Introduction to the course Jerzy Nawrocki [email protected] oznan.pl Requirements Eng. & Project Manag.
Transcript
Page 1: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to the course

Jerzy [email protected]

Requirements Eng. & Project Manag.

Page 2: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (2)

Requirements Eng. & Project Manag.

Aim of the course

Prepare the students to the role of Analyst and Project Manager

Page 3: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (3)

Requirements Eng. & Project Manag.

Context of the course

Requirements Engineering and

Project Management

Software Development

Studio

Page 4: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (4)

Requirements Eng. & Project Manag.

Outline of the schedule

March Lectures + labs on RE&PMApril Lectures + labs on RE&PM

Project Startup Presentation for 3rd year

May 3r year team selects projectsProject Initiation

Page 5: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (5)

Requirements Eng. & Project Manag.

Announcement

From dr Adam Wojciechowski:

Software Development Studio will start in the end of March – you will be informed later

Page 6: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (6)

Requirements Eng. & Project Manag.

Lectures

Date Time No. Title26.02 15:10 1 Introduction to the Course28.02 13:30 2 The Start-up Stage06.03 13:30 3 Functional Requirements (adv.)13.03 13:30 4 Non-functional Requirements20.03 13:30 5 The Project Initiation Stage27.03 13:30 6 The Architecture Elaboration Stage03.04 13:30 7 Soft Skills10.04 13:30 8 Release and Risk Management17.04 13:30 9 Mission-Critical Systems24.04 13:30 10 Project Closing and Course Summary

Page 7: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (7)

Requirements Eng. & Project Manag.

Rules

Load of the course: 20 lectures, 20 labs, 20 projects; 5 ECTS

Presence:Lectures – optionalLabs – obligatory

Grading rules:Labs: Running evaluationProject: Evaluation of the presentation + PIDNo exam

Page 8: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (8)

Requirements Eng. & Project Manag.

Rules

Consultation hours:J.Nawrocki: Tue (every 2nd), 11:15 – 12:00, room 109www.cs.put.poznan.pl/jnawrocki/require [email protected]

Estimated effort (hours): 20 lectures 10 running repetitions 50 literature 20 labs 10 preparation for labs 40 preparation for project150 TOTAL

Consultation hours:J.Nawrocki: Tue (every 2nd), 11:15 – 12:00, room 109www.cs.put.poznan.pl/jnawrocki/require [email protected]

Estimated effort (hours): 20 lectures 10 running repetitions 50 literature 20 labs 10 preparation for labs 40 preparation for project150 TOTAL

Page 9: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to

Jerzy [email protected]

Requirements Eng. & Project Manag.

Page 10: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (10)

Requirements Eng. & Project Manag.

Laboratory of Software EngineeringInstitute of Computing Sci.Poznan University of Technology

Master Degree Programme in Software Engineering

Consortium XPrince

Page 11: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (11)

Requirements Eng. & Project Manag.

Aim of the lecture

Outline the XPrince methodology.

Page 12: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (12)

Requirements Eng. & Project Manag.

Aim of the lecture

Outline the XPrince methodology.

Page 13: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (13)

Requirements Eng. & Project Manag.

Agenda

• XPrince – What for?• Team• Lifecycle• Final remarks

Page 14: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (14)

Requirements Eng. & Project Manag.

Agenda

• XPrince – What for?• Team• Lifecycle• Final remarks

Page 15: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (15)

Requirements Eng. & Project Manag.

XPrince – What for?

Page 16: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (16)

Requirements Eng. & Project Manag.

Software crisis

• Late delivery• Over budget• Overtime• Poor quality

Page 17: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (17)

Requirements Eng. & Project Manag.

Discipline-based approaches

More discipline!

Requirem.

Design

Code

Tests

ISO 9000

IEEE Std

IEEE Std

IEEE Std

1

2

3

4

5

Page 18: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (18)

Requirements Eng. & Project Manag.

PRINCE2

PRINCE = PRojects IN Controlled Environments

CCTA = the Central Computer and Telecommunications Agency, UK

1989: CCTA introduces PRINCE

1996: CCTA announces PRINCE2

Page 19: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (19)

Requirements Eng. & Project Manag.

PRINCE2

Project management methodology

Main actor: Project Manager

http://www.ccta.gov.uk/prince/

Managing Successful Projectswith PRINCE2

Page 20: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (20)

Requirements Eng. & Project Manag.

Page 21: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (21)

Requirements Eng. & Project Manag.

Complaints

Too much paper work! Too many

meetings!

Page 22: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (22)

Requirements Eng. & Project Manag.

Changes in requirements

CustomerCustomer

Let’s change requirements.

Developers

OK. OK. OK. OK.

Page 23: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (23)

Requirements Eng. & Project Manag.

Formal approach to changes

Change order

Err

End-user Configuration Manager

Change order

Developer

Report

Configuration Management Board

Decision

Change order

Project Manager

Page 24: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (24)

Requirements Eng. & Project Manag.

Page 25: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (25)

Requirements Eng. & Project Manag.

Page 26: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (26)

Requirements Eng. & Project Manag.

Extreme Programming (XP)

Tom DeMarcoTom DeMarco

"XP is the most import

movement in our field today."

lightweight (agile) methodology of software development

Page 27: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (27)

Requirements Eng. & Project Manag.

XP the Saviour

• Oral communication.• Artefacts: code + test cases• IEEE/ANSI standard 830/1993?

Needless!• Fagana inspections? Needless!• Function points? Needless!• No overtime!

I always said that!

Page 28: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (28)

Requirements Eng. & Project Manag.

Weaknesses

Discipline (Celebrity)

Agility (XP)

• Too much paperwork

• Slow decision process

• Resistance against change

• Assuming „on-site customer”

• Lack of written documentation

• Too short planning perspective

Page 29: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (29)

Requirements Eng. & Project Manag.

Solution

Addison-Wesley, 2004.

„every successful venture in a changing world requires both agility and discipline”

Page 30: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (30)

Requirements Eng. & Project Manag.

XPrince

eXtreme Programmingin controlled environments

XPrince Sources

XP

PRINCE 2 Rational Unified Process

Page 31: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (31)

Requirements Eng. & Project Manag.

Agenda

• XPrince – What for?• Team• Lifecycle• Final remarks

Page 32: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (32)

Requirements Eng. & Project Manag.

XP Team

Customer

Coach

Tracker

Tester

Developers

Page 33: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (33)

Requirements Eng. & Project Manag.

Management Team in PRINCE2

Project Board

Senior User Executive Senior Supplier

Page 34: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (34)

Requirements Eng. & Project Manag.

Management Team in PRINCE2

Project Manager

Report

Plan

Project Board

Senior User Executive Senior Supplier

Page 35: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (35)

Requirements Eng. & Project Manag.

Management Team in PRINCE2

Project Manager

Project AssuranceReport

Plan

Project Board

Senior User Executive Senior Supplier

Page 36: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (36)

Requirements Eng. & Project Manag.

Roles in RUP

Project Manager

Tester

Developer

Analyst

Architect

Page 37: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (37)

Requirements Eng. & Project Manag.

XPXP

Prince2Prince2

XPrince Team

Kierownik ZespołuKierownik ZespołuDevelopers

Analyst Architect

Project Board

Senior User Executive Główny dostawca

Manager (Coach, Tracker)

(Coach)(Cust., Tester)

Page 38: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (38)

Requirements Eng. & Project Manag.

Small but difficult project

Jurek – Senior user + Executive

Ewa – Project Manager + Analyst

Mirek – Architect (natural language processing)Łukasz – Architect (IBM Eclipse and Java)

Honoriusz – Developer Pankracy – Developer

Page 39: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (39)

Requirements Eng. & Project Manag.

Key roles in XPrince

Project ManagerAnalyst Architect

Page 40: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (40)

Requirements Eng. & Project Manag.

Team

Fred BrooksOS/360, IBM

Administrator

Secretary

Second pilot

Documentalist

Tools expert

Tester

Language expert

Editor

Secretary

Surgeon

Page 41: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (41)

Requirements Eng. & Project Manag.

Agenda

• XPrince – What for?• Team• Lifecycle• Final remarks

Page 42: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (42)

Requirements Eng. & Project Manag.

Release 2Release 1

XP Lifecycle

Increment 1.1 Increment 1.2 Increment 2.1 Increment 2.2

Page 43: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (43)

Requirements Eng. & Project Manag.

PRINCE2 Lifecycle

16.10 27.11 23.01 8.04 27.05 17.06 1.07

Starting up a Project

Initiating a Project

Stage 1 Stage 2 Stage 3 Stage 4 Closing a

Project

Page 44: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (44)

Requirements Eng. & Project Manag.

RUP Phases

Inception Elaboration Construction TransitionTransition

Page 45: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (45)

Requirements Eng. & Project Manag.

XPrince Lifecycle

16.10 27.11 23.01 8.04 27.05 17.06 8.07

Startup Initiation Elaboration

Release 1 Release 2 Release 3 Closing

Page 46: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (46)

Requirements Eng. & Project Manag.

Main outcomes of Startup

Startup

Project sponsor (customer)ProblemOutline of the solutionInterfaces (system’s environment)Preferred approach . . .

Page 47: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (47)

Requirements Eng. & Project Manag.

XPrince Lifecycle

16.10 27.11 23.01 8.04 27.05 17.06 8.07

Startup Initiation Elaboration

Release 1 Release 2 Release 3 Closing

Page 48: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (48)

Requirements Eng. & Project Manag.

Main outcomes of Initiation

Initiation

Business Process ReengineeringNon-functional requirementsRoles (Actors) Outline of functional requirementsOutline of the architecture. . .

Page 49: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (49)

Requirements Eng. & Project Manag.

XPrince Lifecycle

16.10 27.11 23.01 8.04 27.05 17.06 8.07

Startup Initiation Elaboration

Release 1 Release 2 Release 3 Closing

Page 50: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (50)

Requirements Eng. & Project Manag.

Main outcomes of Elaboration

Elaboration

Most difficult and important use casesArchitectural approaches (mechanisms)Description of crucial elements (protocols, database desing etc.)Code pieces (examplary solutions)

Page 51: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (51)

Requirements Eng. & Project Manag.

XPrince Lifecycle

16.10 27.11 23.01 8.04 27.05 17.06 8.07

Startup Initiation Elaboration

Release 1 Release 2 Release 3 Closing

Page 52: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (52)

Requirements Eng. & Project Manag.

XPrince Lifecycle

16.10 27.11 23.01 8.04 27.05 17.06 8.07

Startup Initiation Elaboration

Release 1 Release 2 Release 3 Closing

Increment

1

Increment

1

Increment

1

Increment

2

Increment

2

Increment

2

TransitionTransition TransitionTransition TransitionTransition

Page 53: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (53)

Requirements Eng. & Project Manag.

XPrince Lifecycle

16.10 27.11 23.01 8.04 27.05 17.06 8.07

Startup Initiation Elaboration

Release 1 Release 2 Release 3 Closing

Req.

Arch.

Code

Page 54: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (54)

Requirements Eng. & Project Manag.

Agenda

• XPrince – What for?• Team• Lifecycle• Final remarks

Page 55: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (55)

Requirements Eng. & Project Manag.

Agility Alliance Manifesto

Individuals and interactions

Page 56: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (56)

Requirements Eng. & Project Manag.

7 Habits of Higly Effective People

Dr Stephen Covey 15 mln sold, 32 languages

Page 57: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (57)

Requirements Eng. & Project Manag.

Principles of Effectiveness

Be proactiveBe proactive Begin with the end in mindBegin with the end in mind

Put first things firsPut first things firs

Think win/winThink win/win

Seek first to understand ...Seek first to understand ...

SynergizeSynergize

Sharpen the sawSharpen the saw

Page 58: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (58)

Requirements Eng. & Project Manag.

Individuals and interactions

O KO K

Working software

Agility Alliance Manifesto

Page 59: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (59)

Requirements Eng. & Project Manag.

Cost of Requirements Defects

Cost of Error Correction

0

20

40

60

80

100

120

Req. Design Code Dev.Tst Sys.Tst Field Op.

Development Phase

Re

lati

ve

Co

st

Roger S. Pressman

13-6

times

10 times

15-40 times

30-70 times

40-1000 times

Page 60: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (60)

Requirements Eng. & Project Manag.

XPrince Lifecycle

16.10 27.11 23.01 8.04 27.05 17.06 8.07

Startup Initiation Elaboration

Release 1 Release 2 Release 3 Closing

Increment

1

Increment

1

Increment

1

Increment

2

Increment

2

Increment

2

TransitionTransition TransitionTransition TransitionTransition

Page 61: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (61)

Requirements Eng. & Project Manag.

Individuals and interactions

O KO K

Working software

Agility Alliance Manifesto

Customer collaboration

Page 62: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (62)

Requirements Eng. & Project Manag.

Natural languageUpdating the dataUpdating the data

ActorActor: MemberGoalGoal: Update personal data.Main scenarioMain scenario1. Member enters his account and password.2. System presents the personal web page.3. Member selects the update option.4. System presents the personal data ready for update.5. Member changes the data.6. System asks for acknowledgement.7. Member confirms the changes. ExtensionsExtensions1a. Account or password is incorrect. 1a1. System presents a message and returns to Step 1.

Page 63: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (63)

Requirements Eng. & Project Manag.

Individuals and interactions

O KO K

Working software

Agility Alliance Manifesto

Customer collaboration Responding to change

Tommorow or never!

Page 64: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (64)

Requirements Eng. & Project Manag.

XPrince Lifecycle

16.10 27.11 23.01 8.04 27.05 17.06 8.07

Startup Initiation Elaboration

Release 1 Release 2 Release 3 Closing

Increment

1

Increment

1

Increment

1

Increment

2

Increment

2

Increment

2

TransitionTransition TransitionTransition TransitionTransition

Page 65: Introduction to the course Jerzy Nawrocki Jerzy.Nawrocki@put.poznan.pl Requirements Eng. & Project Manag.

Introduction to XPrince (65)

Requirements Eng. & Project Manag.

Thank you for your attentionThank you for your attention!!