SEWER SEPARATION
Field investigations are ongoing from December 2014 to June 2015
ININVESTING
Northeast Industrial District
PROJECT AREA
WHAT?
• Construction of approximately 13,500 feet of sanitary sewers.
• Separation of approximately 260 acres of the combined sewer system.
• Elimination of Diversion Structure 006.
WHY?
• Eliminate overflows.
• Reduce the volume of untreated wastewater to the receiving waters downstream.
• Meet regulatory requirements as part of KC’s Overflow Control Program.
WHEN?
• Field investigations will be ongoing from December 2014 through June 2015.
• Construction is expected to be completed in late 2017.
SEWER SEPARATION
YOUR INVESTMENTS AT WORK
Northeast Industrial District
QUESTIONS?
WHO?
• Kansas City Water Services assisted by Tetra Tech, Ace Pipe Cleaning, EAE Inc., Schmitz, King & Associates, SE3, TSi Engineering, Inc., and Vireo.
WHERE?
The project area boundaries:
• Northern boundary: Riverfront Road/Levee Road
• Southern boundary: Front Street
• Eastern boundary: North/south railroad track (between Southern Rd. and Topping Ave)
• Western boundary: Riverfront Road
IMPROVEMENTS?
• More reliable sanitary sewer service and stormwater conveyance that is less prone to wet weather problems.
WHAT TO EXPECT?
• Various field crews cleaning and closed-circuit video of public sewer lines.
• Smoke from smoke testing activities.
• Temporary street closures.
• Smoke testing field crew trucks will be in the area and clearly marked.
• Once construction begins, businesses are expected to be impacted.
CONTRACT AMOUNT
Design professional services contract includes all services rendered through the preliminary design phase of the project.
• $478,000
Specific questions about this project can be directed to:
• Alex Ivanescu, Project Manager, KC Water Services, 816-513-0445, or [email protected]
• Mike Odrowski, Project Manager, Tetra Tech, 816-412-1741, or [email protected]
• Bryan Ballard, Field Crew Coordinator, Tetra Tech, 816-412-1783, or [email protected]