Intro.
Mark S. SchuylerWork History
Program/ProjectManager - with 20+ years
in the field.
Project ManagementOrganizational Structure
Project Management -defined graphically in anorganizational structure
layout.
Introduction to this document
This document depicts a flow within an organization, whether that organization is structured as a Vertical, Matrix orHybrid entity, the Project Management process will apply with moderate fluctuations to the process. Regardless of an
Entities' structure, Project Management will be utilized in the operations of that organization.
The document attempts to flow the reader through the Project Management process without leaving them stranded withunanswered questions and incomplete process control. It is believed to be a good comprehensive and complete
Management tool for a solid operational experience to process control.
Entering this document will first take you through the Authors Work History and background to give you a level ofconfidence pertaining to professional accuracy of the presented information and then you will be lead into the specifics ofProject Management as a management tool. It is comprehensive and will require some patience to maneuver through, but
after completion you will have a sound understanding of organizational Project/Program management.
It is recommended to the reader to begin the journey at the glossary once introduced in the flow controls, then return tothe document and continue the experience. Once complete, you will have tools to operate at any position, and assigned
to any function, within any organization at a more complete professional level.
Document Control System
As you enter this document you will see the symbols below. Everyattempt to complete an "outgoing" ("Home-plate" pentagon shape)
depicting the outgoing flow of information, with its counterpart"Incoming" ("reverse Home-plate" pentagon shape representing theincoming flow of information and returning you back to the incoming
point of origination, has been made.
Double clicking on these "bases" will flow you to the next intendedpoint of information and back again.
OutgoingInfo - Incoming
Info -
OUTGOING Information - this willSEND you to the next intended page
of information.
INCOMING Information - this willTAKE you BACK to the ORIGINAL
page of information.
DOUBLE CLICK -these Pentagon shapes to TEST the
concept..... go ahead try it now.
To AuthorWork History
From end ofGlossary
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
5/14/2013
Mark S. Schuyler Sr.
Program / Project Manager
Dossier
My job, as management for your company, is to take my assignments of design conceptsthrough operation implementations and develop non-convoluted project management reportsfor the leaders of the company, allowing them to direct the company with the proper fiduciaryresponsibility assigned to them by the Board of Directors.
Good management is what great Leaders hire to perform their jobs most effectively.
Education & Leadership Training
EDUCATION:B.S., Engineering Management - University of IllinoisB.S., Equivalent, Electrical Engineering - University of IllinoisU.S. Marine Corps Training - Crypto/Teletype Technician
Courses: University of Michigan - Project Management;Designing for EMC - Practical Tools and TechniquesUL - ISO14000/9000 Compliance;UL - Key to International Compliance;
Extension Courses/Software:MS Project, Excel, Access, Visio, Office;Database Engineering;minor in ORCAD, AUTOCAD
Work HistoryGeneral Dynamics, Space Systems Division August 1988 - January 1993Test Operations & LaboratoriesInformation / Operations Research Control Systems Engineer
· Organized work breakdown structures (WBS);Identified responsibility assignment matrix;Implemented cost account effectiveness;Utilized cost/schedule control systems criteria (C/SCSC);Automated cost/schedule control systems;Designed internal cost performance monitoring system;Organized database cost/parts tracking system; Monitored integrated management systems;Systematically time phased budgets;Scheduled work authorization;Developed milestone reports and variance analysis;Generated work package histories;Created and monitored schedules;Supported management/program office;Developed, integrated, and implemented mainframe and P.C. systems.
Secret security clearance.
WorkHistory #2
Intro.
Back toIntro. page
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
WorkHistory
#2
Work HistoryHitachi Home Electronics (America), Inc. August 1993 - September, 23 2004Design EngineeringSafety / Compliance Assistant Manager - Accomplishments/Duties/Functions:
· Review electrical and mechanical designs of Television Receivers to ensure compliance with UL, FCC, FDA,Environmental, Energy Star and NAFTA standards, codes, and directives.
· Research, recommend, implement, and manage design and testing of standards and directives concerning product safetyand Electromagnetic Compatibility for TV Receivers and Monitors (Analog and Digital) including: applications, samples,and in-house testing for UL, FCC, FDA, and NAFTA products.
· Design, construct, implement and control system for distribution of applications, procedures, and reportsfrom all regulatory agencies, which include implementation of ISO14000/9000 process controls.
· Designed, constructed, implemented, operated and managed UL Client Test Data Program for ULand C-UL in-house test laboratory; including Laboratory design and construction test site,MS Project management implementation, test equipment, procedures, and reports;decreasing UL test schedules by 60% and reducing cost by 40%.
· Research, recommend, implement, configure, and manage Chase Pre-Compliance EMC/EMI in-house test facilitysaving company 25% per model including: implementation of 3 meter Screen Room and related test equipment,FCC Class A and B (Radiation & Conducted) of Title 47- Part 15; Attend continuing education seminars;Knowledge of CE and International Standards, Medical and Machine Directives, and GMP.
· Extensive experience with UL Standards: UL/IEC60065, UL 1492 - Audio/Video Products and Accessories,UL1950 - Safety of Information Technology Equipment (Second & Bi-National) and all interrelated standards.
· Extensive experience with FCC Title 47; Parts 2, 15, 68, 73 and 76. Experience with Title 16 and Title 21.
· Plan, coordinate, conduct, manage and report formal FCC testing of products at local NRTL reducing schedule by 15%.Liaison to UL for formal testing of cost prohibitive in-house tests.
· Research, recommend and configure test equipment for Design and Pilot Laboratories including:pre-compliance Chase EMC/EMI test facility, UL Client Test Data Program,DaqBook Data Acquisition system (LabTech/LabView Software), IEEE 488/GPIB test equipment.
· Research, recommend, configure, and manage Electronic CAD system (Zuken-Redac CR5000)which converts UNIX Japanese PWB and Schematics (CR3000) to editable NT-based English PWB and Schematics (CR5000).
· Represent, vote, report and make recommendations on all issues involving the company and EIA/CEMA Standards Committeesand Working Groups which include: R1.0 - Product Safety Committee, TC108-US TAG,R4.0 - Video Systems Committee, R4.3 - Television Data Systems Subcommittee (Closed Captioning and V-Chip development),R4.6 - A/V Bus Subcommittee and JEC (Joint Engineering Committee).
· Study, report and make recommendations on HDTV/NTSC concerns including:Closed Caption Display and V-Chip development and testing for HDTV and current NTSC TV Receiver issues.
· Confirm by design review and testing that Engineering Change Notices comply with regulatory specificationsat both the system and component levels.
· Developed and implemented cost management system reducing schedule and increasing accuracyof budgeting for all regulatory activities by 20%.
· Develop and submit budgets for all regulatory activities including: samples, materials, manpower, applications and reports.
WorkHistory #3
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
WorkHistory #3
Work HistoryHitachi Home Electronics (America), Inc. August 1993 - September, 23 2004Design EngineeringDesktop Publishing Manager - Accomplishments/Duties/Functions:
· Designed, developed, constructed, implemented, and managed "in-house" Instruction Bookand Service Manual process and procedures including: software, hardware, networking,integration, configuration, document and graphics control.
· Designed, implemented and manage configuration control processesfor graphics, document and drawing control.
· Eliminated label repairs of Instruction Books and Service Manuals and implementedQuality Control system reducing cost by 35% and schedule impacts by 75%.
· Created design specifications to implement creation of Instruction Books and Service Manuals.
· Created, managed, interviewed, and reviewed Engineering Technical Writing positionsto create Instruction Books and Service Manuals to specifications.
· Recommend, authorize and implement hardware and software to network DTP system.
· Review, interview, recommend and manage vendor implementation for all printed materials.
· Developed and implemented cost management system reducing scheduleand increasing accuracy of budgeting for all printed materials by 30%.
· Research, recommend, and manage project to convert existing paper Service Manualsto electronic (CD-ROM) format (*.pdf) including: D/E size schematics, Troubleshooting Guides,Adjustment Specs., and Theory of Operation.
Work HistoryHitachi Home Electronics (America), Inc. August 1993 - September, 23 2004Design EngineeringDesign Engineering Network Administrator - Accomplishments/Duties/Functions:
Organized, designed and implemented design engineering computer network including:
· Systems analysis on 25 PC workstations and Level/Category 5 cabling.
· Installed cable, PC workstations, hardware and software for the network.
· Connectivity of workstations using Windows, Win95 and WindowsNT to Novell based server.
· Proficient in all Windows environments including: workstation, remote and network environments.
Proj.Defn.
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
WHAT IS A PROJECT?
A project is generally defined asa program of work to bring about
a beneficial change and whichhas:-
A defined Goal with a startand an end
Requires expertiseand support from
other functions , e.g.- a multi-disciplinary
team broughttogether for the
project
constraints of cost, timeand quality (orfunctionality)
a scope of work that isunique and involves
uncertainty
Examplesof a
project:-
Thedevelopment ofa management
informationsystem
The creation of alarge tender orthe preparationof a response to
it.
Setting up a newcare initiative
Thedevelopment
and introductionof new services
The introduction of animprovement to anexisting process
The production of anew customer
newsletter, catalogueor Web site
Using a project team approach will help youto achieve the beneficial gain in a
structured, controlled and cost effectiveway.
PL
C
Yes
TheProject
Life Cycle
PMGlossary
Proj.Defn.
PMGlossary
PMBenefits
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
PROJECT
MANAGEMENT
Project Management is amethodology and a discipline
which can bring significantbenefits to organizations by:-
However, every organization has finite resources and, therefore, a limit to the number of projects it can initiate and control. Pushing too many projects through a resource limited organization causes gridlock and stress.
Managing the project portfolio efficiently is a fundamental principle of good project management.
Ensuring limitedresources are
used on the rightprojects
Assessing risks,defining goals
andkey success
areas and settingquality objectives.
Managingcomplex changesin an organized
wayHarnessing the
energy of staff inachieving
beneficial change
PMDefn.
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
Because most projects involvenew ideas and learning (evena project to build houses or
flats may involve newmaterials or unusual soil
conditions or there may benew initiative for tenant
selection or co-ownershipschemes) project
management has evolved adiscipline to manage the new
and unusual.
Project ManagementObjectives:
reduce it to a setof manageable
tasks
obtainappropriate and
necessaryresources
build a team orteams to performthe project work
plan the work andallocate the
resources to thetasks
monitor andcontrol the work
report progress tosenior
management and/or the project
sponsor
close down theproject when
completed
review project toensure the lessons are
learned and widelyunderstood
It is this structured approach that makesproject management the best method for
change management.
SingleProject
define the project
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
PROJECT
MANAGEMENT
Total QualityManagement
(TQM)
Improvement projectsuse the principles ofproject managementespecially where theimprovements are
cross functional ones.
The introduction of TQM aims toencourage ‘divine discontent’ in
staff and to give them the tools toachieve continuous improvements
in the way they work.
PerformanceManagement
Business ProcessRe-Engineering
(BPR)
Performancemanagement bringstogether all the best
practice for managingstaff to achieve their
full potential.
BPR focuses onoptimizing the
processes in anorganization and, if
necessary,redesigning them tomeet the customer’s
needs.
Effective project leaders use all theprinciples of performance
management to motivate the teambut do not have the authority of a
line manager.
In a major survey on BPR by theHarvard Business School Reviewthe second most significant factor
in the recent failure of BPRinitiatives was the lack of Project
Management expertise and culture.The first was the failure to analyze
and understand the processrequirements. The research andthe implementation should be
managed as a project.
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
Doesn’t ProjectManagement
stiflecreativity?
No - in fact a well managed project will encouragecross functional creativity because that is what is
needed in ‘change projects’. An experienced projectmanager will know when to tap into this creativity
and when to drive the project forward. It is only whenproject methodologies become bureaucratic and
override common sense that creativity can be stifled.
ProjectManager
No
How to get started?
As with most otherthings in life, good
preparation isessential to
success. In practicethis requires thatyou spend time
discussing,agreeing, and then
approving:-
The overallaim of the
project andthe benefit of
doing it
The scope(or terms ofreference) ofthe project
The keyobjectives
project
The specificdeliverables
Roles andresponsibilities within the
project
Theresources
available tothe project
Often it is not possible to define the overall requirementsuntil some feasibility work has been done, in which case a
short feasibility study may be required. Once feasibility hasbeen established and approved then the work may be
planned in the appropriate detail. This process of planningwill help the team to understand its mission better and
resolve outstanding research questions. The next stage isto implement the plans and monitor progress continuouslyuntil the goal is achieved. The final stage is to close down
and review the project so that the lessons learnt are passedon to the next project.
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
PLC
Preparation
Start Up
Feasibility
Definition&
Planning
Implementation
Close Down
The Project LifeCycle
SimpleProject
No
Yes
DefinedMilestones
Checklists&
Inspection
For complex projects in a largeorganization a more structured
approach is needed, to set up andapprove the project, monitor and
guides its progress, solve itsproblems, deliver the end product
(or gain) and close it down.
In order to understand themethodology we need to look at theproject life cycle. The detailed lifecycle will be dependent upon thesize and type of organization andthe size and type of the project.However, in outline they all have
very similar elements.
Pre
par
atio
nS
tart
Up
Fea
sib
ility
Def
init
ion
&P
lan
nin
gIm
ple
men
tati
on
Pro
ject
Clo
seD
ow
n
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
PreparationThe preparation stageinvolves the project
manager and sponsorin the preparation andapproval of an outlineproject justification,
plan and projectbudget.
Yes
NoCan Project be modified to meet
requirements, or should project bescrapped?
Yes
No
Close Down
Create theProject Plan
Outline
Create theProjectBudgetOutline
$
VISIO CORPORATION
Finance
Research & Development
Preparation
Board of Directors Management
Projectjustification?
to ProjectStart UP
Yes
There is no reason why a project sponsor should not also bethe project manager. A senior manager who has a strong
business reason to drive the project will have theorganizational authority and "clout" with other senior
managers and will often make an excellent project manager.
EVAReports
MonitoringEVA
EVAMonitoring
ProductDescriptions.
The productdescription should
describe thepurpose, form
and componentsof a product.
It should also list, orrefer to, the quality
criteria applicable tothat product.QA
Criteria
ProductDescriptions.
Each productdescription may
either apply to aspecific item, or
to all the productsof a given type.
Complex Product
The componentproducts of a
complex productmay be described
in separatedescriptions,giving rise to a
hierarchy ofproduct
descriptionsfor that product.
P.I.D.Plan Project Initiation
Document (PID) -Configuration
Management System
The configurationmanagement plan
should be produced aspart of the project
initiation document(PID).
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
to ProjectStart UP
StartUp
Selection and Briefingof the project team
discussionon the roles
of the ProjectTeam
discussionon the roles
of theOrganization
Feasibility orResearch
stage
StartUp
The ProjectSponsor
The projectsponsor should
be a seniorperson in the
organization whohas the most togain from the
project’s successand the most to
lose if it fails.
The SteeringTeam
a large project aformal cross
functional seniorteam
The steering team mayonly be one person on
a small project(perhaps the projectsponsor) who meetsinformally with theproject manager.
On a large project aformal cross functionalsenior team will be setup to meet regularly toreview progress and
provide strategicguidance.
Functional or linemanagers
The line managerof each team
member will wantto be kept
informed aboutthe progress of
the project and beinvolved insetting ofindividualobjectives.
The projectcustomer
The project ‘customer’ should
either be amember of the
steering team orrepresented on
that team.
To use the toolsand techniques tomanage projects
effectively.
Setting theconditions and
culture such thatthe business can
select andimplementappropriateprojects tosupport thebusiness.
Middlemanagement
Ensuring that allprojects are
selected,allocated, steeredand closed down
satisfactorily.Ensure that
projects that arenot approved arenot worked on.
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
Feasib
ility or
Researchstag
e
Research & Development
Feasibility orResearch
stage
Establish therisks
Establishkey success
measures
Unless theorganizationundertakes
research or newproduct
development,feasibility oftenmeans ‘can this
process ortechnology becost effectivelyapplied to the
organization ordepartment’,
rather than is itgenerally feasible.
Identification ofExternal Resources Specialist
consultantsrequired?
Product andService
providersrequired?
Tender goods, for the project.
Tender services, for the project.
Tender software, for the project.
ProjectManager
coordinates thework
work will beundertaken by theteam (which mayinclude external
consultants)
This team shouldconsist of the key usersor main beneficiaries of
the beneficial change theproject is delivering
(hence the term ‘projectdeliverables’ or ‘
products’. They may beline managers,
supervisors or staff withparticular skills. They
must be the best peopleavailable and neverthose ‘who can be
spared’ because theyhave difficult or
awkward personalities.The object is to build ateam that is better than
the sum of theindividuals.
NOTE: it is often thedifficult people who
consider and manage thedetail. Their expertise and
diligence should not beignored but they are
usually happier working ina solitary way or with like
minded individuals.
Fea
sib
ility
Def
init
ion
&P
lan
nin
g
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
Defin
ition
&P
lann
ing
Defining andplanning the
project in moredetail by writingand publishing afull definition of
the project.
Determininga project
plan.
ProjectManager
coordinates thework
work will beundertaken by theteam (which mayinclude external
consultants)
Defin
ition
&P
lann
ing
Both should becommunicated
widely to ensuremaximum
understanding ofthe project’s
objectives by allstaff who will beaffected by theproject. Now is
the time to ensuretheir input to
minimizesurprises at a
later stage.
Quality AssuranceSpecification
An important part ofdefining the end-product of
the project is thespecification of its quality
related features - which theproject must then aim to
deliver.
QASpec.
Quality planningis an integral part
of the planningactivity.
Quality relatedactivities shouldalso be explicitlyintegrated into
the resource andtechnical plans.
Quality planningmanifests itself in
the productdescriptions ,specifically intheir quality
criteria.
Quality planningmanifests itself in thescheduling of quality
related activities in thePERT charts. .
QAPert
Quality planningshould have a
significant effecton the overall sizeand scope of the
projects plans
PERT containsdetailed informationon the duration of
each activity and thesequence in which
they should beperformed.
The tasks required to ensure the quality of the
delivered products are often overlooked, with theresult that the PERT chart fails to represent quality related
work.
This can have serious consequencesfor either: the quality levels achieved,
the overall budget, or both.
The PERT chart also clearly identifies the critical path, whichis the sequence of related activities which will take the
longest time to complete.
It is important that every task required to accomplish the
project is included, or accurate project planningwill be jeopardized.
Config.Item
Baseline
Configuration Item Baseline
In the first instance, a configurationitem should be created and
documented as the first version.
The first baseline for aconfiguration item will be
established when the specificationof the item has been prepared,
reviewed and agreed.
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
Imp
lemen
tation
The implementationstage involves theexecution of the
project as agreed
while carefullymonitoringprogress
while carefullymanaging changes
The team may needto be expanded at
this stage toresource all the
tasks
If so, it is essential theyare fully briefed and feel ‘included’ as part of the
team.
ProjectImplementation
Is PM an integral part of thisorganization's culture?
Yes
No
Develop Team Building Events
Events that allow the team to worktogether in a competitive but non-
threatening environment.
As people get used toforming and dissolvingteams the need for and
style of such teambuilding events will bedecided by the team.
QAPlan
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
Pro
jectC
lose
Do
wn
The close down stage involves the satisfactory delivery(satisfactory to the project ‘customer’ that is) of the
products or services that achieve the beneficial gain.
Project Review
What lessonslearned?
Lessons learned should beformally published ‘warts
and all’.
Lessons learnedshould beformally
documented .
Having attended seminars inwhich very senior managershave disclosed the best andworst features of their mostcritical projects; They are
always received with respectbecause people like to learn
from the experience of othersand bad experience is oftenmore informative than good.
Be honest aboutyour mistakes
Mistakes are notfailures, they are
how we learn.
Ignoring ordenying
mistakes ishow we fail.
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
Pro
jectM
anag
er
So whatdoes aProject
Manager do?
Typically a project manager will benominated to lead a project and willbe expected to be fully accountable
for meeting its objectives.
The project manager will be theleader of the project team and will be
responsible for ensuring thefollowing are completed in a timely
way:-
Gaining approvalfor the project aim
and terms ofreference
Selecting andleading the team
and settingindividualobjectives
Ensuring afeasibility study is
complete
Ensuring that theproject is planned
in appropriatedetail
Allocating andmonitoring thework and cost
Motivating theteam
Reportingprogress back tothe organization
Helping the teamto solve project
problems
Achieve, throughthe team, the
goals
Reviewing andclosing down
What skillsdoes aproject
managerneed?
PMSkills
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
What skillsdoes aproject
managerneed?
Very broad skills areneeded to manage a
large projectsuccessfully.
A deal of experienceare needed to
manage a largeproject successfully.
They includebusiness
knowledge
They includetechnical skills
They includeindividual and
team leadershipskills.
They will havetechnical skills insetting objectives
They will havetechnical skills inplanning complex
tasks
They will havetechnical skills in
negotiatingresource
They will havetechnical skills infinancial planning
They will havetechnical skills in
contractmanagement,
They will havetechnical skills inmonitoring skills
They will havetechnical skills in
managingcreative thinking
They will havetechnical skills inproblem solving
They will havetechnical skills aswell as their ownspecialist topic
They willappreciate the
differing needs ofboth individualsand the project
team at differentstages of the
project.
They will beaware of different
team types.
TeamSkills
IndividualSkills
TechnicalSkills
Goodpresentation
skills
Good persuasiveskills
Good writtenskills but allied togoal orientation
High energy
Credibility
Having high energy doesnot mean you play squashfive times a week but thatyou have the intellectual
energy and commitment todeliver the project with a
positive ‘we can do it’ teamapproach.
Good project managersknow their own strengthsand weaknesses and willcompensate for these in
selecting the team.
P MTools
&Techniques
PMSkills
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
P M
To
ols
&T
ech
niq
ue
s
Verifiableobjective setting
This ensures thatthe objectives forthe project can be
measured andverified to ensure
that they have beenmet.
Brain storming
This technique isused at all stages of
the project toencourage creativethinking and solve
problems
Work BreakdownStructures
This is a techniqueto analyze the
content of work andcost by breaking it
down into itscomponent parts.
It isproduced
by :-
Identifying thekey elements
Breaking eachelement down
into componentparts
Continuing tobreakdown until
manageable workpackages havebeen identified.
These can then beallocated to the
appropriateperson.
Below is a workbreakdown
structure for therecruitment of a new
person to fill avacant post.
Project EvaluationReview Technique
(PERT)or
Network Analysis
PERT
WBS
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
PE
RT
Used to analyze the inter-relationshipsbetween the tasks identified by the work
breakdown structure
Used to define the dependencies of eachtask.
Network analysis or PERT(Program Evaluation and Review
Technique)
Work BreakdownStructure - WBS
Network Analysisapplied
Below is thePERT chart of the
WBS shownabove after
network analysisas been applied.
While laying out a PERT chart it is often possible to see thatassumptions for the order of work are not logical or could be achieved
more cost effectively by re-ordering them. This is particularly truewhile allocating resources; it may become self evident that two taskscannot be completed at the same time by the same person due to lackof working hours or, conversely, that by adding an extra person to theproject team several tasks can be done in parallel thus shortening the
length of the project.
Critical path analysis(CPA)
CPA is used inconjunction with PERTanalysis to identify thetasks that are critical indetermining the overallduration of the project.
Yes
Critical Path is shown by thetasks with heavy outline boxes.
MilestonePlanning
Milestone planning isused to show the
major steps that areneeded to reach the
goal on time.
Management
Accrued costand
Earned Value AnalysisSenior Management
MilestoneReport
Quality Assurance
Accounting
Information Systems EVA
GanttChart
QAPert
CPA
The PERT chartalso clearly
identifies the criticalpath, which is the
sequence ofrelated activitieswhich will take
the longest timeto complete.
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
EVA
$
VISIO CORPORATION
Finance
Finance Management
Accrued costand earned
value analysis
These measuresenable the progressof the project to be
monitored infinancial terms.
Earned valueanalysis, or EVA,
represents apractical approach to
measuring theprogress of a projectagainst the plans and
this approach isbased on variance
analysis.
Relies on themeasurement of
the actual amountof work that hasbeen done at a
given date
Cost/ScheduleControl System
Criteria
C/SCSC
(used byGovernments andLarge Contractors)
Since EVA relies onthe measurement ofthe actual amount ofwork that has beendone at a given date
and themultiplication of this
by the associatedcost rates, many of
the delaysassociated with
variance analysis canbe eliminated.
multiplication ofthis by the
associated costrates
Earned valueanalysis has
severaladvantages;
EVA compareslike terms
EVA is quick toapply in practice
A single piece of paper canoften adequately summarizethe progress of the project.
EVA requires theongoing
measurement ofthe actual workdone, which isnormally taken
from timesheets.
Timesheets
The useful workcompleted also
requiresmeasurement,normally by
physicalobservation.
Physicalobservation. EVA should reflect all of the
significant non-productivemanpower costs associated
with the project
for example costsincurred for projectmanagement and
administrationshould be factoredin to give a realistic
figure.
Tasks which have startedbut are not yet complete
the problem ofquantifying the earnedvalue is compounded iftasks of long duration
are involved
Therefore EVA ismade easier byhaving a larger
number of shortertasks in the plan.
EV
AV
aria
ble
s
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
Gan
ttC
hart
Gantt charts (named after theinventor) or bar charts, as they
are sometimes called, are used todisplay and communicate the
results of PERT and Critical Pathanalysis in a simple bar chart
format that can be readilyunderstood by those not involved
in the detail of the project.
The PERT chartis now displayedas a Gantt chart
below
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
Running MultipleProjects?
If an organization isconsidering managinga portfolio of projectsit needs to consider 5
key areas:-
Yes
No
SingleProject
Commitment ofthe senior
managementteam to the
effective use ofproject
management andits acceptance by
staff.
People in theorganization whohave been trainedin the principlesand practice of
projectmanagement are
required.
Systems thatprovide theinformation
needed by seniormanagement to
manage theportfolio ofprojects.
A methodologythat is clearly
understood byeveryone andwhich every
project will follow.
An organizationalstructure to selectthe projects that
support thestrategy, guidethem, prioritizethem and close
them down.
Program Manager(sometimesknown as a
Change Manager)
The role is astrategic one. Heor she will have
command ofProject Managers
and ProjectLeaders who
report forindividualprojects.
Yes
The ProgramManager is
responsible to theSenior
Management forthe portfolio of
projects under hiscontrol.
The ProgramManager is
responsible forensuring that the
portfolio ofprojects deliverthe beneficialbusiness gain
intended.Project Manager
A ProjectManager is
experienced inthe skills anddisciplines of
projectmanagement, may
manage morethan one projectat a time and may
have ProjectLeaders as
directly reportingstaff.
Project Leader
A project leaderusually managesa project stage or
a small projectwhere his or her
particular skills orexpertise are alarge part of thework. A Project
Leader mayreport to a ProjectManager or to the
ProgramManager.
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
EVAVariables
The Earned ValueAnalysis
Variables.
The earned valueapproach to
project controlovercomes the
problem ofmanagers makingdecisions based
on isolatedinformation.
Three basicvariables relatingto budgetary and
actual costs
These variablescan be used to
analyze theproject, at any
level, to establisha variety of useful
parameters.
BCWS
The BudgetedCost for Work
Scheduled(BCWS) is the
value of work thatshould have been
done at a givenpoint in time.
It indicates thebudget and worktargets at a given
point.
BCWP
The BudgetedCost for Work
Performed(BCWP) is thevalue of work
actually done at agiven point in
time.
It takes the workthat has beendone and the
budget for eachtask and indicates
what portion ofthe budget shouldhave been spent
to achieve it.
This variable issometimes
referred to asEarned Value.
ACWP
The Actual Costfor Work
Performed(ACWP) is the
actual cost of thework done and itmay vary fromthat budgeted.
ACWP is theamount reported
as actuallyexpended in
completing thework
accomplishedwithin a giventime period.
Earned ValuePercentageComplete
Budget
As defined by theBudgeted Cost
for WorkScheduled (ineither cost or
man-hour terms).(BCWS)
Cost Variance.
A measure of thedeviation
between theEarned Value
and the actualcost of the
workperformed
(ACWP)
Example:A project has aEVA Variables
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
Example:A project has aEVA Variables
BCWP
$25,000
#1: ExampleProject
(at specific pointin time)
ACWP
$30,000
Cost Variance
BCWP - ACWP = - $5,000
Percentage CostVariance
Cost Var. / BCWP =-20%
In other words itis overspent by$5,000 or 20%.
Schedule variance (cost),is a measure of the
deviation between theactual progress and the
planned progress. This isusually measured in
units of cost rather thantime.
BCWS
$30,000
Schedule (Cost)Variance
BCWP - BCWS = - $5,000
BCWP
$25,000
#2: ExampleProject
(at specific pointin time)
Percentage CostVariance
Cost Var. / BCWP =-13.3% over-spent
Schedule (Cost) Variance
BCWP - BCWS = - $50,000 or 25% behind
schedule
Cost Variance
BCWP - ACWP = - $20,000
Scheduledexpenditure is
$50,000 per weekfor the first four
weeks,
BCWS = $200,000ACWP = $170,000
the projectmay be on
schedule butunder-
spending
or it may bebehind
schedule andover-spending
It is only when the earned value (BCWP) is known that the status of theproject can be determined.
BCWP
= $150,000
CumulativeCost
Curves
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
CumulativeCost
CurvesThe three variables BCWS,
BCWP and ACWP should beplotted graphically as the
project progresses.
UnderstandingCumulative Cost
Curves.
Note: that normallythe solid curves
represent actual dataand the dotted curvesrepresent projections.
It is these 'cumulativecost curves' that
enable analysis of theproject to be
undertaken at anypoint in time.
BCWS curve
Only the BCWScurve can be
plotted inadvance
BCWP and ACWP curve
The BCWP and ACWPcumulative cost curves are
normally plotted on aweekly or monthly basis.
Board of Directors
Management
ACWP
The ACWP curveis plotted by
measuring theactual work doneas recorded on
timesheets.
BCWP
The BCWP can becalculated by
multiplying theassessed
percentagecomplete by thebudget (BCWS).
Cost Variance
The cost variancecan be
established at anypoint in time byreferring to the
differencebetween ACWP
and BCWP.
Remember, costvariance is a
measure of thedeviation betweenthe earned value
and the actualcost of the work
performed.
Schedule Variance (Cost)
The schedule variance(cost) can be established
at any point in time byreferring to the difference
between BCWS andBCWP.
Remember, schedulevariance is a measure of
the deviation between theactual progress and the
planned progress.
This variance is normallyconverted to a percentage
value to avoidrepresenting the schedule
variance in cost units.
Schedule Variance (Time)
The schedule variance(time) can be establishedat any point by referringto the difference between
BCWS and BCWP - butwith reference to the
horizontal axis.
EVAReports
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
MonitoringEVA
Monitoring Efficiency.
In addition to calculating the cost and schedulevariances earned value analysis can also supplyfigures that quantify how efficiently the project is
progressing.
The formulae on this page provide feedback onperformance efficiency in relation to the
Budgeted Cost of Work Performed.
An index value of 1 indicates that the project isentirely in line with the plan.
An index value >1.0 indicates exceptional projectperformance.
An index value < 1.0 indicates performance belowplanned expectations.
Monitoring Progress.
One of the most important benefits of EVA is thecalculation of the Overall Percentage Complete of
either a complete project or sub-project.
This is obtained by dividing the total earnedvalue, which is the sum of all the individual
earned values, by the original budget.
It is this variable togetherwith the predicted final costand cost variance that will
be of most interest to seniormanagement.
EVAMonitoring
Budget Variance.
As a project progresses it is usually important tomonitor the overall costs of the project in relation
to the original budget.
Budget variance is a key measure of theanticipated cost of the whole project at some time
after project initiation.
Once again a negative value indicates a budgetoverrun.
Estimated Cost at Completion(ECAC)
Estimated Cost at Completion is a revisedprediction of how much the project will cost (ittakes into account the money spent so far and
your current estimate of the total resourcesrequired to complete the project).
Budgeted Cost at Completion(BCAC)
Budgeted Cost at Completion is the originalbudget for the whole project.
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
QAPlan
QASpec. Quality Conscious
Industrial and BusinessPractices
This has been identified asbeing of the utmost
importance in gaining andretaining a competitive
edge.
In the context of a projectthat aims to deliver a
complex end-product, thequality aspects of that end-
product will need to beplanned, designed and
worked for.
Quality
“Quality is the totalityof features and
characteristics of aproduct or service
which bear on its abilityto satisfy a given need”.
Quality Policy
Defines the reporting policyand responsibility of
management in the QAfunction of the corporation.
QualityAssurance
Quality Management
Defines the reporting policyand responsibility of
management in the QAfunction of the corporation.
Quality Control Functions
Quality control isconcerned with ensuringthat the required qualities
are built into all of theproducts throughout theirdevelopment life cycles.
QA requires agreementon the level of quality
controls to be adopted,both specifically relatingto the project and to theoverall organizational
policy.
It is important that allthree interests
represented by theproject owner are taken
into account whendeciding the
mechanisms to beadopted.
Combine to assure theclient that the product
will be consistentlymanufactured to therequired condition.
QCFunctions
Its aim is to achieve andassure quality throughthe adoption of a cost
effective quality controlsystem
Its aim is to achieve andassure quality throughthe adoption of a cost
effective quality controlsystem
...and through externalinspectionsand audits.
Results ofQuality Plans
Reflected in theresource and technicalplans, at each level of
the project.
QACriteria
Quality Criteria.
Quality criteria should be usedto define the characteristics of
a product in terms that arequantifiable, and thereforeallow it to be measured - at
various points in itsdevelopment life cycle, if
required. .
The criteria effectively define'quality' in the context of theproduct and are used as a
benchmark against which tomeasure the finished product.
Quality criteria should bedetailed, or referred to, in therelated product description.
Quality Criteria.
Quality criteria should beestablished by considering
what the importantcharacteristics of a product
are in satisfying the need thatit addresses, and they should
always be statedobjectively. Subjectiveor descriptive criteria
such as 'quickresponse' or
'maintainable' areunsatisfactory - as they
do not permitmeaningful
measurement.
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
QCFunctions Quality Control Functions
Quality control isconcerned with ensuringthat the required qualities
are built into all of theproducts throughout theirdevelopment life cycles.
Quality Control Functions
Quality control utilizesmeasurable quality criteria
and is exercised via:Quality Reviews
Project Reviews
Testing ofProducts
Change Control
Quality Reviews
Quality reviewsare planned and
documentedinspections of a
review item.
The review itemmay be a product,a group of relatedproducts or part
of a product.
Quality Reviews
Thescheduling of
quality reviews islikely to representa significant effort
in terms ofrequired
resources.
Error Detection
The earlier an error is identifiedthe less costly are the implications
and the penalty for failing toconduct adequate reviews
The early detection of errors alsominimizes the degree to which
faults in one product can becompounded - either in its later
development or in thedevelopment of related products.
The quality review is a formalprocedure for reviewing a
product, or group of relatedproducts, against an agreed
set of quality criteria.
The review meeting shouldbe run by a designatedchairman and brings
together the reviewers and adesignated presenter
Quality ReviewPersonnel
Review CommitteeChairman
Chairman of ReviewCommittee
The chairman shouldbe responsible for
organizing the review,including the initial
selection of reviewers.
Chairman of ReviewCommittee
This role is normallyundertaken by the lead
developer of theproduct to be
reviewed.
Quality Reviewers
They should set theagenda for, and ensurethe smooth running of
the review itself,striving to minimize
deviation andprotracted discussionof potential solutions.
Chairman of ReviewCommittee
The presenter shouldensure that all
reviewers have theinformation they
require, ahead of thereview meeting.
Chairman of ReviewCommittee
The Presenter isnormally responsiblefor correcting errorsfound at the review
and therefore shouldrecord all the agreed
points.
Quality Reviewers
The main duty of thereviewers is to checkthe item under reviewagainst the relevantcriteria as defined in
the productdescriptions and other
review checklists.
Quality ReviewersFollow-Up Phase
During the follow-up phase one or
more reviewers shouldconfirm that the
corrective work wascarried out and that no
undesirable sideeffects occurred.
QRPhases
ConfigMgmnt
DURchange
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
QRPhases
Quality Reviewers
Quality reviews should
be seen as a threephase process
Phase 1 –
Preparation.
Preparation, whichprecedes the actual
review meeting.
Phase 2 –
The ReviewMeeting.
The central phase ofthe quality review
process is the reviewmeeting itself.
Quality Reviewers
Quality reviews should
be seen as a threephase process
ChairmanPreparation
Invitations and copiesof the products beingreviewed should be
issued, allowingsufficient time for eachreviewer to compile anerror list - which theyshould bring to the
review meeting.
Quality ReviewersError Lists
Compiledindependently by each
reviewer -
error lists detail anysignificant defects
observed in the reviewitem.
Each reviewer shouldinspect the review item
from a particularviewpoint - for
example, a user oroperator.
Quality ReviewersError Lists
During the reviewmeeting the emphasis
should be on errordetection, in line withthe criteria, and onlylimited discussion of
corrective actionshould occur.
error lists detail anysignificant defects
observed in the reviewitem.
'personalities' and'politics'
It is important that'personalities' and
'politics' are kept outof the review - in
particular it isessential that thereview remains
focused on the reviewitem and not on the
presenter.
CompleteReviews
action list tasks areallocated along with
designated reviewers,to verify that the work
is done.
IncompleteReviews
If the review endsabnormally it should
be deemed'incomplete'.
CompleteReviews
the chairman should
forward the follow-up action list and
all copies of theannotated product to
the presenter togetherthese represent all ofthe errors identified.
CompleteReviews -
Results Notification
The chairman shouldalso distribute copies
of the resultnotification to the
presenter and thereviewers.
Non-Review Items -Project Exception
Report
A project exceptionreport should be
raised for any errorsdetected in non-review
items.
Phase 3 –
The Follow-Up.
Following the qualityreview meeting thereshould be a follow-upperiod during which
the errors identified atthe review that were
committed to thefollow-up action list
are rectified andsigned off.
Project ExceptionReport
If there is anurgent need forthe product, and
the reworkcannot be carriedout in the allotted
time, then aproject exceptionreport should be
generated,requiring the
project manager’s approval.
ChairmanPreparation
Following the qualityreview meeting the follow-
up action list; as agreed bythe reviewers and
completed by the chairmanshould be forwarded along
with all copies of theannotated product to the
presenter.
Phase 3 –
End of theFollow-Up.
At the end of thefollow-up period,which is typically
restricted to one week,the follow-up action
list should be signed-off by the chairman.
Phase 3 –
End of the Follow-Up.
A reviewer may be delegated tosign-off areas of remedial work,
usually those that theyidentified.
ConfigMgmnt
QAFurtherActions
ChangeControl
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
ConfigMgmnt
ConfigurationManagement System
Once the follow-upaction list has beensigned-off the re-worked product
should be resubmittedto the configuration
management system.
DURStatus
DUR - ConfigurationManagement System
The appropriateproject manager is
responsible forscheduling all of thework for approveddocument update
requests. This workmust take into account
all of the changes toevery configurationitem that requires
change.
DUR - Project MonitorCMS
This work should bemonitored and if
planned resourcesand/or deadlines maybe violated then thisshould be brought tothe attention of the
overall projectmanager.
ConfigMgmnt
DURchange
ConfigurationManagement System
On receiving acompleted DocumentUpdate Request the
person responsible forthe Configuration
Management Systemshould ensure that allof the products thatshould have been
changed are returnedand document this.
Config.Mgmnt.
ConfigurationManagement System
Configurationmanagement is a
method foradministering an
evolving, and ofteninterrelated, set of
products and projectdocumentation.
CMS Procedures
The application ofeffective
procedures shouldensure the accurate
and up-to-datedocumentation anddistribution of allrelevant productcomponents and
project information.
ConfigurationManagement System
ConfigurationManagement should
be applied to projectsof any significant size,and should be the day-to-day responsibility of
a single individual.
P.I.D.Plan
ConfigurationManagement System
Where products constitutesub-assemblies of morecomplex products, theapproach used must be
able to track all suchrelationships, enabling the
accurate analysis of allassociated information.
Configuration ITEMS
All of the products anddocuments that require theadministrative controls of
the configurationmanagement methodbeing used are calledconfiguration items.
Configuration ITEMS
Initially the overall end-product (or project
deliverable) can,theoretically, be viewed as
the only identifiableconfiguration item.
However, an increasingnumber of configuration
items will usually beidentified as the end
product is sub-divided intothe manageable elementsrepresented in the work
breakdown structure(WBS).
WBS
Configuration ItemDescription Record
A configuration itemdescription record should
be used to record theinformation needed toidentify and track each
configuration item throughits development life cycle.
Configuration ItemDescription Record
Procedures
Configuration control isconcerned with the
procedures for the issueand submission of
configuration items. Theseprocedures should
address both physical andelectronically storedconfiguration items.
Configuration Item Baseline
In the first instance, a configurationitem should be created and
documented as the first version.
The first baseline for aconfiguration item will be
established when the specificationof the item has been prepared,
reviewed and agreed.
Configuration Item BaselineVersion System
The configuration item may thenundergo a number of modificationsas it is tested and errors corrected,or as changes are requested andthese subsequent submissions
should be reflected by anincreasing version number.
Config.Item
Baseline
Configuration Item AuditSystem
Configuration audits consistof cross checking the
configuration item descriptionrecords with the current
version of the configurationitem as held in its
development folder.
Subsequent Baselines
Subsequent baselines willnormally be established at
points at which theconfiguration item is ready tobe used as a basis for further
work in which a majortransformation of it will take
place.
CM Item Release
A release consists of aspecified set of products from
one or more base-linedconfiguration items, which areissued as a set for a specificpurpose. Releases should beauthorized by the project or
sub-project manager.
PIDSetUp
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
QAFurtherActions
Phase 3 –
End of the Follow-Up Review
Further Actions
At the end of a review thechairman should
designate it as 'complete'or 'incomplete'.
Re-Reviewof
Incomplete Review
The objective of the re-review is to ensurethat the review itemreceives adequate
quality review, giventhat the initial review
was designated'incomplete'..
Re-Reviewof
SupportingDocumentation
The supportingdocumentation shouldbe passed, along with
the Chairman’srecommendation, to
the appropriate projectmanager who should
decide, as soon aspossible, on
subsequent action.
Re-Reviewof
Subsequent Action.
Re-Work
Re-work, this option isuseful where the
product was deemedinadequate, or
requires a secondreview to verify thatall errors have been
satisfactorily resolved.
Re-Reviewof
Subsequent Action.
Reconvene
Reconvene, if keyreviewers were unableto attend or the review
ran out of time thisoption enables the
later continuation ofthe meeting.
Re-Reviewof
Subsequent Action.
Project Delay?
This may delay theproject if the
reconvening movesthe product
completion date back.
Re-Reviewof
Subsequent Action.
Reorganize,
Reorganize, thisoption is useful in
situations where theproject manager
wishes to change thecomposition of the
review team, perhapsto include people withmore specialist skills.
Re-Reviewof
Subsequent Action.
DeclareComplete
Declare Complete, onreviewing the
information the projectmanager may decide
that most, or all, of theerrors have in factbeen identified and
that a further review isnot justified.
Re-Reviewof
Subsequent Action.
DeclareComplete
This is effectively bypassing the normalrigors of the quality control system and
should only be considered inexceptional circumstances - for example,
severe resource shortages, and within the contextof a non-critical product.
Re-Reviewof
Subsequent Action.
Abandon
Abandon, in exceptionalcircumstances where the product
under review is urgentlyrequired the decision may betaken to abandon furtherreview, using the product
'as is'.
Re-Reviewof
Subsequent Action.
AbandonProject Exception Report
Errors identified in the initial review will not be corrected butnoted on a project exception report recommending that a
document update request is used to highlight thesedeviations in the delivered product.
Re-Reviewof
Subsequent Action.
AbandonDocument Update Request
A Document Update Request is used to
highlight deviations in the deliveredproduct.
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
ChangeControl The Big
4 Threats
No matter how carefully planned a project has been, changes will need to be made asit progresses. These will result from both external influences as well as problems that
arise within the project environment.
Business Changes
Business changes,which may result from:
changes in legislation,
changes ingovernment policy or
changes in businessstrategy.
Marketing / UserChanges
Marketing/userchanges, which may
result from:
changes in therequirements of the
customer, who may beeither part of, oroutside of, theorganization.
It is also possible thatfeedback gained
during the review ortesting of a productmay show that it is
inappropriate in someunforeseen way.
Technical Changes
Technical changesmay be required as
emerging technologymay offer a better
solution to thatoriginally planned.
Alternatively, technicalproblems may prevent
a product fromworking in the way
that it was supposedto.
High Level BusinessDecisions
High level businessdecisions may change
the basic terms ofreference of the
project - for examplethere may be a changeto the overall scope of
the project.
Change ControlProcess
This process, calledchange control, shouldensure that proposed
changes areinterpreted in terms oftheir potential effect
on:
Change ControlProcess
ProjectTimescales
Change ControlProcess
ProjectCosts
Change ControlProcess
ProjectQuality
Change ControlProcess
ProjectPersonnel
Change ControlProcess
ProjectBenefits
Proposed ProjectAlterations / Changes
Prioritize and plan thenecessary work, and
finally control itsimplementation.
It is important that noaction is taken without
the authority of theappropriate level of
management.
Project Exception
Report (PER).
Any person associatedwith a project shouldbe able to raise any
concern they have atany time.
The concern mayinvolve a perceived
problem or asuggestion for animprovement to:
some area of the work,documentation or
project organization.
ProjException
Rpt
Proposed ProjectExceptions
There are 3 possibilities:
Firstly, that the impact of the changedoes not exceed the sub-project
tolerance. In this case the decisionrests with appropriate sub-project
manager.
Secondly, that the impact of thechange falls outside of sub-project
tolerance but within projecttolerance. In this case the decision
rests with the overall projectmanager, who may wish to consult
the project owner.
Finally, the impact of the change mayexceed the project tolerance - inwhich case the decision is the
responsibility of the project sponsor.
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
ProjException
Rpt
Project ExceptionReport (PER).
Any person associatedwith a project shouldbe able to raise any
concern they have atany time.
The concern mayinvolve a perceived
problem or asuggestion for animprovement to:
some area of the work,documentation or
project organization.
Project ExceptionReport (PER).
Meeting
All project exceptionreports should be
reviewed at regularmeetings (a PER
Meeting).
The meeting shouldrecommend one of the
following outcomesshown for each project
exception report:
Project ExceptionReport (PER).
Meeting
All project exceptionreports should be
reviewed at regularmeetings (a PER
Meeting).
The meeting shouldrecommend one of the
following outcomesshown for each project
exception report:
Document UpdateRequest (DUR)
A document updaterequest (DUR) will bethe preferred optionwhere a product is
found not to conformto its product
description but wherechanging the product
description isconsidered preferable
to re-working theproduct in line with itsoriginal description.
Change Request (CR)
A change request (CR)will be the preferred
option where there is arequirement to changethe design or features
of a product, eventhough that productcurrently agrees with
its specification orproduct description.
Project Exception Report(PER) - Rejected
Rejecting a project exceptionreport indicates that, after dueconsideration, it is not felt to
represent a significantconcern.
Impact Analysis Report (IAR)
The purpose of the impact analysis isto arrive at a balanced view of the
effect of the proposed change on theprojects ability to satisfy its mandate.
The reviewers, who should include allproject coordinators, may decide that
they require more information before adecision can be taken.
This process looks at the knock-oneffects of the change on other
products, and also the effect if thechanges are not implemented. The
analysis will ideally be carried out fromthe business, marketing or user and
technical viewpoints - as appropriate.
Project ManagementDecision
This will enable projectmanagement to decide
whether to proceed with thechange or not.
The appropriate project
manager should use theimpact analysis to
assess the change interms of its effect on
timescales, cost,benefit, quality,
personnel and risk and
to decide at what levelthe decision to
proceed should betaken. The appropriate
project managershould then determine
whether or not theproposed change will
exceed the permissibletolerance.
DUR&
CR
IAR
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
DUR&
CR
Document UpdateRequest (DUR)
orChange Request (CR)
Once it has beenassessed a ProjectException Report
(PER) may beclassified as a
Document UpdateRequest (DUR) or
Change Request (CR).
Document UpdateRequest (DUR)
This is a standard formthat is used to updatea product design to
reflect how it is in itscurrent
implementation, ratherthan how it was in its
original design.
Document UpdateRequest (DUR)
Even though thedocument update
request indicates achange (update) to thedocumentation rather
than a change to aproduct or procedure
it will usually stillwarrant an impact
analysis - in order torecord the
ramifications of theidentified productdeviation on the
project as a whole.
IAR
Project Manager -Document Update
Request (DUR)or
Change Request (CR)
A Document UpdateRequest or ChangeRequest can only be
raised on the authorityof the Project
Manager.
Project Manager -Document Update
Request (DUR)
It should refer to theProject Exception
Report (PER) whichoriginated it andshould contain
sufficient detail toenable the fault it is
concerned with to berecreated.
Technical AnalysisTeam
The Document UpdateRequest or Change
Request should thenbe passed to an
appropriate person toanalyze it.
A technical member ofthe team, with
assistance from othersas required, shouldperform a technical
analysis on thedocument update
request and establishthe resources requiredfor its implementation.
Technical Analysis Team- Priority Rating
They should also assignthe Document UpdateRequest or Change
Request with a priorityrating – either:
high,mediumor low.
The technical team membershould also conduct anImpact Analysis (IAR) to
ensure no implications ofthe proposed change have
been overlooked.
Document UpdateRequest (DUR) -
Status
When the status of adocument update
request is changedfrom 'outstanding' -which is its originalstatus, it should be
returned to theConfiguration
Management System.
DURStatus
Change Request (CR)
This is a standard formthat is used to changea product design - toreflect a significantamendment to the
original design.
It records a proposedmodification to the
products to bedeveloped, or achange in the
management ortechnical approach
adopted.
Config.Mgmnt.
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
PIDSetUp
ConfigurationManagement Plan
The configurationmanagement plan
should be produced aspart of the project
initiation document(PID), for approval bythe project owner at
project initiation.
ConfigurationManagement Plan
Whereappropriate
configurationmanagement shouldcontinue throughout
the life of the deliveredend-product, and
therefore the approachadopted should betransferable to the
client organizationsoperational and
maintenance sectionsat the end of the
project.
ConfigurationManagement Plan
If other projects withinthe organization are
using a configurationmanagement methodthen this should be
seriously consideredfor the current project,particularly if the two
projects share anyareas of interest.
ConfigurationManagement Plan
The following list isthe recommendedminimum scope
required of aconfiguration
management method.This should be
adjusted to suit theneeds of each
particular project.
Synopsis & Purpose
This should provide abrief overview of the
plan and highlight anydifferences in
approach to existingsite standards - with ajustification thereof.
Synopsis & Purpose -Aim of the Activities
It should also explainthe aim of the
activities defined inthe plan.
Any dependencies onconfiguration
management plansfrom other projectsshould be identified.References
This serves to identifyall other standards to
be used by theconfiguration
management method.
Configuration ItemIdentification
This section shouldspecify the naming
and numberingconventions to be
used for all types ofconfiguration items.
Scope
This should outline thefull range of tasks in
the plan, in particular itshould consider all
areas that have linkswith associated
projects or that maybe bringing inprefabricatedcomponents.
Scope -Special Operating
Requirements
Any special operatingrequirements shouldalso be considered.
It should also definewhich items are to bemanaged under theplan and which areoutside the plans
control.
Definitions,Abbreviations and
Acronyms
This is a shortglossary; that should
be produced tosupport the plan if
necessary.
Responsibilities
The clearestrepresentation is a
responsibility matrix,showing which role
should carry out eachactivity in the plan.
The configurationadministrator will
feature often.
Filing
This section defines indetail the filing
structure to be usedfor each category ofconfiguration item.
This should coverhardware, software,
documentation, humanand machine readable
items.
Document IssueProcedures
This should define theprocedures to be used
for issuing anddistributing copies of
all manageddocuments.
Security
This should define theaccess security
measures for themaster copies of allconfiguration items.
Config.Item ID
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
Config.Item ID Configuration Item Identification
When any member of the project team creates any newitem of project documentation that requires distributionto a variety of other project staff, they should submit it
to the configuration administrator, or whoever isdesignated as being responsible for administering theconfiguration management procedures - in order that
they can decide whether or not it constitutes aconfiguration item (CI).
If the configuration administrator decides that thearticle does require the formal procedures of the
configuration management method they should give itthe status of CI.
Configuration Item Identification - Not Required
The configuration administrator may decide that thearticle does not require all the rigors of configuration
management and therefore not create a correspondingCI.
In this case the article should be distributed &administered outside of the configuration management
system.
Configuration Item Identification -CI Description Record -
Configuration Administrator
As CI's are identified, each should have a CIdescription record created for it - which should then be
forwarded to the configuration administratorfor filing.
The CI description record should contain all of theinformation needed to identify and track the item
through its development life cycle.
Configuration Item Identification -CI Description Record -
Configuration Administrator -
Configuration Item Issue & SubmissionProcedures
Issue and submission procedures are concerned withthe submission of and access to the identified CI's.
These procedures will relate to administrative items aswell as those pertaining to the evolving products.
Without careful control over the issue and submissionof CI's the configuration management process can
collapse.
Configuration Item Identification -CI Description Record -
Configuration Administrator -
Configuration Item Issue & SubmissionProcedures - Software Control
Due to the increasing use of computer networks to
support project work, control can besignificantly more difficult than for products
and hardcopy documents.
The use of password protected files anddirectories should help, but the recall of obsolete
versions can cause problems.
Configuration Item Issue & SubmissionProcedures - Re-Submission
Only when the author of a new or revised product ordocument is satisfied that it is complete or ready forreview should it be re-submitted to the configuration
administrator.
The submission procedure shouldnot be used to introduce new CI's.
CIControl
CIAudits
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
CIControl
C.I. - Property Report Issue Log
4) Creator: Money
1) Based on: PM_Draw_20130514.vsd Range of data:
2) Created: 7/12/2010, 7:55:15 PM
3) Spreadsheet:
5) Purpose of report:
CONFIDENTIAL
Configuration Item Identification -CI Description Record -
Configuration Administrator -
Configuration Item Issue & Submission Procedures -Software Control
In relation to quality reviews, the administrator should be responsible for
issuing a copy to each reviewer, in line with the issue procedures, and filingthe original in the relevant development folder.
The configuration administrator should never issue themaster copies of base-lined CI's.
It is important that current official copies are readilyidentifiable, to avoid any obsolete documentation being used
as the basis of future work.
Configuration Item Issue & SubmissionProcedures - Software Control
Issue Log
The administrator should maintain an issue logfor each CI, which records:
the1) identity and
2) version of documents issued, the
3) name of the recipient,the
4) authority for and5) purpose of the issue
and the6) date of issue.
Configuration Item Change Request -Document Control
Issue Log
When a document is the subject of an approvedchange request, the administrator should issue acopy to the appropriate person to carry out the
work and notify all other copy holders of theimpending change.
On completion it should be passed back to theadministrator, who should only then make it
available for further changes.
Ideally when a new version of a CI is issued, earlierand now obsolete, copies should be recalled and
destroyed.
Configuration Item:Configuration Audits.
Configuration audits consists of cross checkingthe CI description records with the current version
of the CI as held in its development folder.
These audits are normally carried out ahead ofeach project review, although they can be
requested at any time by the project manager orthe project owner.
Configuration Item:Configuration Audits.
Configuration audits should establish that:
1) the current physical representation of each CImatches its current specification,
that there is2) consistency in design between each CI and its
parent, if there is a parent.
Finally it also3) establishes that the documentation is up to date
and
4) all relevant standards are being adhered to.
Configuration Item:Configuration Audits - Log
The configuration administrator should be responsible for producing all scheduled and ad hoc reports onthe status of the CI's at an given point in time.
Typical reports that may be required include:
1) numbers of change requests and2) number of project exception reports opened during a specific period,
3) closed during a specific period,4) those currently open and
5) unresolved document update requests.
CIAudits
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
PMGlossary
Acceptance Criteria.
Acceptance criteria, or quality criteria, are thosecharacteristics of a product against which it can be
objectively measured in order to determinewhether it meets the
specified requirements. These criteria thereforedefine 'quality' in the context of that product and
are specified in the appropriate productdescription.
ACWP.
ACWP - Actual Cost for WorkPerformed
This is the actual cost of the work done, which mayvary from that budgeted. You do not need to know
how much has actually been spent - just theamount of work done multiplied by the associated
unit costs.
Approval to Proceed.
This formal approval is given by the project ownerat project initiation and at each main projectreview, prior to commencement of the workinvolved in the next phase. It represents a
commitment to further expenditure up to the end ofthe next phase of the project.
Arrow Diagram.
There are two basic networking techniques called :
1. Arrow diagram method (ADM) - also called network-on-arrow.
2. Precedence diagram method (PDM) - which usesactivity network diagrams.
The arrow diagram approach depicts activityinformation on the arrow or relational link. The
preceding and succeeding activities are more clearlyhighlighted and this can be useful when dealing with alarge network. However this method has been largely
superceded by the PDM approach which has beenincorporated into most project management software
packages.
Baseline.
A baseline is a snapshot of the state of aconfiguration item (or a plan) and its componentconfiguration items at a point in time. Baselines,
plus approved changes from those baselines,constitute the current configuration identification.Baselined plans represent those which have been
formally agreed and accepted; each baselineshould be permanently recorded - so that it can be
recalled at any future time.
BCWP - Budgeted Cost for WorkPerformed.
BCWP - Budgeted Cost for Work Performed
This is the value of work actually done at a givenpoint in time. It takes the work that has been done
and the budget for each task and shows whatportion of the budget should have been spent to
achieve it. This variable is often referred to as'earned value' as it represents the true value of the
work that has been completed.
BCWS - Budgeted Cost for WorkScheduled.
BCWS - Budgeted Cost for Work Scheduled.
This is the value of work that should have beendone at a given point in time, it indicates thebudget and work targets at that point in time.
PMG_B-C
To Endof
Glossary
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
PMG_B-C
Budget Variance.
As a project progresses it is important to monitorthe overall costs of the project in relation to the
original budget. These values are :
Business Coordinator.
The business coordinator is responsible for theplanning, monitoring and reporting of a variety of
administrative aspects of the project. The businessco-coordinator should act as the focal point foradministrative controls and is responsible for
seeing that quality control procedures arefollowed.
Business Case.
The business case details the justification forundertaking, and for continuing, a project. It isused to define the financial and other benefits
which the project is expected to deliver, and thecost, timescale and other constraints within which
the project is required to operate and againstwhich its performance will be evaluated..
ECAC - Estimated Cost at Completion
This is a revised prediction of how much theproject will cost (it takes into account the moneyspent so far and your current estimate of the total
resources required to complete the project).
BCAC - Budgeted Cost at Completion
This is the original budget for the whole project.
% Budget Variance
% Budget Variance = (BCAC - ECAC)/BCAC * 100
Chairman.
The chairman of a quality review should ensurethat the review process is properly organized in allthree of its phases; preparation, review and follow-up. He/she chairs the review, records the actions
noted by the reviewers and ensures that thedirection of the review does not stray from its main
aim - to detect errors.
Change Control.
The recommended change control framework isadministered via the project exception mechanism.Project exceptions enable anybody connected with
the project to raise any issue that is concerningthem with the confidence that this issue will be
analyzed via formal procedures. Project exceptionsshould be processed within the framework of a
formal configuration management scheme.
Change Request.
Change requests are a formal means of proposingmodification to the proposed end-product. Theyshould only be raised under the authority of the
project Manager as a result of analysis of a projectexception. Each change request should be
evaluated and a decision made whether to reject it,adopt it immediately or adopt it at a later date. Inthe latter case it is "held over" and may form partof a later enhancement to the product in question.
PMG_C
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
PMG_C
Configuration Audit.
Configuration audits involve verifying that all ofthe required configuration items are, in fact, in the
stage of production indicated by the progressreporting information and that the current version
agrees with specified requirements. The auditsshould also ensure that the technical
documentation completely and accuratelydescribes the configuration items and that all
change requests have been resolved.
Configuration Control
Configuration control is the process of evaluating,approving and coordinating changes to
configuration items after formal establishment oftheir configuration identification description
record.
Configuration Identification.
The process of identifying and designating theconfiguration items in a project and recording their
characteristics. The method and scope ofidentifying configuration items should be designed
to address the requirements of each individualproject.
Configuration Item.
Configuration items can be formally defined as;"Any article that is indicated by any component ofa configuration that has a defined function and is
designated as requiring the controls ofconfiguration management." Configuration items
vary widely in complexity, size and type.
CIDR -Configuration Item Description Record .
The configuration item description record contains theinformation needed to identify and track a configuration
item through its development life cycle and correctlyposition it in the final deliverable. This record should
contain the following information :
1) Name2) Description
3) Life-cycle description4) List of parent items5) List of child items6) Staff responsible
7) Date responsibility started8) Source - e.g. in-house, externally supplied etc.
9) Current life-cycle phase10) Latest baseline identity
11) Product list - required for current step12) Change history - for any associated products
Configuration Administrator.
The configuration administrator is appointed toadminister the configuration management and
project exception procedures. They should controlthe receipt, storage and issue of the products
created during the life of the project. This role mayexist within the project team, or externally with
responsibility for the delivered end-product - ratherthan being concerned with the project itself.
Configuration Management.
Configuration management is the process ofidentifying and defining the configuration items
within the project environment and controlling therelease and change of those items throughout the
life cycle of the project. Configuration managementalso encompasses the recording and reporting of
the status of configuration items and changerequests, and verifying the completeness and
correctness of configuration items.
Configuration Management Plan.
The configuration management plan should detailthe configuration management procedures to be
used throughout the project. It should be producedas part of the project initiation document, for
approval by the project owner - at project initiation.
PMG_C-D
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
PMG_C-D
Control Points.
Project controls should be applied as and whenrequired. The controls are divided between
management and product controls - the formerbeing collectively termed control points, i.e.
1) Project initiation2) Project reviews4) Project closure
5) Post implementation review
Critical Path.
The critical path is the sequence of activities, asdepicted on a PERT chart (activity network), thatshould take the longest time to complete. This
sequence of activities (and there may be more thanone such sequence on the network) will have zero
float associated with it. The critical path isprobably the single most important item ofinformation shown on a PERT chart and is
normally highlighted in some way - e.g. by using acontrasting color.
Dependency.
A dependency indicates a constraint on thesequence and timing of work within a project.Activities may be dependent on other project
activities (internal dependencies) or on resourcesor inputs from outside the project (external
dependencies).
Detailed Plan.
A detailed plan normally comprises twocomponents - a detailed technical plan and a
detailed resource plan. Detailed technical plans willexist on most larger projects. They are used to
give a detailed breakdown of certain majoractivities, e.g. product testing, and are produced as
and when required. A detailed resource plan willexist when it is considered necessary to plan andcontrol a particular major activity within a stage.The detailed resource plan sets out the costs and
resource usage, categorized by resource type,which correspond to a detailed technical plan..
Detailed Resource Plan.
A detailed resource plan should be created when itis considered necessary to plan and control a
particular major activity within a stage. Thedetailed resource plan sets out the costs and
resource usage, categorized by resource type,which correspond to a detailed technical plan.
Detailed Technical Plan
Detailed technical plans give a detailed breakdownof certain major activities, for example producttesting, and should be produced as and when
required.
Document Update Request.
A document update request (DUR) is used todocument any situation where the products being
developed will fail to meet their originalspecification in some respect.
A DUR is a formal document that is used to updatethe documentation to reflect the product as it now
is, rather than as it was in the existing designdocumentation.
PMG_E-H
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
PMG_E-H
Earned Value Analysis.
Earned value analysis (EVA) is an approach whichcompares the value of the work done with the
value of the work that should have been done. Youdo not need to know how much has been spent -just the amount of work done and its value. EVA
overcomes many of the intrinsic delays associatedwith variance analysis - the major problem with
which is the amount of time it takes to accuratelyestablish actual costs.
End Project Report.
This report should be produced by the overallproject manager and tabled at the project closure
meeting. It is used to document the projectsperformance and the major issues that were raised.
To ensure that the experience of the project isrecorded for the benefit of others it is helpful to
hold a post-implementation review, typicallyaround six months after delivery of the projects
end-product.
Exception Memo.
An exception memo is a document that should beused to record situations which have resulted in a
significant deviation from the planned qualityreview activities. They may be raised by the sub-
project manager or project manager, or thechairman of a quality review.
Float.
Activity float is a measure of the flexibility of anactivity, indicating how many working days theactivity can be delayed or extended before it willeffect the completion date of the project - or any
shorter term milestone dates that are beingapplied. In addition to the float associated with aspecific activity, there are two other types of float
in network analysis:1) Total float - here the float is shared with all of theother activities in the arm. Therefore using the floatin one activity will reduce the float available for the
other activities.2) Free float - this is the amount of float that theactivity can use up without affecting the 'earliest
start' of any other activity. Only activities thatprecede a junction can have free float..
Gantt Chart.
Gantt charts, or Barcharts, are one of the mostwidely used project planning diagrams. The
horizontal axis is normally used to represent thecalendar time-scale in days and the activities arerepresented along the vertical axis. These charts
should clearly communicate the duration andscheduling of the various activities - each activitybeing represented by a horizontal line from the itsstart to its finish date. The length of this line will be
in proportion to the scheduled duration of theactivity.
Highlight Report
Highlight reports should be prepared by the projectmanager at intervals determined by the project
owner, often monthly or four-weekly. They can alsobe generated at any time if the project managerbecomes aware of an issue of sufficient urgency
that needs to be communicated to the projectowner. Highlight reports are also used to collate
and distil the information conveyed in the progressreports. They review progress to date and highlightany actual or potential problems which have been
identified during the period which they cover.
Histogram
Histograms are graphical representations of theamount of resources that will be needed over a
given period of time. They are a widely usedproject planning aid and are normally derived fromthe relevant Gantt chart. The only information thatmay be required in addition to the Gantt chart isthe type of specialist resource required for each
activity.
PMG_I - L
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
PMG_I - L
Impact Analysis.
Impact analysis is the term given to the process ofassessing the ramifications of pursuing a
particular course of action - typically a change tothe existing project. Impact analysis can be carried
out quickly and easily under a configurationmanagement method which contains the following
features:1. A mapping from the requirements onto the
configuration items2. mapping from configuration items back onto the
requirements3. A structure showing the relationships betweenconfiguration items, so that no configuration itemis changed without checking for implications that
may effect its 'associates'.al plan.
Library.
A library is a set of configuration items - whetherthey comprise physical components, software ordocumentation. The project environment should
have only one library, containing references to allconfiguration items; if not the items themselves.
Each individual item within the library, i.e. allversions and all variants of all configuration items,
will have a unique identification. Where severalprojects are working on the same end-product,
they will share the library.
Implementation Strategy.
Projects that are delivering a sophisticated orwidely used end-product may well require animplementation strategy in order to detail the
introduction and initial use of the end-product.Examples would include projects aimed at
introducing new technology or at widening itsapplication - for example the introduction of a newcomputerized accounts system. Other examplesinclude business re-engineering projects and thedelivery of large products that have a technical
bias.
Individual Work Plan.
The individual work plan is the lowest level oftechnical plan which defines the tasks and
responsibilities of an individual team member. It isderived from a project technical plan, a sub-project
technical plan or a detailed technical plan -depending on the size and scope of the project.Individual work plans should be created by team
leaders in conjunction with the appropriate projectmanager.
Informal Review.
Although the main application of quality reviews isfor the formal review of an evolving, or complete,
product; it is also possible to use a subset of theseprocedures in order to conduct an informal review.Informal reviews should be designed specifically to
address the needs of the product(s) in question -but typically the usual sequence of events
consisting of preparation, review and follow-upmay be concatenated - as may the staff involved in
the process.
Life Cycle.
Projects are temporary structures set up with thespecific aim of delivering an identifiable end-product. All projects will therefore have an
identifiable life cycle, thecharacteristics of which will vary according to the
size and complexity of the project. A typical lifecycle will run from the formal initiation of a project
through to a post implementation review of thedelivered end-product. This is an important point -
that most project life cycles extend beyond theformal project closure and hand over of the
specified end-product.
Line Manager.
Line managers are those staff who occupypermanent managerial positions within the
organizational structure. The term is used to referto all levels of organizational
management but does not include projectmanagement staff - who operate in a fluid
environment (projects by their nature beingtemporary structures). Departmental managers,heads of department etc. are all job descriptions
that fall within the general umbrella of linemanagement.
PMG_M - P
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
PMG_M - P
Matrix Management.
A descriptive term for the managementenvironment where projects cut across
organizational boundaries and involve staff whoare required to report to their own line
manager as well as to project management staff. Inthis environment, staff are required to report tomore than one manager - hence the term matrix
management.Marketing/User coordinator. The marketing, or
user, coordinator is responsible for the planning,monitoring and reporting on all marketing, or user,related aspects of the project. This role essentiallyinvolves representing the marketing department or
the users at all times.
Plans.
The plans used should be tailored to match therequirements of each individual project. A flexible
framework of plans is proposed, along with anexplanation of their use in a variety of project
scenarios. Planning is an essential process but onethat is frequently under- valued or viewed as 'anunproductive use of resources'. However whilst
highlighting the need for effective planning itshould be realized that the rigorous adherence to acomprehensive set of plans is not always the ideal
solution for each and every project.
Post Implementation Review.
A post implementation review should be viewed asan integral part of the management and control ofthe end-product, carried out typically some 6 to 12months after the end-product has been delivered.Its purpose is twofold: to check that the deliveryhas met the project objectives; and to check that
the delivered product is meeting user needs.
Presenter.
A presenter at a quality review is usually the authorof the item under review. During the preparationfor, and during, the quality review he/she should
ensure that the other review attendees (thechairman and a number of reviewers) have all theinformation they require in order to carry out the
review effectively.
Product.
The concept of products is very useful as itfacilitates efficient planning, activity identificationand resource allocation. The overall deliverable of
the project is termed the end-product. Productscan be identified as any tangible output, either
produced by, or for, a project. Virtually anythingcan be identified as a product - for the purposes of
facilitating their planning and production. Aproduct may be a physical component, an item of
software, an intellectual creation, documentation oreven a discrete group of tasks or activities (whenthe planners are desperate). A product may itself
be a collection of other products - therefore givingrise to a product breakdown structure (PBS) and
associated product specification diagrams.
Product Description.
The product description describes the purpose,form and components of each product and lists the
quality criteria which apply to it. Each product inthe product breakdown structure is associated witha product description; the component products ofa complex product may be described in separateproduct descriptions, producing a hierarchy of
product descriptions for the product.
Product Design.
The product description describes the purpose,form and components of each product and lists the
quality criteria which apply to it. These, inassociation with the information contained in theproduct breakdown structure and product flow
diagram will constitute the product designdocumentation. Each product in the product
breakdown structure is associated with a productdescription. The component products of a complex
product may be described in separate productdescriptions, giving rise to a hierarchy of product
descriptions for the product.
Product Flow Diagram.
The product flow diagram shows how the productsare produced by identifying their derivation andthe dependencies between them. Inputs to theproduction of product flow diagrams includeproduct breakdown structures and product
descriptions. The product flow diagrams are onetype of product specification diagrams. PMG_
P - Pc
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
PMG_P - Pc
Progress Meeting.
This is a regular management control point.Progress meetings should be conducted on behalf
of the sub-project manager or project manager.They bring together the project team members and
provide the basic information used to measureactual achievement against plans. Ideally theyshould be run in an open manner, encouraging
contributions from all members of the team.
Progress Report.
Each project should hold regular progressmeetings as prescribed by the project owner -
when specifying the controls framework they wishto see. Following each progress meeting the sub-
project manager (with help from the projectcoordinators) should prepare a progress report
and forward this to the project manager.
Project
There are numerous definitions of what constitutesa 'project', many of which fail to define the term
clearly and concisely. We suggest the following :“A project is a human activity that aims to achievea clearly defined objective against time, cost and
other constraints.”Projects should be characterized by :
1. A life cycle, defined by start and end dates.2. A clearly defined objective.
3. A budget that is approved and forthcoming.4. A team of suitably qualified people.
Projects should aim to :1. Deliver the specified end-product(s).
2. Meet the specified quality goals.3. Stay within budgetary limits.
4. Deliver on time.Projects are unique, no matter how similar a
previous project may have been - each project willbe different in some respect. If this is not the case
then the work being undertaken is not really aproject.
Project Brief.
The project brief is a document initially providedby senior management, which is subsequentlyrefined by the project owner into the terms of
reference for the project. Both of thesecomponents should form part of the project
initiation document.
Project Closure.
Project closure, signifying the formal end of theproject, requires approval by the project owner.
This is normally given at the project closuremeeting control point. These activities should beled by the project owner and a formal mechanismfor project closure, including a structured project
closure meeting is advisable for all projects ofsignificant size.
Project Closure Meeting.
The project closure meeting is concerned withreviewing the project, particularly with regard to
ensuring the completeness of all projectdeliverables. The agenda should be based upon :
1. Review the end project report2. Review all other information presented by the
project manager3. Ensure that all acceptance letters are signed
4. Verify hand-over of all maintenance documents5. Verify hand-over of QA and training materials to
the relevant staff6. Schedule a subsequent meeting if any items
remain unresolved7. Inform the project sponsor and/or senior
management of the outcome8. Distribute minutes of the meeting, if appropriate.
Project Boundary.
A project does not normally exist in isolation.There are various relationships and areas of
common interests with other projects, or otheractivities in the same department, organization, or
even externally. The project boundary musttherefore be defined in a way which makes it clearhow related projects interact, and where the output
from one project forms the input to anotherproject, or related area of work.
Project Coordinators
Project coordinators can be used to providesupport in the planning and control of the project,in the application of standards, quality assuranceand user/client liaison. They are usually full time
members of the project office and bring continuityto each project they are involved with, by being
familiar with its work from beginning to end.Project coordinators may be involved in more than
one project at any given time. Four coordinatorroles are described in Project Team, and their
appointment may shadow the roles appointed tothe Project Executive:
1. Business Coordinator.2. Technical Coordinator.3. Marketing Coordinator.
4. User Coordinator.
PMG_Pd - Pm
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
PMG_Pd - Pm Project Exception
A project exception is any concern that has beenformally raised by any member of the project team.It may address a potential technical problem, such
as errors and failures, or identify ideas forimprovements. Alternatively it may address a
management issue, perhaps related to budgets,plans, schedules or skill shortages. The raising of
a project exception report should start a formalprocess to ensure that it is analyzed and resolved.This process is called change control and should
be administered within the context of theconfiguration management method adopted.
Project Exception Report.
A project exception report enables any member ofthe project team to raise any concern, in the
knowledge that it will be considered and evaluatedvia a formal mechanism. This mechanism is calledchange control and should be administered within
the context of the configuration managementmethod adopted. The original concern can relate to
any aspect of the project - it may address apotential technical problem, such as errors and
failures, or identify ideas for improvements.Alternatively it may address a management issue,perhaps related to budgets, plans, schedules or
skill shortages.
Project Owner.
The project owner is the senior management body(and this can be one individual) that is deemed tohave ownership of a project. Its members should
be appointed by the 'project sponsor' and beresponsible for approving plans, committing
resources and assessing the continuing viability ofthe project. The project owner is not normally
responsible for the hands-on management of theproject but should appoint staff to manage the
project on their behalf and should avoid becomingentangled in day-to-day management decisions.
Project Initiation.
Certain management activities are required atproject initiation to ensure that the project is
established with clear 'terms of reference' and anadequate management
structure. These activities should be led by theproject owner and a formal mechanism for projectinitiation, including a structured project initiation
meeting is strongly advised for all projects ofsignificant size.
Project Initiation Document.
The project initiation document (PID) should formthe basis for gaining formal approval for the
project - from the project owner at projectinitiation. It defines the 'terms of reference' for theproject, based on the initial 'project brief' providedby senior management. In a typical project the PID
should have the following components :* Business case
* Project boundary* Business needs
* Information needs* Organization and responsibility definitions
* Project plans* Terms of reference
* Configuration management plan (inc. changecontrol)
* Quality policy
Project Initiation Meeting
The project initiation meeting is normally the finalstage in the project initiation process. It should beconvened by the senior business member of the
project owner in order to formally initiate theproject.
Project Manager.
The project manager is appointed, by the projectowner, to assume overall responsibility for the
project throughout its life cycle. The projectmanager is responsible for : Planning at the projectand sub-project level, exercising control (on a day-
to-day basis), ensuring product delivery andexerting people management and motivation. On
large or complex projects the project manager maybe supported by sub-project managers, who are
responsible for discrete sub-divisions (called sub-projects) of the overall project. Depending on theresources required and/or the skills available, the
project owner may choose to appoint:1. One project manager, supported by a sub-
project manager for each sub-project;2. One project manager who assumes the role of
sub-project manager throughout;3. A succession of sub-project managers, eachassuming the role of project manager for the
duration of the sub-project.
PMG_Po - Pz
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
PMG_Po - Pz Project Office.
The most common project managementenvironment combines full time project staff withdepartmental staff who are used on an as neededbasis. Full time project staff who are permanently(and long term) involved in project related work,are often collectively referred to as the project
office and their purpose is to support the projectmanager in carrying out his duties. Typically the
project office supplies a variety of key projectspecialists - e.g. planners and coordinators, to any
number of projects that may be being run withinthe organization. The project office usually
includes a variety of staff with expertise in one ormore specialist project areas e.g. planning and the
application of organizational standards.
Project Office Manager.
Where the project office contains a significantnumber of people a project office manager may beappointed - to ensure the optimum utilization of its
resources. Where this is the case the projectmanagers will normally communicate directly with
this individual in order to secure project officeresources for their projects.
Project Plan.
A project plan will normally consist of a projecttechnical plan and a project resource plan. The
project technical plan is produced at the beginningof the project and shows the products required andthe corresponding schedule of major activities that
will occur throughout the project. It is a top-levelplan produced in conjunction with a project
resource plan. The project resource plan is a top-level management resource plan produced at the
beginning of the project. It addresses all of theactivities necessary in the production of all
products - categorized by resource type, which fallwithin the project boundary. Both the project
resource plan and project technical plan are usedto monitor progress on the project as a whole. The
project technical plan should also addressstrategic issues related to quality control and
configuration management.
Project Resource Plan.
The project resource plan should show thebreakdown of the major resource types the projectwill utilize. Once approved by the project owner the
project resource plan becomes the top levelbusiness plan for the project. If the project hasbeen divided into sub-projects then this plan
should reflect the content of all the sub-projectresource plans.
Project Review
Project review meetings should be staged tomonitor the actual progress against the baselined
plans and to review any current or potentialproblems. The aim of these meetings is to gatherinformation from project team members and allowthem to hear what others involved in the project
are doing. These meetings are usually held atregular intervals, for example weekly or fortnightly.
Project reviews are primarily a project managerstool for monitoring progress at a practical level.
They also consider current and potential problemsand can be used to consider corrective action,
where appropriate
Project Sponsor
The body responsible for the origination andfunding of the project. In the context of critical
projects in large organizations the project sponsorwould normally be the board of directors; less
significant projects may be sponsored at variouslower levels. The project sponsor may also be a
body that exists outside of the organization that iscarrying out the work of the project - in which case
it is normally referred to as the 'client'.
Project Team.
All of the staff working on project related tasks should beregarded as members of the project team. On large scale projects
more than one team may be set up - to reflect discrete sub-divisions of the project; whilst smaller projects are likely to be
serviced by a single team. Because any project team may consistof a mixture of full-time and part-time staff the definition of
precisely who is in the 'team' at any given time, e.g. for reportingpurposes, may not be clear cut.
Projects may be run on the basis of a single project team,alternatively a number of separate teams may be created - forexample to reflect the division of the project into sub-projects.
The team organization, responsibility definitions and theallocation of these responsibilities to individuals will depend uponthe size and nature of the project and the skill mix available. Task
leaders should be appointed, usually by identifying suitablyqualified personnel in the project teams.
Project Technical Plan.
The project technical plan shows the productsrequired and a corresponding breakdown of the
relationships between the major activities requiredby the project. Once approved by the project
owner the project technical plan becomes the toplevel production schedule for the major productsrequired throughout the project. If the project has
been divided into sub-projects then this planshould reflect the content of all the sub-project
technical plans.PMG_Q -R
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
PMG_Q -R Quality Assurance.
Quality assurance is concerned with how quality isachieved and assured through the specification of
cost-effective quality control procedures, andthrough external
inspections and audits of the quality controlsystem.
Quality Control.
Quality control is the process of ensuring that therequired qualities are built into a product
throughout its development. Quality controlinvolves the examination and checking of products
produced by the project. It is facilitated via thequality review, the various control mechanisms put
in place (e.g. progress meetings and reports,highlight reports, change control and configurationmanagement mechanisms etc.) and by the testing
of the products against pre-determined acceptancecriteria.
Quality Criteria
Quality criteria, or acceptance criteria, are thosecharacteristics of a product against which it can be
objectively measured in order to determinewhether it meets the
specified requirements. These criteria thereforedefine 'quality' in the context of that product and
should be specified, in subjective and measurableterms, in the appropriate product description.
Quality Policy
Quality policy, where it is applied, is thedocumented standard for the application of quality
assurance and quality control procedures to therunning of projects within an organization. Quality
assurance is concerned with how quality isachieved and assured through the specification of
cost-effective quality control procedures, andthrough external inspections and audits of the
quality control system.
Quality Review
The quality review is a means whereby a product(or group of related products) is checked against
an agreed set of quality criteria (or acceptancecriteria). Those criteria will be defined for everytype of product and will be supplemented withother documents as appropriate. The review
should be conducted by a chairman, a presenterand a number of reviewers. Where only a subset of
the complete review process is required, aninformal review may be carried out.
Release.
A release consists of a specified set of productsfrom one or more baselined configuration items,which are issued as a set for a specified purpose.All recipients of the release should be informed, orconsulted, before approval of any change to anyconstituent configuration items. Releases should
be authorized by the project or sub-projectmanager.
Remedial Plan.
Remedial plans may be produced in situationswhere costs or timescales have already beenexceeded, or are anticipated to exceed, the
tolerance limits. If this is the case and no easiercourse of action can be undertaken to resolve thesituation then a remedial plan may be appropriate.
It is used to detail the work considerednecessary to bring the project back in line and
effectively replaces the existing sub-project plan.
Resource Plan.
Resource plans are used to identify the type, sizeand allocation of the various resources required
during the project. There are three levels ofresource plans :
1) Project resource plan2) Sub-project resource plan
3) Detailed resource plan
Requirements Specification.
The requirements specification details the userrequirements including any constraints and
possible future enhancements. The requirementsspecification should be written at a level of detailthat enables appropriate solutions to be identified
and formally proposed.
Resource Planning
Resource planning involvesthe assignment of resources
to each project activity inorder to optimize efficiencyand effectiveness. This mayinclude scheduling activities
so as to minimize fluctuationsin day-to-day resource
requirements.
Reviewer.
A number of reviewers may attend a quality review.They are responsible for checking that the productunder review is complete and fault, or error, free.
Quality reviews should be undertaken against pre-determined quality criteria - as detailed in the
relevant product descriptions.
PMG_S - Su
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
PMG_S - Su
Senior Business Role
The senior business role is one of the threerepresentatives of the project owner - the seniormanagement body deemed to have ownership of
the project. The seniorbusiness role should chair project owner meetingsand provide direction to the other members of the
project owner, this responsibility reflecting theimportance of the
business interest. The senior business role shouldalso take personal responsibility for ensuring thatthe project is delivered on time and within budget
Senior Marketing/User Role.
The senior marketing (or senior user) role is one ofthe three representatives of the project owner - the
senior management body deemed to haveownership of the project. The main responsibilityof the senior marketing role is to ensure that theproject delivers the needs of the marketplace andto monitor progress against these requirements. Ifthe project is going to deliver an end-product for
use within the organization, then the seniormarketing member should be replaced by a senioruser member within the project owner body. Thesenior users prime responsibility should be to
ensure that the users interests are represented atall times, at project owner level.
Senior Technical Role
The senior technical role is one of the threerepresentatives of the project owner - the seniormanagement body deemed to have ownership of
the project. The mainresponsibility of the senior technical role is torepresent the interests of the development andoperations departments at project owner level;
their other duties include ensuring that thetechnical activities are properly resourced.
Stage.
Larger projects may be divided into a number ofstages; each stage forming a distinct unit for
management review purposes. The main reason fordividing a project into stages is to facilitate
detailed periodic reviews of the projects progress.The dividing up of a project into stages can be a
complex process that benefits from the applicationof past experience. Generally speaking stagesshould reflect the completion of defined sets of
products.
Sub-Project.
Large or complex projects may be broken downinto one or more discrete sub-divisions. These
sub-divisions can be identified as sub-projects forthe purpose of management control, technical
expediency, or both. It is normal to divide projectson the basis of major identifiable deliverables -such as major products, or groups of products;
however the division can be based on anyappropriate criteria.
Submission.
Formal procedures should be in place controllingthe issue and submission of all configuration items(CI's) - those relating to administrative CI's as well
as those pertaining to the evolving products.Configuration items are originally created at the
time of their identification and then issued toappropriate staff in order that the necessary workcan commence. Only when the author of a new orrevised product or document is satisfied that it is
complete and ready for review should it be re-submitted to the configuration librarian. The
configuration librarian should receive and issuecopies of all such documentation, in accordancewith the formal procedures devised, and updatethe appropriate configuration item description
record - in particular to reflect its currentcirculation. Without careful control over the issue
and submission of configuration items theconfiguration management process can collapse.
Submission Request Form.
When a new or revised product or document iscomplete and ready for review, it should be
submitted to the configuration librarianaccompanied by a submission request form,
detailing the following :1) The identity of the document, and version
number2) The date of submission
3) The configuration item (CI) to which it relates4) Step and stage number in the CI's life cycle
5) The name of the person submitting it6) A list of the reviewers - each will need a copy
Sub-Project Manager.
The sub-project manager is appointed, by theproject owner, in consultation with the project
manager, to assume day-to-day management ofone or more discrete
sub-divisions of the project (the sub-projects). Theresponsibilities of this role are similar to those of
the project manager but are restricted to theboundaries of the clearly defined sub-project. Thesub-project manager should report directly to the
overall project manager.
PMG_Su - T
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
PMG_Su - T Sub-Project Plan.
The sub-project plan normally consists of a sub-project technical plan and a sub-project resourceplan. A sub-project technical plan is required foreach sub-project. It shows all technical products,
activities and quality controls in that sub-project. Asub-project resource plan contains details of all the
required resources for any one particular sub-project. A sub-project resource plan is produced
initially - as the budget for the sub-project ispresented to the project owner for approval priorto the formal commencement of the sub-project.
Sub-Project Resource Plan.
The sub-project resource plan contains details ofall the required resources for any one particularsub-project. It is produced initially as the budget
for the sub-project is presented to the projectowner for approval prior to the formal
commencement of the sub-project. After approvalthis plan is used by the sub-project manager toreport actual financial expenditure and resource
usage against that planned.
Sub-Project Technical Plan.
A sub-project technical plan is normally requiredfor each sub-project of a project. It represents all of
the technical products, activities and qualitycontrols within the scope of the sub-project. The
sub-project technical plan is produced inconjunction with a sub-project resource plan. The
plans for the first stage sub-projects should beprepared and submitted at project initiation.
Task Leader.
The task leader fulfils a role in the projectorganization similar to that of a first line supervisor
and will usually be expected to take on theresponsibility for delivering discrete areas of work.
Task leaders should be appointed, usually byidentifying suitably qualified personnel in the
project teams.
Technical Coordinator.
The technical coordinator is responsible for theplanning, monitoring and reporting on all technicalaspects of the project. The technical coordinator is
also responsible for ensuring that theorganizational technical standards are applied
correctly and that products meet their technicalquality criteria.
Technical Plan
Technical plans are used to define the sequenceand timing of activities, together with
responsibilities assigned forproducing various parts of the overall product.Technical plans are derived from the product
breakdown structure, the product flow diagram(PFD) and the PERT chart (which is itself based on
the transformations identified from the PFD).There are four levels of technical plan :
1. Project technical plan2. Sub-project technical plans
3. Detailed technical plans4. Individual work plans
Terms of Reference.
A definition of the objectives for a project,including any relevant background information.
Tolerance
The permitted limits - as set by senior managementor the project sponsor, in terms of the cost andtimescale of the overall project. Tolerance mayalso be set by the project owner in terms of thecost and timescale of either a project or a sub-
project. These limits may not be exceeded withoutreference to the appropriate body (the project
owner, senior management or the project sponsor -in the case of externally funded projects).
User Co-coordinator
The role responsible for monitoring, advising andreporting on all user aspects of the project.
PMG_V - Z
Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)
PMG_V - Z
Variance.
Variance quantifies the difference between thecosts detailed in the plans and the actual costs
incurred at any point intime. It can be used to quantify the difference
between the planned costs and the current costsincurred, at whatever level is required - for example
for the project as a whole, for a sub-project, agroup of related tasks or for individual tasks. In
order to calculate variance, up to date and accurateinformation is essential - this is the main difficulty
preventing the practical application of thisstraightforward technique.
Version.
A configuration item may have a number ofversions relating to the continuing development of
that configuration item.In the first instance, a configuration item should be
created and documented by the configurationlibrarian (the first
version). The configuration item may then undergoa number of modifications as it is tested and errors
corrected, or as changesare requested
Work Breakdown Structure
The work breakdown structure is a product-oriented subdivision of all of the resources,
including hardware, services and data that arerequired to deliver the required
end-product. The projects end-product appears atthe top of the work breakdown structure, with the
products that are required representedhierarchically beneath it. The work breakdownstructure can be split into a series of diagrams,
representing discrete sub-divisions; such asproduct groupings or all of the products relating to
specific sub-projects.
PMDefn.
ToIntroduction
page
To Start Pageof
Glossary