+ All Categories
Home > Documents > introduction to the project panel 1 - City of Toronto...introduction to the project scope of work...

introduction to the project panel 1 - City of Toronto...introduction to the project scope of work...

Date post: 09-Jul-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
10
residential residential residential Ranleigh Avenue Bedford Park Bedford Park Jr. Public School Community Centre introduction to the project scope of work panel 1 Investigations and Schematic Design MAY TO JULY 2018 site analysis, review of documents, design concepts Detailed Design JULY TO AUG 2018 synthesis of public meeting feedback into detailed design, review with City staff Contract Documentation SEPT TO DEC 2018 preparation of working drawings and specifcations for tender Tender and Contract Administration APR TO SEPT 2019 project tendering, supervision of construction until completion location ve E ence A Lawr Mount Pleasant Rd Bedford Park Y Community Centre onge St Bedford Park Junior P.S. Ranleigh Park estimated extent of contaminated soil Ranleigh Park, at 100 Ranleigh Ave., is a 0.25 ha new City park that was previously occupied by a church (demolished in 2011-2012). The site currently sits vacant with four monitoring wells that will be decommissioned. Environmental Site Assessments have been completed, showing the soil is contaminated mostly in the footprint of the old church. As part of the environmental remediation process, it is expected that the contaminated soils will be removed from the site following a more extensive investigation into the extent of contamination. RANLEIGH PARK preliminary design public meeting June 11, 2018
Transcript
  • residential

    resi

    dent

    ial residential

    Ranleigh Avenue Bedford Park Bedford Park Jr. Public School Community Centre

    introduction to the project scope of work

    panel 1

    Investigations and Schematic Design

    MAY TO JULY 2018 site analysis, review

    of documents, design concepts

    Detailed Design

    JULY TO AUG 2018 synthesis of public

    meeting feedback into detailed design, review

    with City staff

    Contract Documentation

    SEPT TO DEC 2018 preparation of working

    drawings and specifcations for tender

    Tender and Contract Administration

    APR TO SEPT 2019 project tendering,

    supervision of construction until

    completion

    location

    ve Eence ALawr

    Mount Pleasant Rd

    Bedford Park Y

    Community Centreonge St

    Bedford Park Junior P.S.

    Ranleigh Park

    estimated extent of contaminated soil

    Ranleigh Park, at 100 Ranleigh Ave., is a 0.25 ha new City park that was previously occupied by a church (demolished in 2011-2012). The site currently sits vacant with four monitoring wells that will be decommissioned. Environmental Site Assessments have been completed, showing the soil is contaminated mostly in the footprint of the old church. As part of the environmental remediation process, it is expected that the contaminated soils will be removed from the site following a more extensive investigation into the extent of contamination.

    RANLEIGH PARK preliminary design

    public meetingJune 11, 2018

  • panel 2introduction to the project

    northwest corner northeast corner

    looking west looking east

    looking south onto community centre and school

    looking east onto Ranleigh Ave

    site panorama

    RANLEIGH PARK preliminary design

    public meetingJune 11, 2018

  • panel 3introduction to the project neighboring facilities Redesign of Ranleigh Park will take into account the facilities and equipment available at the adjacent Bedford Park Junior Public School and Bedford Park Community Centre, just south of the site.

    school grounds baseball and track school grounds play court

    school grounds play structure (ages ≤ 5)school grounds basketball school grounds play structure

    (ages 5+)

    school grounds climber (ages 5+)

    site design programming Stakeholder consultation thus far has revealed that the community desires Ranleigh Park to accommodate the following passive and active programming. The initial design concepts on the following panels provide for some or all of these uses.

    & Seating (ages ≤ 5) Horticulture Junior Play

    Adult Outdoor Fitness Dining

    RANLEIGH PARK preliminary design

    public meetingJune 11, 2018

  • panel 5cottage garden concept

    precedents

    panel 4

    dining communal

    games tables

    ping pong

    shade structure

    benches

    RANLEIGH PARK preliminary design

    public meetingJune 11, 2018

  • junior play

    panel 7fractal concept

    precedents

    shade structure

    ping pong

    seatwalls

    communal dining

    games tables

    RANLEIGH PARK preliminary design

    public meetingJune 11, 2018

  • games tables

    shade structure

    seatwalls

    open lawn

    ping pong

    wood deck seating

    communal dining

    panel 9vine concept

    precedents

    RANLEIGH PARK preliminary design

    public meetingJune 11, 2018

  • panel 10components

    adult fitness

    junior play

    RANLEIGH PARK preliminary design

    public meetingJune 11, 2018


Recommended