  • 7/27/2019 INTRODUCTION TO HOOK-UP & COMMISSIONING

    1/25

    MOHD HAZWAN BIN JAMHURI2010872644

    HOOK-UP & COMMISSIONING

    ANDPIPELINE SERVICES

  • 7/27/2019 INTRODUCTION TO HOOK-UP & COMMISSIONING

    2/25

    COMPANY PROFILE

    Baxtech Resources Sdn. Bhd., a Malaysiancompany was formed to provide a specializedand dedicated approach to Engineering,Construction fields and supply especially in

    the oil and gas industries both on onshoreand offshore and power station development.

    Offer a broad spectrum of mechanical

    engineering, construction and maintenanceservices in the petroleum/gas plant,petrochemical, power plant, offshorefabrication works and general industries too.

  • 7/27/2019 INTRODUCTION TO HOOK-UP & COMMISSIONING

    3/25

    Expert in onshore (Prefabrication) andoffshore (Installation) work.

    Hook-Up & Commissioning (HUC) and

    Pipeline Services.

  • 7/27/2019 INTRODUCTION TO HOOK-UP & COMMISSIONING

    4/25

    WHAT IS HUC?

    Two different jobs

    The scope encompasses all surface

    engineering capabilities that include

    design, engineering, procurement,provision, fabrication, installation, and

    construction.

  • 7/27/2019 INTRODUCTION TO HOOK-UP & COMMISSIONING

    5/25

    The HOOK-UP" refers to making theconnections from the well to the oil

    and gas separator and from the

    separator to either the storage tanksor a flow line. It also includes

    connection the utilities needed for the

    controls to function. The COMMISSIONING" refers to

    activating the system once it is hooked

    up.

  • 7/27/2019 INTRODUCTION TO HOOK-UP & COMMISSIONING

    6/25

    WORKING EXPERIENCES

    Learned from the engineer on how toread pipeline drawing.

    Learned from the yards supervisor,

    Encik Azaha on how to make QualityControl (QC) Calculation and Fitter

    Calculation.

    Prepared weld map on the drawing. Prepared Job Hazardous Analysis.

    Prepared Material Tracking Report-

    Cable Instrument (MTR).

  • 7/27/2019 INTRODUCTION TO HOOK-UP & COMMISSIONING

    7/25

    Learned safety requirement foronshore and offshore work.

    Learned several Standard Operation

    Procedure (SOP) for several job. Learned on how to prepare Daily

    Progress Report (DPR) for HUC.

    Pipeline services- PIGGINGprocedure.

    Preparing NORMS.

  • 7/27/2019 INTRODUCTION TO HOOK-UP & COMMISSIONING

    8/25

    JOB DESCRIPTION

  • 7/27/2019 INTRODUCTION TO HOOK-UP & COMMISSIONING

    9/25

    JOB HAZARD ANALYSIS (JHA)

    This analysis of a project is completed

    by engineer to identify hazards toemployees and the public. It identifies

    hazards, corrective actions and the

    required safety equipment to ensure

    public and employee safety.

  • 7/27/2019 INTRODUCTION TO HOOK-UP & COMMISSIONING

    10/25

  • 7/27/2019 INTRODUCTION TO HOOK-UP & COMMISSIONING

    11/25

    MATERIAL TRACKING

    REPORT(MTR)

    Is the process of analyzing thedrawings and determining all the

    materials required to accomplish the

    design.

  • 7/27/2019 INTRODUCTION TO HOOK-UP & COMMISSIONING

    12/25

    DAILY PROGRESS REPORT

    (DPR)

    HUC PROCEDURE Work instruction from NEWFIELD

    Site visit

    Send site visit report to NEWFIELD Work order from NEWFIELD

    Material Verification Report (MVR)

    Welding Procedure Specification / WQT

    Fit-up Report

    Visual Report

    Welding Summary

  • 7/27/2019 INTRODUCTION TO HOOK-UP & COMMISSIONING

    13/25

    Non Destructive Report (NDT)

    i. Radiographic testing

    ii. Dye penetrant inspection

    Hydrotest Test Teport

    Painting Report

    Pipework Checksheet

    ISO Drawing and Weld Map

  • 7/27/2019 INTRODUCTION TO HOOK-UP & COMMISSIONING

    14/25

    PIPELINE SERVICES-PIGGING

    PROCESS

    Which uses pressurised container to

    shoot a cleaning device (PIG)

    through the pipeline to perform a

    variety of functions.

    Objectives:-

    i) Used to clean and clear the pipeline.

    ii) Removed unwanted material from theline.

    iii) Examined the pipe from the inside.

    iv) Corrosion inspection of the pipe.

  • 7/27/2019 INTRODUCTION TO HOOK-UP & COMMISSIONING

    15/25

    PIG DEVICES

    TYPICAL CONFIGURATION OF PIG LAUNCHER

  • 7/27/2019 INTRODUCTION TO HOOK-UP & COMMISSIONING

    16/25

    PIPELINE CLEANING CALIPER INSPECTION

    METAL LOSS INSPECTION

  • 7/27/2019 INTRODUCTION TO HOOK-UP & COMMISSIONING

    17/25

    NORMS

    Stands for NUMBER OFMANHOURS.

    The purpose of this document is as a

    guideline for PBJV staff or contractorsto carry out construction manhours

    estimate of Offshore

    engineering/maintenance activities. The schedule of NORMS shall be

    used to evaluate all works.

  • 7/27/2019 INTRODUCTION TO HOOK-UP & COMMISSIONING

    18/25

    HEALTH AND SAFETY

    ENVIRONMENT

  • 7/27/2019 INTRODUCTION TO HOOK-UP & COMMISSIONING

    19/25

    ONSHORE AND OFFSHORE

    REQUIREMENT

    18 years old and above.

    i. OFFSHORE

    Attending safety course. The company will give the workers

    safety passport:Basic Offshore Safety Induction and Emergency Training

    (BOSIET)

    a. Helicopter safety and escape training

    (HUET)

    b. Sea survival

    c . Fire fighting and self rescued . Basic safety induction

    e . Emergency Breathing Systems (EBS)

    f . Survival first aid

    Medical card

    COMPULSORY

  • 7/27/2019 INTRODUCTION TO HOOK-UP & COMMISSIONING

    20/25

    ii. ONSHORE Medical check-up

    Attending rigging and slinging course (for

    RIGGER)Attending scaffolding course ( for

    SCAFFOLDER)

    NIOSH card (if work in plant)

  • 7/27/2019 INTRODUCTION TO HOOK-UP & COMMISSIONING

    21/25

    IN PROGRESS PROJECT

    (SITE VISIT)

  • 7/27/2019 INTRODUCTION TO HOOK-UP & COMMISSIONING

    22/25

    LADDER WITH

    HANDRAIL

    16 PIPE WITH 10 PIPE

    REDUCER

  • 7/27/2019 INTRODUCTION TO HOOK-UP & COMMISSIONING

    23/25

    DECK WITH THE GRATINGS

  • 7/27/2019 INTRODUCTION TO HOOK-UP & COMMISSIONING

    24/25

    HYDROTEST

    FIT-UP PROCESS

  • 7/27/2019 INTRODUCTION TO HOOK-UP & COMMISSIONING

    25/25