Introduction to Fiber Documentation Fabian Guerrero ver 1.1
Transcript

Introduction to Fiber Documentation

Fabian Guerrero ver 1.1

Documentation Examples:

Documentation Examples:

Metro Splice-Point

Level 3 Fiber

Level 3 Lateral

2 0 21

Miles

Confidential & Proprietary

11-23-0410802 Airport Ct to1850 Pearl St

I 76

I 25

I 70

I 270

US

HW

Y 28

7

US H

WY 36

PE

CO

S S

T

ST

AT

E H

WY

121

W 20TH AVE

COUNTY HWY 58

WA

SH

ING

TO

N S

T

ST

AT

E H

WY

95

LO

WE

LL B

LVD

W 80TH AVE

W 58TH AVE

US HW

Y 6

W 64TH AVE

E 88TH AVE

STATE HWY 72

W 104TH AVE

W 92ND AVE

W 112TH AVE

STATE HWY 128

HU

RO

N S

T

YO

RK

ST

COUNTY HWY 180

COUNTY HWY 181

W 38TH AVE

QU

EB

EC

ST

COUNTY HWY 34

E 112TH AVE

W 32ND AVE

SMITH RDS

HE

RID

AN

BLV

D

STA

TE H

WY

265

CO

LO

RA

DO

BL

VD

STATE HWY 224

E 120TH AVE

ST

AT

E H

WY

2

W 84TH AVE

W 72ND AVE

CO

UN

TY

HW

Y 5

W 52ND AVE

W 82ND AVE

E 104TH AVE

MC

INT

YR

E S

T

E 26TH AVE

CA

RR

ST

W 26TH AVE

SIM

MS

ST

20TH ST

W 86TH PKWY

HW

Y 2

HO

LLY

ST

QU

AK

ER

ST

W 120TH AVE

23RD ST

E 56TH AVE

W 108TH AVE

W 88TH AVE

E 64TH AVE

MONTVIEW BLVD

W 44TH AVE

IND

IAN

A S

T

E 58TH AVE

RAMP

LARIMER S

T

DA

HLIA

ST

OA

K S

T

CO

UN

TY

HW

Y 1

9

COUNTY HWY 172

KIP

LING

ST

IRM

A D

R

W 70TH AVE

W 74TH AVE

ALK

IRE

ST

MA

I N S

T

WA

RD

RD

PIE

RC

E S

T

OBER

ON

RD

MO

NA

CO

ST

COUNTY HWY 4

ELD

RID

GE

ST

RALSTON RD

80TH AVE

100TH AVE

W 72ND AVE

YO

RK

ST

W 80TH AVE

RA

MP

YO

RK

ST

STATE HW

Y 2

W 32ND AVE

I 70

W 88TH AVE

RAM

P

SIM

MS

ST

0550-0127 0550-01250550-0121

0550-0117

0550-0065

0550-00570550-0050

0550-0028

0009-5994

0009-5928

0009-58730009-5868

0009-5832

0009-5799

0009-5776

10802 Airport Ct

1850 Pearl St

Metro Splice-Point

Level 3 Fiber

Level 3 Lateral

1,000 0 1,000500

Feet

Confidential & Proprietary

11-23-041850 Pearl StDenver, CO

STOUT ST

15TH ST

CHAMPA ST

CURTIS S

T

LARIMER ST

PARK AVE

WELTON S

T

BLAKE ST

22ND ST

21ST ST

CALIFORNIA S

T

16TH AVE

17TH AVE

18TH AVE

20TH AVE

SPEER BLVD

WAZEE S

T

28TH ST

I 25

PE

AR

L S

T

GR

AN

T S

T

LO

GA

N S

T

CL

AR

KS

ON

ST

EM

ER

SO

N S

T

WYNKOOP S

T

DELGANY ST

RAMP

PLATTE ST

COURT PL

WA

SH

I NG

TO

N S

T

19TH ST

FO

X S

T

9TH ST

12TH ST

HU

RO

N S

T

INC

A S

T

7TH ST

8TH ST 11TH

ST

13TH ST

BA

SS

ET

T S

T

GR

INN

EL

L C

T

LIT

TL

E R

AV

EN

ST

CURTIS ST

19TH ST

RAMP

I 25

19TH ST

FOX ST

FO

X S

T

11TH ST

0550-0065

0550-00570550-0050

0550-0028

0009-5994

1850 Pearl St

200 0 200100

Feet

Metro Splice-Point

Level 3 Fiber

Level 3 LateralConfidential & Proprietary

11-10-0410802 Airport CtBroomfield, CO

120TH AVE

HANGAR C

T

AIRPORT CT

0550-0125

0550-0127

Level 3 to meet up with existing customer conduit. Two new HH’s to be set.

Project Name

Management LayerInstallation (MAC) Layer Disaster Recovery Layer

Segment/Project Name (BRAN, BEAR, BiSON) Link to Logical diagram, description and detail.-Legend including:

*Splice/Patch Icon *Color coded “Owner” identifier

-Segment Length in fiber miles (major spans)-Segment Details Document – Each segment:

*Contract Agreement *Circuit Number *Contract Duration *Circuit Endpoints – Collocation Information

-Endpoint Hardware Icon – General information (Cisco 6509, Juniper, Movaz)

*Equipment maintenance - Installation Layer *What is connected – Installation Layer

-Accompanying table: *Distance Table *Project Dates

Equipment Documentation- Manufacturer and p/n, equipment name, and location (bldg/room/rack/equipment #).

-Equipment Maintenance-Equipment breakdown and population (Blade to Port)

*Patch cable physical information (MM,SM, connectors, length)

-Connection Identification and xWDM *Lambdas *Channels

Project Documentation (Each project)-Project Name / Description-Project Dates and Schedule-Project Contributors and Collaborators-Project Setting Detail - Where is it connected

*Patch Document-Test Documentation

*OTDR launch organized by Project?/Segment/Fiber/Date *Power Meter results by Project?/Segment/Fiber/Date *OSA results by Project?/Segment/Fiber/Date *Photographs by Project?/Segment/Fiber/Date

Dedicated CAD diagram including GPS coordinates for access locations, waypoint and/or track information for fiber pathway-GIS diagram with waypoint information along pathway

-Locating Agreement Information *What is Covered -Maintenance Work Agreement-Spare Location

*Equipment *Hardware

Management Layer – Logical Map

-Segment/Project Name (BRAN, BEAR, BiSON) Link to Logical diagram, description and detail.-Legend including:

*Splice/Patch Icon*Color coded “Owner” identifier

-Segment Length in fiber miles (major spans)-Segment Details Document – Each segment:

*Contract Agreement *Circuit Number*Contract Duration*Circuit Endpoints – Collocation Information

-Endpoint Hardware Icon – General information (Cisco 6509, Juniper, Movaz)*Equipment maintenance - Installation Layer *What is connected – Installation Layer

-Accompanying table:*Distance Table*Project Dates - when was the project completed

BRAN Distance Table:

Management Layer – Logical Map

-Segment/Project Name (BRAN, BEAR, BiSON) Link to Logical description and detail-Legend including:

*Splice/Patch Icon*Color coded “Owner” identifier

-Segment Length in fiber miles (major spans)-Segment Details Document – Each segment:

*Contract Agreement *Circuit Number*Contract Duration*Circuit Endpoints – Collocation Information

-Endpoint Hardware Icon – General information (Cisco 6509, Juniper, Movaz)*Equipment maintenance - Installation Layer *What is connected – Installation Layer

-Accompanying table:*Distance Table*Project Dates - when was the project completed

Installation (MAC) Layer – Data sheets, Diagrams and Documentation

Equipment Documentation- Manufacturer and p/n, equipment name, and location (bldg/room/rack/equipment #).

-Equipment Maintenance-Equipment breakdown and population (Blade to Port)

*Patch cable physical information (MM,SM, connectors, length)-Connection Identification and xWDM

*Lambdas*Channels

Project Documentation (Each project)-Project Name / Description-Project Dates and Schedule-Project Contributors and Collaborators-Project Setting Detail - Where is it connected

*Patch Document-Test Documentation

*OTDR launch organized by Project?/Segment/Fiber/Date*Power Meter results by Project?/Segment/Fiber/Date*OSA results by Project?/Segment/Fiber/Date*Photographs by Project?/Segment/Fiber/Date

Archive Documentation

Disaster Recovery Layer (cut/break) – Physical Diagram

Dedicated CAD diagram including GPS coordinates for access locations, waypoint and/or track information for fiber pathway-GIS diagram with waypoint information along pathway

-Locating Agreement Information*What is Covered

-Maintenance Work Agreement-Spare Location

*Equipment *Hardware

Project Name

Administrative LayerInstallation (MAC) Layer Disaster Recovery Layer

Segment/Project Name (BRAN, BEAR, BiSON) Link to Logical diagram, description and detail.-Legend including:

*Splice/Patch Icon *Color coded “Owner” identifier

-Segment Length in fiber miles (major spans)-Segment Details Document – Each segment:

*Contract Agreement *Circuit Number *Contract Duration *Circuit Endpoints – Collocation Information

-Endpoint Hardware Icon – General information (Cisco 6509, Juniper, Movaz)

*Equipment maintenance - Installation Layer *What is connected – Installation Layer

-Accompanying table: *Distance Table *Project Dates

Equipment Documentation- Manufacturer and p/n, equipment name, and location (bldg/room/rack/equipment #).

-Equipment Maintenance-Equipment breakdown and population (Blade to Port)

*Patch cable physical information (MM,SM, connectors, length)

-Connection Identification and xWDM *Lambdas *Channels

Project Documentation (Each project)-Project Name / Description-Project Dates and Schedule-Project Contributors and Collaborators-Project Setting Detail - Where is it connected

*Patch Document-Test Documentation

*OTDR launch organized by Project?/Segment/Fiber/Date *Power Meter results by Project?/Segment/Fiber/Date *OSA results by Project?/Segment/Fiber/Date *Photographs by Project?/Segment/Fiber/Date

Dedicated CAD diagram including GPS coordinates for access locations, waypoint and/or track information for fiber pathway-GIS diagram with waypoint information along pathway

-Locating Agreement Information *What is Covered -Maintenance Work Agreement-Spare Location

*Equipment *Hardware

Questions??

Thank You!!