Airspace Management Center
• New location, new building & facility • Organization structure• Major working area• Means of work and new application• Working responsibility• Recent work plan(New entry/exit point)
– New location: Nearby the Beijing Capital International Airport
ATMB HQ Building
PEK
AMC, ATMB of CAAC
New Location of AMC
Organization Structure of AMC
Integrated Office 综合办公室
Planning & Research Office规划研究室
Flight Procedure Designing Office 飞行程序设计室
Airspace Management Office 空域管理室
Director and Deputy Directors 中心领导
Major Working AreaPolicy and recommendations for the use of national
airspace, airspace planning, air routes/airways technical standards
Delignating of Flight Information Region of air routes/airways planning
Orchestration of organizing civil aviation flight routes and conditional routes management
Monitor and evaluate airspace operations environment
Means of Work and New Tech Application
Technical tool: TAAM (Boeing & Jeppesen) – Terminal and Enroute IDS (Italy) AirTop (Belgium) – Terminal Airspace data management system
New technology application: CCO/CDO RNP/AR
Continuous research on advanced airspace management technology of foreign countries CCO/CDO ADS-B ARINC-424 Static data processing Flexible use of entry/exit points and air routes
Working Responsibility
Planning & Research
Office
Research and propose the planning schemes of all kinds of national airspace and air routes
Research and propose the policy and recommendations for the use of national airspace
Organize the work of national airspace experiment, simulation and verification
Conduct airspace operations statistics and analysis
Working Responsibility
Airspace Management
Office
Organize and coordinate for the management and use of civil aviation airspace in the whole country
Undertake the establishment and adjustment of air routes/airways and flight routes
Organize and implement the national boundary points and transnational route adjustment, and leading the construction of the Asia Pacific air routes network
Organize and implement the professional technical training for airspace management staff
Working Responsibility
Flight Procedure Designing Office
Organize and implement the professional technical training for flight procedure designers
Coordinate and manage the flight procedure designing work for civil aviation airport and provide technical support
Organize, work out, evaluate and proof the special project of major airspace involved in the flight procedure planning scheme
Organize and develop the new technology research, launch a pilot project and application and promotion for ATM system
Recent work plan(new entry/exit point)
New entry/exit point between: 1.China and Mongolia2. China and Russia