)

Map of Dena Region

Gachsaran 8th Olefin (8th Olefin)* Gachsaran Petrochemical Co. (Private Joint Stock)

Kazerun LDPE / HDPE* Kazerun Petrochemical Co. (Private Joint Stock)

Mamasani HDPE* Mamasani Petrochemical Co. (Public Joint Stock)

Dehdasht HDPE* Dehdasht Petrochemical Co. (Public Joint Stock)

Boroujen HDPE* Boroujen Petrochemical Co. (Private Joint Stock)

IN OTHER REGIONS

Central Ethane-Ethylene Pipeline NPC

Map of Central Ethylene Pipeline Zanjan Petrochemical Industry Co.

Firouzabad 14th Olefin (14th Olefin)* Firouzabad Olefin Petrochemical Co. (Private Joint Stock)

Jahroom LLDPE/ HDPE* Jahroom Petrochemical Company (Public Joint Stock)

Fasa LDPE* Fasa Petrochemical Company (Public Joint Stock)

Darab HDPE* Darab Petrochemical Company (Public Joint Stock)

Estehban EVA* Estahban Fars Kimiya Petrochemical Company

Zanjan Ammonia / Urea (10th Ammonia / Urea)* Zanjan Petrochemical Industry Co. (Public Joint Stock)

Lordegan Ammonia / Urea (11th Ammonia / Urea)* Lordegan Petrochemical Industry Co. (Public Joint Stock)

Golestan Ammonia / Urea (12th Ammonia / Urea)* Golestan Petrochemical Industry Co. (Public Joint Stock)

Genaveh Dashtestan Olefin (15th Olefin)* Genaveh- Dashtestan Petrochemical Company (Private Joint Stock)

Ardabil Ammonia & Urea Ardabil Petrochemical Company

Khomein Polypropylene Di Arya Polymer Company (Private Joint Stock)

Dehloran Olefin (17th Olefin)* Sepehr Dehloran Petrochemical Co. (Public Joint Stock)

Siraf Methanol Siraf Energy Petrochemical Co.

Nodan Polyacetal Kazeroon Petrochemical Company

Farashband Ammonia/Urea Kimiya Petrogas Iliya Company

Masjid Soleiman Ammonia/Urea (9th Ammonia/Urea)

Masjid Soleiman Petrochemical Company (Private Joint Stock)

Expandable Polystyrene (EPS) Petro Ramsheh Co. (Private Joint Stock)

Formalin Ghamron Petro Sanat Complex (Private Joint Stock)

74

75

76

77

7879

80

81

82

83

84

85

86

87

88

8990

91

92

93

*Approred by the goverment (Mandatory Projects)

Projects Under Study96

History of 2500 years of the Persian Gulf

100

102

UNDER STUDY

ONSTREAM

NPC onstream projects since the beginning of the 2nd 5-year Development Plan

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

6

Remarks

Intermediate products

figures indicated in the final products column of the tables in this borchure are inclusive of both final and surplus intermediate products.

Figures shown in the intermediate products column of the tables in this brochure indicate the products nominal output capacity which are inclusive of battery-limit consumption plus ex-works saleable products.

- According to the article 44 of Iran’s Constitu-tion, the share of National Petrochemical Com-pany in all future projects should be less than 20 %.

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

7

The petrochemical industry is as creation value industry in the country. In other words, petrochemical industry is as pioneer industry in creating value added in petroleum which requires the government‘s special attention and support as well as further participation of private sector. To this end, the state-governed vision in petrochemical industry changes its place to private sectors having top-notch participation in petrochemical projects.Accessing to international waters and abundance varieties of feedstock in the country makes this industry to face minor risk for investment. By considering these advantages, the investors are very keen on participating in completion of petrochemical projects.Nowadays, over 70 petrochemical projects at different stages are under way, anticipated to have 100 million tons of petrochemical production by the end of 5th five-year development plan. By completion of these projects, many jobs will be created and different regions of the country would be developed and also through the oil and gas resources, creating value added products would be even further importance.Furthermore, technical and economic studies are in progress to establish Chahbahar Petrochemical Special Economic Zone promising a sustainable development in petrochemical industry.

Preface

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

9

UNDER IMPLEMENTATION IN PETROCHEMICAL SPECIAL ECONOMIC ZONE

PROJECTS

Lying on the coast of the Persian Gulf, the Petrochemical Special Economic Zone, originally spread out on an area of 1700 hectares in southwestern city of Mahshahr, Bandar Imam Khomeini district. The zone was expanded over an area of 2300 hectares in March 2007 based on authorization No. K 36042 T/167936 by Iran’s High Council of Free Industrial / Trade Zone. According to this addendum, Bandar Imam, Razi and Farabi petrochemical companies were located in Petrochemical Special Eco-nomic Zone. Mahshahr is already the hub of Iran’s petrochemical industry. In view of its natural & geographical location and also enjoying the legal facilities of special zones, the Petrochemical Special Eco-nomic Zone has been created in order to develop the industry and trade activities (specially downstream industries), meet-ing the economic, social and national in-terests, attracting new technologies and increasing employment. From the geographical point of view, the zone has access to the international waterway through Bandar Imam and through the national railway network is accessible to Turkey, Europe and Cen-tral Asian countries.

The Petrochemical Special Economic Zone Organization was established in 1997 based on an authorization by Iran’s High Council of Free Industrial / Trade Zone to manage and develop industrial and economical activities including pet-rochemical sector in the area.As a subsidiary of NPC, the Petrochemi-cal Special Economic Zone Organization welcomes local and foreign investors to invest in this economically important area.

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

10

Implemented by: Karoon Petrochemical Co. (Private Joint Stock)

www.krnpc.com

FinalProducts40Methylene diphenyl di-isocyanate (MDI)45Chloridric acid85Total

Product Capacity (‘000 t/y)

Isocyanates - Phase 2

Location: Petrochemical Special Economic Zone Area: 34 hectares (Phases 1 & 2) Ownership: Bandar Imam Petrochemical Co. (40.9%), Chematur

of Sweden (30.6%), Petrochemical Industries Investment Co. (PIIC) (20.4%), PCC (8.1%) Start date: 2006 Projected production date: 2011

ApplicationsRaw material for polyurethanes (for the production of foam and sponges), automobile parts, insulation, surface coverages, urethane elastomers, adhe-sives, shoes industry &...

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

11

SourceCapacityInput FeedFanavaran Petrochemical Co.9.5CO (98%)

Razi Petrochemical Co.16.5 Ammonia (100%)Razi Petrochemical Co.0.12Sulfuric acid

Arvand Petrochemical Co.23Chlorine (99.6%)Fanavaran Petrochemical Co.2.5Hydrogen

Bandar Imam Petrochemical Co.26BenzeneImport5.5Formaldehyde

Bandar Imam Petrochemical Co.12Caustic soda (32%)

Feedstock (‘000 t/y)

License & basic engineering: Chematur Co. of Sweden Detailed engineering & procurement: Chematur Co. of Sweden Erection & construction: Tanarob Major local manufacturers: Sadid Jahan Sanat, Oxin Sanat & Iran Tablo

Earth work: 63,810 m3 Volume of concrete work: 31,730 m3Weight of steel structure: 4,772 tonnesWeight of equipment: 3,936 tonnesPiping: 321,932 inch-diamCable work: 386 kmPiling: 2,660 km Engineering work: 300,000 man/hour Erection & construction: 7,000,000 man/hou rPhysical progress (as of 20 March 2012): 72.8%

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

12

FinalIntermediateProducts300--PVC (Suspension)

40--PVC (Emulsion)187585*Liquid chlorine330890*Ethylene di chloride (EDC)

--343VCM634660*Caustic soda (100%)*

16--*Sodium hypochlorite*1,507Total

Product Capacity (‘000 t/y)

ApplicationsIn production of various containers, kitchen appliances, plastic and medical parts, pipes, detergents, toys, antiseptic, textile, insulation,...

Location: Petrochemical Special Economic Zone Area: 108 hectares Ownership: Persian Gulf Petrochemical Co. (80%),

Petroleum Ministry Retirement & Welfare Fund (20%) Start date: 2003 Projected production date: 2012* *All units came onstream and under trial production

Implemented by: Arvand Petrochemical Co.(Private Joint Stock) Chloralkali & PVC

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

13

SourceCapacityInput FeedEthylene Grade Network of Petrochemical Special Economic Zone252Ethylene

Local Sources1,300SaltKaroon Petrochemical Co.50Chloridric acid (97%)

Feedstock (‘000 t/y)

License & basic engineering: Vinnolit (Germany)/ Uhde (Germany)/ Sazeh(Iran) Detailed engineering & procurement: Uhde / Sazeh Erection & construction: Tecnican, Piphond, Mana, Kanrood Sazeh, Mashin Sazi

Arak, Omid Hafshjan, Petro Taksan, Pidco, Oxin Sanat Contractors of prerequisite projects: Eitsen / CAC, Aron Ab / Bina , Khord Sanat,

Sidek, Norhan Sanayeh

Volume of concrete work: 143,000 m3Weight of steel structure: 20,000 tonnesWeight of equipment: 22,000 tonnesPiping: 950,000 inch-diamCable work: 2,636 kmEngineering work: 500,000 man/hour Erection & construction: 10,552,000 man / hourPhysical progress (as of 20 March 2012): 99.9%

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

14

Product Capacity (‘000 t/y)FinalProducts

443Ethane870Propane688Butane649C5+

35Fuel gas2,685Total

Feedstock (‘000 t/y) SourceCapacityInput Feed

Oil rich regions2,685NGL

Applications

PIDMCO

Location: Bandar Imam Petrochemical Complex Area: 7.8 hectares Ownership: BIPC (100%) start date: 2006 Projected production date: 2012

Cable work: 255 kmPiling: 2,201 kmEngineering work: 353,937 man/hourPhysical progress (as of 20 March 2012): 96.4%

Detailed engineering & procurement: Namvaran / Tecnicas Reunidas Erection & construction: Asfalt Toos

Earth Work: 67,150 m3Volume of concrete work: 18,971 m3Weight of steel structure: 2,451 tonnes Weight of equipment: 4,920 tonnesPiping: 230,565 inch-diam

BANDAR IMAM 3rd NF

Feedstock for petrochemical units & as fuel

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

15

Product Capacity (‘000 t/y)FinalIntermediateProducts

450--Propylene

Feedstock (‘000 t/y)SourceCapacityInput Feed

Bandar Imam Petrochemical Co.560Propane

Applications

Propane De Hydrogenation(PDH) Implemented by: Salman-e-Farsi Petrochemical Co. (Private Joint Stock)

License & basic engineering: UHDE Detailed engineering & Procurement: ECEC

Location: Petrochemical Special Economic Zone Area: 16.75 hectares Ownership: National Petrochemical Co. (20%), Others (80%) start date: 2012 Projected production date: 2015

Feedstock for polypropylene, phenol, acrolynitryl, units

Physical progress (as of 20 march 2012): 6.8%

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

16

www.fajrco.com

FinalProducts6 48 mw*Electricity

740 t/h*Steam5,460 m3/hRO water 1,470 m3/hDM water 9,000 m3/hCooling water

250 m3/hPW (Potable water)400 m3/hSW (Service water)

7,630 m3/hFW9,800 m3/hLimpid water

27,000 nm3/hInstrument air15,000 nm3/hService air24,000 nm3/hNitrogen13,000 nm3/hOxygen

Product Capacity

FeedstockSourceCapacityInput Feed

Karoon River9,800 m3/hRaw WaterNIGC4.58 mn nm3/dNatural Gas

Applications

Centralized Utility(FAJR, PHASE 2)

* Electricity & steam units came onstream late 2010

Implemented by: Fajr Petrochemical Co. (Private Joint Stock) Location: Petrochemical Special Economic Zone (5 km from Fajr-1) Area: 30 hectares Ownership: NPC (70%), Justice Shares Broker Co. (30%) Start date: 2007 Projected production date: 2011

Utilities required by the process plants in Petrochemical Special Economic Zone are supplied by Fajr Petrochemical Co.

Detailed engineering, procurement, erection & construction: shafab, Zolal Iran ,Mapna

Volume of concrete work: 164,837 m3

Weight of steel structure: 16,343 tonnesPhysical progress (as of 20 March 2012): 90.8%

Weight of equipment: 13,056 tonnesPiping: 424,194 inch-diamCable work: 1,299 km

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

17

Product Capacity (‘000 t/y)FinalIntermediateProducts

100--Acrylonitrile3.2--Astonitrile11--Hydrogen Cyanide12--Ammonium sulfate

126.2Total

Feedstock (‘000 t/y)SourceCapacityInput Feed

Salman-e-Farsi Petrochemical Co. , Abadan Refinery 110PropyleneRazi Petrochemical Co.54AmmoniaRazi Petrochemical Co.12.5Sulfuric acid

BIPC, Shiraz Petrochemical Co.1.8Caustic soda

Applications

Acrylonitrile

In production of acrylic fiber, ABS and SAN resins, nylon, ediponitrile, industrial fibers, elastomers and …

Implemented by: Arg Petrochemical Company (Private Joint stock)

Location: Petrochemical Special Economic Zone Area: 12 hectares Ownership: Tabriz Petrochemical Co. (28.4%), Iran Investment Co.

(26.99%), Others (44.61%) Start date: 2012 Projected production date: 2016

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

18

Product Capacity (‘000 t/y)FinalCapacityProducts

3080Acrylic acid--100Propylene

2562Oxo Alcohols62--Acrylic Esters45--Super Absorbing Polymers

718co2 (Liquid) 169Total

Feedstock (‘000 t/y)SourceCapacityInput Feed

BIPC 185Propane

Applications

Acrylates Implemented by: Ofogh Polymer Petro-Technology Company(Private Joint Stock)

Location:Petrochemical Special Economic Zone Area: 8 hectares Ownership: Private Sector (100%) Start date: 2012 Projected production date: 2016

Used in leather industry, paper, textiles, and protective coverage …

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

19

FinalIntermediateProducts25110MAH2075BDO60--PBT50--Isobutane24--Tetrahydrofuran

179Total

Product Capacity (‘000 t/y)

Feedstock (‘000 t/y)SourceCapacityInput Feed

BIPC 170ButaneTondguyan Petrochemical Co. / import45PTA

Fanavaran Petrochemical Co.4Methanol

Applications

Maleic Anhydride (MAH), Butandiol (BDO) and Polybutylene Terephthalate (PBT)

In production of polyester resins, fumaric acid, auto and marine industry, lubri-cant additives, electronic industry, filament fibers, elastic poly urethane fibers, Copolyester - poly ether elastomers

Implemented by: Ibn-e- Sina Petro Kimiya Company(Private Joint Stock)

Location: Petrochemical Special Economic Zone Area: 10 hectares Ownership: Private Sector (100%) Start date: 2012 Projected production date: 2016

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

20

www.petzoneorg.com

2nd Liquid Projects Jetty

* Civil Work has been finished and installation of mechanical equipment is in progress.

Implemented by: Petrochemical Special Economic Zone Organization

Location: Petrochemical Special Economic Zone Start date: 2003 Projected production date: 2012*

Loading/unloading capacity: 2.4 mn t/yOverall length: 300 mMain body length: 98.9 mMain body width: 28.15 mAccess bridge length: 90 m Access road length: 56 mAccess road width: 16.5 mProcurement, Erection&Commissioning Contractor: Steam Co.Marine structure & Industrial civil contractor: Omran Falat Co.Physical progress (as of 20 March 2012 ): 97%

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

21

FinalIntermediateProducts20--MAH4--Furmaric acid

15--Unsaturated Poly ester resins39Total

Product Capacity (‘000 t/y)

Feedstock (‘000 t/y)SourceCapacity Input Feed

BIPC 40Butane

Applications

Maleic Anhydride (MAH) Implemented by: Modabberan Shimi Company

Location: Petrochemical Special Economic Zone Area: 4.5 hectares Ownership:Private Sector (100%) start date: 2012 Projected production date: 2013

In production of polyester resins, alkyd resins, insecticide…

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

22

Product Capacity (‘000 t/y)FinalProduct

8Methyl Ethyl Ketone/ Butyl Alcohol (MEK/SBA)

Feedstock (‘000 t/y) SourceCapacityInput Feed

Shimi Baft Co. 6Raffinate-2

Applications

Methyl Ethyl Ketone Implemented by: Arya Shimitex Company (Private Joint Stock)

Location:Petrochemical Special Economic Zone Area: 5 hectares Ownership: Private Sector (100%) Start date: 2008 Projected production date: 2013

Used as a solvent in chemical industry particularly in paint industry

Physical progress (as of 20 march 2012): 98%

UNDER IMPLEMENTATION IN

PARS SPECIAL ECONOMIC / ENERGY ZONE (Assaluyeh)

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

24

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

25

UNDER IMPLEMENTATION IN PARS SPECIAL ECONOMIC / ENERGY ZONE

PROJECTS

The Pars Special Economic / Energy Zone Organization as a representative of Iran’s Petroleum Ministry and National Iranian Oil Company (NIOC) man-ages and develops the South and North oil and gas fields in the region. Pars Special Economic / Energy Zone consists of three regions; Pars 1 (South Pars) with an area of 14 hectares, Pars 2 (Pars Kangan) with an area of 16 hectares and Pars 3 (North Pars) with an area of 16 hectares. the Organization was established in 1999 to protect the world largest gas field through activities of establishment, approval, planning, implementation, utilization and maintenance of public infrastructures like roads, rail ways, ports, airports, electricity, drinking water, integrated management of the re-gions. The proper infrastructures in the up, middle and down streams of oil and gas industry, Pars Complex Port, the International Persian Gulf Airport, water and electricity facilities, communication, roads and available natural tourist attractions made the region interesting for local and foreign investors to invest in this economically important area.Lying on the coast of the Persian Gulf, the Zone has access to the rich hydrocarbon resources in the region providing suitable conditions for foreign investment. It is the hub of development activities underway at South Pars gas field. With its reserves estimated at 14 trillion cubic meters of gas and 18 billion barrels of condensates, the field is the world’s largest gas field. It represents 6.8% of the world’s total gas reserves. Given the field’s capacity, 28 develop-ment phases and 3 giant LNG projects have so far been planned to be built in Assaluyeh and Kangan in an area of 30,000 hectares. Currently, the first ten phases are onstream. An average, $1bn has been invested for each phase.The implementation work of phases 11,13,14,15,16,17,18,19,20,21,22,23 and 24 have been started and are underway. Several world-scale petrochemical plants are being constructed in Assaluyeh as part of the country’s 3rd, 4th & 5th Development Plans.

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

26

www.jpsomplex.com

FinalIntermediateProduct100--Butene -1

Product Capacity (‘000 t/y)

Feedstock (‘000 t/y)SourceCapacityInput Feed

Jam Petrochemical Co.110Ethylene

Applications

Butene-1 Implemented by: Jam Petrochemical Co. (Private Joint Stock)

Location: Pars Special Economic / Energy Zone Area: 1.7 hectares Ownership: Private sector (100%) Start date: 2008 Projected production date: 2012

In production of co-polymers in various polyethylenes

License & basic engineering: Axens Detailed engineering & procurement: Nargan/Jam Sefat Karan

Major local manufacturers: Esfahan Mashinsazi,Fateh Sanat, Diesal

Physical progress (as of 20 March 2012): 95.99%

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

27

FinalProducts2,000Ethylene

180C3+2,180Total

Product Capacity (‘000 t/y)

SourceCapacityInput FeedSouth Pars Oil & Gas2600Ethane

Feedstock (‘000 t/y)

Applications

11th Olefin Implemented by: Kavyan Petrochemical Co. (Private Joint Stock)

Location: Pars Special Economic / Energy Zone (Phase 2) Area: 43 hectares Ownership: Bakhtar Petrochemical Co. (56.5%),

Gachsaran Petrochemical Co. (6.5%), Lorestan Petrochemical Co.(6.5%), Kermanshah Polymer Co. (6.5%), Kordestan Petrochemical Co. (6.5%), Mahabad Petrochemical Co. (6.5%), Others(17.5%) Start date: 2006 Projected production date: 2012

Feedstock for the petrochemical companies planned to be built alongside the West Ethylene Pipeline

License & basic engineering: Technip Detailed engineering & procurement: Nargan Erection & construction: Rah Sahel & Fater Kousar Jonoob, Ramco,

Mobin sanat, sina sanat, Kankashkar

Volume of concrete work: 112,000 m3Weight of steel structure: 7,500 tonnesWeight of equipment: 160,000 tonnesPiping: 1,134,000 inch-diamCable work: 530 kmPhysical progress (as of 20 March 2012): 95.17%

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

28

www.morvaridpc.ir

Product Capacity (‘000 t/y)FinalProducts

500MEG50DEG

4TEG554Total

Applications

Assaluyeh Ethylene Glycol Implemented by: Morvarid Petrochemical Co. (Private Joint Stock)

Location: Pars Special Economic / Energy Zone (Phase 2) Area: 5.15 hectares (ethylene glycol) & 2.98 hectares (storage tanks) Ownership: NPC (100%) Start date: 2007* Projected production date: 2013

* The project was transferred from Kharg Island to Assaluyeh in 2007

Raw material for the production of PET, anti-freeze, softeners in textile,...

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

29

Feedstock (‘000 t/y)SourceCapacityInput Feed

Olefin Complexes of the Region340EthyleneDamavand Petrochemical Co.368Oxygen

License & basic engineering: Shell Co. of Netherlands & MES of Japan Detailed engineering & Procurement : Mitsui / PIDEC

Physical progress (as of 20 March 2012 ): 48.41%

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

30

www.fajrco.com

Products Capacity *FinalProducts

1,900 mwElectricity1,900 t/hSteam

900 t/hOxygen

70,000 nm3/hNitrogen

31,000 nm3/hInstrument air

20,000 nm3/hService air

5,000 m3/hFresh water

37,000 m3/hDM water

80,000 m3/hCooling water1,500 m3/hPotable water

FeedstockSourceCapacityInput Feed

South Pars Oil & Gas14 mnm3/dNatural gasPersian Gulf380,000 m3/hSea water

Applications

Assaluyeh Centralized Utility Expansion Implemented by: Damavand Petrochemical Co.(Private Joint Stock)

Location: Pars Special Economic / Energy Zone (Phase 2) Area: 90 hectares Ownership: NPC (100%) Start date: 2009 Projected production date: 2014

Utilities required by the petrochemi-cal process plants in site no. 2 of the Special Economic /Energy Zone (Assaluyeh) are supplied by Dama-vand Petrochemical Co.

License, basic and Detailed engineering & Procurement: Mapna (Power Plant) Physical progress (as of 20 March 2012): 26.6%

* Products capacity are being finalized

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

31

Product Capacity (‘000 t/y)FinalIntermediateProducts

8681200Ethylene167327Propylene

--294C4 cut26--Liquid fuel

1089--Heavy ends33382Benzene

528--Paraxylene90--Orthoxylene25--Heavy aromatics--476Ethyl Benzene

440--Styrene200--Linear Alfa Olefin200--Propylene Oxide130--Butadiene160--Raffinate

3,956Total

Feedstock (‘000 t/y)SourceCapacityInput Feed

Phases 4 & 5 of South Pars Oil & Gas3,000CondensatesNouri (Borzuyeh)/Petrochemical Co.340Light cuts

Kavyan & Morvarid & Bushehr Petrochemical Cos.315C3+POGC900Ethane

Applications

12th Olefin Implemented by: Under Privatization

Feedstock for various downstream industries in production of polyolefin, butadiene, styrene, polyester, PTA

Location: Pars Special Economic / Energy Zone (Phase 2) Area: 75 hectares Start date: 2012 Ownership: under study Projected production date: 2016

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

32

Product Capacity (‘000 t/y)FinalIntermediateProducts

-832Ethane3851,000Ethylene

88--C3+ cuts1,4881,650Methanol

181--C3/C4124--Sulfur554--EG300--LLDPE/HDPE300--Acetic acid

3,420 Total

FeedstockSourceCapacityInput Feed

South Pars Oil & Gas Co.10 mm3/dRich gasDamavand Petrochemical Co.1,094 t/yOxygen

Jam Petrochemical Co., other complexes 11,000 t/yButene-1Import2,000 t/yHexane-1

Phases 13 & 14 of POGC468,000t/yEthane

Applications

Bushehr Olefin & Methanol (16th Olefin & Methanol)

Location: Pars Special Economic/Energy Zone (Phase2) Area: 59.43 hectares Ownership: Private Sector (100%) Start date: 2012 Projected production date: 2016

Implemented by: Bushehr Petrochemical Co. (Private Joint Stock)

Feedstock for production of polyesters, VA, MTBE, Acetic acid, resins, adhesives, cable & wire coverage, plastic parts, anti-freeze, various films

Engineering & Procurement: HFEC ,IPIP

Physical progress (as of 20 March 2012): 2.08%

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

33

Product Capacity (‘000 t/y)

FinalProduct1,650Methanol

Feedstock (mm3/y)SourceCapacityInput Feed

South Pars Oil & Gas Co.1,500Natural gas

Applications

Methanol (JV) Implemented by: Veniran Petrochemical Co.

Location: Pars Special Economic/Energy Zone (Phase 2) Area: 9 hectares Ownership: NPCI (49%), PIIC (1%), Venezuela’s Pequiven (49%),

Venezuela’s IPHL (1%) Start date: 2010 Projected production date: 2014

For production of MTBE, a gasoline additive which boosts the octane levels, acetic acid, solvents, resins, formaldehydes, anti-freeze, various types of plastics, DME, MTP and MTO

Licensor: Ammonia Casale of Switzerland Basic engineering: TKT, PIDEC Detailed engineering & Procurement: Hualu Co.

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

34

Product Capacity (‘000 t/y)Final capacityIntermediateProducts

75680Ammonia1,075--Urea1,150Total

Feedstock (mm3/y)SourceCapacityInput Feed

South Pars Oil & Gas Co.670Natural gas

Applications

Indonesia Ammonia/Urea (JV) Implemented by: Hengam Petrochemical Co. (Private Joint Stock)

Location: Pars Special Economic/Energy Zone (Phase 2) Area: 25.47 hectares Ownership: NPCI (49%), PIIC (1%), Indonesia’s Pusri (50%) Start date: 2010 Projected production date: 2014

As chemical fertilizer for agricultural purposes

License & basic engineering: Haldor Topsoe / SAIPEM Detailed engineering & Procurement & Erection &

Constuction&Commissioning: PIDEC, SEIPhysical progress (as of 20 March 2012): 1.5%

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

35

Feedstock (mm3/y)

Product Capacity (‘000 t/y)Final capacityIntermediateProducts

175660Ammonia860--Urea

1,035Total

SourceCapacityInput FeedSouth Pars Oil & Gas Co.657Natural gas

Applications

LAVAN Ammonia/Urea (8th Ammonia/Urea) Implemented by: Lavan Petrochemical Co. (Private Joint Stock)

Location: Pars Special Economic/Energy Zone (Phase 2) Area: 24.85 hectares Ownership: NPCI (20%), Sab Industries (55%), Arak

Petrochemical Co. (20%), Bank Melli Investment Co. (5%) Start date: 2010 Projected production date: 2014

As chemical fertilizer for agricultural purposes

License & basic engineering: Topsoe/ SAI PEM Detailed engineering, Procurement, Erection & Construction : PDIL

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

36

Product Capacity (‘000 t/y)

Final capacityProduct1,650Methanol

FeedstockSourceCapacityInput Feed

South Pars Oil & Gas Co.1,500mm3/yNatural gas Damavand Petrochemical Co.700 mm3/yOxygen

Applications

MARJAN Methanol (7th Methanol) Implemented by: Marjan Petrochemical Co. (Private Joint Stock)

Location: Pars Special Economic/Energy Zone (Phase 2) Area: 7 hectares Ownership: Private Sector (100%) Start date: 2011 Projected production date: 2015

For production of MTBE, a gasoline additive which boosts the octane levels, acetic acid, solvents, resins, formaldehyde, anti-freeze, various types of plastics, DME, MTP and MTO

License & basic engineering: Haldor Topsoe Detailed engineering & Procurement: Namvaran / CCEC

Physical progress (as of 20 March 2011): 2.48%

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

37

www.hormoz-pet.com

Product Capacity (‘000 t/y)Final capacityIntermediateProducts

75680Ammonia1,075Urea1,150Total

SourceCapacityInput FeedSouth Pars Oil & Gas Co.670Natural gas

Applications

HORMOZ Ammonia/Urea (13th Ammonia/Urea)

Location: Pars Special Economic/Energy Zone (Phase 2) Area: 24.45 hectares Ownership: NPCI (49%), PIIC (1%), Oman Oil Co. (50%) Start date: 2012 Projected production date: 2016

Implemented by: Hormoz Petrochemical Co. (Private Joint Stock)

As chemical fertilizer for agricultural purposes

Feedstock (mm3/y)

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

38

Styrene Park Coordinated by: Jam Petrochemical Co.

Location: South Pars Special Economic/Energy Zone (Phase 2) Area: 39 hectares Ownership: Private Sector (100%) Start date: 2012 Projected production date: 2016

The first chemical park of the country approved by the Government to be built in South Pars Special Economic/Energy Zone in 2008 basis on value added of chain styrene products. The executive project activities and pro-viding its infrastructures have been started by the NPC and some private companies.

The following projects would be built in the Styrene Park:ABS & LCBR/ SB/ SBS of Jam petrochemical Co.EBSR of Sadaf Chemical Co. of AssaluyehPolystyrene of Dalahu Kimiya Industry Co.Polystyrene project

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

39

www.jpcomplex.com

FinalIntermediate Products200--ABS

3060SBS/ SB / LCSR230Total

Product Capacity (‘000 t/y)

Source CapacityInput feedPars Petrochemical Co.143StyreneJam Petrochemical Co.51ButadieneArak Petrochemical Co.45Acrylonitrile

Feedstock (‘000 t/y)

Applications

Styrene Park (SBS / SB / LCBR, ABS) Implemented by: Jam Petrochemical Company (Private Joint Stock)

In production of auto parts, home appli-ances & …

License & basic engineering: Nargan/Tecnimont/ Polymeri Euroupe

Physical progress (as of 20 March 2012): ABS (13.11%) SBS / SB / LCBR (12.81%)

Location: South Pars Special Economy/Energy Zone (Phase 2) Area: 14.89 hectares Ownership: Private Sector (100%) Start date: 2011 Projected production date: 2014

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

40

AmountProduct100Methanol100Total

Product Capacity (‘000 t/y)

Source CapacityInput feedJam Petrochemical Co.80Butadiene

Pars Petrochemical Co.20Styrene

Feedstock (‘000 t/y)

Applications

Styrene Park (ESBR)

Location: South Pars Special Economy/Energy Zone (Phase 2) Area: 7.3 hectares Ownership: Private Sector (100%) Start date: 2011 Projected production date: 2014

Implemented by: Sadaf Chemical Assaluyeh Company (Private Joint Stock)

In production of tires, cable and wire coverage & …

License & basic engineering: Nargan/Tecnimont/ Polymeri EuroupePhysical progress (as of 20 March 2012): 4.72%

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

41

Feedstock (‘000 t/y)

Product Capacity (‘000 t/y)

AmountProduct120EPS120Total

SourceCapacityInput feed Pars Petrochemical Co.110Styrene

Applications

Styrene Park (EPS)

Location: South Pars Special Economy/Energy Zone (Phase 2) Area: 3.75 hectares Ownership: Private Sector (100%) Start date: 2012 Projected production date: 2014

Implemented by: Dalahoo Kimiya Industry Company

In production of home appliances, packing industry, electrical insula-tion & …

License & basic engineering: S.H. Energy Chemistry

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

42

FinalProducts200Polystyrene50EPS

250Total

Product Capacity (‘000 t/y)

SourceCapacityInput FeedPars Petrochemical Co.236Styrene monomer Arak Petrochemical Co.6.8Butadiene Rubber

local3.8n-Pentaneimport6.5Mineral oil

Feedstock (‘000 t/y)

Applications

Styrene Park - Polystyrene Project

Location: South Pars Special Economic / Energy Zone Area: 5.85 hectares Ownership: under study Start date: 2012 Projected production date: 2015

Implemented by: Under Privatization

In production of home ap-pliances, electrical insula-tion, packing industry, food containers, toys…

(‘000 t/y) Cap

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

43

FinalProduct1650Methanol

Product Capacity (‘000 t/y)

Source Capacity Input feedPOGC1500Natural gas

Damavand P-etrochemical Co.700Oxygen

Feedstock (mm3/y)

Applications

SABALAN Methanol

Location: South Pars Special Economy/Energy Zone (Phase 2) Area: 7 hectares Ownership: Private Sector (100%) Start date: 2012 Projected production date: 2015

Implemented by: Sabalan Petrochemical Company (Private Joint Stock)

In production of MTBE, acetic acid, resins, formaldehyde, anti-freeze, adhesives, diesel fuel, different plastics and as solvent in downstream industries, MTP, MTO

License & basic engineering: Topsoe of Denmark Basic engineering & Procurement: PIDEC / ECESTC

Physical progress (as of 20 March 2012): 11.19%

pacity

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

44

Source Capacity Input feedPOGC1500Natural gas

Damavand Petrochemical Co.700Oxygen

Applications

DENA Methanol

Location: South Pars Special Economy / Energy Zone (Phase 2) Area: 7 hectares Ownership: Private Sector (100%) Start date: 2011 Projected production date: 2014

Implemented by: Dena Petrochemical Co. (Private Joint Stock)

In production of MTBE, acetic acid, resins, formaldehyde, anti-freeze, adhesives, diesel fuel, different plastics and as solvent in downstream industries, MTP, MTO

License & basic engineering: Topsoe of Denmark Detailed engineering & Procurement: PIDEC / ECESTC

Physical progress (as of 20 March 2012): 11.5%

FinalProduct1650Methanol

Product Capacity (‘000 t/y)

Feedstock (mm3/y)

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

45

FinalProduct1650Methanol

Product Capacity (‘000 t/y)

Source CapacityInput feedPOGC1500Natural gas

Damavand Petrochemical Co.700Oxygen

Feedstock (mm3/y)

Applications

Di Polymer Aryan Methanol

License & basic engineering: Topsoe of Denmark Detailed engineering & Procurement & Erection and Construction: CTEC

Location: South Pars Special Economy / Energy Zone (Phase 2) Area: 7.44 hectares Ownership: Private Sector (100%) Start date: 2012 Projected production date: 2015

Implemented by: Di Polymer Aryan Company (Private Joint Stock)

In production of MTBE, acetic acid, resins, formaldehyde, anti-freeze, adhesives, diesel fuel, different plastics and as solvent in down-stream industries, MTP, MTO

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

46

FinalProduct1650Methanol

Product Capacity (‘000 t/y)

Source Capacity Input feedPOGC1500Natural gas

Damavand Petrochemical Co.700Oxygen

Applications

Middle East Kimiya Pars Methanol

Location: South Pars Special Economy / Energy Zone (Phase 2) Area: 7.48 hectares Ownership: Private Sector (100%) Start date: 2011 Projected production date: 2014

Implemented by: Middle East Kimiya Pars Company

In production of MTBE, acetic acid, resins, formal-dehyde, anti-freeze, adhesives, diesel fuel, differ-ent plastics and as solvent in downstream indus-tries, MTP, MTO

License & basic engineering: Topsoe of Denmark Detailed engineering & Procurement & Erection & Constuction & Commissioning: CTEC

Feedstock (mm3/y)

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

47

FinalProduct1650Methanol

Product Capacity (‘000 t/y)

SourceCapacity Input feedPOGC1500Natural gas

Damavand Petrochemical Co.700Oxygen

Applications

Arman Methanol

Physical progress (as of 20 March 2012): 6.93%

Location: South Pars Special Economy/Energy Zone (Phase 2) Area: 7 hectares Ownership: Private Sector (100%) Start date: 2011 Projected production date: 2014

Implemented by: Arman Methanol Company (Private Joint Stock)

In production of MTBE, acetic acid, resins, formaldehyde, anti-freeze, adhesives, diesel fuel, different plastics and as solvent in downstream industries, MTP, MTO

License & basic engineering: Topsoe of Denmark Detailed engineering & Procurement: Namvaran / Chengda

Feedstock (mm3/y)

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

48

FinalProducts990Methanol300Ammonia

1290Total

Product Capacity (‘000 t/y)

Source CapacityInput feed POGC3.3Natural gas

Applications

Parsa Arg Shimi Ammonia / Methanol

Location: South Pars Special Economy/Energy Zone (Phase 2) Area: 9 hectares Ownership: Private Sector (100%) Start date: 2011 Projected production date: 2014

Implemented by: Parsa Arg Shimi Company (Private Joint Stock)

Methanol: In production of MTBE, acetic acid, resins, formaldehyde, anti-freeze, adhesives, diesel fuel, different plastics and as solvent in down-stream industries, MTP, MTOAmmonia: In production of urea

License & basic engineering: Topsoe of Denmark Detailed engineering & Procurement & Erection & Construction: SEDIN

Physical progress (as of 20 March 2012): 6.3%

Feedstock (mm3/d)

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

49

FinalProducts500MEG50DEG4TEG

554Total

Product Capacity (‘000 t/y)

Source CapacityInput feed Boushehr Petrochemical Co.340Ethylene

Damavand Petrochemical Co.368Oxygen

Applications

Ethylene Glycols

Location: South Pars Special Economy/Energy Zone (Phase 2) Area: 7 hectares Ownership: Private Sector (100%) Start date: 2011 Projected production date: 2014

Implemented by: Pars Phenol Company (Private Joint Stock)

As raw material in production of PET, anti-freeze, softeners in textiles, re-fineries & …

Engineering& Procurement: ECEC

Feedstock (‘000 t/y)

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

50

Product Capacity (‘000 t/y)

Source CapacityInput feedSouth Pars (Phases 9 & 10)560Propane

Applications

Mehr Petrokimiya Propane De Hydrogenation (PDH)

Location: South Pars Special Economy / Energy Zone (Phase 2) Area: 23.5 hectares Ownership: Private Sector (100%) Start date: 2011 Projected production date: 2014

Implemented by: Mehr Petrokimiya Company (Private Joint Stock)

License: Uhde of Germany, Mitsui of Japan Basic engineering: DAELIM / Uhde Detailed engineering & Procurement: Sazeh / Tecnimont

In production of polypropyle, acrylonitryl, films, home appliance, outo parts, wire, cables, fittings,...

Physical progress (as of 20 March 2012): 6.9%

FinalIntermediateProducts200450Propylene250--Polypropylene450Total

Feedstock (‘000 t/y)

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

51

Applications

Assaluyeh Centralized Storage Tanks (for export)

Location: South Pars Special Economic Energy Zone (Phase 2) Area: 46.7 hectares Ownership: Private Sector (100%) Start date: 2011 Projected production date: 2014 Total capacity: 320,000 cm

Implemented by: Under Privatization

Storage petrochemical products for export

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

52

FinalProducts990Methanol300Ammonia

1290Total

Product Capacity (‘000 t/y)

SourceCapacityInput FeedPOGC3.3Natural gas

Feedstock (mm3/d)

Applications

2nd Ammonia/Methanol

Location: South Pars Special Economic / Energy Zone Area: 8.43 hectares Ownership: Private Sector (100%) Start date: 2012 Projected production date: 2016

Implemented by: Lavan Development Industry

Methanol: In production of MTBE, acetic acid, resins, formaldehyde, anti-freeze, adhesives, diesel fuel, different plastics and as solvent in downstream industries, MTP, MTOAmmonia: In production of chemical fertilizers

IN OTHER REGIONSPROJECTES

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

54

Product Capacity (‘000 t/y)FinalIntermediateProducts

153458Ethylene120124Propylene300--HDPE132--Pyrolysis gasoline

33--Fuel oil--75C4 cuts

738Total

Applications

Ilam Olefin (13th Olefin)

Location: Ilam Area: 108 hectares Ownership: Private Sector (100%) start date: HDPE (2004) - Olefin (2007) Projected production date: HDPE(2012)*, Olefin( 2013)*Operating of HDPE Plant depends to receive ethylene from west ethylene pipeline

Implemented by: Ilam Petrochemical Co. (Private Joint Stock)

In production of films, water and gas pipes, containers, plastic parts & raw material for polyolfins and ethylene glycol

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

55

Feedstock (‘000t/y)SourceCapacityInput Feed

Ilam Gas Refinery233EthaneIlam Gas Refinery328C3+ cutsIlam Gas Refinery391C5+ cuts

Jam Petrochemical Co.4Butene-1

License & basic engineering: Mitsui (MCI)(Japan) / Stone & Webster, Axens Detailed engineering & procurement: MES, Bina Erection & construction: EIED / MES, Bina Major local manufacturers: Norhan Sanaye, Tehran Sam Andish, Farab

Gostaresh khadamate sanati Iran, Mohandesi Gostaresh Amid

Volume of concrete work: 90,114 m3Weight of steel structure: 5,520 tonnesWeight of equipment: 7,126 tonnesPiping: 388,289 inch-diamCable work: 1,063 km Erection & construction: 2,404,000 man/hourPhysical progress (as of 20 March 2012): 61.12%

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

56

www.hipc-ir.com

Product Capacity (‘000 t/y)FinalIntermediateProducts

3439PVC (Suspension - Medical grade)9--PVC (Compound - Medical grade)

43--Total

Feedstock (‘000t/y)

SourceCapacityInput FeedGhadir Petrochemical Co.40VCM

Applications

HAMEDAN PVC Implemented by: Hegmataneh Petrochemical Co. (Private Joint Stock)

Location: Hamedan Area: 15 hectares Ownership: NPC (32%), Private Sector (57%), IGS Co. of Italy (10%),

Iran Petrochemical Commercial Co. (IPCC) (1%) Start date: 2003 Projected production date: 2012

Medical equipments including blood packs, Oxygen masks, food packing industries,...

License & basic engineering: IGS of Italy & ICC Detailed engineering & procurement: Tondok Engineering Co. & IGS of Italy Construction: Ekbatan Sakhteman Major local manufacturers: Mashin Sazi Arak, Nirosan Gostar, Iran Transfo,

Mashin Daroo, Electro Kavir Yazd

Cable work: 140 km

Engineering work: 382,185 man/hour

Erection & construction: 3,000,000 man/hour

Physical progress (as of 20 March 2012): 79.2%

Earth Work: 256,500 m3 Volume of concrete work: 18,750 m3 weight of steel structure: 1,410 tonnesweight of equipment: 605 tonnesPiping: 85,890 inch-diam

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

57

www.spc.co.ir

Product Capacity (‘000 t/y)FinalIntermediateProducts

75680Ammonia1,075--Urea1,150Total

Feedstock (mm3/y)SourceCapacityInput Feed

NIGC670Natural gas

Applications

7th Ammonia / Urea (Marvdasht Martyrs Petrochemical Co.)

Location: Marvdasht Area: 18 hectares Ownership: Private Sector (100%) start date: 2006 Projected production date: 2013

Implemented by: Petrochemical Industries Development Management Co. (Private Joint Stock)

In production of chemical fertilizer for agricultural usages

License & basic engineering: Ammonia (Ammonia Casale of Switzerland),Urea (Toyo of Japan) Detailed engineering, procurement, Erection & Construction: PIDEC

Physical progress (as of 20 March 2012): 63.73%

* Approved by the government

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

58

Projects*Dena Region.Holding: Bakhtar Petrochemical Co

KazeroonKermanshahMamasaniLorestanDehdashtKordestan

BrojenMahabadMiandoabAndimeshk**Hamedan**

Applications

West Ethylene Pipeline & DENA Region Implemented by: Petrochemical Industries Development Management Co.

(Private Joint Stock)

Conceptual design: Technip, Nargan Detailed & basic engineering: Touseh Energy Paidar, Sherkat-e-Mohandesi Pipeline contractors: Omran Sazan, Sahand Azar, Asfalt Toos, Iran Pipline, Bornak, Iran Ertebat, Rampco, Sat, Sahand Sazeh Alborz, Marun Mecanic

Earth work: 50.6 mm3 Physical progress (as of 20 March 2012): 69.55%

No. of projects: 7 (Bakhtar Petrochemical Co.), 4 (Dena Region), Tabriz petrochemical co. Minimum pipe pressure: 55 bar Maximum pipe pressure: 93 bar No. of pump stations: 8 Capacity: 3.5 million t/y

Location: West of Iran (From Assaluyeh to Tabriz) Start date: 2004 Projected production date: 2012-2015 Overall length (Main trunk & branches): 2,712 km

Smallest pipe size: 8 inch Largest pipe size: 24 inch* Approved by the government

Transfering ethylene from 11th Olefin, Assaluyeh Olefin & Gachsaran Olefin to western provinces & Dena region to provide feedstock for petrochemical complexes

** Handed over to private sectors.

Supplier complexes for West Ethylene Pipeline Subordinate complexes to West Ethylene Pipeline

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

60

www.bpc.co.ir

BAKHTAR Petrochemical Co. (Holding)

In order to organize and arrange the financial resources and also implement the western petrochemi-cal projects, Bakhtar Petrochemical Company was established with the contribution of NPC and some invest-ment companies. It acts as a holding company, and is tasked with providing the required funds for implementing

SourceStock holders of Bakhtar Petrochemical Company30% National Petrochemical Co.40%Kavosh Sanat Sepid Co.20%Petroleum Ministry Pension Fund

5%Social Security Investment Co.5%National Pension Fund Investment Co.

the projects. It is also responsible for supplying the feedstock required for the facilities through the West Ethyl-ene Pipeline.

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

61

Product Capacity (‘000 t/y)FinalProduct

300HDPE

SourceCapacityInput FeedWest Ethylene Pipeline305Ethylene

Other Complexes5Butene-1

Feedstock (‘000t/y)

Applications

KERMANSHAH HDPE Implemented by: Kermanshah Polymer Co. (Private Joint Stock)

Location: Kermanshah, Harsin Area: 55 hectares Ownership: Bakhtar Petrochemical Co. (100%) Start date: 2005 Projected Production date: 2012*

* Approved by the government

* Its’ operation depends on receiving feedstock through West Ethylene Pipeline

License: Basell Basic & detailed engineering: Uhde, Sazeh Procurement, Erection & Construction: Uhde, Sazeh, Qods Niroo

Cable work: 878 km

Engineering work: 550.000 man/hour

Erection & construction, precommissioning& commissioning: 6.000.000 man/hour

Physical progress (as of 20 March 2012): 97.83%

Earth work: 1,287,311 m3

Volume of concrete work: 91,810 m3

Weight of steel structure: 3,450 tonnes

Weight of equipment: 4,381 tonnes

Piping: 380,000 inch-diam

Feedstock for downstream industries in produc-tion of various pipes, plastic parts, cables,...

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

62

www.bpc.co.ir

Product Capacity (‘000 t/y)FinalIntermediateProducts

300--HDPE / LLDPE730Butene-1

307Total

SourceCapacityInput FeedWest Ethylene Pipeline324Ethylene

Feedstock (‘000t/y)

Applications

LORESTAN HDPE / LLDPE

Feedstock for downstream industries in producion of various pipes plastic parts, cables,...

Implemented by: Lorestan Petrochemical Co.(Private Joint Stock)

Location: 12th km of Khoramabad - Koohdasht Road Area: 130 hectares Ownership: Bakhtar Petrochemical Co. (100%) Start date: 2008 Projected Production date: 2013

* Approved by the government

License: Basell, Axens Basic & detailed engineering, procurement:Consortium of Tecnimont / Nargan

Erection & Construction, Utility & Offsite: Navrood,TS.K, SA, ESWDUS, Azarab, Fimco, Tabdil EnergyPaya, IMFY

Physical progress (as of 20 March 2012): 70.65%

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

63

FinalProduct300HDPE

Product Capacity (‘000 t/y)

SourceCapacityInput FeedWest Ethylene Pipeline310Ethylene

BIPC, Tabriz Petrochemical.Co1.5Propylene

Feedstock (‘000t/y)

Applications

KORDESTAN LDPE Implemented by: Kordestan Petrochemical Co. (Private Joint Stock)

Location: Sanandaj Area: 130 hectares Ownership: Bakhtar Petrochemical Co. (100%) Start date: 2008 Projected production date: 2014

* Approved by the government

Production of Polyethylene films, Polyethylene foam, cable & wire covers, plastic parts,...

License & basic engineering: Basell Detailed engineering, procurement:

Nargan / Uhde Erection & construction: Mazand Niroo

/ Parsian

Physical progress(as of 20 March 2012): 44.50%

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

64

www.mahabadpetco.ir

FinalIntermediateProducts300--HDPE / LLDPE

730Butene-1307Total

Product Capacity (‘000 t/y)

SourceCapacityInput FeedWest Ethylene Pipeline324Ethylene

Feedstock (‘000t/y)

Applications

MAHABAD HDPE / LLDPE Implemented by: Mahabad Petrochemical Co. (Private Joint Stock)

Production of various films,containers, plastic parts, pipes, cables,...

License & basic engineering: Basell / Axens Detailed engineering & procurement: Tecnimont / Nargan Erection & Construction: Navrood

Physical progress (as of 20 March 2012): 51.03%

Location: Mahabad Area: 202 hectares Ownership: Bakhtar Petrochemical Co. (100%) Start date: 2008 Projected production date: 2013

* Approved by the government

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

65

IntermediateProduct140--HDPE

Product Capacity (‘000 t/y)

SourceCapacityInput FeedWest Ethylene Pipeline140Ethylene

Petrochemical Complexes2Butene-1

Feedstock (‘000t/y)

Applications

MIANDOAB HDPE Implemented by: Miandoab Petrochemical Co. (Private Joint Stock)

Location: Miandoab Area: 220 hectares Ownership: Bakhtar Petrochemical Co. (100%) Start date: 2012 Projected production date: 2015

* Approved by the government

Feedstock for petrochemical downstream plants, various pipes, plastic parts

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

66

www.bpc.co.ir

FinalProduct300LDPE

Product Capacity (‘000 t/y)

SourceCapacityInput FeedWe st Ethylene Pipeline311Ethylene

Feedstock (‘000t/y)

Applications

ANDIMESHK LDPE

License & basic engineering: Basell Detailed engineering & procurement: Nargan

Implemented by: Andimeshk Petrochemical Co. (Private Joint Stock)

Location: Andimeshk Area: 158 hectares Ownership: Bakhtar Petrochemical Co. (60%), Others (40%) Start date: 2012 Projected production date: 2015

In production of polyethylene films, polyethylene foams, Cable & wire cover, plastic parts,...

* Approved by the government

Physical progress (as of 20 March 2012): 10.67%

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

67

FinalIntermediateProducts2100EO

80--Ethoxylates50--Glycol Ether30--MEA/MDEA

6--EG168--Total

Product Capacity (‘000 t/y)

SourceCapacityInput FeedWest Ethylene Pipeline80EthyleneArak Petrochemical Co. 30Normal Butanol

Import 28AlcoholKermansha Petrochemical Co. 6Ammonia

Feedstock (‘000t/y)

Applications

HAMEDAN Ethylene Oxide Implemented by: Ibn-e-Sina Hamedan Petrochemical Co. (Private Joint Stock)

Location: Hamedan Ownership: NPC (20%), Others (80%) Start date: 2012 Projected production date: 2015

* Approved by the government

In production of detergents, solvents, paints.

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

68

Supplier complexes for West Ethylene Pipeline Subsidiaries of West Ethylene Pipeline (Dena Region)

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

69

FinalProducts1,000Ethylene

90C3+1,090Total

Product Capacity (‘000 t/y)

SourceCapacityInput FeedBid Boland Project No.21300Ethane

Feedstock (‘000t/y)

Applications

GACHSARAN Olefin (8th Olefin)

Location: Gachsaran Area: 157 hectares Ownership: NPC (20%) ,Mamasani Petrochemical Co. (20%), Kazeroon Petrochemical Co.(20%), Brojen petrochemical Co. (20%),

Dehdasht Petrochemical Co. (20%) Start date: 2007 Projected production date: 2013

Implemented by: Gachsaran Petrochemical Co. (Private Joint Stock)* Approved by the government

Providing feedstock for petrochemical units alongside the West Ethylene Pipeline (Dena Region)

Basic engineering: Alinam Erection & Construction: Fater Kosaran, Zidon koosh Major manufacturers: Fateh Sanat, Siemens,

Rasha Kamyar, Sanat Pars, ABB, EBARA, Tekinco, Taghdis, Moein, Electro Kavir, Azar Poolad

Physical progress (as of 20 March 2012): 19%

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

70

FinalIntermediateProduct300--HDPE/LLDPE

Product Capacity (‘000 t/y)

SourceCapacityInput FeedWest Ethylene Pipeline (Gachsaran Petrochemical Co.)290Ethylene

Local Petrochemical Coplexes23Butene-1

Feedstock (‘000t/y)

Applications

KAZEROON HDPE / LLDPE Implemented by: Kazeroon Petrochemical Co (Public Joint Stock).

Location: Kazeroon Area: 53 hectares Ownership: NPC (20%), Others (80%) Start date: 2012 Projected production date: 2015

* Approved by the government

Detailed engineering & procurement & Erection & Construction:AVIC / HFEC

Production of various films, containers, plastic parts, pipes, cables,...

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

71

SourceCapacityInput FeedWest Ethylene Pipeline (Gachsaran Petrochemical Co.)305Ethylene

Petrochemical projects 5Butene-1

Feedstock (‘000t/y)

Applications

MAMASANI HDPE

In production of pipes, bottles, film, home appliances, industrial parts, sewage pipes, sacks,...

License & basic engineering: Basell Detailed engineering & procurement & Erection & Construction: AVIC / HFEC

Implemented by: Mamasani Petrochemical Co. (Public Joint Stock)

Location: Mamasani Area: 67 hectares Ownership: Private Sector (100%) Start date: 2012 Projected production date: 2015

* Approved by the government

FinalProduct300HDPE

Product Capacity (‘000 t/y)

Physical progress (as of 20 March 2012): 6.1%

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

72

FinalProduct300HDPE

Product Capacity (‘000 t/y)

SourceCapacityInput FeedWest Ethylene Pipeline (Gachsaran Petrochemical Co.)305Ethylene

Other petrochemical projects5Butene-1

Feedstock (‘000t/y)

Applications

DEHDASHT HDPE Implemented by: Dehdasht Petrochemical Industry Co. (Public Joint Stock)

Location : Dehdasht, Kalachou Desert Area: 100 hectares Ownership: NPC (20%) Others (80%) Start date: 2012 Projected production date: 2015

* Approved by the government

In production of various plastics, pipes, bottles, films, industrial parts & home appliances

License & basic engineering: Basell Detailed engineering & procurement & Erection & Construction: AVIC /HFEC

Physical progress (as of 20 March 2012): 4.5%

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

73

FinalProduct300HDPE

Product Capacity (‘000 t/y)

SourceCapacityInput FeedWest Ethylene Pipeline (Gachsaran Petrochemical Co.)305Ethylene

Other petrochemical projects5Butene-1

Feedstock (‘000t/y)

Applications

BOROUJEN HDPE

Physical progress (as of 20 March 2012): 4.9%

Implemented by: Boroujen Petrochemical Co. (Private Joint Stock)

Location: Halvaie Desert of Boroujen Area: 300 hectares Ownership: Private Sector (100%) Start date: 2012 Projected production date: 2015

* Approved by the government

In production of pipes, bottels, containers, film, industrial parts & home appliances

License & basic engineering: Basell Detailed engineering & procurement & Erection & Construction: AVIC / HFEC

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

74

capacity (’000t/y) productionProject1000EthyleneFirozabad

300LL/HDPEJahrom300LDPEFasa300HDPEDarab100VAMEstahban

* Iegally registered

Projects

Applications

Central Ethane-Ethylene Pipline*

* Approved by the government

Location: Fars Province No.of complexes: 5 Start date: 2012 Projected production date: 2014 No. of Ethane pump stations: 1 No. of Ethylene pump stations: 1 Ethane pipeline capacity: 1.3 million t/y Ethylene pipeline capacity: 1 million t/y Overall Ethane pipeline length: 238 km Overall main trunk & branches of Ethylene pipeline length: 297 km Smallest pipe size: 8 inch Largest pipe size: 24 inch

Transferring Ethane from Parsian Refinery to Firoz Abad petrochemical proj-ects and also transferring Ethylene to Jahrom, Fasa, Darabad and Estahban complexes to provide feedstock for petrochemical projects.

Advisor of conceptual design and basic engineering: Energy Petro Farayand Co. Detailed engineering & Erection & Construction & Procurement: Niroo Gostar Institue

Implemented by: NPC

Physical progress (as of 20 March 2012): 6.69%

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

75

Supplier complexes to central ethylene pipeline Supplier complexes to central ethane pipeline

Consumer complexes of central ethylene pipeline

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

76

FinalProducts1000Ethylene

40C3+Cuts1040Total

Product Capacity (‘000 t/y)

SourceCapacityInput feedParsian Sepehr Refinery 1300Ethane

Feedstock (‘000t/y)

Applications

FIROUZABAD Olefin (14th Olefin)

As raw material in production of polyethylene and ethylene glycols

Implemented by: Firouzabad Petrochemical Company (Private Joint Stock)

Location: 12th km of Firouzabad-Ghir Road in jaidasht Area: 160 hectares Ownership: NPC (1%), Jahroom Petrochemical (27%), Fasa Petrochemical

(27%), Darab Petrochemical (27%), Others (18%) Start date: 2011 Projected production date: 2014

Basic engineering: Nargan Detailed engineering & Erection & Construction & Procurement: HFEC

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

77

Product Capacity (‘000 t/y)

FinalProducts300LLDPE/HDPE

SourceCapacityInput feedFirouzabad Petrochemical Co.292Ethylene

Local Petrochemical Complexes23 Butene-1

Feedstock (‘000t/y)

Applications

JAHROOM LLDPE/HDPE Implemented by: Jahroom Petrochemical Company (Public Joint Stock)

Location : 37 km of Jahroom - Shiraz Road Area: 200 hectares Ownership: NPC (20%), Others (80%) Start date: 2011 Projected production date: 2014

As feedstock in petrochemical down-stream plants, various films, contain-ers, plastic parts, pipes, cables & …

Detailed engineering & Erection & Construction, Procurement: HFEC

Physical progress (as of 20 March 2012): 8.92%

* Approved by the government

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

78

FinalProduct300LDPE

Product Capacity (‘000 t/y)

Feedstock (‘000t/y)SourceCapacityInput feed

Firouzabad Petrochemical Co.311Ethylene

Applications

FASA LDPE Implemented by: Fasa Petrochemical Company (Public Joint Stock)

Location: 20th km Fasa- Darab Road Area: 120 hectares Ownership: NPC (20%), Others (80%) Start date: 2012 Projected production date: 2015

As feedstock in petrochemical down-stream plants, various polyethylene films & foams, cable coverage, plas-tic parts & …

Detailed engineering & Erection & Construction & Procurement: HFEC Basic engineering: HEDCO

Physical progress (as of 20 March 2012): 9.5%

* Approved by the government

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

79

FinalProduct300HDPE

Product Capacity (‘000 t/y)

SourceCapacityInput feedFirouzabad Petrochemical Co300Ethylene

Local5Butene-1

Feedstock (‘000t/y)

Applications

DARAB HDPE Implemented by: Darab Petrochemical Company (Public Joint Stock)

Location : 18th km Darab-Shiraz Road Area: 120 hectares Ownership: NPC (20%), Others (80%) Start date: 2012 Projected production date: 2015

As feedstock in petrochemical down-stream plants, various pipes, plastic parts, cables & …

Detailed engineering & Erection & Construction & Procurement: HFEC

Physical progress (as of 20 March 2012): 9.46%

* Approved by the government

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

80

FinalProduct100EVA

Product Capacity (‘000 t/y)

SourceCapacityInput feedFirouzabad Petrochemical Co.115Ethylene

Arak & Novin Petrochemical Cos.13.5VAM

Feedstock (‘000t/y)

Applications

ESTAHBAN EVA

In Production of films, injection equipments, adhesives

License: Duppont / Mitsui Detailed engineering & Erection & Construction & Procurement: Kimiya

Petrogas Iliya / HIRONA SHOJI of Japon / SAM PETROL of Turkey

Implemented by: Estahban Fars Kimiya Petrochemical Company

Location: Estahban Area: 236.2 hectares Ownership: NPC (20%), Others (80%) Start date: 2012 Projected production date: 2015

* Approved by the government

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

81

FinalIntermediateProducts 75680Ammonia

1075--Urea1150--Total

Product Capacity (‘000 t/y)

SourceCapacityInput FeedNIGC670Natural gas

Feedstock (mm3/y)

Applications

ZANJAN Ammonia / Urea (10th AMMONIA / UREA) Implemented by: Zanjan Petrochemical Industry Co. (Public Joint Stock)

Location: Ejroud Area: 200 hectares Ownership: NPC (16%), Other (84%) start date: 2007 Project production date: 2014

* Approved by the government

In production of chemical fertilizer for agricultural usages

License: Ammonia Casale for Ammonia, Sub- Tec for Urea Engineering, procurement, erection & construction (EPCC): Hampa Co.

Physical progress (as of 20 March 2012): 16.48%

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

82

FinalIntermediateProducts75680Ammonia

1075--Urea1150Total

Product Capacity (‘000 t/y)

SourceCapacityInput FeedNIGC670Natural gas

Feedstock (mm3/y)

Applications

LORDEGAN Ammonia / Urea (11th Ammonia / Urea)

Location: Charmahal Va Bakhtiari - Lordegan Area: 300 hectares Ownership: NPC (20%), Other (80%) start date: 2007 Project production date: 2014

* Approved by the government

License: Ammonia Casale for Ammonia / Sub - Tec for Urea Engineering & procurement & erection & construction (EPCC): Hampa

Co. / AVIC /HFEC Utility & offsite: HFEC of China

Implemented by: Lordegan Petrochemical Industry Co. (Public Joint Stock)

In production of chemical fertilizer for agricultural usages

Physical progress (as of 20 March 2012): 19.26%

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

83

Feedstock (mm3/y)

FinalIntermediateProducts75680Ammonia

1075--Urea1150Total

Product Capacity (‘000 t/y)

SourceCapacityInput FeedNIGC670Natural gas

Applications

GOLESTAN Ammonia / Urea (12th Ammonia / Urea)

Physical progress (as of 20 March 2012): 14.7%

Implemented by: Golestan Petrochemical Co. (Public Joint Stock)

Location: Golestan, Agh-ghala Area: 300 hectares Ownership: NPC (13%), Kamyab Kam Golestan (14%), Other (73%) start date: 2007 Project production date: 2014

* Approved by the government

License: Ammonia Casale for Ammonia / Sub - Tec for Urea Engineering & procurement & erection & construction (EPCC): Hampa Co.

In production of chemical fertil-izer for agricultural usages

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

84

FinalIntermediateProducts161500Ethylene500--MEG

51--DEG2--TEG

44--C3+

758Total

Product Capacity (‘000 t/y)

SourceCapacityInput feedKharg Refinery (gas & liquid chlor fractionation unit)650Ethane

Feedstock (‘000t/y)

Applications

GENAVEH DASHTESTAN Olefin (15th Olefin)

Location: Genaveh & Dashtestan Ownership: Private Sector (100%) start date: 2012 Project production date: 2015

Implemented by: Genaveh - Dashtestan Petrochemical Company (Private Joint Stock)

In production of polyethylene, PET, anti-freeze, textile...

* Approved by the government

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

85

FinalIntermediateProducts75680Ammonia

1075--Urea1150Total

Product Capacity (‘000 t/y)

SourceCapacityInput feedNIGC670Natural gas

Applications

ARDABIL Ammonia & Urea (15th Ammonia / Urea)

Detailed engineering & Procurement & Erection& Construction: WUHUAN

Location: Ardabil Area: 60 hectares Ownership: Private Sector (100%) start date: 2012 Project production date: 2015

As chemical fertilizers for agricultural purposes

Feedstock (mm3/y)

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

86

finalProducts300Polypropylene

Product Capacity (‘000 t/y)

Source CapacityInput feed Arak & Esphahan Refineries270Propylene

Local10Ethylene

Local2Butene-1

Feedstock (‘000t/y)

Applications

KHOMEIN Polypropylene Implemented by: Di Arya Polymer Company (Private Joint Stock)

In production of home appliances, stationeries, packing, machine equipments & …

License & basic engineering: Basell Detailed engineering, Procurement, Erection & Construction: Nargan

Location: Khomein Area: 58 hectares Ownership: Private Sector (100%) start date: 2011 Project production date: 2013

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

87

FinalIntermediateProducts--410Ethane--559Mixed Propane & Butane--93Mixed C5+

13607Ethylene91--Propylene68--Pyrolysis gasoline33--Liquid Fuel

300--LL/HDPE300--HDPE805Total

Product Capacity (‘000 t/y)

SourceCapacityInput FeedGas Refinery& 3100 Liquid Gas1,090Mixed C2+

petrochemical complexes14Butene-1

Feedstock (‘000t/y)

Applications

DEHLORAN Olefin (17th Olefin) Implemented by: Dehloran Sepehr Petrochemical Co. (Private Join Stock)

Detailed engineering & Procurement & Erection & Construction: LIAONING / AVIC / HFEC

Feedstock for polypropylene units, for production of various films, polyethylene foam, cable coverage,..

Location: Dehloran-Ilam province Area: 200 hectares Ownership: NPC (10%), Private Sector (90%) start date: 2012 Project production date: 2016

* Approved by the government

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

88

FinalProducts1650Methanol

Product Capacity (‘000 t/y)

SourceCapacityInput FeedNIGC1500Natural gas

Feedstock (mm3 /y)

Applications

SIRAF Methanol Implemented by: Siraf Energy Petrochemical Co.

In production of MTBE, acetic acid, resins, formaldehyde, anti-freeze, adhe-sives, diesel fuel, different plastics and as solvent in downstream industries, MTP, MTO

License: Topsoe of Denmark Detailed engineering & Procurement: Namvaran/Chengda

Location: Daiyer Area: 6.5 hectares Ownership: Private Sector (100%) start date: 2012 Project production date: 2016

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

89

FinalProduct20Polyacetal

Product Capacity (‘000 t/y)

SourceCapacityInput FeedZagros Petrochemical Co.23,000 t /yMethanol

Arak Petrochemical Co.448 t/yEthylene OxideEsfahan Petrochemical Co.1568 t/yBenzene

Feedstock

Applications

NODAN Polyacetal Implemented by: Kazeroon Petrochemical Company

Used as appropriate materials for steels and some plastics, auto industry, electronic and electric industries, home appliances, sport tools …

Location: Nodan City Area: 8 hectares start date: 2012 Project production date: 2016

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

90

FinalIntermediateProducts75680Ammonia

1075--Urea1150Total

Product Capacity (‘000 t/y)

SourceCapacityInput FeedNIGC670Natural gas

Feedstock (mm3/y)

Applications

FARASHBAND Ammonia/Urea Implemented by: Kimiya Petrogas Iliya Company

Used as chemical fertilizers

Location: Farashband Area: 265 hectares Ownership: Private Sector (100%) start date: 2012 Project production date: 2016

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

91

FinalIntermediateProducts75680Ammonia

1075--Urea1150Total

Product Capacity (‘000 t/y)

SourceCapacityInput Feedlocal670Natural gas

Feedstock (mm3/y)

Applications

MASJID SOLEIMAN Ammonia/Urea (9th Ammonia / Urea) Implemented by: Masjid Soleiman Petrochemical Company (Private Joint Stock)

Basic engineering & Procurement: WUHUAN

Used as chemical fertilizers

Location: Masjid Soleiman Area: 50 hectares Ownership: Private Sector (100%) start date: 2012 Project production date: 2016

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

92

FinalProduct50EPS

Product Capacity (‘000 t/y)

SourceCapacityInput FeedPars Petrochemical Co.40Styrene

Feedstock (‘000 t/y)

Applications

Expandable Polystyrene (EPS) Implemented by: Petro Ramsheh Co. (Private Joint Stock)

In production of home appliances, electrical insulation, packing industry, toys…

Location: Esfahan (next to Ramsheh industrial Township) Area: 8.5 hectares Ownership: Private Sector (100%) start date: 2012 Project production date: 2015

License: INEOS of France

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

93

Product Capacity (‘000 t/y)

SourceCapacityInput FeedZagros Petrochemical Co.25Methanol

Shiraz Petrochemical Co.3Ammonia

Shiraz Petrochemical Co.4.2Urea

Feedstock (‘000 t/y)

Applications

Formalin Implemented by: Ghamron Petro Sanat Complex (Private Joint Stock)

In production of formaldehyde resins

Location: Bandar Abbas (next to industrial Township no.1) Area: 6 hectares Ownership: Private Sector (100%) start date: 2012 Project production date: 2015

FinalIntermediateProducts56--Formalin

5--Hexamine7.5--Urea Formaldehyde Methyl10--Para- Formaldehyde

78.5Total

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

94

Petrochemical as Value Creating Industry

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

95

UNDER STUDYPROJECTES

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

96

LIST OF PETROCHEMICAL PROJECTS UNDER STUDY

Novin VAM

Petrokimiya keron Polypropylene

Cyclohexane (Ramshir Hexan Shimi Sanat)

Pentaerythritol

Larestan Ammonia / Urea

Khodabandeh MTP

Sarvestan MTP

Petro Hidehj Methanol

Petrochemical projects in Chabahar

Petrochemical projects in Gheshm

Petrochemical projects in Kish

Petrochemical projects in Lavan

Petrochemical projects in North Pars

Petro refineries

Petrochemical projects in phase 3 of South Pars Special Economic/Energy Zone (Assaluyeh)

Petrochemical projects in Petrochemical Special Eco-nomic Zone (Mahshahr)

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

97

Contemplation, Trust in God, Endeavor

ONSTREAMPROJECTES

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

100

From the beginning of the 2nd 5-year davelopment planMethanol Kharg Petrochemical Company

Paraxylene Bandar Imam Petrochemical Company

MTBE Bandar Imam Petrochemical Company

Centralized Utility Fajr Petrochemical Company

Ethoxylates Arak Petrochemical Company

NGL 1200/1300 Petrochemical Industries Development Co.

Line E (ABS/BD) Tabriz Petrochemical Company

Granular urea Razi Petrochemical Company

HDPE Amir Kabir Petrochemical Company

Crystal Melamine Khorasan Petrochemical Company

3rd Aromaric Buali Sina Petrochemical Company

3rd Methanol Fanavaran Petrochemical Company

Engineering Polymers Khuzestan Petrochemical Company

Export Jetty (First) Petrochemical Special Economic Zone

Linear Alkyl Benzen (LAB) Bisootun Petrochemical Company

Feedstock & Products Pipeline Petrochemical Special Economic Zone

6th Olefin (Excluding LDPE plant) Amir Kabir Petrochemical Company

1st PTA/PET Shahid Tondguyan Petrochemical Company

Petrochemical Special Economic Zone Storage Tanks Petrochemical Special Economic Zone

Ethane Recovery Pars Petrochemical Company

Centralized Utility Mobin Petrochemical Co.

7th Olefin Marun Petrochemical Company

CO & Acetic Acid Fanavaran Petrochemical Company

4th Methanol Zagros Petrochemical Company

4th Aromatic Nouri (Borzuyeh) Petrochemical Company

LIST OF NPC ONSTREAM PROJECTS

W W W . N I P C . N E T

PETROCHEMICAL INDUSTRYPROJECTES

18 th Edition

101

From the beginning of the 2nd 5-year davelopment plan4th Ammonia / Urea Pardis Petrochemical Compa ny

LDPE Laleh Petrochemical Company

1st Ammonia (3rd Razi Ammonia) Razi Petrochemical Company

2nd PTA/PET Shahid Tondguyan Petrochemical Company

5th Ammonia / Urea Kermanshah Petrochemical Industry Company

9th OLefin Arya Sasol Polymer Company

10th OLefin Jam Petrochemical Company

Ethylene glycols Farsa Shimi Company

Isocyanates (1st Phase) Karoon Petrochemical Company

Centralized UT (Fajr-1 expansion) Fajr Petrochemical Company

Assaluyeh HDPE Mehr Petrochemical Company

6th Methanol Zagros Petrochemical Company

Ghadir PVC Ghadir Petrochemical Company

Butadiene(Jam expansion project) Jam Petrochemical Company

EB/styrene Pars Petrochemical Company

Air Seperation Unit (Mobin expansion Project) Mobin Petrochemical Company)

Pars Petrochemical Jetty National Petrochemical Company

6th Ammonia/Urea Pardis Petrochemical Company

Assaluyeh Olfin Morvarid Petrochemical Company

High-Impact Polystyrene-2 Tabriz Petrochemical Company

Centralized Utility Offsite Mobin Petrochemical Company

LDPE Amir Kabir Petrochemical Company

2nd Fajr Centralized Utility Offsite Fajr Petrochemical Company

Phosphoric Acid Ariya Phosphoric Co.

Persian Gulf

The Persian Gulf is the name of a body of water which is an extension of the Indian Ocean located between Iran and the Arabian Peninsula. Geologists believe that about five hundred thousands years ago, the Persian Gulf was formed in its early shape near Iran’s southern plateau. Its shape, however, changed as the result of geological de-velopments over the years. The Persian Gulf ancient inhabitants were the first to learn navigation skills and to build ships. Iranians actually began to navigate the Persian Gulf back in 500 B.C. under the rule of Darius I. He built the world’s first mari-time fleet. His ships sailed through the Sind River to the coast of the Indian Ocean, the Oman Sea and the Persian Gulf. They circumvented the Arabian Peninsula and reached the end of what is now called the Red Sea. Darius issued an order to his soldiers to construct a canal at a place which is now known as Suez Canal through which his ships reached the Mediterranean Sea. Among the Achaemenid inscriptions found in Egypt (515-518 B.C.) mention should be made of the three stele of Darius I bearing inscriptions about the construction of The Suez Canal. One of the inscriptions reads: “I am a Persian; setting out from Persia I conquered Egypt. I ordered to dig this canal from the river that is called Nile and flows in Egypt, to the sea that begins in Persia.

A history of 2500 years

Therefore, when this canal had been dug as I had ordered, ships went from Egypt through this canal to Persia, as I had intended.” The second century Greek geogra-pher, astronomer, and astrologer Claudius Ptolemaeus used the words “Sinus Persi-cus” meaning the Persian Gulf in a book he wrote on the world’s geography. In the first century B.C., the Greco-Roman geographer and historian Estrabon re-peatedly used the name Persian Gulf in his book. He has written that Arabs inhabited an area between the Red Sea and the Persian Gulf. Arrianus Flavius, a second century Greek historian and philosopher in his book “Anabasis of Alexander” or “The Campaigns of Alexander” has used the word “Periskon Kaitas” for the Persian Gulf. Many Arabic books also refer to the sea in south Iran as the “Persian Gulf”, including the world famous Arabic encyclopedia ‘Al-Monjad’ which is the most reliable source in this respect. The name Persian Gulf has appeared most in the Arabic works than any other language. Those who have only a faint acquaintance with the works of the Islamic period have heard the names of famous scholars and historians like Masoud Ibn Batutah, Persian geographer Hamdallah Mostoufi, Hamza Esfahani, Abu Rayhan Biruni and Naser Khosro Ghobadiyani who have written most of their works in Arabic. “Persian Gulf” has been mentioned in the books of these scholars. Many Arab writers have also used the name Persian Gulf in their writings.

Published by: Public Relation of National Petrochemical Company

General Manager of NPC Public Relation: Shamsollah JashniPerformance Manager: Malihe Abam

Experts: Ahmad Jalilian Fard, Homa Mehraye, Sudeh Maleki, Farzaneh Shahbazi,

Mohsen Gheibi, Seiyed Mehdi Rasti Translators: Daryoush Babarsad, Bahram Najar

Photo: Abolghasem Rahmani, Mohsen BahrehvarDesigner: Mitra Mohammadi

Art Director: Mahdi HajimohammadiCooperator Company: Simia Honar Design & Publication Office


Recommended