Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 1
List of Cases to be submitted before 4th Consent Committee Meeting of 2014-15
scheduled on 16.05.2014 at 02:30 p.m. (Booklet No. 7) Sr. No.
Name & Address Capital
Investment Applied For Section
Page No.
Remarks
Resubmission
1
DTL Ancillares Ltd., Unt III, 373, Kharabwadi, Nr. WMDC Indl Area, Chakan, Tal- Khed, Dist - Pune
44.92 Crs 1st Operate JD(APC) 1 to 28
2
Kalpataru Construction, "Kalpataru Estates", Phase-I,II,III, Sr. No. 85/1B/2/1, 85/1A
208.54 Crs. 1st Operate RO(HQ) 29 to 48
Fresh Agenda
1 Mphasis Ltd., 101, 201, Building No. 4, InfinityIT Park, Dindoshi, Malad (E)
39.22 Crs. Establish RO(HQ) 49 - 59
2
Tata Consultancy Services, At Plant No. 12, Godrej Boyce Complex, LBS Marg, Vikroli (E), Mumbai
101.06 Crs. Establish &
Operate RO(HQ) 60 - 70
3
Tarapur Environment Protection Society (CETP), Plot No. OS-30(pt), MIDC Tarapur, Tal - Palghar, Dist - Thane
70 Crs. Establish JD(WPC) 71 - 83
4
Datwayler Pharma Packaging India Pvt. Ltd., Plot No. 5, Kesurdi SEZ Industrial Area, Phase- 1, Tal - Khandala, Dist - Satara
366.98 Crs. Establish
(Expansion) AS(T) 84 - 95
5
Electromech Material Handling Systems (India) Pvt. Ltd., G No. 316, Plot No. 1A,1, Indl. Area, A/p- Kasar Ambolki, Tal- Mulshi, Dist - Pune
22.05 Crs Establish
(Expansion) JD(APC) 96 - 113
6
Electromech Material Handling Systems (India) Pvt. Ltd., G No. 316, Plot No. 1A,1, Indl. Area, A/p- Kasar Ambolki, Tal- Mulshi, Dist - Pune
55.68 Crs. Renewal JD(APC) 114 - 126
7
Mahadeo Construction Pvt. Ltd., "Cosmos Garden", S. No. 73/1,2,3,4,5. S. No. 74/1,2,3,4,4 S. No. 75/10(p) S. No. 78/1, 2(p), 3,4. S. No. 82/1(pt), S. No. 83, Kolshet Road, Thane(W)
93.50 Crs. 1st Operate RO(HQ) 127 - 138
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 2
8
Tata Consultancy Services Ltd., 1st to 13th Floor, Kensington B-wing, Hiranandani Business Park at Powai.
157.29 Crs. 1st Operate RO(HQ) 139 - 161
9
Sigma Electric Manufacturing Corporation Pvt. Ltd., Unit-III, B-27, MIDC Chakan, Tal- Khed, Dist - Pune
48.12 Crs. Renewal JD(APC) 162 - 190
10 Viraj Profiles Ltd., G-75/76/77, MIDC Tarapur, Tal- Palghar, Diust - Thane
24.96 Crs. Renewal JD(APC) 191 - 210
11 Jyoti Structures Ltd., Plot No.51/52/53-A, MIDC, Satpur, Nashik
32.24 Crs. Renewal JD(APC) 211 - 227
12 Interglobe Hotels Pvt. Ltd., Plot No. 9, MIDC Satpur, Tal & Dist - Nashik
53.65 Crs. Renewal RO(HQ) 228 - 243
13
Peepul Tree Properties Pvt. Ltd., Infinity IT Park, Building No. 4, Dindoshi, Malad (W), Mumbai
250.89 Crs. Renewal RO(HQ) 244 - 261
14
Manganese Ore (I) Ltd., Dongri Buzurg Mine, At Dongri Buzurg, Tal - Tumsar, Dist - Bhandara
70.27 Crs. Renewal JD(APC) 262 - 296
15 SMV Beverages Pvt. Ltd., A-28, MIDC Industrial Area, Saoner, Dist - Nagpur
40.34 Crs. Renewal JD(WPC) 297 - 312
16
Clean Science & Technology Pvt. Ltd., D-28, MIDC Area Kurkumbh, Pune
49.34 Crs.
Renewal (with
increase in C.I.)
AS(T) 313 - 335
17
Chemtail India Pvt. Ltd., Gat No. 569, Village - Koregaon Bhim, Tal - Shirur (Ghodnadi), Nagar Road, Pune
28.95 Crs. Amedment AS(T) 336 - 351
18
Lona Industrial Ltd., Vill - Ladivali, Post - Gulsunde, Tal - Panvel, Dist - Raigad
62.67 Crs.
Renewal (with
increase in C.I.)
AS(T) 352 - 376
JD(WPC) 2 `
AS(T) 4
RO(HQ) 7
JD(APC) 7
PSO 0
Total 20
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 3
CC-Resubmission
Agenda no. 1 Region : SRO Pune II Section : JD(APC) Section Date : 11.05.2014.
Name & Address DTL Ancillaries LTD , Unit III 373, Kharabwadi, Near WMDC Industrial
Area, Chakan, Tal: Khed, Dist: Pune.
Consent For Ist Consent to operate.
Capital Investment Rs. 44.92.8 Crs
Previous Consent
Validity
Consent to Establish obtained.
Industry Type O23 Engineering and fabrication units (With investment on Plant
Industry Category Green
Compliance Of
Water Pollution
Related Conditions
YES ( √ )
Details: - Ind. Eff: 49 CMD ETP provided., Dom. Effluent: 5.0 CMD, septic tank provided.
Compliance Of Air
Pollution Related
Conditions
NO (√ ) Industry has not provided scrubber to phosphating section.
Water Cess Assessment Done : Paid Upto :
BG Details Amount : ---- Validity : -----
BG Obtained against :
Details of BG forfeited/encashed , if any :
Submission of
Environmental
Statement
Period -------
Other Relevant
Information
- This case was discussed in the CC meeting held on 24.02.2014.In this
meeting it was decided to issue final closure direction to the industry as
industry is in operation without obtaining consent for expansion activities
and not providing air pollution control system.
- Refusal order was issued to the industry on 28.02.2014.SRO-Pune II has
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 4
reported that during the visit on 07.03.2014, industrial activities were not in
operation.
- Industry has submitted reply vide letter dated 03.03.2014 stating that they
have submitted reply to RO Pune .They have not started production. They
are using low concentrated 0.3 % phosphoric acid which is in stable form
hence scrubber is not required .They have provided proper ventilation
arrangement.
- Industry has requested to withdraw closer direction and to grant consent to
operate.
- The case was again resubmitted before CC dated 29.04.2014 along with
above details, but it was decided to keep the case in abeyance and
resubmit after re –examination.
Industry have stopped the manufacturing activities since
04.03.2014 and complied with the direction and provided pollution
control systems.
Recommendation of
SRO/RO
RO Pune has recommended to issue direction to the industry.
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 5
Agenda no. 2 Region : RO Pune Section :RO(HQ) Date :
Name & Address M/s. Kalpataru Construction, “Kalpataru Estates”,
Phase-I,II,III, S.No. 85/1B/2/1, 85/1A, 86/2B/1, 90/2/1 & 91/1A, At Pimpale Gurav,
Pune.
Consent For C to O 1st
with amalgamation of existing phase.
Capital Investment 208.54 Cr.
Previous Consent
Validity
COU
Industry Type O08 Building and construction projects more than 20,000 Sq mtr
Industry Category Orange
Compliance Of Water
Pollution Related
Conditions
YES ( ) NO ( )
Details :-Water Consumption;-625.15 CMD, Effluent generated 500 CMD
Proposed STP capacity 500 CMD
BG Details Amount : Validity :
BG Obtained against :
Submission of
Environmental
Statement
Period
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 6
Other Relevant
Information
1. PP has applied for consent to 1st
Operate
2. The Residential project covering total area of around 84,000 sq.mtrs with total
built up area of 121232.4 sq mtrs
3. PP has obtained environment clearance From MoEF on 02nd
Jan 2007 for total
plot area 84800 sq.mtrs and total BUA of 77,627.68 sq.mtrs. Total three phases
having 16 building.
4. PP has obtained consent to establish on 09/12/2011 for total plot area 84,800
sq.mtrs and BUA of 77,627.68 sq.mtrs.
5. Out of which PP has obtain consent to operate part for two phases having BUA
63,572.54 sq.mtrs which is valid for period upto 31/12/2013.
6. Now PP has applied for 1st
operate for third phase and amalgamation of earlier
two phase i.e operate for complete project having BUA 121232.4 sq.mtrs
7. Total water consuming 625.15 m3/day of water out of which 404 m3/day fresh
water will be supplied by PMC & generating about 500 m3/day of sewage, which
PP has provided STP of capacity 500 m3/day, Treated 202.05 m3/day waste water
will be used for utilities, and partially of which 152.0 m3/day will be used for
gardening.
8. Bio-degradable waste 1456.50 Kg/Day and 971 kg/D generated per day. PP has
provided vermicomposting pit for Bio degradable waste.
9. 4 no. of DG sets each having capacity, 125x2,200,320 KVA.
10. Proposed site is located near about 10 mtrs Pawana river (A-IV,Class).
11. The existing STP located near Pawana River.
12. The total cost of the project is Rs 208.54 Crore for which they have paid Rs.
417198.0 as consent fees for 1st
Operate.
13. PP has submitted BG of Rs 10 Lakhs which is valid for period upto 07/06/2014.
14. PP has constructed 6 buildings in phase-I,10 Buildings in Phase-II, and 9 Buildings
in Phase-III.
15. SRO Pimpri-Chinchwad has asked clarification regarding total construction BUA.
The case was discussed in CC meeting held on 15/10/2013 during discussion it was
decided to issue SCN for refusal as EC is not valid and BUA mention in EC in
application of C to O not match.
Applicant has submitted reply of SCN issued on 09/12/2013 in reply PP stated that
MoEF has published EIA notification on 14th Sept 2006 in which project having BUA
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 7
20,000 sq. mtrs required EC. And that time definition of BUA was builtup area ,
area open to sky will be activity area as per this definition non FSi area excluded
from BUA, on this basis we approached MoEF to obtained environmental clearance
for Permissible BUA 77672.68 sq.mtrs Non FSI area 48,266 sq.mtrs not mentioned
in the EC.
No of Building mentioned in EC :- Ph I -6 Bldg., Ph II-10bldg., Ph III-10bldg. total -26
Bldg.
PP actually constructed:- Ph I -6 Bldg., Ph II-10bldg., Ph III-9 bldg total:-25 bldg.
As per minutes of SEIAA meeting held on 27/01/2014, as per minutes of meeting if
project proponent has not commissioned the project within five years then
required revalidation as a fresh application and if Project proponent has
commissioned the project within 5 years then no revalidation required. (Minutes
of meeting attached with the agenda)
Submitted for CC discussion.
Recommendation
of SRO/RO
RO, Pune has recommended that decision regarding grant of consent may be
taken at HQ level after receipt of reply.
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 8
CC-Fresh Agenda
Agenda no. 1 Region : SRO Mumbai IV Section :RO(HQ) Date :
Name & Address M/s.Mphasis Ltd.,101,201, building No.4,Infinity IT Park,Dindoshi,Malad(E)
Consent For C to E,
Capital Investment C.I. is Rs.39.22 Cr.
Since PP is on rental basis, PP has not submitted investment of land/building in CA
Certificate
Previous Consent
Validity
--
Industry Type O08 Building and construction projects more than 20,000 Sq mtr
Industry Category Orange
Compliance Of Water
Pollution Related
Conditions
YES ( ) NO ( )
Details :-
Water consumption - 301 CMD.
Sewage Generation -275 CMD
Capacity of STP Proposed -290 CMD
Water Cess Assessment Done : Paid Upto :
BG Details Amount : Validity :
BG Obtained against :
Details of BG forfeited/encashed , if any :
Submission of
Environmental
Statement
Period
Application for grant of Renewal of Consent for IT Activity.
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 9
Other Relevant
Information
SRO reported that, Previously PP has applied for Consent to Establish & Operate
dated 30.3.2011 since due to incomplete information ,Application was returned to head
office due to non submission of
1.Area statement of project.
2.water balance of project.
3.IOD, Laypout plan.
4.APC Equipment details.
5.Solid waste management plan.
(Copy of letter attached).
PP has not obtained C to E & Operate from Board.
and submitted consent fee of Rs.2,55,000/- .
Unit is on rental basis in the Building of M/s.Peepul Tree Properties Pvt. Ltd(owner)
M/s.Peepul Tree Properties has also applied for renewal of consent for STP Activity
and agenda was also submitted for placing before CC Meeting for discussion.
SRO reported that,
PP has not submitted,
1)balance sheet.
2)details of cess returns & payment mode.
3)copy of Environment statement.
4)details of water budget, solid waste details.
SRO has issued letter to PP 12th March,2014 & reply awaited.
SRO reported that M/s. Peepul tree has provided STP having capacity 200 CMD.
Recommendation of
SRO/RO
SRO recommended consent may be granted after receipt of above information.
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 10
Agenda no. 2 Region : SRO Mumbai IV Section :RO(HQ) Date :
Name & Address M/s. Tata Consultancy Services, at Plant No.12,Godrej BOYCE Complex, LBS
Marg,Vikroli(E),Mumbai
Consent For C to Operate,
Capital Investment C.I. mentioned by PP is Rs.101.06 Cr.
PP has submitted CA Certificate without including land/building cost & not submitted
the certificate of owner/lesser/licensor stating the cost of assests.
Previous Consent
Validity
--
Industry Type O08 Building and construction projects more than 20,000 Sq mtr
Industry Category Orange
Compliance Of Water
Pollution Related
Conditions
YES ( ) NO ( )
Details :-
Water Consumption-200 CMD
Effluent generation-160 CMD.
SRO reported that centralized STP provided by M/s.Godrej Industries.
Water Cess Assessment Done : Paid Upto :
BG Details Amount : Validity :
BG Obtained against :
Details of BG forfeited/encashed , if any :
Submission of
Environmental
Statement
Period
Other Relevant
Information
Application for grant of Consent to Establish & Operate for IT Activity at Plant
No.12,Godrej BOYCE Complex,LBS Marg,Vikroli(E),Mumbai
Said project is in operation from July,2009 but not submitted consent fee of lapse
period.
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 11
Non Hazardous Waste:
Wet Garbage: 72,000 Kg/Annum
SRO reported that indigestive pant provided by M/s.Godrej industries
Dry Garbage: 50,000 Kg/Annum
SRO reported that PP has not submitted,
1.Details of E-Waste generation & its disposal.
2.Cess details.
3.Copy of EC & Consent to Establish for infrastructure Bldg.
SRO has issued letter to PP dated 4/4/2014 and reply awaited.
Recommendation of
SRO/RO
SRO recommended consent may be granted after receipt of above information.
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 12
Agenda no. 3 Region : SRO Tarapur I Section : JD(WPC) Date : 12.05.2014
Name & Address Tarapur Environment Protection society (CETP) , Plot No. OS-30(pt), MIDC Tarapur,
Tal. Palghar, Dist. Thane
Consent For CE
Capital Investment 7000 Lacs
Previous Consent
Validity
Proposed CETP
Industry Type R14 Common treatment and disposal facilities (CETP, TSDF, E-Wast
Industry Category Red
Compliance Of Water
Pollution Related
Conditions
YES ( ) NO ( )
Details :- Proposed CETP of capacity 50 MLD,
The Primary, secondary and tertiary treatment is proposed for the 50 MLD effluent.
Water Cess Assessment Done : Paid Upto :
BG Details Amount : Validity :
BG Obtained against :
Details of BG forfeited/encashed , if any :
Submission of
Environmental
Statement
Period
Other Relevant
Information
1. The proposed disposal of the treated effluent is in Navapur creek.
2. DPR is not submitted.
3. Environmental Clearance is applicable.
4. A query letter dtd. 13.03.2014 is issued by RO Thane to Project proponent for
Submission of DPR, details of agreement with M/s. TIMA, time bound program for
construction and erection of proposed CETP, Permanent Account Number, Index/Site
plan, detailed layout plan for conveyance system, C.A certificate or undertaking and
documented feasibility report for recycle / reuse of treated effluent as per revised
guidelines for CETP.
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 13
Recommendation of
SRO/RO
Case is forwarded for considering suitably for grant of consent to establish subject to
obtaining EC from GOM.
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 14
Agenda no. 4 Region : Pune Section : AST Date : May 2014
Name & Address M/s Datwayler Pharma packaging India pvt.ltd.
Consent For Consent to establish for expansion
Capital Investment Current CI : Rs.151.03 Cr. , Proposed CI : Rs.215.95 Cr ,Total CI after
expansion : Rs. 366.98 Cr.
Previous Consent
Validity
31/03/2014
Industry Type R 60 Pharmaceutical (excluding formulation)
Industry Category Orange
Compliance Of Water
Pollution Related
Conditions
No
Details :- Existing IE- 70.0 CMD, DE- 18.0 CMD. Proposed IE :70 CMD ,DE : 18 CMD . total IE : 140 CMD ,DE :36 CMD.
Existing full-fledged ETP of capacity 260 CMD will be used for treatment. treated effluent used on land for gardening .Land available for disposal is 11879 M2 is inadequate for proposed effluent disposal .
Water Cess Assessment Done : JULY 2013 Paid Upto : ….
Compliance Of Air
Pollution Related
Conditions
Yes
Exiting boiler & DG will utilsed for expansion. Adequate APCS is provided for same .
BG Details Amount : Nil Validity : NIL
BG Obtained against : NA
Details of BG forfeited/encashed , if any : NA
Submission of
Environmental
Statement
Period
2012-201
3
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 15
Other Relevant
Information
1. Applied for C to E (expansion) in orange category .
2. Total CI after expansion : Rs. 366.98 Cr. ,hence it is new entry for CC.
3. Industry located 8 km away from river Nira (class II) .Saticefied RRZ distance criteria.
4. Industry has reported that production quantity in present consent is 450 Cror Nos./Y which is total plant capacity with 40 nos. of Machinery .but as present production quantity is only 30 % as there are only 14 nos of machineries are installed & for 100 % production need to install 26 Nos. of Machinery for which they applied for the C to E with proposed CI 215.95 Cr. Also reported that the existing effluent quantity will remain same as the production quantity remains same as per existing C to O.
5. This office has called verification report from SRO in industry says ,vide email dtd 05/05/2014 field Officer of SRO has reported that due to expansion additional 88 CMD effluent (IE : 70 CMD ,DE :18 CMD) ,hence after expansion total IE : 140 CMD & DE : 36 CMD. Land available for disposal is 11879 M2 is inadequate for proposed effluent disposal.
6. After Expansion total BUA will be more than 20000 M2 ,hence attracts EIA notification 2006 .
Recommendation of
SRO/RO
RO has recommended for grant of C to E for expansion with condition not to take effective steps until obtaining EC.
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 16
Agenda no. 5
Region : Pune Section : JD(APC) Date :
Name & Address M/s. Electromech Material Handling Systems (India) Pvt.
Ltd., Gat No. 316, Plot No. 1A,1B, industrial Area, A/P. Kasar
Amboli, Tal. Mulshi, Pune
Consent For CTE (Expansion)
Capital Investment 22.05 Crs
Previous Consent
Validity
31/12/2013
Industry Type O23
Industry Category RED
Compliance Of Water
Pollution Related
Conditions
YES ( ) NO ( √ )
Details: - 1) ETP not provided for painting activity effluent.
2) Industry has provided sewage effluent plant for domestic
effluent-16 CMD
Water Cess Assessment Done : Paid Upto :
BG Details Amount : Rs. 2.00 lakh Validity :13.09.2013
BG Obtained against : consent conditions
Submission of
Environmental
Statement
Period --
Other Relevant
Information
1. M/s. Electromech Material Handling Systems (India) Pvt. Ltd., Gat No. 316, Plot No. 1, A/P. Kasar
Amboli, Tal. Mulshi, Pune has applied for consent to establish for expansion.
2. Earlier consent obtained vide No. BO/JD(APC)/EIC No.
PN-8481-10/O/CC-115 dated 04/01/2012 valid till
31/12/2013
Recommendation of
SRO/RO
Decision of grant of consent to establish may be taken at H.Q.
level after receipt of reply to the show cause notice & B.G. &
forfeiting B.G.
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 17
Agenda no. 6
Region : Pune Section : JD(APC) Date : /04/2014
Name & Address M/s. Electromech Material Handling Systems (India) Pvt. Ltd., Gat No. 316, Plot
No. 1, A/P. Kasar Amboli, Tal. Mulshi, Pune
Consent For Renewal
Capital Investment 55.68 Crs
Previous Consent
Validity
31/12/2013
Industry Type O23 Engineering and Fabrication units
Industry Category Orange
Compliance Of Water
Pollution Related
Conditions
YES ( ) NO ( )
Details :- Sewage – 23.00 CMDSTP provided
Water Cess Assessment Done : Paid Upto :
BG Details Amount : Rs. 2.00 lakh Validity :
BG Obtained against : consent conditions
Details of BG forfeited/encashed , if any :
Submission of
Environmental
Statement
Period 2012-2013
Other Relevant
Information
1. M/s. Electromech Material Handling Systems (India) Pvt. Ltd., Gat No. 316, Plot No. 1, A/P. Kasar Amboli, Tal. Mulshi, Pune has applied for renewal of consent.
2. Earlier consent obtained vide No. BO/JD(APC)/EIC No. PN-8481-10/O/CC-115
dated 04/01/2012 valid till 31/12/2013
3. Water Consumption Domestic – 30.00 CMD
Sewage – 23.00 CMD
Industrial – 0.20 CMD 4. Industry has submitted process flow diagram and list of raw materials
required.
Recommendation of
SRO/RO
RO Pune commented that the industry has applied for C to E for expansion.
And now applied for renewal of consent. Industry has already carried out
expansion. Clarification regarding non provision of ETP is not satisfactory.
BG of Rs. 2.00 lakh submitted.
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 18
Agenda no. 7 Region : RO Thane Section :RO(HQ) SRO Date:-18/02/2014
Name & Address M/s. Mahadeo Construction Pvt. Ltd., “Cosmos Garden”
S. No. 73 / 1, 2, 3, 4, 5. S No. 74/1, 2, 3, 4, 4 S.No. 75/10 (P) S. No. 78/1, 2 (P), 3, 4 S
No. 82/1(PT), 2, 3, 4(PT), S.No. 83, Kolshet Road, Thane(W). Maharashtra
Consent For C to O
Capital Investment 93.50 Cr.
Previous Consent
Validity
----
Industry Type O08 Building & Construction Projects more than 20,000 Sq. mtr.
Industry Category Orange
Compliance Of Water
Pollution Related
Conditions
YES ( ) NO ( )
Details :-Water Consumption: 253.0 CMD, Effluent generated 205.0 CMD. STP
Proposed of Capacity :220.0 CMD
BG Details Amount : Validity :
BG Obtained against :
Other Relevant
Information
16. PP has applied for consent to 1st Operate.
17. PP applied for Residential & commercial project covering total area of around
91,976.0 Sq. mt with total built up area of 31,458.50 sq mtrs
18. PP has obtained environment clearance from GOI having total plot area
91,976.0 sq.mtrs BUA 31,458.50 sq.mtrs on 2 April 2007.
19. PP has obtained consent to Establish on dated 28/04/2006 for same area.
20. Capital investment of the project is 93.50 Cr.
21. Total water consuming 253.0 m3/day & generating about 205.0 m3/day of
sewage, PP has provided STP having capacity 220.0 CMD.
22. PP has provided Vermi-Composting arragement for bio-degradable waste,
Non-biodegradable waste send to authorized vender.
23. 2 no. of DG sets having capacity, 125 & 250.0 KVA.
24. Applicant has completed construction of project.
25. Applicant has paid consent to Establish revalidation Fees.
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 19
In view of above we may consider consent to operate as PP has completed
construction and provided STP and vermin-composting arrangement.
Recommendation
of SRO/RO
.
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 20
Agenda no. 8 Region : SRO Mumbai III Section :RO(HQ) Date :
Name & Address Tata Consultancy services Ltd., 1st to 13
th Floors , Kensington B- wing, Hiranandani
Business Park at Powai.
Consent For CO
Capital Investment C.I. mentioned by PP
1st to 4
th floor is Rs.47.20Cr.
5th to 8
th floor is Rs.58.93Cr
9th to 13
th floor is Rs.51.16 Cr.
Total C.I. is 157.29 Cr.
Previous Consent
Validity
---
Industry Type IT & ITES Activity
Industry Category Orange
Compliance Of Water
Pollution Related
Conditions
YES ( ) NO ( )
Details :-
Water Consumption-125 CMD
Effluent generation-100 CMD.
Applicant mentioned that waste water recycled through STP but capacity of STP
is not mentioned.
Water Cess Assessment Done : Paid Upto :
BG Details Amount : Validity :
BG Obtained against :
Details of BG forfeited/encashed , if any :
Submission of
Environmental
Statement
Period
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 21
Other Relevant
Information
Application for grant of Consent to Operate for IT Activity.
PP has applied for Consent application ,separately floor wise for IT PARK at
Kensignton,B-Wing, Hiranandani Buisiness park, Powai for
1st to 4
th floor(CO1403000229)
5th to 8
th floor(CO1403000231)
9th to 13
th floor(CO1403000232)
All 3 cases are herewith submitted together for placing before CC Committee
meeting. PP has submitted CA Certificate without including land/building cost & not
submitted the certificate of owner/lesser/licensor stating the cost of assests.
SRO reported that,Said project is in operation from July,2009 but not submitted
consent fee of lapse period.
Non hazardous waste:
Biodegradable waste :50,000 Kg/Annum
(Treated through bio digester)
SRO reported that PP has not submitted,
1.Details of E-Waste generation & its disposal.
2.Cess details.
3.Copy of Environmental Clearance & Consent for bldg.Kensignton of
hiranandani builder SEZ project.
SRO has issued letter to PP dated 4/4/2014 and reply awaited.
Recommendation of
SRO/RO
SRO recommended consent may be granted after receipt of above information
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 22
Agenda no. 9
Region : Pune Section : JD(APC) Date : /05/2014
Name & Address M/s. SIGMA Electric Manufacturing Corporation Pvt. Ltd. (Unit III)
B- 27, MIDC Chakan, Tal. Khed, Dist. Pune
Consent For Renewal
Capital Investment 48.12 Crs
Previous Consent
Validity
28/02/2014
Industry Type Automobile Manufacturing
Industry Category Red
Compliance Of Water
Pollution Related
Conditions
YES
Details :- Sewage – 50.00 CMD STP Provided
Effluent – 72.00 CMD ETP Provided.
JVS result of parameter BOD dated 21.01.2014 exceeded BOD limit.
Compliance Of Air
Pollution Related
Conditions
YES
- Dust collection system is provided to shot blasting section.
Water Cess Assessment Done : Paid Upto :
BG Details Amount : Rs. 5.00 Lakhs Validity :
BG Obtained against : O & M of Pollution Control System
Details of BG forfeited/encashed , if any :
Submission of Environmental Statement
Period 2012-2013
Other Relevant
Information
1. M/s. SIGMA Electric Manufacturing Corporation Pvt. Ltd. (Unit III) B- 27, MIDC Chakan, Tal. Khed, Dist. Pune has applied for renewal of consent.
2. Earlier consent obtained vide No. BO/JD(APC)/EIC No. PN-16334-13/0-CC-2944 dated 08/04/2013 valid till 28/02/2014 and amendment dated 23/08/2013.
3. There increase in CI 5.12 Crs.
Recommendation of
SRO/RO
Decision may be taken at H.Q.level.
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 23
Agenda no. 10 CC Item –
Region : Thane │Section : JD(APC) Date
Name & Address
M/S. Viraj Profiles Ltd. ,Plot No.- G-75/76/77,
MIDC Tarapur,Taluka-Palghar,Dist-Thane.
Consent for Renewal of consent
Capital Investment Rs. 24.96 Crs
Consent Valid upto 30/11/2013
Industry Type R 72
Industry Category RED
Compliance of
Water Pollution
Related Conditions
YES (√) NO ( )
ETP & STP provided ,Treated effluent dispose to CETP
Compliance of Air
Pollution Related
Conditions
YES (√ ) NO ( )
Scrubber provided to pickling section
Water Cess
Assessment Done:
Submitted up to: Jan 2013
Paid upto:
BG Details Amount: Nil Validity -
BG obtained against:
Submission of
Environmental
Statement
Period 2012-13
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 24
Other Relevant
Information
This office issued query letter for increased C.I. to industry on 07/04/2014 &
reply received 2/5/2014.
Recommendation
of SRO/RO
Recommended for grant of plain renewal of consent upto 30/11/2016.
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 25
Agenda no. 11 Region : Nashik Section : JD(APC) Date : /05/2014
Name & Address M/s. Jyoti Structures Ltd. Plot No. 51/52/53-A, MIDC, D Road,
Satpur, Nashik – 422 007
Consent For Renewal
Capital Investment Rs32.24 Crs
Previous Consent
Validity
31/12/2013
Industry Type Heavy Engineering including ship building
Industry Category Red
Compliance Of Water
Pollution Related
Conditions
YES
Details :- Sewage – 40.00 CMD STP Provided.
Effluent – 21.00 CMD ETP Provided.
Compliance Of air
Pollution Related
Conditions
YES ,
Scrubber system provided
Water Cess Assessment Done :July- to Sept-
2013
Paid Upto : 30.09.2011
BG Details Amount : Rs. --------- Validity : --------
BG Obtained against :
Details of BG forfeited/encashed , if any :
Submission of Environmental Statement
Period 2012-2013
Other Relevant
Information
1. Industry has applied for plain renewal of consent. 2. Earlier consent obtained vide No. BO/JT. Dir (APC)/EIC No. NK-7634-
11/0-297 dated 15/06/2011 valid till 31/12/2013. 3. Earlier CI of plant was Rs.14.63 Crs, Now shown Rs.32.24 Crs. 4. SRO Nashik has reported that industry submitted justification about
increase in CI and paid additional consent fees.
Recommendation of
SRO/RO
SRO Nashik recommended the case for grant of renewal
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 26
Agenda no. 12 Region : Nashik Section : RO(HQ) Date : /05/2014
Name & Address M/s. Interglobe Hotels Pvt. Ltd.,
Plot NO. 9, MIDC Satpur, Tal. & Dist. Nashik
Consent For CR
Capital Investment 53.65 Crs.
Previous Consent
Validity
31.10.2013
Industry Type R29 Hotels (3 star & above) and Hotels having 100 rooms and above
Industry Category Red
Compliance Of Water
Pollution Related
Conditions
YES ( ) NO ( )
Details :-
Water Cess Assessment Done : Paid Upto :
BG Details Amount : Validity :
BG Obtained against : O & M of Pollution control system
Details of BG forfeited/encashed , if any :
Submission of
Environmental
Statement
Period
Other Relevant
Information
M/s. Interglobe Hotels Pvt. Ltd., Plot NO. 9, MIDC Satpur, Tal. & Dist. Nashik
has applied for renewal of consent.
Earlier C to O granted for Hotel activity (Lodging & Boarding activity) without
swimming pool & laundry activity for 125 Rooms vide No.
MPCB/RONK/CON-435/2011/4678; dt; 03/11/2011 Valid upto 31.10.2013
CI of Total Project is 53.65 Crs.
CI increased from 24.85 Crs to 53.65 Crs.
Details of water consumption as under :- Water consumption
Domestic – 64.00CMD
Sewage Generation – 60.00 CMD
STP – 65 CMD provided for treatment of sewage.
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 27
DG sets - 250 KVA x 2 Nos.
Recommendation of
SRO/RO
SRO Nashik has recommended that consent may be renewed upto 31/10/2014
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 28
Agenda no. 13 Region : SRO Mumbai IV Section :RO(HQ) Date :
Name & Address M/s.Peepul Tree Properties Pvt Ltd. ,
Infinity IT Park,Building No.4, Dindoshi, Malad(w), Mumbai-97
Consent For Renewal of Consent
Capital Investment C.I. of project is Rs.250.89Cr
C.I increased from Rs.1 Cr to Rs.250.89Cr
Previous Consent
Validity
Regional Office Mumbai has granted consent for operation of STP (its capacity not
mentioned in consent) which is valid up to 31.01.2013 and having C.I. is Rs.1 Cr.
Industry Type O08 Building and construction projects more than 20,000 Sq mtr
Industry Category Orange
Compliance Of Water
Pollution Related
Conditions
YES ( ) NO ( )
Details :-
PP has applied for effluent discharge of 300.00 CMD while STP provided of 200 CMD
capacities.
Water Cess Assessment Done : Paid Upto :
BG Details Amount : Validity :
BG Obtained against :
Details of BG forfeited/encashed , if any :
Submission of
Environmental
Statement
Period
Other Relevant
Information
Project proponent has applied for renewal of consent for STP having capacity 200
CMD at infinity IT Park,239,Buiding No.4,Dindoshi,Maad(E),Mumbai.
SRO reported that,
1.From the documents submitted by PP vide letter dated 21/10/2013,
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 29
carpet area of building is 6,185 Sq. Mtrs
Total built up area is 80,464 Sq. Mtrs.
2)However as per new categorization of CPCB’s June 2012 individual STP cat. is not
included due to which application processed considering cat no. O-8.
Applicant has not submitted details of solid waste/ HW.
PP has submitted,
IOD is granted in name of M/s.Ferani hotels Ltd.,for Bldg. No.4 at CTS No.
827A(pt),S.no.239(pt) of village, malad.
Plinth level work completed before 28th Jan 2004.
Recommendation of
SRO/RO
RO Recommended , decision may be taken at higher level that whether consent may
be granted or not as the individual STP Cat is not mentioned in new categorization or
whether consent may be granted considering construction project having total built up
area 80464 Sq.Mtrs.
PP has paid fee of Rs. 15,000/- along with applications against the total fees of
Rs.5,01,740/-.
Also PP has not paid required amount of consent fee. However as the STP
categorization is not define in the CPCB’s list of categorization of industries, this office
has not instated for the fees at actual.
Agenda no. 14
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 30
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 31
Agenda no. 15 Region : SRO Nagpur I Section : JD (WPC) Date :
Name & Address SMV Beverages Pvt. Ltd., , A-28, MIDC Industrial Area, Saoner, dist - Nagpur.
Consent For Applied for renewal of consent.
Capital Investment 1) Previous C. I. of Rs. 29.64 Cr.
2) Enhanced C.I. of Rs. 10.70 Cr. (increased due to pollution control arrangement &
Total C.I. of Rs. 40.34 Cr. infrastructure & lab equipment)..
Previous Consent
Validity
1) Previous consent dtd. 30.04.2005 valid up to: 28.02.2014, granted for manufacturing of soft drinks – 386400 Litrs/day. (Pepsi, Mirinda, Teem, 7-Up, M/Dew, Slice, E-Soda, Mineral Water (P.D.W.) & Pet bottle processing).
2) Applied for manufacturing of Soft Drinks – 38640 Litrs/day (Pepsi, Mirinda, Mountain Dew, Slice, Soad, Package Drinking Water (P.D.W.) & Pet bottle Processing).
Industry Type G58 Mineralized water
Industry Category Red/LSI
Compliance Of Water
Pollution Related
Conditions
YES
Details :- ETP comprising Primary & secondary treatment provided.
JVS result dated 16.05.2013 within limit..
Compliance Of Air
Pollution Related
Conditions
Furnace oil boiler with chimney height – 30 mtr., provided.
Water Cess Assessment Done : Paid Upto :
BG Details Amount : ---- Validity :----
BG Obtained against : ----
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 32
Details of BG forfeited/encashed , if any :
Submission of
Environmental
Statement
Period ) Environment statement for the year 2012-2013 submitted.
Other Relevant
Information
JVS result dated 16.05.2013 within limit.
Furnace oil boiler with chimney height – 30 mtr., provided.
Recommendation of
SRO/RO
SRO recommended to grant consent upto: 28.02.2019
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 33
Agenda no. 16 Region : Pune Section : AST Date : May 2014
Name & Address M/s Clean Science & Technology Pvt.ltd. ,D -28 ,MIDC Area Kurkumbh, Pune
Consent For Renewal of consent with increase in Capital Investment & Consent to
establish for expansion
Capital Investment Existing CI : Rs.5.38 Cr. , Current CI : Rs.49.34 Cr
Previous Consent
Validity
31/12/2013
Industry Type R 5 chemicals
Industry Category Red
Compliance Of Water
Pollution Related
Conditions
No
Details :- Existing IE-13.3 CMD & DE-4.5 CMD, applied for proposed IE- 43.50 CMD, DE-16.0 CMD. Totat IE : 56.8 CMD ,DE : 20.5 CMD .Industry has already provided ETP comprising primary & secondary treatment ,which is oversize . Treated effluent sent to CETP . JVS reports submitted are within consented limit .
Water Cess Assessment Done : Sept -2013 Paid Upto : Sept-2013
Compliance Of Air
Pollution Related
Conditions
Yes
Industry has provided dust collector, cyclone separator to boiler .Also reported
that there are no process emissions .
BG Details Amount : Nil Validity : NIL
BG Obtained against : NA
Details of BG forfeited/encashed , if any : NA
Submission of
Environmental
Statement
Period
2012-2013
Other Relevant
Information
1. Industry has applied for C to R with increase in CI & increase in effluent
quantity without change in product quantity. Industry has separately
applied for C to E without increase in production & increase in effluent
quantity with proposed CI 41.20 Cr. same application is clubbed
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 34
herewith.
2. Existing CI- Rs.5.38 Cr. , increased in CI Rs. 41.20 cr.(as per C to E) ,
Now applied with CI- 49.34 Cr. (As per CA certificate). From the
balance sheet it seems that industry has increased CI from 2011. As
per balance sheet submitted by in dustry CI in 2011 was 11.3 Cr
however in consent it was given 5.38 cr.
3. Products attracts EIA notification 2006 ,as effluent quantity increase
from 13.3 CMD to 56.8 CMD , however industry has reported that
establishment of their unit is before EIA notification 2006 hence do they
not required EC.
4. RO has issued SCN on 17.09.2013 for installing boiler & thermopack
without permission of Board. Reply submitted by industry is not in
order.
5. SRO has issued discrepancy letter on 28.12.2013 , industry has
submitted reply for same. but same was not satisfactory.
6. This office has called additional information from industry i.e. reply for
SCN issued by RO & justification for increase in CI . Same was not in
order.
Recommendation of
SRO/RO
RO has recommended for grant of plain renewal & reported that attracts
EC & CETP is not working satisfactorily hence C to E granted with condition to
achieve ZLD & not to take effective steps of until obtaining EC ,which are
already taken by PP .
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 35
Agenda no. 17 Region : Pune Section : AST Date : May 2014
Name & Address M/s Chemtall India Pvt.ltd,Gat no.569 Village Koregaon Bhima ,Tal-
Shirur(Ghodnadi),Nagar Road, Pune
Consent For Amendment in consent for change of name
Capital Investment CI : Rs.28.95 Cr.
Previous Consent
Validity
31/05/2016
Industry Type R 5 chemicals
Industry Category Red
Compliance Of Water
Pollution Related
Conditions
Yes
Details :- IE-23.0 CMD & DE-12.0 CMD3.Industry has provided full-fledged ETP,. Treated effluent disposed on land for gardening .
Water Cess Assessment Done : …. Paid Upto : ….
Compliance Of Air
Pollution Related
Conditions
---
---
BG Details Amount : 5 lakh Validity : 01.06.2015
BG Obtained against : Compliance of consent conditions
Details of BG forfeited/encashed , if any : Nil
Submission of
Environmental
Statement
Period
2012-2013
Other Relevant
Information
1. Industry has applied for amendment in consent for change of name
from M/s Chemetall Rai (I) Ltd. to M/s Chemetall India Pvt.ltd.
2. Industry has submitted fresh certificate of incorporation consequent
upon change of name obtained from ministry if corporate affairs ,GOI.
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 36
3. This office has called compliance report from industry as per Board
circular dtd.08/02/2013 regarding change of name from industry.
Industry has submitted compliance report for same ,which seems to be
in order.
Recommendation of
SRO/RO
Ro has reported that industry has not submitted BG of Rs. 5 lakhs towards
compliance of consent condition till date & recommends to take dicision at HQ
level.As per Industry reply dtd 12.05.2014 they had submitted BG of Rs. 5
lakh on 11.03.2014 .
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 37
Agenda no. 18
CC Item -
Region : Raigad │Section : AS(T) Date: 15 /05/2014
Name & Address
M/s. Lona Industries Ltd.
Vill. Ladivali, Post. Gulsunde,
Tal. Panvel, Dist. Raigad.
Consent for Renewal with Increase in CI
Capital Investment
Previous Rs. 34.72 Crore, which is increased by Rs. 27.95 Crore.
Now Total CI is Rs. 62.67 Crore.
Consent Valid up to 31/12/2013
Industry Type R-16, Dyes and Dye-Intermediates
Compliance of Water
Pollution Related Conditions
Yes
Details: IE generation is 1460 m3/d. & DE generation is 40 m3/d.
Industry has provided primary & Secondary treatment. Treated
effluent discharged to Saline zone of Patalganga river. JVS results
are within consented limits.
Water Cess Assessment Done: July-2013 Paid up to: July- 2013
BG Details
Amount: 1) 1.5 Lakh
2) 1.00 Lakh
3) 1.00 Lakh
Validity: 04/04/2014
BG obtained against: Interim Directions vide No.
MPCB/ROR/ID/130326FT0215 dtd. 26/03/2013
Details of BG forfeited / enchased, if any: --
Submission of
Environmental Statement Period- 2012-2013
Compliance of Air Pollution
Related Conditions
Yes
Details: Industry has provided Scrubbers, dust collector & water
sprinkling system.
Web agenda of 4th CC meeting (Part-2) of 2014-15 dtd. 16.05.2014 38
Other Relevant Information
Industry was engaged in manufacturing of Dye & Dye intermediates.
Previous consent granted on 19/06/2009 which was valid up to
31/12/2013. Interim Directions issued by RO Raigad on 26/03/2013.
SRO has submitted Compliance report of Interim Directions. Industry
is a member of CHWTSDF for disposal of HW. Industry has
submitted form –IV & Form-V and paid cess regularly. CI has
increased from Rs. 34.72 Crore to Rs. 62.67 Crore. Increase in CI is
due to modernization, atomization, old process units / installations
replacement activities. Industry has paid consent fees however laps
fee of Rs. 1.30 Lakh called by SRO from industry.
Recommendation of SRO
/RO Renewal of consent may be granted.