Introduction of the EUSO-BALLOON 9th Progress Meeting Naples, November the 9th, 2012 Guillaume Prévôt, Sylvie Dagoret and Peter von Ballmoos 1 EUSO-BALLOON, 9th progress Meeting 2012
Transcript

Introduction to EUSO-BALLOON 5th progress Meeting LAL, April 19th 2012

Introduction of theEUSO-BALLOON 9th Progress MeetingNaples, November the 9th, 2012 Guillaume Prvt, Sylvie Dagoret and Peter von Ballmoos1EUSO-BALLOON, 9th progress Meeting 2012first flight in spring 2014 from Timmins (4834' N, 8122' W)

CNES campaign starts March 1st 2014

=> EUSO BALLOON is to be flight-ready in Timmins by end of february

flight scenarios have been elaborated by Jean Evrard for the december flight review

=> we can make it, but must stay on tight schedule

first light / first flight

at one glance2

Timmins EUSO-BALLOON, 5th progress Meeting 20125

Timmins

the lenght of the astronomical night at Timmins (4834' N, 8122' W)

PDM- MAPMT- EC : Front Boards OK , EC-Units OK, Proto M OK - EC ASIC- EC Proto - HVPS 1&2 / SWITCHES : prototypes under test - PDM Board- meca : Top: manuf..Bottom follows, modif ok except HVPSDP- CPU, CCB, and communication (CLOCK): OK- HK, testsDP / HK- LVPSand interfaces- S/W CPU : Low level protocol and interfaces, other S/WArchitecture- Electrical : "interior"/"exterior", design frozen- Mechanical, design frozen, study on struct. integrity going- Thermal, ongiong, first resultsLenses- manufacturing on trackAIT/AIV- planning startedIRCAM- position on gondola, safety constraintsDocuments- 1st versions for dec DR have been read by Pascale

EUSO-BALLOON Dashboard 9.11.2012meet dec DR(Tableau de bord)7PDM- MAPMT: Gain measured - EC : Front Boards OK , EC-Units OK, Proto M OK - EC ASIC: brazing process suspected - EC Proto E waiting for Matra - HVPS 1&2 / SWITCHES : prototypes under test - PDM Boardunder tests in Corea, expected at LAL mid-Nov- meca : Top: manuf..Bottom follows, modif ok except HVPSDP- CPU, CCB, and communication (CLOCK): OK- HK, testsDP / HK- LVPSand interfaces- S/W CPU : Low level protocol and interfaces, other S/W ?Architecture- Electrical : "interior"/"exterior", design frozen- Mechanical, design frozen, study on struct. integrity going- Thermal, ongiong, first resultsLenses- manufacturing on trackAIT/AIV- planning startedIRCAM- position on gondola, safety constraints, Documents- very little is written up for the december DR

EUSO-BALLOON Dashboard 12.10.2012meet dec DR(Tableau de bord)8PDM- MAPMT- EC : Front Boards OK , EC-Units OK, Proto M OK - EC ASIC- EC Proto - HVPS 1&2 / SWITCHES : prototypes under test - PDM Board- meca : Top: manuf..Bottom follows, modif ok except HVPSDP- CPU, CCB, and communication (CLOCK): OK- HK, testsDP / HK- LVPSand interfaces- S/W CPU : Low level protocol and interfaces, other S/WArchitecture- Electrical : "interior"/"exterior", design frozen- Mechanical, design frozen, study on struct. integrity going- Thermal, ongiong, first resultsLenses- manufacturing on trackAIT/AIV- planning startedIRCAM- position on gondola, safety constraintsDocuments- 1st versions for dec DR have been read by Pascale

EUSO-BALLOON Dashboard 9.11.2012meet dec DR(Tableau de bord)9Since the last progress meetingAPC Paris, October the 12thThe electrical prototype has been received by LAL (before potting)EC ASIC card has been sucessfully tested (before data transmission tests)We fixed the design of PWPThe delivery of 19 missing MAPMTs + UV filters on going (december 2012)Cockroft Walton and switches prototypes have been tested at APC (and a bit modified to be adapted to MAPMTs) PDM board delay : 6 PCBs produced and partially tested, delivery at LAL is scheduled for end of November, we are trying now to organize EC-ASIC/PDM Board communication testsDP tests are undergoing in NaplesThermal analysis has been doneThe documentation is well-advanced (architecture documents, Technical specification for CPU software , PAIE, updates of Phase A documents, ICD, etc.)

10EUSO-BALLOON, 9th progress Meeting 2012Since the last progress meeting (2)PWP design definedSee Hector Prietos presentationEc_ASICs electrical tests has been doneSee Pierre B.s presentationCW and switches tests has been doneSee Ph Goro.s presentationWriting of the electrical architecture DocumentSee Michels presentationWriting of the mechanical architecture DocumentSee Peters presentationThermal architecture analysis (Document on going)See Gustavos presentationTests of HK & LVPS communicationPhase A documents actualizedSee Andreas presentationWriting of the CPU software DocumentSee Francescos presentation

11EUSO-BALLOON, 9th progress Meeting 2012Since the last progress meeting (3)Interfaces Control Document has been defined and commencedSee Sylvies presentationPAIE Document (about integration) well advancedSee Sylvies presentationVerification matrix to the technical requirements has been definedSee Guillaumes presentationList of the steering committees actionsSee Guillaumes presentation

12EUSO-BALLOON, 9th progress Meeting 2012The work to be done13EUSO-BALLOON, 9th progress Meeting 2012Ending the work on the interfaces and writing the related documentation (mechanics I/F, cables, pinout assignment, etc.)Ending the communication tests Performing the HK / LVPS Boards communication tests before mid-decemberPerforming the CCB / PDM Board communication tests before mid-decemberOrganizing and performing the EC-ASIC / PDM Board communication tests before mid-decemberDefining the software specificationsTesting on the EC electrical prototype before end after pottingWriting the last versions of the documents

Questions and ProblemsExpected progresses on PDM board stand alone testsExpected progresses on PDM board / Ec-ASIC communication testsExpected progresses on PDM board / CCB communication tests

14EUSO-BALLOON, 9th progress Meeting 2012The Goal of this meetingDiscussing the last programmatic aspects before CDR ReviewDiscussing the expectation of the different documents written for the CDR ReviewListing actions

15EUSO-BALLOON, 9th progress Meeting 2012