InvestinGreenJanuary2011
7/31/2019 Invest in Green
2/31
TheGreekRESMarkettoday
TheGreekInvestmentProposal
Legislation&Regulation
RESInvestmentProjects
7/31/2019 Invest in Green
3/31
TheGreekRESMarkettoday
7/31/2019 Invest in Green
4/31
TheGreekRESmarkethasshownstrong
performance
EvolutionofShareofRESinelectricityproduction
largehydroexcluded
3,5%
3,75%
Source:RAE
10
7/31/2019 Invest in Green
5/31
andhasreachedaconsiderablepercentage
ofelectricity
production
ElectricityProduction,2009 ShareofallSourcesinElectricityBalance
Hydro
10%
RES
3,75%70%
Lignite
NaturalGas19%
62%
52%
40%
50%
60%
Oil5% 19%
10% 8%
20%
12% 12%
10%
20%
30%
Hydro
RES4,3%
ElectricityProduction,2010*,
0.30%,
0%
Lignite
NaturalGas
2009 2010
Source:RAE
60%
Oil0%
Estimateyearend11
7/31/2019 Invest in Green
6/31
A
B
C
527 209 246
A B C
588 179 106
A B C
682 236 4EasternMacedonia&Thrace
CentralMacedoniaWestMacedonia
Epirus
A B C
228 44 45
A B C
239 154 44
Thessaly
A B C
2574 1129 321
A B C
185 114 71
A B C
CentralGreece
ATTIKIWestGreece
715 329 120367 215 66
A B C
A B C
1485 749 218 SouthAegean
Islands
Peloponnese
76 4 2
A:Licensesatdifferentstages(MW)
B:LicensesatthestageofSupply
connection(MW)C:UnitsinOperation(MW) Source:HTSO,ReportfortheDevelopmentoftheTransmissionSystem20102014
7/31/2019 Invest in Green
7/31
anddifferentRESSourcespenetrating
inEvery
Region
EasternMacedonia
Thrace
Wind:
197
MWSolar:4,6MW
CentralMacedonia:
Wind:27MW
Solar:
20
MWSmallHydro:53
SmallHydro:2MW
Other:63MW
Biomass:8
Other:45MW
Epirus:
Wind:
212
MWSolar:20MW
SmallHydro:59MW
Biomass:2MW
Solar:4MWSmallHydro:46MW
er:
Peloponnese: Evia:Wind:216MW
Wind:71MW
Solar:0,2MW
Wind:213MW
Solar:18MW
SmallHydro:3MW Attiki:
Wind:2MW
Solar:1MW
Wind:3MW
Solar:2MW
Biomass:40MW
SmallHydro:1MWOther:30MW
Source:HTSO,ReportfortheDevelopmentoftheTransmissionSystem20102014
7/31/2019 Invest in Green
8/31
InvestmentsinRES,approvedforfunding
throughthe
Investment
Incentives
Law
88 projects,2,1 billion,224 newworkingplaces
ManufacturingFacilities6projects,270,65mil.
672newworkingplaces
7/31/2019 Invest in Green
9/31
*.
Company NAME Capacity (MW)* Market Share
Rokas Renewables (Iberdrola) 287,60 20,6%
, ,
Terna SA 141,97 12,1%
Enel 86,23 7,9%
Ellhnikh Texnodomikh SA 76,70 7,1%
Eunice 46,00 4,2%
Babcock & Brown 42,00 3,9%
PPC Renewables 39,25 3,6%
Acciona 34 85 3 2%
*Capacity
of
the
companys
wind
projects
operating
or
currently
under
development
Source:ELETAEN
7/31/2019 Invest in Green
10/31
.
Thetopfive(5)ofCompanieswithOperation
License*
Thetopfive(5)ofCompanieswithProduction
License*
A/A CompanyName
Capacity
(MW)A/A CompanyName
Capacity
(MW)
1 Iktinos SA 4,51 PPCRenewables 50
2 RokasSolarIILLC 22 Aktina S.A 24
3 Za eiratosEnergyEE 3
4 AnemosSA 2
3 SelectedVoltSA 10
4
InternationalAirportofGreece Eleftherios
Venizelos 8
5 Tekom A.B.E.T.E. 25 EDFENSA 8
*Source:RAE
7/31/2019 Invest in Green
11/31
The
Greek
Investment
Proposal
7/31/2019 Invest in Green
12/31
ThestrengthsoftheGreekRESmarketcreatea
veryattractive
business
opportunity
Bound by EU regulations and Kyoto Protocol agreements
National target for RES at 20% of electricity production by
44 Billions EurosInvestment
2020
Increased domestic demand for electrical energy, to
210.000newJobs
, ,
2009
High feedin tariffs through 20 year PPA (power purchase
Projectswith
strongcashflows
andattractive
agreement)
Ideal conditions for wind and solar energy
Investment
Decrease of RES production cost, attractive investmentincentives
7/31/2019 Invest in Green
13/31
Greeces attractivenessin RES
(Ernst&
Young,
August
2010)
7/31/2019 Invest in Green
14/31
Greecehasalongwaytogoinordertoreach
e
uropean
arge s
EUMemberState 2008Figure 2020Target %Tocover:
1 UnitedKingdom 1,5% 15% 13,5%2 Ireland 2,9% 16% 13,1%
3 Greece 7,1% 20% 12,9%4 Denmark 17,2% 30% 12,8%5 France 10,5% 23% 12,5%6 Netherlands 2,7% 14% 11,3%7 Spain 8,7% 20% 11,3%
EU 9,2% 20% 10,8%
8 Italy 6,3% 17% 10,7% , ,
10
Belgium
2,6
% 13
% 10,4
%11 Cyprus 2,7% 13% 10,3%12 Germany 7,8% 18% 10,2%13 Luxembourg 1% 11% 10%14 Malta 0% 10% 10%15 Portugal 21,5% 31% 9,5%16 Slovenia 15,5% 25% 9,5%17 Finland 28,9% 38% 9,1%18 Austria 25,1% 34% 8,9%
19 Lithuania 14,6% 23% 8,4% , ,
21 Hungary 5,1% 13% 7,9%22 Sweden 41,3% 49% 7,7%23 Poland 7,5% 15% 7,5%24 Slovakia 6,8% 14% 7,2%25 Bulgaria 8,9% 16% 7,1%
oman a27 Czechrepublic 6,5% 13% 6,5%
7/31/2019 Invest in Green
15/31
TheGreekRESMarketisexpectedtogrow
significantly
TargetedparticipationofRES&conventionaltechnologyinelectricity
generationfortheyear2020 inmarketshares&numericaltargets
In20201MWoutof3MW
shouldcomefromRES
TargetsarebindingfortheGreekgovernment
WindenergyisexpectedtodominateelectricitygenerationfromRES
Theinfrastructurecostto
meettargetsrepresents1/3
ofthepenaltytobepaidby
Greeksincasethetargets
arenotmet 7,500NationalTargetsfortheyear2020
PV 1,44% Hydro6,08% Biomass
3,237
4,650
2,200
ParticipationofRES&ConventionalTechnology
inElectricityGenerationfortheyear2020
Geothermal
0,24%
Biogas
0.53%
Wind24,09%0 184 0
1,327
60120 250350
Hydro Geothermal PV Concetraded Wind Biomass
Concetrated
Solar 0.73%
Conventional
66,90% Source:YPEKA,NationalRenewableEnergyActionPlan
Source:Committee fortheNationalEnergyStrategy
Solar
Capacity2010 Target2020
7/31/2019 Invest in Green
16/31
TheRenewableEnergySourcessectorin
Greecehas
various
opportunities
to
offer
Wind
Greenfieldinvestmentsinwindfarms
Cooperationwithexistingfirms
PV&SolarThermal GreenfieldinvestmentsinPV&Solar
Thermalparks
g manu ac ur ng
Geothermal Greenfieldinvestmentsingeothermal
GreenfieldinvestmentsinBiofuelplants
Biorefineries
y ro
plants
7/31/2019 Invest in Green
17/31
.accordingtotheWindEnergy
productionPotential
7/31/2019 Invest in Green
18/31
andtheSolarenergyproduction
potentialof
each
area
7/31/2019 Invest in Green
19/31
ElectricityProductionfrom:
Interconnected
System
(Euro/MWh)
Noninterconnected
Islands
(Euro/MWh)
OnshoreWindFarms>50kW 87,85 99,45
WindEnergy 50kW 250
,
PV 10KW onrooftops 550
SolarThermal 264,85
SolarThermal withstoragesystemwhich
ensures2operationalhours.
284,85
Geothermalenergy oflowenthalpy 150
Geothermalenergy ofhighenthalpy 99,45
7/31/2019 Invest in Green
20/31
ElectricityProductionfrom:
Interconnected
System
(Euro/MWh)
Noninterconnected
Islands
(Euro/MWh)
Biomass 1MW 200
1MW 2MW 99,45
Biogasoutof biomass 3MW 220
Biogasoutofbiomass>3MW 200
, ,
7/31/2019 Invest in Green
21/31
Year Month
Tariffs(/Wh)
InterconnectedSystem
>100KW
7/31/2019 Invest in Green
22/31
95.3871.76
70.47
68.76107.81
129.21
SLOVENIA
SPAINPrem
UK
396.96
330
277.46
324.85
333.33
68.76
107.81
SLOVAKREPUBLIC
SPAINFIT
UK
69.9114
94
94.5
91.79
76.46
186
MALTA
POLAND
ROMANIA
395
69.9
516.33
94
370
.
LUXEMBOURG
NETHERLANDS
PORTUGAL
114.22
58300
148.79145.31
75.31.
IRELAND
ITALYGC
LITHUANIA
391.2550
437.25
319.4
450
114.22
190
376.17
427.65
GREECE
IRELAND
LATVIA
Greece
70.62
51.76
128.965
92
85.94
95130
.
CZECH REPUBLIC GP
ESTONIA
FRANCE
GREECE 550
350
447.37
464.52
67.15
51.76
128.9
CYPRUS
CZECHREPUBLICGP
ESTONIA
102.88
75.4
142.3
86.24166
107.77
.
129.31
138.5
EU27AVERAGE
BELGIUM
CYPRUS
421.08282.63386.47
504.8
403.41
0 100 200 300 400 500 600
EU27AVERAGE
BELGIUM
2121
0 50 100 150 200 250 300 350Offshore Onshore
PV PVFullyorPartiallyIntegated
Source:EuropeanRenewableEnergiesFederation(EREF),Report2009
7/31/2019 Invest in Green
23/31
7/31/2019 Invest in Green
24/31
ew
ex e
ramewor
or
NationalRESTargets
fortheyear2020LandPlanningforRES
CasesExcludedofthe
productionlicense
issue
RESinBuildingsOnestopshopfor
RES
Contributionofthe
energyproduced
fromRES:
(a)tothegrossfinal
ener consum tion
InstallationofRESin
compliancewiththeGeneral
andSpecialFrameworkfor
LandPlanningandSustainable
Develo ment for RES
Geothermalstations
withcapacityless
than0.5MW
biomass,biogasand
biofuel roduction
TheuseofRESinnewbuildingsismandatory
Specialprovision(KENAK)forenergy
AnIndependent
ServiceforRESis
introducedinthe
MinistryOf
Environment Ener
by20%
(b)tothegross
electricalenergy
consumptionofat
InstallationofRESin
compliancewiththeGeneral
andSpecialFrameworkfor
LandPlanningandSustainable
withcapacityless
than1MWPVorsolarthermal
stationswith
sav ngs n ebuildingsector
ProgramSave
Energyathome(expectedtobe
andClimateChange
whichwillactasan
onestopshopand
willberesponsible
(c)tothefinalenergy
consumptionfor
heating&coolingof
atleast40%
Permissiongrantedforusing
highproductivityagricultural
land,providingthatitcovers
lessthan1%ofallfarmlandin
MW
windparkssmaller
than100KW
combinedcyrcle
January2011)
informationtoall
potentialinvestors
whoaareinterested
inRES(d)Tothegross
energyconsumption
intransportationby
10%
thespecificprefecture
Permissiongrantedforusing
highproductivityagricultural
land,providingthatitcovers
lessthan1%ofallfarmlandin
stationswith
capacitylessthan1
MW
standaloneREor
combinedcircle
23 PleaserefertothefulltextofthenewLaw3851/2010fordetailed
andanalyticalinformation
thespecificprefecture stationsnot
connected
with
the
grid withcapacity
lessthan5MW
7/31/2019 Invest in Green
25/31
OffshoreWindFarms:
thelight
just
turned
on
TheIndependentOfficeofRES,
whichbelongstotheMinistryof
Environment&ClimateChange
AccordingtothenewRESLaw3851/2010:
The
installation
of
wind
farms
for
the
production
of
(YPEKA)isresponsibleforthe
planningandthecoordinationof
offshorewindfarms.
allowed.
Fortheconstructionandtheoperationofeachoffshorewindfarm,thecontractorfollowstheprocedure
ofenvironmentalApproval.
Aftertheissueoftheinstallationlicense,anopenpublictenderingisannounced,fortheexecutionwith
theoffshorewindfarmanditsconnectiontothe
network.
TheOneStop ShopbelongstotheMinistryofEnvironment&ClimateChange(YPEKA)isresponsible
fortheplanningandthecoordinationof offshore
windfarms.
Thepotentialistremendousformanyareasofthecountry
7/31/2019 Invest in Green
26/31
O shoreWindFarms:
ProposedAreas
Theproposedareas*forthe
developmentofoffshorewindarms,accor ingtot e
preliminaryreportconducted
bytheIndependentOfficefor
RES arethefollowin :
Alexandroupolis Fanari Thassos amo ra Limnos Kymi
Petalion Kerkyra
Pleasenotethattheevaluationofthe
ro osedareasisunder ro ress.
7/31/2019 Invest in Green
27/31
Licensing Procedure - Steps Time Needed
RAE / ProductionLicense
Region in charge /Operation License
Production License 3 months
(a) connection offer, 4 monthspprova o
environmental terms,(c) forestal license
(a) Installation Licenseb contract for connection
4 months
Region in charge /Application for:
(a) connection offer,
(b) approval ofenvironmental terms
Region in charge /(a)Installation License
(b)contract forconnection
(c) contract of purchase of
electric power
Operation License 1 month
(c) forestal license
of electric power Total Time Needed 12 MONTHS
7/31/2019 Invest in Green
28/31
LicensingProgressof
RESprojects
(by
technology)
TECHNOLOGY
WithOPERATION
License
WithINSTALATION
License
WithPRODUCTION
License
Totalca acit MW Totalca acit MW Totalca acit MW
Wind1218,5 1198,3 9504
Biomass43,3 21,2 319,6
Geothermal 0 0 8
SmallHydro185,1 84,9 754,4
PV139,7 232,2 1026,8
SolarThermal
0 0 0
Hybrid0 0 150,1
TotalCapacity(MW)1586,6 1536,6 11762,9
Source:YPEKA,October2010
7/31/2019 Invest in Green
29/31
7/31/2019 Invest in Green
30/31
Iberdrola RokasWindFarminEvoia MytilinaiosWindFarminThrace
7/31/2019 Invest in Green
31/31
YourInvestmentPartnerintheregion