INVESTOR MEET – DHRUV CONSULTANCY SERVICES LIMITED
HEM SECURITIES LTD. AWARD WINNING MERCHANT BANKER
DHRUV CONSULTANCY
SERVICES LIMITED
COMPANY SNAPSHOT
Company Name Dhruv Consultancy Services Limited
Registered Office Navi Mumbai, Maharashtra
Corporate Office Navi Mumbai, Maharashtra
Date of Incorporation August, 26 2003
Exchange BSE - SME
Industry Consultancy
• Incorporated on August 26, 2003 and since then they are into infrastructure consultancy. Company provides design, engineering, procurement, construction and integrated project management services for Highways, Bridges, Tunnels, Architectural, Environmental Engineering and Ports.
• Over the years company has developed a track record of working majority of projects with government bodies and
public sector undertakings. • Being a consultancy organisation, They believe that human capital is one of most valuable assets. They have a qualified
and professional employee base of over 313 employees, including 240 Engineers as on December 31, 2017.
• Company’s total revenue has increased from Rs. 510.85 lakhs for Fiscal 2013 to Rs. 3046.24 lakhs for Fiscal 2017, at a CAGR of 56.27%. Net profit as restated has increased from Rs. 34.52 lakhs for Fiscal 2013 to Rs. 308.16 lakhs for Fiscal 2017, at a CAGR of 72.85%.
• Company deals in varied services. The diversified range of services helps them to cater different spectrum of clients which also increases their clientele base all over India. Their service sector includes Highways, Bridges, Tunnels, Architecture, Environmental and Ports.
• The majority of their business has been concentrated in Maharashtra, They also have relationships with clients outside Maharashtra. Now they are propose to focus on improving their relationships in strategically important areas such as Ahmedabad, Bangalore, Chennai, New Delhi, Hyderabad and Mumbai.
2
COMPANY TIMELINE 3
ESTABLISHMENT Started with 4 employees
in a 200 sq. ft. rented office
FIRST PMC WORK Bhiwandi Kalyan
Shilphata Road by PLUS Expressway BERHAD
TEN YEARS COMPLETION
Empanelment with Ministry of Road
Transport & Highways
HIGHEST WORK ORDER RECEIVED
National Highway Bridge Inspection in
Gujarat and Maharashtra
PRESENT More than 300
employees working in 11 states across the
nation with office space of 10,000 sq.ft. DPR Works of 1300 Km,
Authority Engineer’s Works of 740 Km
2003 2006 2013 2015 2018
2003 – Till Date
HIGHWAY SECTOR 4
DETAILED PROJECT REPORT
COMPLETED MORE THAN 75
WORKS
CONSTRUCTION SUPERVISION
COMPLETED 300 KMS AND 800 KMS
CURRENTLY ONGOING
OPERATION AND MAINTENANCE
MAJOR WORKS: NH4 SECTION OF
MUMBAI PUNE, MPEW AND SATARA
KAGAL
INDEPENDENT ENGINEER
1. Solapur Yedshi- 98.71 Km
2. Yedshi Aurangabad- 190.20 Km
3. Khed Sinner- 135.00 Km
CONTRIBUTES FOR 80% WORKS
5
BRIDGES & TUNNEL SECTOR 5
SAVITRI RIVER BRIDGE IN MAHAD
• 3-LANE MAJOR BRIDGE ON NH-17
• COMPLETED IN A RECORD
PERIOD OF 165 DAYS • AWARDED WITH
EXCELLENCY CERTIFICATE BY HON. MINISTER SHRI NITIN GADKARI
NATIONAL HIGHWAY BRIDGE INSPECTION
• GUJARAT
• TOTAL KM – 5062 KMS
• AWARD VALUE – RS. 17 CR.
• MAHARASHTRA, GOA AND
DADRA & NAGAR HAVELI
• TOTAL KM – 7727 KMS
• AWARD VALUE – RS. 20 CR
MUMBAI PUNE EXPRESSWAY CAPACITY AUGMENTATION
MANALI TO SHIMLA PARALLEL ROUTE
BRIDGE DESIGN, CONSTRUCTION SUPERVISION AND INSPECTION
ARCHITECTURAL, ENVIRONMENTAL & PORT WORKS
ASHTAVINAYAK RE-DEVELOPMENT
AMRUT SMART CITY PROJECTS
FOR 8 CITIES
ARCHITECTURAL
PLANNING &
DESIGN
SMART CITIES
INTERIOR
DESIGNING
01 02
HERITAGE
CONSERVATION 03
04
ENVIRONMENTAL – DESIGN OF SEWAGE TREATMENT PLANTS GOT PMC OF 135 NAGAR
PANCHAYATS IN MAHARSHTRA WHICH INCLUDES STP.
DEVELOPMENT OF JALNA AND WARDHA DRY PORT
6
ARCHITECTURE PLANNING AND DESIGNING
6
35
TENDER EVALUATION
Feasibility Study and Preparation of DPR for up gradation to 2 lane with paved shoulder of MSH-15 from Bankot - Mandangad - Mahad - Rajewadi- Raigad District Border in Ratnagiri and Raigad Districts approximate length Km.98.00 And SH-97 from Mahad Junction (at Km 123/400 on NH-66) to Raigad Fort.
Sr. No Name of Bidder Financial
Bid
Technical
Marks
Technical
Score
Financial
Score Total
1 L&T Infrastructure Engineering Limited 38710500 91.25 73.00 17.82 90.82
2 VOYANTS SOLUTIONS PRIVATE LIMITED 26852700 92.30 73.84 OUT OUT
3 SOWIL LIMITED 34487400 83.85 67.08 20.00 87.08
4 DHRUV CONSULTANCY SERVICES PVT LTD. 37620000 96.25 77.00 18.33 95.33
5 MONARCH SURVEYORS AND ENGG CONSULTANTS PVT LTD
36373300 90.00 72.00 18.96 90.96
Total 174043900
Average 34808780
Above 20% 41770536
Below 20% 27847024
DPR Rate Rs.1.5 Lakhs/Km Our Quoted Rate Rs. 3.06 Lakhs/Km Expected Profit 51%
7
MBIU MAHARASHTRA EVALUATION
Sr. No Name of Bidder Financia
l Bid
Technica
l Marks
Technic
al Score
Financial
Score Total
1 S N Bhobe & Associates Pvt. Ltd 153698669 84.58 67.66 20 87.66
2 Dhruv Consultancy Services Pvt. Ltd 175500000 87.71 70.17 17.52 87.68
3 Sowil Limited 180100000 79.03 63.22 17.07 80.29
4 Casta Engineers Pvt. Ltd 179350000 81.06 64.85 17.14 81.99
Our financial quote is much higher than the lowest bidder (L1), but due
to strong technical marks we got this work by a difference of 0.02.
8
EMPLOYEE STRENGTH
Category No. of Employees
Administrative Staff 23
Skilled Workers 236
Semi-Skilled Workers 37
Unskilled Workers 17
Total 313
As of December 31, 2017 They have employed 313 full-time employees at their locations and project sites. They have employed a prudent mix of the experienced staff and youth which gives them the dual advantage.
9
MANAGEMENT TEAM
Mrs. Jayashri P. Dandawate Chairman and Executive Director • Graduate in Home Science with a professional experience of 22 years. • She is the proprietor of Tanvi Enterprises, Sanpada, Navi Mumbai since
the year 1998 and also of Tanvi Motor Driving School, Sanpada, Navi Mumbai since 2005.
Mr. Pandurang B. Dandawate Non Executive Director and Promoter • B.E. (Civil) with Professional experience of 33 years • Worked in Maharashtra state PWD and MSRDC for 19 years and has a vast
experience in roads and bridge constructions, tolls and BOT projects. • He heads the company since last 12 years.
Mrs. Tanvi Auti Managing Director • B.E. (Civil) with Professional experience of 3 years • Worked in Hiranandani Construction, Mumbai and Simplex Infrastructure
Limited as an Engineer Trainee. • She oversees the overall functioning of the Company.
10
Contd.
Mr. Milind V. Kulkarni Joint Managing Director • B. E (Civil) with professional experience of 33 years. • He has worked in Maharashtra State Public Works Department (PWD) for
30 years and has a vast experience in this field. • He is a Certified by the Indian Institution of Valuers (India) as a
Chartered Valuer for the Category of Immovable Property.
Mr. Sandeep B. Dandawate Executive Director • Diploma (Civil) with professional experience more than 20 years. • He oversees the project implementation, project estimation and project
engineering of the projects that we undertake.
11
GROWTH OPPORTUNITIES
Overview of the Infrastructure Sector in India Infrastructure sector is a key driver for the Indian economy. Our country needs massive investments estimated to be in excess of Rs 50 lakh crore in infrastructure to increase growth of GDP, connect and integrate the nation with a network of roads, airports, railways, ports and inland waterways and to provide good quality services to our people. GOVERNMENT INITIATIVES DRIVING GROWTH IN THE SECTOR Railways and Metro Rail • For 2017-18, the total capital and development expenditure of Railways has been pegged at US$ 20.33 billion. • As per 2017-18 Budget, railway lines of 3,500 kms will be commissioned in FY18. Roads and Airports •Budget allocation for road sector increased to US$ 10.07 billion in 2017-18 from US$ 8.99 billion in 2016-17. •2,000 kms of coastal connectivity roads have been identified for construction and development .
Construction •In 2017, government announced plans to facilitate higher investment in affordable housing
Consultancy Service Consultancy services are emerging as one of the fastest growing service segments in India cutting across different sectors with some overlapping. The Government of India has taken many initiatives to help the consulting industry, including the Marketing Development Assistance and Market Access Initiative schemes; coming out with guidelines on broad policies and procedures for selection, contracting and monitoring of consultants; and initiatives aimed towards capacity development of domestic consultants and sensitization of client organizations. Recent initiatives taken by the government such as Make in India, development of smart cities, skill development, along with the focus on improving industrial policies and procedures, have opened up a plethora of opportunities for consultants.
12
GROWTH OPPORTUNITIES
TENDERS FOR FEASIBILITY STUDY AND DETAILED PROJECT REPORTS HAVE BEEN OPENED ON THE WEBSITE OF MINISTRY. PROJECT COST – RS. 7 LAKH CRORE DURATION - 5 YEARS
CONSULTANCY BUSINESS EXPECTED DPR 1.5% - RS. 10,500 CR
SUPERVISION 2% - RS. 14,000 CR
TOTAL – RS. 24,500 CR BUSINESS OF RS. 5000 CR PER YEAR
13
BHARATMALA PARIYOJANA
ISSUE DETAILS
ISSUE OPENS 27th April, 2018
ISSUE CLOSES 2nd May, 2018
LISTING ON BSE SME
LEAD MANAGER TO THE ISSUE
Hem Securities Limited
REGISTRAR TO THE ISSUE
Link Intime India Private Limited
RESERVATION FOR NO OF SHARE
Market Maker 2,24,000
RII 20,36,000
Other Then RII 20,36,000
NO OF SHARE
Pre Issue 1,00,00,000
Post Issue 1,42,96,000
IPO DETAILS
Issue Size (No of Share) 42,96,000
Fresh Issue (No of Share) 42,96,000
Issue Size In Rs 23.19 Cr
Face Value Rs.10
Issue Price Rs. 54
Post Issue No Of Share 1,42,96,000
Post Issue Paid Up Capital 14.29 Cr
Post Issue Implied Market Cap
77.19 Cr
SHARE HOLDING PATTERN PRE IPO POST IPO
Promoter Holding 100% 69.95%
Public Holding 0.00% 30.05%
BID LOT
RII 2000
Other Then RII 4000 & in multiples of 2000
14
OBJECTS OF THE ISSUE
OBJECTS AMOUNT ALLOCATED IN (Rs. In Crore)
Repayment/ prepayment of certain indebtedness 5.12
To Meet Working Capital requirements 11.60
General Corporate Expenses; 4.53
Issue Expenses 1.94
Total 23.19
15
COMPETITOR ANALYSIS
Face Value EPS PE RONW Book Value
Artefact Projects ltd. 10 0.35 129.00 0.54 64.17
MITCON Consultancy & EngineeringServices Limited
10 3.66 18.84 4.80 76.13
Dhruv Consultancy Services Ltd* 10 7.2 7.5 35.48 228.54
0
30
60
90
120
150
180
210
16
SEGMENTAL REVENUE
Division FY 13 FY 14 FY 15 FY 16 FY 17
Highways 4.73 9.03 9.39 10.64 23.79
Bridges - - - 4.43 5.98
Tunnels 0.26 - - - 0.05
Architectural - - 0.04 0.02 0.02
Environmental Engineering - - 0.03 0.03 0.02
Ports - - - - 0.57
Total Consultancy Income 4.99 9.03 9.46 15.11 30.43
Amount In (Rs. Cr)
17
REVENUE STATEMENT
Particulars Amount In (Rs. Cr) As At
30-12-2017 31-3-2017 31-3-2016 31-3-2015 31-3-2014 31-3-2013
Revenue 33.48 30.44 15.11 9.45 9.02 4.99
Expenditure 24.10 22.79 11.65 7.80 7.28 4.43
Operating Profit 9.38 7.65 3.46 1.65 1.74 0.56
Operating Profit Margin % 28.02 25.13 22.89 17.46 19.29 11.22
Other Income 0.039 0.021 0.037 0.28 0.14 0.11
Depreciation 0.72 0.85 0.34 0.297 0.066 0.07
EBIT 8.69 6.82 3.15 1.63 1.814 0.6
Interest 1.28 1.87 0.86 0.29 0.11 0.05
PBT 7.41 4.95 2.28 1.34 1.70 0.55
Tax 2.007 1.864 0.96 0.55 0.57 0.20
PAT 5.40 3.08 1.32 0.79 1.13 0.35
NPM % 16.13 10.11 8.73 8.35 12.52 7.01
18
BALANCE SHEET
Particulars Amount In (Rs. Cr) As At
31-12-2017 31-3-2017 31-3-2016 31-3-2015 31-3-2014 31-3-2013
LIABILITIES
Share Capital 1.00 0.38 0.30 0.30 0.30 0.20 Reserves & Surplus 13.09 8.30 5.22 3.90 3.11 1.98 Net worth 14.09 8.68 5.52 4.20 3.41 2.18 Share Application Money Pending
Non Current Liabilities
- Long Term Borrowings 5.34 5.70 4.34 0.81 0.23 - - Deferred Tax Liabilities (Net) - - - - - - - Other Long Term Liabilities 1.03 0.88 0.50 0.35 0.19 0.12 - Long Term Provision - - - - - -
Current Liabilities 22.53 15.23 7.56 7.14 3.56 2.58 Total Liabilities 42.99 30.50 17.92 12.50 7.39 4.88
ASSETS
Non Current Assets
- Fixed Assets 6.88 5.30 3.04 1.18 0.93 0.50 - Non Current Investments - - 0.006 0.006 0.16 0.006 - Long Term Loans and Advances - - - - - - - Deferred tax assets (Net) 0.34 0.29 0.20 0.19 0.15 0.16 - Other Non Current Assets - - - - - -
Current Assets 35.77 24.91 14.68 11.13 6.16 4.22 Total Assets 42.99 30.50 17.92 12.50 7.39 4.88
19
FINANCIAL RATIOS
Particulars For Period Ended
31-12-2017* 2017 2016 2015 2014 2013
Return on Net worth (%) 38.34 35.48 23.94 18.80 33.03 15.80
EBITDA Margin (%) 28.02 25.13 22.89 17.46 19.29 11.22
Current Ratio 1.59 1.63 1.94 1.55 1.72 1.63
Restated Basic and Diluted Weighted Average Earning Per Share
5.40 3.10 1.33 0.80 1.15 0.35
Adjusted Net asset value per share (In Rs.) 140.86 228.54 184.10 140.03 113.7 109.23
*Figures are not annualized
20
STRONG FINANCIAL GROWTH
2013 2014 2015 2016 2017
Revenue 5.10 9.16 9.74 15.15 30.46
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
Revenue
2013 2014 2015 2016 2017
EBITDA 0.56 1.74 1.65 3.46 7.65
0.00
2.00
4.00
6.00
8.00
10.00
EBITDA
2013 2014 2015 2016 2017
PAT 0.35 1.13 0.79 1.32 3.08
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
PAT
2013 2014 2015 2016 2017
ROCE 47.00 60.00 30.00 30.00 44.00
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
ROCE
21
In Rs. Crore
In Rs. Crore
In Rs. Crore
In %
INVESTMENT RATIONALE
Valuation : Company is bringing the issue at PE multiple of 7.50 on pre issue annualized FY18 eps of Rs. 7.20 at a price of Rs. 54/- per Share.
Healthy Financial Performance: Company has shown strong financial performance during FY17 as it has posted strong operating & net profit margin of 25.13 % & 10.11% respectively during FY17.Also, co has generated strong return on shareholder’s fund of 35.48% during the same year. During FY13-17, the Company’s Revenue and Profit have grown at 57.16% and 72.23% CAGR respectively
Strong Client Base : Customer are mainly PSUs & Government Corporations. Company’s major clientele includes Ministry of Road Transport and Highways, National Highways Authority of India, The City and Industrial Development Corporation of Maharashtra Ltd., Jawaharlal Nehru Port Trust, Maharashtra State Road Development Corporation, Mumbai Metropolitan Region Development Authority, Public Works Department, Maharashtra Tourism etc.
Wide Range of Services: Company deals in varied services. The diversified range of services helps them to cater different spectrum of clients which also increases their clientele base all over India. Their service sector includes Highways, Bridges, Tunnels, Architecture, Environmental and Ports.
Strong Order Book: Company is having Strong order book of Rs. 131.41 Crores as on 31st December, 2017.
22
DISCLAIMER
Disclaimer: * For additional information & risk factors please refer to Draft Prospectus. • This document is provided for assistance only and not intended to be taken alone for the basis for an investment
decision. • Our presentation/proposal may include predictions, estimates, management opinions or other information that
might be considered forward-looking. These forward-looking statements represent our current judgment on the future, they are subject to risks and uncertainties that could cause actual results to differ materially. Such forward-looking statements are subject to risks and uncertainties like regulatory changes, local political or economic developments, and many other factors that could cause actual results to differ materially from those contemplated by the relevant forward-looking statements.
• Hem Securities Limited will not be in any way responsible for any action taken based on such statements and undertakes no obligation to publicly update these forward-looking statements to reflect subsequent events or circumstances.
23
REACH US
THANK YOU
HEM SECURITIES LTD. AWARD WINNING MERCHANT BANKER
A – 904, Naman Midtown, Senapati Bapat Marg, Elphinstone Rd, Lower
Parel, Mumbai - 400013 Tel: +91 - 22 – 4906 0000
Email ID: [email protected] Website: www.hemsecurities.com
501, Pujit Plaza, Palm Beach Road, Sector - 11, Opp. K-Star Hotel, Near CBD Station, CBD Belapur, Navi Mumbai-400614. Telephone: +91 022 – 27570710 E-mail ID: [email protected] Website: www.dhruvconsultancy.in
DHRUV CONSULTANCY SERVICES LIMITED
24