Investment projects and proposals
Chemical and petrochemical industry
1 Name of project ( proposal) Reconstruction of the Site of purification of hydrogen chloride and
chlorine in order to obtain hydrochloric acid and sodium hypochlorite
1. Name of project ( proposal) Isomerization of gasoline fractions with capacity 460 thousand tons per year
2. Brief description Construction isomerization of gasoline fractions will ensure production of high component will enable to reduce the benzene content in motor gasoline
3. Project Type: • Expansion • Modernization • construction
Construction
4. The project cost, mln.UAH 80 5. Own costs, mln.UAH 17 6. Needs in investment capital, mln.UAH 63 7. Form of investment resources:
• External investment • Credit • Financial leasing • Other investment agreement conclusion.
Conclusion of the investment agreement. Credit
8. Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Design and estimate documentation
9. The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
Bank guarantee
10. Payback period 3,5 years 11. Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
5ha industrial
12. Availability of land use: • Certificate of ownership • looking documents lease • Other
Certificate of ownership
13. Brief description of the company Jsc “Naftokhimik Prykarpattya” located in the eastern part of the town Nadvirna. The area of the land on which the enterprise is located -180 ha. Jt rail, pipeline and road. Provided with all necessary manufacturing processes for communications. Distance to major settlements 35 km.
14. Ownership structure (the share of state ownership,%)
Private (26%)
15. Number of employees, people 1600 16. Main activities Petrol A-80, 92.95, diesel, fuel oil, diesel fuel, coke COP-8, CC-0,
liquefied petroleum gas. 17. Company details - developer of the project:
• Address • Phone • Fax • E-mail
78405, Nadvirna , st. Maydanska, 5, (0342) 50-18-48 (0342) 50-18-56 [email protected]
2 Brief description The project includes: 1) design 2) building work 3) assembling 4) instrumentation equipment 5) start-up and debug of
3 Project Type: • Expansion • Modernization • Construction
Modernization
4 The project cost, mln.UAH 32,0 5 Own costs, mln.UAH 0,2 6 Needs in investment capital, mln.UAH 32,0 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other investment agreement conclusion.
External investment Credit
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Project proposal
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
A collateral Bank guarantee
10 Payback period 3-5 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
2,738
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Certificate of ownership
13 Brief description of the company State Enterprise "Kalush Experimental Plant is the production of chemical products for industrial purpose”
14 Ownership structure (the share of state ownership,%)
100%
15 Number of employees, people 79 16 Main activities 17 Company details - developer of the project:
• Address • Phone • Fax • E-mail
77311 Іvano-Frankivsk district., t. Kalush 11, А-8 7-58-68, 2-80-53 fax (03472) 2-80-53, www.sillard.com.ua [email protected]
1 Name of project ( proposal) Manufacture of infusion solutions 2 Brief description The production of infusion solution, including: solution of glucose 0,9
%, 5 % glucose solution, solution of dyzol 10%. 2mil.dol. per year, profitability 20%
3 Project Type: • Expansion • Modernization • construction
Modernization
4 The project cost, thd. USD 1500 5 Own costs, thd. USD 1200
6 Needs in investment capital, thd. USD 300 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other investment agreement conclusion.
Co-production
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Design and estimate documentation
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
A collateral
10 Payback period 5years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company Central district hospital 14 Ownership structure (the share of state
ownership,%) 100%
15 Number of employees, people 248 16 Main activities Solution of glucose 0,9 %, 5 % glucose solution, solution of dyzol
10%. 2mil.dol. per year, profitability 20% Health safety
17 Company details - developer of the project: • Address • Phone • Fax • E-mail
t. Gorodenka, st., Sheptytskogo,24 (03430)21092, (03430)21604
Energetics
1 Name of project ( proposal) Complex hydrotreating and dewaxing of diesel fuel capacity of 1,5 million tons per year
2 Brief description Construction of a diesel hydrotreating provided using technology company UOP Limited (USA), which enable direct process gas oil mix race, light gas oil and gasoline sulfur coking of 0,73%, output 1.5 million tons per year. The main products of complex hydro cleaning is cleaning the European standard diesel with sulfur content of 0,001%. Project payback to 3.5 years. Construction period 2009-2012
3 Project Type: • Expansion • Modernization • construction
construction
4 The project cost, mln.USD 184 5 Own costs, mln.USD 98 6 Needs in investment capital, mln.USD 86 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other investment agreement conclusion.
Conclusion of the investment agreement Credit
8 Project readiness • Project proposal • FS • Business Plan
Design estimates, (signed contracts to manufacture and supply of basic equipment)
• Design and estimate documentation 9 The way to guarantee loan resources:
• A collateral • Bank guarantee • Insurance • Other
Bank guarantee
10 Payback period 3,5 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
6,3 household building, transformer substation industrial
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Certificate of ownership
13 Brief description of the company "Naftokhimik Prykarpattya” 14 Ownership structure (the share of state
ownership,%) Private 26%
15 Number of employees, people 1600 16 Main activities Petrol A-80, 92.95, diesel, fuel oil, diesel fuel, coke COP-8, CC-0,
liquefied petroleum gas. 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
78 400, Nadvirna, st. Maydanska, 5. (0342) 50-18-48 (0342) 50-18-56 [email protected]
1 Name of project ( proposal) Production of energy saving lamps in the manufacturing of LED
connection of (VO) "Carpathians " 2 Brief description DPP Karpaty conducts research projects and working in the
manufacturing of power LEDs for lighting lamps highways categories A and B, public and industrial premises of another, emergency, evacuation light housing (the housing-sector), and use for security.
3 Project Type: • Expansion • Modernization • construction
Expantion of production, develop new products
4 The project cost, mln.USD 1,5 5 Own costs, mln.USD 0,5 6 Needs in investment capital, mln.USD 1,0 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other investment agreement conclusion.
Credit
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Business Plan
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 3 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
7,23 Industry land
12 Availability of land use:
• Certificate of ownership • looking documents lease • Other
Permanent use
13 Brief description of the company 14 Ownership structure (the share of state
ownership,%) 100 %
15 Number of employees, people 340 16 Main activities The company has developed and mastered the production of cold and hot
water produced experimental electric EVN party, together with the Slovenian company "Ahromehanika" power tractors from 35 to 50 hp gas heating units with turbovytyahom Sophia M ", intended for heating homes , started production of electronic circuit technology harnesses the American company "Delphi"
17 Company details - developer of the project: • Address • Phone • Fax • E-mail
76008, Ivano-Frankivsk, Ukraine. Galician, 201, tel/fax. 0342 571008 [email protected]
1 Name Manufacture of electrical wiring products for vehicles 2 Name of the enterprise DPP Karpaty 3 Company details - developer of the
project: • Address • Phone • Fax • E-mail
76008, Ivano-Frankivsk, Ukraine. Galician, 201, tel/ fax. 0342 571008 [email protected]
4 Ownership structure (the share of state ownership,%)
State 100%
5 Head of the enterprise Position, contacts
Director Vterkovskyy Dmytro Dmytrivych 050-433-44-30
6 Contact person for project: Position, contacts
Chief Engineer Bybyk Vasyl grygorovych . (0222) 73-17-07
7 Main activities Cable production for cars, plastic molding, stamping production. 8 authorized capital 4824,8 th.USD 9 Number of employers 340 10 Trade turnover by main assets 1822,8 th.USD 11 Scope of investment project Manufacture of cable production for modern cars 12 Readiness of the project Feasibility 13 The Project cost , thd.USD 2500 14 Own costs - 15 Needs in investment capital, thd.USD 2500 16 Form of investment resources Credit 117 Payback period 3 years
1 Name of project ( proposal) Disposal of ash waste heat power 2 Brief description Disposal of waste ash thermal power capacity to 160 tons per year by
method of producing high quality red ceramic bricks cost is lower than the usual 30%
3 Project Type: • Expansion • Modernization • construction
construction
4 The project cost, mln.UAH 20,0 5 Own costs - 6 Needs in investment capital, mln.UAH 20,0 7 Form of investment resources:
• External investment • Credit • Financial leasing
External investment direct investment
• Other investment agreement conclusion. 8 Project readiness
• Project proposal • FS • Business Plan • Design and estimate documentation
FS Project documentation, partly manufactured equipment
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
A collateral
10 Payback period 4 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
Industry land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Permanent use
13 Brief description of the company Machine-Building Plant "Avtolyvmash" The manufacturer of specialized equipment for foundry industry manufacture of machines and equipment for general purpose.
14 Ownership structure (the share of state ownership,%)
Private 100 %
15 Number of employees, people 148 16 Main activities Manufacture of machinery and equipment for general purpose,
production machines and equipment for metallurgy, mining, quarrying and construction;
17 Company details - developer of the project: • Address • Phone • Fax • E-mail
st.Yunosti, 23, Ivano-Frankivsk, 76 495, Ukraine. tel/fax: 78-74-99, mob. 050 393-44-14, 050 338-01-95. [email protected]
1 Name of project ( proposal) Design and manufacture a new generation of infrared heaters 2 Brief description Using infrared technology for energy efficiency and energy saving,
manufacturing infrared heaters, driers and drying conveyor lines for the needs of agricultural systems
3 Project Type: • Expansion • Modernization • construction
Expansion Mastering of development of the new products
4 The project cost, mln.USD 1,5 5 Own costs, mln.USD 0,5 6 Needs in investment capital, mln.USD 1,0 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other investment agreement conclusion.
Funding of the project
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
A collateral
10 Payback period To 3 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
6,94 Industry land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Permanent use
13 Brief description of the company The company is specialized in manufacturing radiocomponents, was one of the main factories in Ukraine on manufacturing of complex components of household appliances
14 Ownership structure (the share of state ownership,%)
The share of state ownership is absent
15 Number of employees, people 49 16 Main activities Major products: transformers for home appliances, connectors,
elektroroz'yemy, elektrovylky, sockets, extension cords. 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
76 009 Ivano-Frankivsk st. Maksymovycha, 15 tel/fax. 03422 64717, 0342 507172 [email protected]
1 Name of project ( proposal) Production of fuel briquettes 2 Brief description Production of fuel briquettes 3 Project Type:
• Expansion • Modernization • construction
Modernization
4 The project cost, thd.USD 600 5 Own costs Contribution, building and land 6 Needs in investment capital, thd.USD 600 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other investment agreement conclusion.
External investment Credit
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Project proposal
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
A collateral Insurance
10 Payback period 3 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
2,5ha 5,2m2 Private
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Looking documents lease
13 Brief description of the company Ltd “Eskida” 14 Ownership structure (the share of state
ownership,%) Private
15 Number of employees, people Expected in 10
16 Main activities 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Ltd “EKSIKA” v. Vorobets, Kosiv district, Ivano-Frankivsk region Yusypchuk I.M 097491 2570
1 Name Introduction of new energy saving technologies through the
reconstruction of the boiler management company 2 Name of the enterprise OJSC "Fur Company Tysmenyts'a 3 Company details - developer of the
project: • Address • Phone • Fax • E-mail
77400, Ivano-Frankivsk region, t Tysmenytsy st. Verbova, 9 (03422) 58-50-01, 58-50-08, 58-50-29 [email protected]
4 Ownership structure (the share of state ownership,%)
Private
5 Head of the enterprise Position, contacts
Chairman Artemovych Ivan Mykhqylovych (0342) 585001, 58-50-98
6 Contact person for project: Position, contacts
Deputy Chairman Proud Mikhail (0342) 58-50-29, 58-50-01
7 Main activities Semi-finished fur, fur products to the public, departmental (uniform), and special working clothes.
8 authorized capital 8,1 mln.USD 9 Number of employers 400 10 Trade turnover by main assets 1620 th.USD 11 Scope of investment project Replacing the old boiler energy saving equipment company modern
economical facilities. 12 Readiness of the project Project proposal 13 The Project cost th.USD 1312,5 14 Own costs th.USD 12,5 15 Needs in investment capital th.USD 1300 16 Form of investment resources External investment, Financial leasing 17 Payback period 8 years
1 Name of project ( proposal) Development and implementation of heat-generating equipment to
alternative fuel 2 Brief description Arrangement of heating equipment modernized, adapted to the use of
alternative fuels (shavings, briquettes) 3 Project Type:
• Expansion • Modernization • construction
Modernization
4 The project cost, mln.usd 0,55 5 Own costs, mln.usd 0,25 6 Needs in investment capital, mln.usd 0,35 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other investment agreement conclusion.
by financing innovative investment projects or joint venture
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
development of project documentation
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance
A collateral
• Other 10 Payback period 3 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
12,18 ha Industrial area
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Permanent use
13 Brief description of the company “63 Boiler Welding Plant” - an enterprise with vast technological opportunities, qualified staff and years of experience in welding production.
14 Ownership structure (the share of state ownership,%)
State 100%
15 Number of employees, people 271 16 Main activities Boilers 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Ivano-Frankivsk, Ukraine. Hriplinskaya, 1911 tel / fax. 0342 752336 Acting Chief - Kostyshyn Vitaly Ivanovych Chief Engineer – Kudryavtsev Olxiy Pavlovych (03422) 3-14-04 [email protected]
Engineering and Instrumentation
1 Name of project ( proposal) Plants for regional centers musorosortirovochnuyu number of residents to 50 000.
2 Brief description Construction of the plant and production equipment for the sorting of mixed waste intended for sorting of household solid waste breath of obtaining secondary mate ¬ rialnyh values. Implementation of this project will provide utilization of domestic waste, ecologically ozdorovlyuvatyme territory, raise the level of environmental protection and ecological security, will create preconditions for vidchutni social and economic development, including through the creation of additional working places in the lucrative enterprise.
3 Project Type: • Expansion • Modernization • construction
construction
4 The project cost (mln USD per town) To 0,9 5 Own costs - 6 Needs in investment capital (mln.USD) To 0,9 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other investment agreement conclusion.
External and direct investments
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
FS Design and estimate documentation
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
A collateral
10 Payback period To 3 years 11 Characteristics of land
• Total area, ha • The presence of buildings and
2 ha desirable
structures • Category of land
industrial land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
industrial land
13 Brief description of the company Machine-Building Plant "Avtolyvmash" The manufacturer of specialized equipment for foundry industry manufacture of machines and equipment for general purpose.
14 Ownership structure (the share of state ownership,%)
Private 100%
15 Number of employees, people 148 16 Main activities Manufacture of machinery and equipment for general purpose,
production machines and equipment for metallurgy, mining, quarrying and construction, special purpose equipment for sorting and recycling of solid waste, foundry equipment, woodworking equipment, silhospererobne equipment eurocontainer and containers for separate waste collection, parts to different mechanisms.
17 Company details - developer of the project: • Address • Phone • Fax • E-mail
st.Yunosti, 23, Ivano-Frankivsk, 76 495, Ukraine. tel/fax: 78-74-99, mob. 050 393-44-14, 050 338-01-95. [email protected]
1 Name of project ( proposal) Skidding mobile cable installation 2 Brief description Production Forestry sliding cable systems for timber wood krutohoriv in
trunks or whip up to 1000 m. 3 Project Type:
• Expansion • Modernization • construction
construction
4 The project cost, thd.UAH Up to 500 5 Own costs - 6 Needs in investment capital, thd.UAH Up to 500 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other investment agreement conclusion.
External and direct investments
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
FS Design and estimate documentation
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
A collateral
10 Payback period 3years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
Production area Industrial land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Permanent use
13 Brief description of the company Machine-Building Plant "Avtolyvmash" The manufacturer of specialized equipment for foundry industry manufacture of machines and equipment for general purpose.
14 Ownership structure (the share of state
ownership,%) Private 100 % 15 Number of employees, people 148 16 Main activities Manufacture of machinery and equipment for general purpose,
production machines and equipment for metallurgy, mining, quarrying and construction;
17 Company details - developer of the project: • Address • Phone • Fax • E-mail
st.Yunosti, 23, Ivano-Frankivsk, 76 495, Ukraine. Tel / fax: 78-74-99, mob. 050 393-44-14, 050 338-01-95. [email protected]
1 Name of project ( proposal) Production of steel panel radiators for heating 2 Brief description production of steel panel radiators for heating in summer program
registration 600 000 pcs. in two-shift work 3 Project Type:
• Expansion • Modernization • construction
construction
4 The project cost, thd.euro 280 5 Own costs, thd. euro 10 6 Needs in investment capital, thdeuro 270 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other investment agreement conclusion.
External investment Co-production
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Project proposal
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
A collateral
10 Payback period 2,5 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
2000m2 Industry land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Leased space
13 Brief description of the company Collective enterprise specializing in manufacturing of energy saving equipment
14 Ownership structure (the share of state ownership,%)
There is no state share
15 Number of employees, people 14 16 Main activities Dynamic solar-electric heating and hot water 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
76008, Ivano-Frankivsk, st. Halitska, 201, tel.0342-57-10-92, m / t 050-944-22-47, f 10/08/1957, [email protected]
1 Name of project ( proposal) Creation and implementation of electronic learning in physics,
mathematics, technical subjects 2 Brief description This project proposes the development and production to supply
educational institutions modern scientific supplies
3 Project Type: • Expansion • Modernization • construction
Modernization
4 The project cost, mln.UAH 13.0 5 Own costs 50.0 ths. - working capital and 300.0 thous. - In the form of buildings
and structures 6 Needs in investment capital thd.UAH 12650.0 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other investment agreement conclusion.
External investment
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
FS Business Plan
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
Insurance
10 Payback period 5 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
0.46 ha Assembly, machine shop - 2nd floor (block A and B) Land of industry, transport, communications, energy, defense and other purposes
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Certificate of ownership
13 Brief description of the company State Enterprise experimental plant of programmable electronic educational terminals “Prut”
14 Ownership structure (the share of state ownership,%)
The state, property management agency - the Ministry of Education and Science of Ukraine
15 Number of employees, people 88 16 Main activities Furniture for educational institutions, technology training, furniture,
laboratory instruments 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
778200, t. Kolomyya, st. Valova,48 тел.: 03433 33588, факс: 03433 26669 e-mail: [email protected]
1 Name of project ( proposal) Production of trucks 2 Brief description The project aims to meet the growing demand for truck, saving
production, that can produce complex competitive technique 3 Project Type:
• Expansion • Modernization • construction
Expansion Modernization
4 The project cost, mln UAH 22 5 Own costs Fixed assets 6 Needs in investment capital, mln UAH. 22 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other investment agreement conclusion.
External investment Financial leasing
8 Project readiness
• Project proposal • FS • Business Plan • Design and estimate documentation
business plan and part of project estimates
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
Other
10 Payback period 2,6 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
20 ha Buildings and facilities intended for the production Land of industry, transport, communications, energy, defense and other purposes
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Other: state certificate of permanent land use
13 Brief description of the company Ltd ‘Kolomyyasilmash’ 14 Ownership structure (the share of state
ownership,%) State-corporate ownership (95.27% stake in Ukraine FGI)
15 Number of employees, people 155 16 Main activities Self-propelled and truck-mounted Universal Clamshell 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
78200, t. Kolomyya, Ivano-Frankivsk region, st Puskina, 6 ph. (03433)23581, (03433) 20898 fax:(03433) 20820
1 Name of project ( proposal) Modernization and reconstruction of existing enterprises for
manufacturing single beam overhead cranes and construction steel 2 Brief description 1. Reconstruction of existing buildings.
2. Purchase new equipment to improve product quality and reduce its cost. 3. Purchase of equipment for production of new products (cranes 15-30 tons).
3 Project Type: • Expansion • Modernization • construction
Expansion Modernization
4 The project cost, mln.UAH 3,0 5 Own costs active property complex (the preliminary estimate cost 18.4 mln.UAH) 6 Needs in investment capital Yes 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other investment agreement conclusion.
External investment Credit
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
FS Business Plan
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
A collateral
10 Payback period 5 years 11 Characteristics of land
• Total area, ha • The presence of buildings and
The total area of 4.9 ha of land The current plant
structures • Category of land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Lease for 25 years
13 Brief description of the company JSC "Kalush LCU” - working enterprises engaged in manufacturing equipment, production facilities' area about 10.0 thousand m2, all communications are secured by adequate staffing.
14 Ownership structure (the share of state ownership,%)
-
15 Number of employees, people 60 16 Main activities metal constructions 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Іvano-Frankivsk region, kalush district, v. Vistova, st. Sich.Striltsiv, 1/c (03472) 6-30-28, 6-30-81 6-30-28 К[email protected]
Light industry
1 Name Introduction of new technologies fur processing, sewing of fur and other products in light industry
2 Name of the enterprise OJSC "Fur Company Tysmenyts'a 3 Company details - developer of the
project: • Address • Phone • Fax • E-mail
77400, Ivano-Frankivsk region, t Tysmenytsy st. Verbova, 9 (03422) 58-50-01, 58-50-08, 58-50-29 [email protected]
4 Ownership structure (the share of state ownership,%)
Private
5 Head of the enterprise Position, contacts
Chairman Artemovych Ivan Mykhqylovych (0342) 585001, 58-50-98
6 Contact person for project: Position, contacts
Deputy Chairman Proud Mikhail (0342) 58-50-29, 58-50-01
7 Main activities Semi-finished fur, fur products to the public, departmental (uniform), and special working clothes.
8 authorized capital 8,1 mln.USD 9 Number of employers 400 10 Trade turnover by main assets 1620 th.USD 11 Scope of investment project Introduction of new technologies fur processing, sewing of fur and other
products in light industry 12 Readiness of the project Project proposal 13 The Project cost, thd.USD 25 14 Own costs, thd.USD 12,5 15 Needs in investment capital, thd.USD 2487,5 16 Form of investment resources External investment, Financial leasing 17 Payback period 8 years
Woodworking
1 Name of project ( proposal) PE “Alliance” 2 Brief description Acquisition of new high quality equipment for processing wood to
increase the production of wooden houses, saunas, bulb, arbors. 3 Project Type:
• Expansion • Modernization • construction
Expansion Modernization
4 The project cost, thd.USD 600 5 Own costs 6 Needs in investment capital, thd.USD 600 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other investment agreement conclusion.
External investment Credit up to 6 years, 10%
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Design and estimate documentation
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
Valuation of real estate 35.0 thousand dollars. U.S.
10 Payback period 10 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
1000m2 of productional areas
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company PE “Alliance” 14 Ownership structure (the share of state
ownership,%) Private
15 Number of employees, people 49 16 Main activities Wooden houses, saunas, cabins, pavilions
Rehabilitation and construction works, timber processing 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
PE "Alliance” Director - Dyakun Dmytro Mykolayovych (03471) 2-20-32 067-342-23-76 77 701, Ivano-Frankivsk region, Bohorodchany district, st. Petrasha, 10 (03471) 24-1-74 (03471) 24-5-32 [email protected]
1 Name of project ( proposal) "Increasing production (ltd “Olpol”) 2 Brief description Working capital to purchase raw materials for manufacturing oak barrels
in wine production by French technology 3 Project Type:
• Expansion • Modernization • construction
Modernization
4 The project cost, thd. USD 200 5 Own costs, thd. USD 60 6 Needs in investment capital, thd. USD 140 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
External investment Credit up to 3 years, 8- 10%
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
FS
9 The way to guarantee loan resources:
• A collateral • Bank guarantee • Insurance • Other
The cost of real estate 280 thousand USD.
10 Payback period 3 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
1800m2 production areas
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company Ltd “Olpol” involved in the processing and manufacturing of wood products from it.
14 Ownership structure (the share of state ownership,%)
Private
15 Number of employees, people 30 16 Main activities Wood (oak casks, barrels (font) for saunas, tubs for pickles and other
coopers' products 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Ltd “Olpol” Director Povoroznyk Yarema Fedorovych tel. 067-342-33-67 77 701, reg . Ivano-Frankivsk, Bogorochany, st. Shevchenka, 114 Tel. (03 471) 2-15-64 Fax: (03 471) 02/12/1964 [email protected]
1 Name of project ( proposal) Expansion of production of paper bags 2 Brief description Ltd. “Pamibro” - manufacturer of paper bags, with a positive reputation
in markets of Ukraine and CIS countries and among European consumers of paper bags.
3 Project Type: • Expansion • Modernization • construction
Expansion
4 The project cost, mln. euro 7,5 5 Own costs, mln. euro 1-1,5 6 Needs in investment capital, mln. euro 6,0 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
Credit Financial leasing
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
FS Business Plan
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
A collateral Bank guarantee Insurance
10 Payback period 5-7 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
3.075 ha industrial, administrative buildings non-agricultural land
12 Availability of land use: • Certificate of ownership
State certificate of ownership from the 6.5.2009
• looking documents lease • Other
13 Brief description of the company 14 Ownership structure (the share of state
ownership,%)
15 Number of employees, people 16 Main activities paper bags for the construction, petrochemical, food and other 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
77611, Ivano-Frankivsk region, u/v. Broshniv-Osada, st. Sichovykh Striltsiv, 52a / 3 (03474) 47-712, 46-851 (03474) 47-250 [email protected] www.pamibro.com
1 Name of project ( proposal) The line to get wood briquettes from sawdust (cod) any moisture. 2 Brief description Production lines for obtaining wood briquettes from sawdust (straw,
wood chips, shredded branches) any moisture that can receive various forms of briquettes and size with density from 0,8 to 1,2 g/cm3 depending on the method of formation and use them as an alternative fuel.
3 Project Type: • Expansion • Modernization • construction
construction
4 The project cost, thd.UAH To 950 5 Own costs - 6 Needs in investment capital, thd.UAH To 950 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other investment agreement conclusion.
External investment Direct investment
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Project proposal FS Business Plan
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
A collateral
10 Payback period 1,6 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
0,05ha Industrial areas
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Permanent use
13 Brief description of the company Machine-Building Plant "Avtolyvmash" The manufacturer of specialized equipment for foundry industry manufacture of machines and equipment for general purpose.
14 Ownership structure (the share of state ownership,%)
Private 100 %
15 Number of employees, people 148 16 Main activities Manufacture of machinery and equipment for general purpose,
production machines and equipment for metallurgy, mining, quarrying and construction;
17 Company details - developer of the project: • Address
st.Yunosti, 23, Ivano-Frankivsk, 76 495, Ukraine. Tel / fax: 78-74-99, mob.
• Phone • Fax • E-mail
050 393-44-14, 050 338-01-95. [email protected]
1 Name of project ( proposal) Modernization of line for splice the brick 2 Brief description Restructuring, reconstruction of basic technological cycles, introduction
of non-waste technologies. Increase production capacity of 500m3. finished products.
3 Project Type: • Expansion • Modernization • construction
Expansion Modernization
4 The project cost, mln. UAH 8,0 5 Own costs - 6 Needs in investment capital, mln. UAH 8,0 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other investment agreement conclusion.
External investment
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Project proposal
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
A collateral
10 Payback period 3 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
1,6ha Industrial fecilities- 500m2 For commercial use
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
looking documents lease with a term for 5 years
13 Brief description of the company Ltd “West Wood” 14 Ownership structure (the share of state
ownership,%) Private
15 Number of employees, people 34 16 Main activities coniferous glued bar, board, floor board 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
st. D. Galytskoho, u/v Vorohta Ivano-Frankivsk region. tel .03 434 - 4-14-69
Name Production of windows and doors
2 Name of the enterprise SE SCB "Orizon OJSC" Rodon " 3 Company details - developer of the
project: • Address • Phone • Fax • E-mail
76 000 Ivano-Frankivsk st. Vovchynetska 225 tel / fax (0342) - 72-32-29 [email protected]
4 Ownership structure (the share of state ownership,%)
Stock
5 Head of the enterprise Position, contacts
Kaspruk Yaroslav Yaroslavovych (0342) 72-32-29
6 Contact person for project: Position, contacts
Technical Director Medvid Vyacheslav Tikhonovich (0342) 72-32-21
7 Main activities Production of windows and doors, services, performance of specific orders for wood products
8 authorized capital 8,1 mln.USD 9 Number of employers 400 10 Trade turnover by main assets 1620 th.USD 11 Scope of investment project Replacing the old boiler energy saving equipment company modern
economical facilities. 12 Readiness of the project Project proposal 13 The Project cost
Own costs Needs in investment capital
1312,5 th.USD 12,5 th.USD 1300,0 th.USD
14 Form of investment resources External investment, Financial leasing 15 Payback period 8 years 16 Profitability 3%
Utilities
1 Name of project ( proposal) Implementation of the collection, recycling and disposal of solid waste in the Galician region
2 Brief description Attracting people to the separate collection of solid waste components; the creation of additional facilities for separate collection, processing and disposal of solid waste components
3 Project Type: • Expansion • Modernization • construction
construction
4 The project cost mln.UAH 15,0 5 Own costs th.UAH 150,0 6 Needs in investment capital th.UAH. 14 850,0 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other.
External investment
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Business Plan
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
Insurance
10 Payback period 3-5 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company District Council 14 Ownership structure (the share of state
ownership,%)
15 Number of employees, people 100 16 Main activities Providing services for the collection of solid waste. 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Ivano-Frankivsk region, t.Halych , sq. Voli (03431) 21-673 Halych District Council t. Burshtyn, st. V Stusa, 2 ME “Zhytlovyk” (03438) 42-681
1 Name of project ( proposal) Modernization and overhaul of the People's house in the village
Petranka 2 Brief description The type of the roof is flat, damaged and is leaking. There is need of
repairing and modernization the roof, to prevent destruction of the building
3 Project Type: • Expansion • Modernization • construction
Modernization and overhaul
4 The project cost, thd.UAH. 629,983 5 Own costs - 6 Needs in investment capital, thd.UAH 629,983 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
Involving the funds for state programs
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Design and estimate documentation
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
A collateral
10 Payback period 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
0.80ha buildings To service the premises of the house
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Permanent use
13 Brief description of the company The initiator is the Petrankivska Village Council - budget Institution 14 Ownership structure (the share of state
ownership,%) Municipal ownership
15 Number of employees, people 5 workers councils with a population 3002 16 Main activities 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Ivano-Frankivsk region, Rozhnyativ district, v. Petranka, st. Hrushevskogo146a (03474)2-02-56
1 Name of project ( proposal) Overhaul the extension of conducting of the People's house in the village. Spas
2 Brief description The roof of the building flows is necessary to arrange tent roof and modernization to prevent destruction of the building.
3 Project Type: • Expansion • Modernization
Modernization Overhaul
• construction 4 The project cost, thd.UAH 550 5 Own costs - 6 Needs in investment capital, thd.UAH 550 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other investment agreement conclusion.
The funds were raised for state programs
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Project proposal
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
A collateral
10 Payback period 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
0.18 ha Existing buildings To service the premises of the house
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Permamental Use
13 Brief description of the company The initiator is the Spas Village council - Budget Institution 14 Ownership structure (the share of state
ownership,%) municipal
15 Number of employees, people 8 16 Main activities 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Ivano-Frankivsk region, Rozhniativ district , v. Spas .(03474 )34-1-42, 2-00-65
1 Name of project ( proposal) Modernization and overhaul of the People's house in the u/v.
Rozhnyativ 2 Brief description The roof of the building flows is necessary to arrange tent roof and
modernization to prevent destruction of the building. 3 Project Type:
• Expansion • Modernization • construction
4 The project cost, thd.UAH 800 5 Own costs - 6 Needs in investment capital, thd.UAH 800 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other investment agreement conclusion.
The funds were raised for state programs
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Project proposal
9 The way to guarantee loan resources: • A collateral
A collateral
• Bank guarantee • Insurance • Other
10 Payback period 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
0,40ha Existing buildings To service the premises of the house
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Permamental use
13 Brief description of the company The initiator is the Rozhnyativ city council - Budget Institution 14 Ownership structure (the share of state
ownership,%) municipal
15 Number of employees, people 64 16 Main activities 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Ivano-Frankivsk region, Rozhniativ district, town. Rozhnyativ Unity Square (03474)2-05-76
1 Name of project ( proposal) Purchase and installation of thermal generators, which will allow low
cost heating services for the population 2 Brief description 3 Project Type:
• Expansion • Modernization • construction
Modernization
4 The project cost, thd.USD 1044,304 5 Own costs, thd.USD 94,937 6 Needs in investment capital, thd.USD 949,367 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other investment agreement conclusion.
Credit
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Project proposal
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 1,8 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
Tlumach Direction DH
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company 14 Ownership structure (the share of state
ownership,%) municipal
15 Number of employees, people 35
16 Main activities Providing DH 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
78 000 Ivano-Frankivsk region, t. Tlumach, st. Shevchenko, 3a.
1 Name of project ( proposal) Construction of station cleaning and softening water intake in the village
Nyzhniv Replacement of emergency water supply in Tlumach
2 Brief description 3 Project Type:
• Expansion • Modernization • construction
construction
4 The project cost, thd.USD 737,5 5 Own costs 6 Needs in investment capital, thd.USD 737,5 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other investment agreement conclusion.
Credit
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Project proposal
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 3,3 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company MP "Tolmach-Water" 14 Ownership structure (the share of state
ownership,%) municipal
15 Number of employees, people 33 16 Main activities Providing water supply and sanitation 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
78 000 Ivano-Frankivsk region, Tlumach district. v. Goncharivka, tel.0347921555
1 Name of project ( proposal) Modernization and overhaul of the People's house in the village.
Recruitment 2 Brief description The roof of the building flows is necessary to arrange tent roof and
modernization to prevent destruction of the building. 3 Project Type:
• Expansion • Modernization • construction
Modernization, overhaul
4 The project cost, thd.USD 550 5 Own costs 6 Needs in investment capital, thd.USD 550 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other investment agreement conclusion.
The funds were raised for state programs
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Project proposal
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
A collateral
10 Payback period 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
0,80ha Existing buildings To service the premises of the house
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Permamental use
13 Brief description of the company The initiator is the Verbivka village council - Budget Institution 14 Ownership structure (the share of state
ownership,%) Common
15 Number of employees, people 8 16 Main activities 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Ivano-Frankivsk region Rozhniativ district v. Verbivka st. Hrushevskogo, 12 03-03-1966, 03-03-1943
1 Name of project ( proposal) Construction of water pumping station on the street. Y. Tselevicha 2 Brief description The working draft provides for the construction of water pumping station 3 Project Type:
• Expansion • Modernization • construction
construction
4 The project cost, UAH 25205874 5 Own costs 6 Needs in investment capital, UAH 25205874 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
Other
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Design and estimate documentation
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
0.8609 ha Missing This corresponds to the category of land residential and public construction
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Certificate of ownership
13 Brief description of the company Capital Construction Committee Executive Board of the Ivano-Frankivsk 14 Ownership structure (the share of state
ownership,%) municipal
15 Number of employees, people 21 16 Main activities 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
76 018 Ivano-Frankivsk, st. Nezalezhnosti, 6 t. 75-23-58 t. 75-23-58
1 Name of project ( proposal) Improving the management of housing stock through a condominium
association for neighborhood Tchaikovsky in town Kolomyya 2 Brief description Carrying out maintenance works on re-equipment, energy saving and
renovated homes. 3 Project Type:
• Expansion • Modernization • construction
Modernizatio
4 The project cost, thd.USD 8370,0 5 Own costs, thd.USD 2510,0 6 Needs in investment capital, thd.USD 5860,0 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
Other
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Design and estimate documentation
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company PUD Operating housing 14 Ownership structure (the share of state
ownership,%) municipal
15 Number of employees, people 137 16 Main activities Provision of maintenance services of buildings and adjacent areas 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Kolomyya st. Bohuna, 42 Tel / Fax 03433-40931 [email protected] utility company for use of home (KPEZH)
1 Name of project ( proposal) Energy efficiency technologies for public lighting in residential buildings 2 Brief description The introduction of timers in housing to reduce power consumption for
public lighting 3 Project Type:
• Expansion • Modernization • construction
Modernization
4 The project cost, thd.UAH 2207,1 5 Own costs, thd.UAH. 207,1 6 Needs in investment capital, thd.UAH 2000,0 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
Other
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Design and estimate documentation
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 3 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company PUD Operating housing 14 Ownership structure (the share of state
ownership,%) municipal
15 Number of employees, people 137 16 Main activities Provision of maintenance services of buildings and adjacent areas 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Kolomyya st. Bohuna, 42 Tel / Fax 03433-40931 [email protected] utility company for use of home (KPEZH)
1 Name of project ( proposal) Pure environment - pure life 2 Brief description The introduction of separate collection of solid waste 3 Project Type:
• Expansion • Modernization • construction
Modernization
4 The project cost, thd.UAH 2780,0 5 Own costs, thd.UAH 255,0 6 Needs in investment capital, thd.UAH 2525,0 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
Other
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Design and estimate documentation
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 3 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company PUD Operating housing 14 Ownership structure (the share of state
ownership,%) municipal
15 Number of employees, people 137 16 Main activities Provision of maintenance services of buildings and adjacent areas 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Kolomyya st. Bohuna, 42 Tel / Fax 03433-40931 [email protected] utility company for use of home (KPEZH)
1 Name of project ( proposal) Construction of the second part of the main sewage collector diameter 1000.0 mm (SOE Kolomyyavodokanal)
2 Brief description Modernization of enterprise, improve performance and re-manufacturing process, reducing losses.
3 Project Type: • Expansion • Modernization • construction
construction
4 The project cost, thd.UAH 4000,0 5 Own costs 6 Needs in investment capital, thd.UAH 4000,0 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
External investment Credit
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Need to produse design and estimate documentation
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
guarantee of the City Council
10 Payback period 5 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
33,1715 ha Buildings and facilities for water supply and sanitation 8.4 ha - non-agricultural land outside settlements 24.7715 hectares - of land settlements
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
State act on permanent use
13 Brief description of the company ME “Kolomyyavodokanal’’ 14 Ownership structure (the share of state
ownership,%) municipal
15 Number of employees, people 200 16 Main activities Water and wastewater 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Ivano-Frankivsk region. Kolomyya district v. Sheparivtsi st. Shevchenko, 3, 78 200 (03433) 4-96-37 [email protected]
1 Name of project ( proposal) Creation of administrative services 2 Brief description Creation Centre providing administrative services to provide integrated
services residents and businesses of 3 Project Type:
• Expansion • Modernization • construction
Modernization
4 The project cost, UAH 1 470525,21 5 Own costs, UAH 770 525,21 6 Needs in investment capital, UAH 700 000 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
Other (international assistance funds in the amount of 42 thousand USD.)
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
A reconstruction, repair work, commissioned
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company Executive Committee of the Ivano-Frankivsk City Council 14 Ownership structure (the share of state
ownership,%) municipal
15 Number of employees, people
16 Main activities Administrative Services 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
76 004, Ivano-Frankivsk St. Hrushevskoho, 21 t. 556 515 fax 556020 [email protected]
1 Name of project ( proposal) Innovative implementation of solar-electric accumulation of heat and
hot water 2 Brief description The project will provide for kindergarten the independent heating and hot
water, using solar energy and electricity per night rate. 3 Project Type:
• Expansion • Modernization • construction
construction
4 The project cost, thd.UAH 1295,7 5 Own costs - 6 Needs in investment capital, thd.UAH 1295,7 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
Other
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Business Plan
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 6years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company Executive Committee of the Ivano-Frankivsk City Council 14 Ownership structure (the share of state
ownership,%) 100% municipal
15 Number of employees, people 16 Main activities 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
76 018 Ivano-Frankivsk , st. S. Bandera, 10a t. 52-23-93
1 Name of project ( proposal) The introduction of technologies to reduce air pollution through the installation of gas generator (heat generator for bio)
2 Brief description Boiler of the clinic The project envisages installation of the heat generator 800 AMT capacity of 800 kW.
3 Project Type: • Expansion • Modernization • construction
modernization
4 The project cost, thd.UAH 1 422,5 5 Own costs 6 Needs in investment capital, thd.UAH 1 422,5 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
The budgets of higher levels
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Design and estimate documentation
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
-
10 Payback period 3,5years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
Existing boiler In constant use
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Certificate of ownership
13 Brief description of the company Communal "Kalush District Hospital District Council" 14 Ownership structure (the share of state
ownership,%) municipal
15 Number of employees, people 16 Main activities 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Kalush, st. Karakaya, 25
1 Name of project ( proposal) Reconstruction of non-residential premises under construction in the
office block, club, library in v. Slobidka, Horodenkivsky district 2 Brief description In the village there are no space for the office block, club, library, post
office room and a district inspector. 3 Project Type:
• Expansion • Modernization • construction
reconstruction
4 The project cost, thd.USD 1226,0 5 Own costs, thd.USD 70.0 (fixed assets, processing line) 6 Needs in investment capital, thd.USD 1156,0 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
External investment, budget
8 Project readiness • Project proposal • FS
Design estimates approved by the year 01/10/2009
• Business Plan • Design and estimate documentation
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
Other
10 Payback period 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company Slobodskaya Village Council 14 Ownership structure (the share of state
ownership,%) Local authorities
15 Number of employees, people 3 16 Main activities 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Horodenka, v. Slobidka. Tarnovetskyy Miroslav Mykhaylovych., tel. (03430) 31241
1 Name of project ( proposal) Station mitigate water intake in Gorodenka 2 Brief description Construction of the plant to reduce water intake in Gorodenka 3 Project Type:
• Expansion • Modernization • construction
Modernization
4 The project cost, thd.UAH 1049,304 5 Own costs 6 Needs in investment capital, thd.UAH 1049,304 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
External investment, other
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Design estimate documentation
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
Other
10 Payback period 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company Horodenka state production control of water and sewer
14 Ownership structure (the share of state ownership,%)
municipal
15 Number of employees, people 51 16 Main activities Water and wastewater 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Town Horodenka st. Shevchenka, 1 t. 2-16-48
1 Name of project ( proposal) Construction of boiler of the Torhovytska secondary school in Horodenka District
2 Brief description Construction of boiler of the Torhovytska secondary school in Horodenka District
3 Project Type: • Expansion • Modernization • construction
Modernization. Boiler equipment obsolete and used its energy resources.
4 The project cost, thd.UAH 450,0 5 Own costs 6 Needs in investment capital, thd.UAH 450,0 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
External investment, other
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Design estimate documentation
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
Other
10 Payback period 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company Department of Education of the Horodenka District Administration, Contact: Mytsus Mykhaylo Ivanovych, tel.: (03 430) 21 448
14 Ownership structure (the share of state ownership,%)
Budget organization
15 Number of employees, people 16 Main activities 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Town Horodenka st. Shevchenka, 77 t (03430) 21448
1 Name of project ( proposal) Reconstruction and finishing building of the school for 190 pupils in the
village Semakivtsi, Horodenka District 2 Brief description Reconstruction and finishing building of the school for 190 pupils in the
village Semakivtsi, Horodenka District 3 Project Type:
• Expansion • Modernization • construction
Expansion
4 The project cost, thd.UAH 11378,0 5 Own costs 6 Needs in investment capital, thd.UAH 11378,0 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
External investment, other
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Design estimate documentation
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
Other
10 Payback period 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company Department of Education of the Horodenka District Administration, Contact: Mytsus Mykhaylo Ivanovych, tel.: (03 430) 21 448
14 Ownership structure (the share of state ownership,%)
Budget organization
15 Number of employees, people 16 Main activities 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Town Horodenka st. Shevchenka, 77 t (03430) 21448
1 Name of project ( proposal) Reconstruction of the cinema for the school named Krushelnytskogo in
the st. L. Kurbasa 2 Brief description High school has no hall, no gym and dining room, study implementation
of this project can improve the learning process 3 Project Type:
• Expansion • Modernization • construction
Reconstruction
4 The project cost, thd. UAH 6838,0 5 Own costs, thd. UAH 50,0 6 Needs in investment capital, thd. UAH 6788,0 7 Form of investment resources:
• External investment • Credit • Financial leasing
External investment, other
• Other 8 Project readiness
• Project proposal • FS • Business Plan • Design and estimate documentation
Design estimate documentation
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
Other
10 Payback period 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company Department of Education of the Horodenka District Administration, Contact: Mytsus Mykhaylo Ivanovych, tel.: (03 430) 21 448
14 Ownership structure (the share of state ownership,%)
Budget organization
15 Number of employees, people 16 Main activities 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Town Horodenka st. Shevchenka, 77 t (03430) 21448
Food processing industry
1 Name of project ( proposal) Creating a network of dairy items 2 Brief description The project foresees the creation in 4 villages of the
district mini milk processing plants to develop a natural dairy products
3 Project Type: • Expansion • Modernization • construction
Construction of container type workshops
4 The project cost, mln.UAH 2,2 5 Own costs, mln.UAH. 0,4 6 Needs in investment capital, mln.UAH. 1,8 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
Financial leasing
8 Project readiness • Project proposal • FS • Business plan • Design and estimate documentation
Project proposal
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 5years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
0,08ha
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Municipal ownership
13 Brief description of the company Farm 14 Ownership structure (the share of state
ownership,%) 100 % Municipal
15 Number of employees, people 3 16 Main activities Cheese etc. 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Ivano-Frankivsk region. Verkhovyna district v. Kryvopillya 098 866 97 32 FG Stefurak Y. M
1 Name of project ( proposal) Construction of a factory for bottling of still and sparkling natural
drinking water. 2 Brief description Bilshivetske underground water deposits most unique and most
powerful in the region. High quality of the drinking water from this deposit were known during the Austro-Hungarian deposit has several horizons. In this study, water from this deposit have low physiological healing, their suggestions for making baby food.
3 Project Type: • Expansion • Modernization • construction
construction
4 The project cost, mln.UAH 10,0 5 Own costs, thd.UAH. 100,0 6 Needs in investment capital, thd.UAH. 9,9 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
External investment Other
8 Project readiness • Project proposal • FS • Business plan • Design and estimate documentation
Project proposal Business plan
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
Insurance
10 Payback period 5-6 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company PE Kurlyak I.O. 14 Ownership structure (the share of state
ownership,%)
15 Number of employees, people 100 16 Main activities still and sparkling natural drinking water. 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Ivano-Frankivsk region, Halych region, t. Burshrtyn, st. kaluska,8
1 Name of project ( proposal) Manufacture of mineral water with medicinal properties that is
unique in Western Ukraine 2 Brief description 3 Project Type:
• Expansion • Modernization • construction
construction
4 The project cost, thd.USD 379,747 5 Own costs - 6 Needs in investment capital, thd.USD 379,747 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
External investment
8 Project readiness • Project proposal • FS • Business plan • Design and estimate documentation
Project proposal
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 5years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company Zhukovska Village Council 14 Ownership structure (the share of state
ownership,%)
15 Number of employees, people 16 Main activities 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Ivano-Frankivsk region. Tlumach district v.Budzyn, Budzynska Village council Tel.(03 479) 22013.33718
1 Name of project ( proposal) Juice plant 2 Brief description Processing of fruit and berries 3 Project Type:
• Expansion • Modernization • construction
Modernization
4 The project cost, thd.USD 400,0 5 Own costs -
6 Needs in investment capital, thd.USD 400,0 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
External investment Financial leasing
8 Project readiness • Project proposal • FS • Business plan • Design and estimate documentation
Project proposal
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
A collateral
Bank guarantee
10 Payback period 3-4years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
1.0 ha 160m2 Rent for 49years
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
looking documents lease
13 Brief description of the company PE Bukadchuk M.D 14 Ownership structure (the share of state
ownership,%) Private
15 Number of employees, people 10 16 Main activities Products of processing fruit and berries 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Bukatchuk Michael Gorbenko v. Kobaky, Kosiv district, Ivano-Frankivsk region . 0968549333
Tourism
1 Name of project ( proposal) Complex project "Establishment of the center of international tourism" Carpathian Sphinx "
2 Brief description The development of the area around the core area of national significance " Dovbush cliffs "
3 Project Type: • Expansion • Modernization • construction
construction
4 The project cost, thd.USD 4 758 5 Own costs - 6 Needs in investment capital, thd.USD 4 758 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
External investment
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Business Plan
9 The way to guarantee loan resources:
• A collateral • Bank guarantee • Insurance • Other
Other (a joint venture or enterprise with foreign investment)
10 Payback period 3 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
Area: 1150 ha Buildings and facilities available. Category: land conservation, recreational, agricultural
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Certificate of ownership Other (safety obligations)
13 Brief description of the company Support Fund “Bolekhiv Business Center” 14 Ownership structure (the share of state
ownership,%) Joint ownership share of state ownership 98%
15 Number of employees, people 2 16 Main activities Consultancy of entrepreneurship and business 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
t. Bolekhiv, 77202, st. Konvaltsya, 18 0 (3437) 3-45-65; 0 50 373 73 87 0 (3437) 3-42-52 Bbusiness@miаl.ru
1 Name of project ( proposal) The development of the former salt combine 2 Brief description Construction a health spa and tourist complex. 3 Project Type:
• Expansion • Modernization • construction
construction
4 The project cost, mln.UAH 106 5 Own costs 6 Needs in investment capital, mln.UAH 106 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
private or public investment
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Business Plan approved concept development of the territory
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 8 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
2.73 ha The preserved buildings of old Austrian saltern in status of architectural monuments Plot of residential and public building
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Land is owned by the territorial community
13 Brief description of the company Dolyna City Council The local government local community in Dolyna, Ivano-Frankivsk region
14 Ownership structure (the share of
state5ownership,%) 15 Num6er of employees, people 16 Mai1activities 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Prospect of Independence 5, Dolyna, Ivano-Frankivsk region., Ukraine 77 500 (03477) 27030 (03477) 27035 [email protected]
1 Name of project ( proposal) Construction of tourist and recreational center in Galych 2 Brief description Project idea is to open tourist-hotel complex, which includes a cafe, sauna,
hotel rooms. Creating an enabling environment for tourism business. 3 Project Type:
• Expansion • Modernization • construction
construction
4 The project cost, mln.UAH 1,5 5 Own costs, thd.UAH 140,0 6 Needs in investment capital, thd.UAH. 1360,0 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
External investment
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Project proposal
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
Insurance
10 Payback period 5-6 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
0,115ha
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Lease
13 Brief description of the company PE Khreptyk M.O 14 Ownership structure (the share of state
ownership,%)
15 Number of employees, people 30 16 Main activities The project involves the expansion of tourist services that will meet
international standards, direction of project is to construct a hotel complex 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Ivano-Frankivsk region. Galych st. Lvivska, 39. Tel. (03431) 22-987 PE Hreptyk M.O
1 Name of project ( proposal) Ski complex "Beskyd" (Dolyna) 2 Brief description Construction of 4 ski lifts and slopes, length of 10 km, entertainment and
hotel complexes 3 Project Type:
• Expansion
• Modernization • construction
construction
4 The project cost, billon UAH 1,5 5 Own costs 50% 6 Needs in investment capital 50% 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
External investment Credit
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Project proposal
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
Bank guarantee
10 Payback period 15 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
480 ha, no building, forests areas (70 ha under buildings)
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Development of general plan by Shevchenko village council
13 Brief description of the company Investment Company “Ukrkapital”, building of recreational and residential complexes, and construction materials
14 Ownership structure (the share of state ownership,%)
Private
15 Number of employees, people 500 16 Main activities construction 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
St. Puhachova, 9 Kyiv 04107 Ph/f: (044)489-04-65
1 Name of project ( proposal) Recreation – tourism, public and social center "Torunskyy Pereval" 2 Brief description Construction of hotel, museum, singing field 3 Project Type:
• Expansion • Modernization • construction
construction
4 The project cost, mln.UAH 20,0 5 Own costs - 6 Needs in investment capital, mln.UAH 20,0 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other.
External investment
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Project proposal
9 The way to guarantee loan resources:
• A collateral • Bank guarantee • Insurance • Other
10 Payback period 3-5 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
3,5ha, no building, forests areas
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company Association of Investment Business "Carpathian Gold Ring"
14 Ownership structure (the share of state ownership,%)
NGO
15 Number of employees, people 16 Main activities 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Prospect of Independence, 5 kab.8 t. Dolyna ph.: (0342) 72-45-24; (03477)2-70-63 e-mail: [email protected]
1 Name of project ( proposal) Sport and training complex Luge and service infrastructure in the
neighborhood "Pidzamche" 2 Brief description In the former military town offer construction training complex Luge and
accompanying attendant infrastructure 3 Project Type:
• Expansion • Modernization • construction
construction
4 The project cost, mln.UAH 110 5 Own costs - 6 Needs in investment capital, mln.UAH 110 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other.
Private or state investment
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Developed investment proposals on individual lots (structures and land)
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 10 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
4.73 ha At the location of the former unit Plots of residential and public building
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Land is owned by the territorial community
13 Brief description of the company DolynaCity Council4The local government local community in the
Dolyna, Ivano-Frank5vsk region 14 Ownership structure (the share of state
ownership,%)
15 Number of employees, people 16 Main activities 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Prospect of Independence 5, Dolyna, Ivano-Frankivsk region., Ukraine 77 500 (03477) 27030 (03477) 27035 [email protected]
1 Name of project ( proposal)
The development of recreational potential around the city park-lake 2 Brief description Existing in the city and situated on its territory lake park proposed to
develop as a regional recreation array. 3 Project Type:
• Expansion • Modernization • construction
construction
4 The project cost, mln.UAH 10,0 5 Own costs - 6 Needs in investment capital, mln.UAH 10,0 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other.
Private or state investment
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Developed by PPP
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 7 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
5.4 ha Building of the summer theater and dance floor Plots of residential and public building
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Land is owned by the territorial community
13 Brief description of the company DolynaCity Council The local government local community in t. Dolyna, Ivano-Frankivsk region
14 Ownership structure (the share of state ownership,%)
15 Number of employees, people 16 Main activities 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Prospect of Independence 5, Dolyna, Ivano-Frankivsk region., Ukraine 77 500 (03477) 27030 (03477) 27035 [email protected]
1 Name of project ( proposal) Construction of recreation and wellness center based on the source of the
"white wells"in the village Markivka Kolomyya district
2 Brief description Recreation and rest houses in pension type 3 Project Type:
• Expansion • Modernization • construction
construction
4 The project cost, mln.USD 9,0 5 Own costs - 6 Needs in investment capital, mln.USD 9,0 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other.
External investment
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Business Plan
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
Insurance
10 Payback period 2,5 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
Size is determined additionally; Purpose - Business Coach
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Land is owned by the territorial community
13 Brief description of the company Village council 14 Ownership structure (the share of state
ownership,%)
15 Number of employees, people 4 16 Main activities Local municipality 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Kolomyya district v. Markivka st. Sichovykh Striltsiv, 88 (03433) 95 020, 25 546
1 Name of project ( proposal) Holding international competitions with delta paragliding, creating a
sport complex in v.Odayiv 2 Brief description Recreation and rest houses in pension type 3 Project Type:
• Expansion • Modernization • construction
construction
4 The project cost, mln.USD 1,658 5 Own costs - 6 Needs in investment capital, mln.USD 1,658 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other.
direct investment
8 Project readiness • Project proposal • FS • Business Plan
Project proposal
• Design and estimate documentation 9 The way to guarantee loan resources:
• A collateral • Bank guarantee • Insurance • Other
10 Payback period 5 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company Budzyn Village council 14 Ownership structure (the share of state
ownership,%)
15 Number of employees, people 16 Main activities 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Ivano-Frankivsk region. Tlumach district v.Budzyn, Budzyn Village council Tel. (03 479) 22013.33718
1 Name of project ( proposal) Creation of the motel complex, hotel services, 2 Brief description 3 Project Type:
• Expansion • Modernization • construction
Modernization
4 The project cost, thd.USD 752,8 5 Own costs - 6 Needs in investment capital, thd.USD 752,8 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other.
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Project proposal
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 3 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company Tlumach district consumer society 14 Ownership structure (the share of
state5ownership,%) Collective 15 Num6er of employees, people 90 16 Mane activities Services, trade in food products 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
78 000, Ivano-Frankivsk region, t. Tlumach, st. Shevchenka, 1.
1 Name of project ( proposal) "Restoring the character of Bolekhiv - Bolekhiv salt plant " 2 Brief description Restoration of character Bolekhiv - Bolekhiv salt plant - by establishing
efficient modern production of salt, creation the complex, salt-SPA-resort 3 Project Type:
• Expansion • Modernization • construction
construction
4 The project cost, mln.UAH 50 5 Own costs - 6 Needs in investment capital, mln.UAH 50 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
External investment
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Project proposal
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
A collateral
10 Payback period 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
6ha Existing buildings and structures Industrial use
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Certificate of ownership
13 Brief description of the company Support Fund “Bolekhiv Business Center” 14 Ownership structure (the share of state
ownership,%) Joint ownership share of state ownership 98%
15 Number of employees, people 2 16 Main activities Consultancy of entrepreneurship and business 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
t. Bolekhiv, 77202, st. Konvaltsya, 18 0 (3437) 3-45-65; 0 50 373 73 87 0 (3437) 3-42-52 Bbusiness@miаl.ru
1 Name of project ( proposal) Sport and recreation complex with a hotel for 300 places in the streets
Chornovola - P. Doroshenka in Ivano-Frankivsk 2 Brief description Provides the construction of the hotel with 300 seats, a universal sport
block; a covered football field, bowling, fitnesklub, recreational and economic block of the hotel, complete construction of the west stand on
the stadium “Rukh” 3 Project Type:
• Expansion • Modernization • construction
construction
4 The project cost, UAH 636504000 5 Own costs 6 Needs in investment capital, UAH 636504000 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
Other
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Project proposal
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
8.605ha This corresponds to the category of land residential and public construction
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Certificate of ownership
13 Brief description of the company Department of capital Construction of Executive committee of the Ivano-Frankivsk council
14 Ownership structure (the share of state ownership,%)
Municipal ownership
15 Number of employees, people 21 16 Main activities 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
76 018 Ivano-Frankivsk Street. Independence, 6 t. 75-23-58 t. 75-23-58
1 Name of project ( proposal) Reconstruction of the Potockyy Palace, a cultural arts center 2 Brief description The project foresees the construction of a cultural arts center. One of the
key measures is the reconstruction of "Potocki Palace, which was built in the former fortress city in 1682 by Stanislav. This is one of the few fortress ground buildings that survived in our time. In the palace there were: the Polish King Jan Sobieski, the Austrian Emperor Joseph II, three decades living Orlyk wife - after Ukraine's hetman Ivan Mazepa.
3 Project Type: • Expansion • Modernization • construction
Modernization construction
4 The project cost, UAH 31 500 000 5 Own costs 6 Needs in investment capital, UAH 31 500 000 7 Form of investment resources:
• External investment • Credit • Financial leasing
• Other Other 8 Project readiness
• Project proposal • FS • Business Plan • Design and estimate documentation
Project proposal
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
14 481 sq. km. m 13 388 sq. km. m 5020 square meters. m 55 300 sq. km. m Downtown
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
looking documents lease
13 Brief description of the company Capital construction and tourism department of the executive committee of the City Council,
14 Ownership structure (the share of state ownership,%)
Communal property - land 100% Private property - buildings 100%
15 Number of employees, people 16 Main activities 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Department of Tourism of the CEC 76018 t.Ivano-Frankivsk.Grushevskogo, 21 55-64-83; 55-20-65 [email protected]
1 Name of project ( proposal) Tourism and recreation complex in the village Lukvytsya 2 Brief description Construction of recreation complex for 120 people (10 houses of cottage
type) 3 Project Type:
• Expansion • Modernization • construction
construction
4 The project cost, thd.USD 1 500 5 Own costs 6 Needs in investment capital, thd.USD 1 500 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
External investment
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
FS
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 3 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures
5ha
• Category of land 12 Availability of land use:
• Certificate of ownership • looking documents lease • Other
Purchase of the plot
13 Brief description of the company Lukvytsya village council, head of the village Cuncil Ilemskyy Volodymyr Stepanovych
14 Ownership structure (the share of state ownership,%)
15 Number of employees, people 16 Main activities Services 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Head of the Village Council Ilemskyy Volodymyr Stepanovych Ivano-Frankivsk region. Bohorodchany district v. Lukvytsya 45-6-02 / 098-802-26-98
1 Name of project ( proposal) Tourism and recreation complex 2 Brief description Construction of cottage, six houses 6-8 persons. Land area in the hamlet
"Kostyachky in the village Mizhgirya, in mountainous areas near the forests.
3 Project Type: • Expansion • Modernization • construction
construction
4 The project cost, thd.USD 500 5 Own costs 6 Needs in investment capital, thd.USD 500 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
External investment
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
FS
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 3 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
0,30ha
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
State Act
13 Brief description of the company Mizhhirya Village Council (head of the v/c Zinyak Pyotro Ivanovych) 14 Ownership structure (the share of state
ownership,%)
15 Number of employees, people 16 Main activities Services 17 Company details - developer of the
project: • Address • Phone • Fax
Mizhhirya village council Head of the Village Council Petro Ivanovych Zinyak Ivano-Frankivsk region. Bohorodchany rn v. Mizhhirya 097-520-44-79
1 Name of project ( proposal) Sports complex in the village Porohy, Bogorodchany district, Ivano-Frankivsk region
2 Brief description Tourist complex with 40 seats. The plot is in the mountainous area near the forests (25-30 m). In the village are preserved folk traditions and customs.
3 Project Type: • Expansion • Modernization • construction
construction
4 The project cost, thd.USD 600 5 Own costs 6 Needs in investment capital, thd.USD 600 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
External investment
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
FS
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 3 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
0,6645ha
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Purchase of land
13 Brief description of the company Porohy Village Council (head of the v/c Fufalko M.H) 14 Ownership structure (the share of state
ownership,%)
15 Number of employees, people 16 Main activities Services 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Head of the Porohy village council (03-471) 63-4-32 Fufalko Mykhaylo Hnatovych Ivano-Frankivsk region, t.Bohorodchany, v Porohy Pinchak Paraska Dmytrivna 63-4-32
1 Name of project ( proposal) Recreation Complex 2 Brief description Tourist complex with 40 seats. The plot is in the mountainous area near
the forests (25-30 m). 3 Project Type:
• Expansion • Modernization • construction
construction
4 The project cost, thd.USD 900 5 Own costs 6 Needs in investment capital, thd.USD 900 7 Form of investment resources:
• External investment • Credit
External investment
• Financial leasing • Other
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
FS
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 3 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
5,7497ha
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Purchase of land
13 Brief description of the company Dzvynyach Village Council (head of the v/c Fufalko M.H) 14 Ownership structure (the share of state
ownership,%)
15 Number of employees, people 16 Main activities Services 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Head of the Dzvynyach village council Volochiy Mykola Stepanovych Ivano-Frankivsk region. Bohorodchany district., v. Dzvynyach 30-3-44 / 034-71-30-2-48
1 Name of project ( proposal) Tourism and recreation Complex 2 Brief description Tourism development, a tourism center. Provision of travel services for
accommodation and meals, ski resorts 3 Project Type:
• Expansion • Modernization • construction
construction
4 The project cost, thd.USD 50 000 5 Own costs 2 500 6 Needs in investment capital, thd.USD 47 500 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
By agreement
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 10 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures
• Category of land 12 Availability of land use:
• Certificate of ownership • looking documents lease • Other
Purchase of land
13 Brief description of the company Ltd “Hants” 14 Ownership structure (the share of state
ownership,%) Private
15 Number of employees, people 37 16 Main activities Mineral water “Perehinska”, apple juice, bread 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Rozhnyativ district u/v. perehinske, str. Sichovyh Striltsiv, 200 (03474)98-7-52
Agriculture
1 Name of project ( proposal) Reconstruction of the cattle slaughter point in the u/v Bogorochany, Ivano-Frankivsk region. PE “Olva”
2 Brief description Purchase of new equipment for reconstruction of cattle slaughter point and on this basis to increase the production.
3 Project Type: • Expansion • Modernization • construction
Expansion Modernization
4 The project cost,thd.USD 200 5 Own costs,thd.USD 25 6 Needs in investment capital thd.USD 175 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other.
External investment Credit (3 years, 8-10%)
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
FS
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
The cost of real estate 281 th.USD
10 Payback period 5years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
230m2 of industrial areas
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Lease agreement
13 Brief description of the company Private Company Olva deals with slaughter and processing of meat of cattle during 1913
14 Ownership structure (the share of state ownership,%)
Private
15 Number of employees, people 16 16 Main activities Meat and meat products 17 Company details - developer of the
project: PE "Olva" director Vasily Vasylovych Gogol
• Address • Phone • Fax • E-mail
77 701, Ivano-Frankivsk region. t.. Bogorochany, st. Petrasha, 30 (03171) 2-42-81 2-42-81 mob. 067-342-15-40 gogol [email protected]
1 Name of project ( proposal) Introduction of project Lagoon 2 Brief description Reconstruction of manure collection TC “Rosan-Agro” 3 Project Type:
• Expansion • Modernization • construction
Modernization
4 The project cost, UAH 8600000 5 Own costs, UAH 1900000 6 Needs in investment capital, UAH 6700000 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
Low rate on the loan, partly percent state compensation
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
FS Design and estimate documentation
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
A collateral State guarantee
10 Payback period 4 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
15,5 There are old manure collections
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
looking documents lease
13 Brief description of the company Grows 23.3 thousand pigs 14 Ownership structure (the share of state
ownership,%) -
15 Number of employees, people 110 16 Main activities pork 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Ivano-frankivsk region, Rohatyn district, v. Pidhoroddya (03435)24056
1 Name of project ( proposal) SE “Yamnytsia"Switching to organic farming 2 Brief description Improving the competitiveness of enterprises through the transition in an
organic way of production and processing of agricultural products 3 Project Type:
• Expansion • Modernization • construction
Expansion
4 The project cost, thd.UAH 5959,0 5 Own costs 6 Needs in investment capital, thd.UAH 5959,0 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
Credit
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Business Plan
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
Other
10 Payback period 5 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
600ha
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
looking documents lease
14 Brief description of the company Cultivation and production of agricultural products 15 Ownership structure (the share of state
ownership,%)
16 Number of employees, people 160 17 Main activities 22 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Tysmenytsya district, v Yamnytsya t/f 584535
1 Name of project ( proposal) Making fuel from waste agricultural production 2 Brief description Making fuel from waste agricultural production 3 Project Type:
• Expansion • Modernization • construction
construction
4 The project cost, UAH 4000000 5 Own costs 6 Needs in investment capital, UAH 3000000 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
External investment
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Business Plan
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
A collateral State guarantee
10 Payback period 5-6 years 11 Characteristics of land
• Total area, ha • The presence of buildings and
structures • Category of land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
looking documents lease
13 Brief description of the company Cultivation of animal, plant 14 Ownership structure (the share of state
ownership,%) Private
15 Number of employees, people 82 16 Main activities Cultivation and production of agricultural products 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Ivano-Frankiivska region. Rohatyn district., v . Uyizd (03435) 65-510,65-551
Produsing of building materials
1 Name of project ( proposal) Quarry 2 Brief description Construction of brick factory, mining, processing and production of clay
bricks from it 3 Project Type:
• Expansion • Modernization • construction
construction
4 The project cost, thd.USD 1 500 5 Own costs 6 Needs in investment capital, thd.USD 1 500 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
External investment
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
FS
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
A collateral State guarantee
10 Payback period 5 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
16,5ha
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company Horoholynska village council in the person of the village council Hedzyka M.V.
14 Ownership structure (the share of state ownership,%)
15 Number of employees, people 16 Main activities Production of clay 17 Company details - developer of the
project: • Address
Head of Horoholyna Village Council - Hedzyk Myron Vasylyovych Ivano-Frankivsk region, Bohorodchany district, v.Horoholyna
• Phone • Fax • E-mail
(03471) 53-4-49
1 Name of project ( proposal) Production of hyper-pressed brick 2 Brief description Organization of hyper-pesovanoyi brick heaps (waste) coal in the village.
Kovalivka Kolomyya district 3 Project Type:
• Expansion • Modernization • construction
Modernization
4 The project cost, mln.USD 0,5 5 Own costs 6 Needs in investment capital, mln.USD 0,5 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
joint production
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Bank proposal
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
Bank guarantee
10 Payback period 11 mounths 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
land of the village council
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Land is owned by the community
13 Brief description of the company Village council 14 Ownership structure (the share of state
ownership,%)
15 Number of employees, people 4 16 Main activities Local Government 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Kolomyya district, v. Kovalivka st. Hrushevskoho, 2 (03433) 93218
1 Name of project ( proposal) Expansion and modernization of cement production in JSC “Ivano-
Frankivskcement” 2 Brief description installing a cement mill to increase the production capacity of cement grinding3 Project Type:
• Expansion • Modernization • construction
Modernization
4 The project cost, USD 8000 000 5 Own costs, USD 1000 000 6 Needs in investment capital, USD 7000 000 7 Form of investment resources:
• External investment Credit
• Credit • Financial leasing • Other
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Business Plan
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
Bank guarantee
10 Payback period 3 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company 14 Ownership structure (the share of state
ownership,%) Private
15 Number of employees, people 1730 16 Main activities Portland cement, slate, asbestos cement pipes and couplings, gypsum plaster,
medical hibsobinty 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
v. Yamnytsia Tysmenytsya district tel./f583764
1 Name of project ( proposal) Resumption of the LLC glass plant named “Smyzhuka” 2 Brief description 3 Project Type:
• Expansion • Modernization • construction
Modernization
4 The project cost, thd.USD 37,6 5 Own costs - 6 Needs in investment capital, thd.USD 37,6 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
External investment
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Project proposal
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 2 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company Village Council Village. Kutysche 14 Ownership structure (the share of state
ownership,%)
15 Number of employees, people 16 Main activities Production of decorative glassware, glass production. 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Ivano-Frankivsk region , Tlumach district, v.Kutysche, Kutysche Village council Tel. (03 479) 6-31-40, 067 34 34 793
10. Construction
1 Name of project ( proposal) Development of the Hriplinskaya Investment Industrial Zone (KhPZ) 2 Brief description investment in priority sectors, modernization of existing enterprises and
creation of modern infrastructure in Ivano-Frankivsk 3 Project Type:
• Expansion • Modernization • construction
Attracting investment, modernization of enterprises, infrastructure
4 The project cost, mln.UAH 13,1 5 Own costs, mln.UAH 3,1 6 Needs in investment capital, mln.UAH 10,0 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
State and local funding foreign and domestic investment
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Currently HIPZ operate more than 70 economic entities.
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
-
10 Payback period 8years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
612 ha. Territory is built with industrial facilities and engineering and transportation infrastructure - 300 ha. industrial land, agricultural land.
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Certificate of ownership looking documents lease
13 Brief description of the company Hriplinskaya investment and industrial zone - is: - Free land for industrial construction; - The existing industrial enterprises, with free production and storage facilities; - Summed communication; - An immediate solution and procedural mechanisms of the construction
permit; - Comprehensive support of investment projects by the administrative authorities of the city.
14 Ownership structure (the share of state ownership,%)
100% municipal
15 Number of employees, people 16 Main activities Special (free) economic zone 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
76 004, Ivano-Frankivsk St. Hrushevskoho, 21 t. 556 515 fax 556020 [email protected]
1 Name of project ( proposal) Technopark - a new industrial zone in Dolyna 2 Brief description A free development of land in the Dolyna investors by building new
industrial facilities. 3 Project Type:
• Expansion • Modernization • construction
construction
4 The project cost, mln.USD 600 5 Own costs 6 Needs in investment capital, mln.USD 600 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
State or private investment
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
An approved concept development of the territory.
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 8 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
27.3ha In one of the areas new industrial zone is being constructed by «Inter-Groclin» Industry plot
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Land is owned by the territorial community
13 Brief description of the company Dolyna City Council The local government of the local community in Dolyna, Ivano-Frankivsk region
14 Ownership structure (the share of state ownership,%)
15 Number of employees, people 16 Main activities 17 Company details - developer of the
project: • Address • Phone • Fax
Prospect of Independence, 5, Dolyna, Ivano-Frankivsk region., Ukraine 77 500 (03477) 27030 (03477) 27035
• E-mail [email protected]
1 Name of project ( proposal) Construction an apartment building in t. Tolmach, Karmelyuka street.
2 Brief description A free development of land in the Dolyna investors by building new industrial facilities.
3 Project Type: • Expansion • Modernization • construction
construction
4 The project cost, thd.USD 2688,2 5 Own costs 6 Needs in investment capital, thd.USD 2688,2 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
State costs
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Working documentation is under production.
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company Ltd “Building company Stanislav” 14 Ownership structure (the share of state
ownership,%) Private
15 Number of employees, people 500 16 Main activities Construction 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Ivano-Frankivsk region. Tlumach district, v. Obertyn, str. Dovbusha 2
1 Name of project ( proposal) Proektna street 2 Brief description The project foresees the construction of main street wide value of total
length 0,598 km: - Street width 15 m - 3.75m width curb on both sides
3 Project Type: • Expansion • Modernization • construction
construction
4 The project cost, UAH 9500000 5 Own costs 6 Needs in investment capital, UAH 9500000 7 Form of investment resources:
• External investment
• Credit • Financial leasing • Other
Other
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Design and estimate documentation
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
2,3ha reserve land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company Department of the Capital Construction by the city council 14 Ownership structure (the share of state
ownership,%) Municipal
15 Number of employees, people 21 16 Main activities 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
76 018 Ivano-Frankivsk, st. Nezalezhnosti, 6 75-23-58 75-23-58 -
1 Name of project ( proposal) Construction of main road street car .. Ivasyuka - Solotvyns'ka river
Bystrytsya (bridge)-v. Klusiv - Galician highway 2 Brief description The project foresees the construction of main street-wide value of total
length 3.806 km including: bridge over the river Bistrica -163 m.; 3 Project Type:
• Expansion • Modernization • construction
construction
4 The project cost, UAH 200000000 5 Own costs 6 Needs in investment capital, 200000000 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
Other
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
FS
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 11 Characteristics of land
• Total area, ha 10,88ha
• The presence of buildings and structures • Category of land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
No right to use land
13 Brief description of the company Department of the Capital Construction by the city council 14 Ownership structure (the share of state
ownership,%) Municipal
15 Number of employees, people 21 16 Main activities 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
76 018 Ivano-Frankivsk, st. Nezalezhnosti, 6 75-23-58 75-23-58 -
1 Name of project ( proposal) "Restoration of the Austrian narrow road along the" Viter-Gir " 2 Brief description narrow roads and restore communication tourist centers 3 Project Type:
• Expansion • Modernization • construction
construction
4 The project cost, billionUAH 1,0 5 Own costs 6 Needs in investment capital, billionUAH 1,0 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
External investment
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Project proposal
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
Other (a joint venture or enterprise with foreign investment)
10 Payback period 5 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
Length - 100 km
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company Support Fund "Bolekhiv Business Center” 14 Ownership structure (the share of state
ownership,%) Joint ownership (share of state ownership 98%)
15 Number of employees, people 2 16 Main activities Consultancy on entrepreneurship and business 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
Bolekhiv, 77 202, st. Konovaltsya, 18 0 (3437) 3-45-65, mob. tel. 0 50 373 73 87 0 (3437) 3-42-52 Bbusiness@miаl.ru
1 Name of project ( proposal) Development Program contact network and upgrade rolling stock electric
2 Brief description Development of a trolleybus network and ensure quality and safe services for passenger
3 Project Type: • Expansion • Modernization • construction
Modernization construction
4 The project cost, UAH 93 260 000 5 Own costs 6 Needs in investment capital 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
Financial leasing
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Design and estimate documentation
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
10 Payback period 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
13 Brief description of the company SCE "Elektroavtotrans " 14 Ownership structure (the share of state
ownership,%) Municipal
15 Number of employees, people 393 16 Main activities Consultancy on entrepreneurship and business 17 Company details - developer of the
project: • Address • Phone • Fax • E-mail
76008 Ivano-Frankivsk, st. Troleybusna,40 (0342)58 45 68
1 Name of project ( proposal)
Construction "Aqua Park" 2 Brief description The development of recreational potential of the tourist complex
"Starytsya" - building "Aqua Park" 3 Project Type:
• Expansion • Modernization • construction
Modernization construction
4 The project cost, thd.USD 6000,0 5 Own costs, thd.USD 2000,0 6 Needs in investment capital, thd.USD 4000,0 7 Form of investment resources:
• External investment • Credit • Financial leasing • Other
External investment Credit
8 Project readiness • Project proposal • FS • Business Plan • Design and estimate documentation
Business Plan
9 The way to guarantee loan resources: • A collateral • Bank guarantee • Insurance • Other
Insurance
10 Payback period 5 years 11 Characteristics of land
• Total area, ha • The presence of buildings and structures • Category of land
1ha
12 Availability of land use: • Certificate of ownership • looking documents lease • Other
Certificate of ownership
13 Brief description of the company PE Shumko A. B 14 Ownership structure (the share of state
ownership,%) Private
15 Number of employees, people 50-70 16 Main activities Recreation and Leisure population of the district and surrounding areas 17 Company details - developer of the