+ All Categories
Home > Documents > Investor Presentation Les Davis January 2008€¦ · Investor Presentation Les Davis January 2008....

Investor Presentation Les Davis January 2008€¦ · Investor Presentation Les Davis January 2008....

Date post: 05-Jun-2020
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
24
1 Investor Presentation Les Davis January 2008 www.silverlakeresources.com.au ABN 38 108 779 782
Transcript
Page 1: Investor Presentation Les Davis January 2008€¦ · Investor Presentation Les Davis January 2008. ABN 38 108 779 782. ... any liability arising from fault or negligence on the part

1

Investor Presentation

Les DavisJanuary 2008

www.silverlakeresources.com.auABN 38 108 779 782

Page 2: Investor Presentation Les Davis January 2008€¦ · Investor Presentation Les Davis January 2008. ABN 38 108 779 782. ... any liability arising from fault or negligence on the part

2

Important Notice and Disclaimer

Silver Lake Resources Limited has prepared this presentation based on information available to it. No representation or warranty,express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusionscontained in this presentation.

To the maximum extent permitted by law, none of Silver Lake Resources Limited, its directors, employees or agents, advisers, nor anyother person accepts any liability, including, without limitation, any liability arising from fault or negligence on the part of any of them orany other person, for any loss arising from the use of this presentation or its contents or otherwise arising in connection with it.

This presentation is not an offer, invitation, solicitation or other recommendation with respect to the subscription for, purchase or saleof any security, and neither this presentation nor anything in it shall form the basis of any contract or commitment whatsoever. Thispresentation may contain forward looking statements that are subject to risk factors associated with gold exploration, mining andproduction businesses. It is believed that the expectations reflected in these statements are reasonable but they may be affected bya variety of variables and changes in underlying assumptions which could cause actual results or trends to differ materially,including but not limited to price fluctuations, actual demand, currency fluctuations, drilling and production results, reserveestimations, loss of market, industry competition, environmental risks, physical risks, legislative, fiscal and regulatory changes,economic and financial market conditions in various countries and regions, political risks, project delay or advancement, approvalsand cost estimates.

Page 3: Investor Presentation Les Davis January 2008€¦ · Investor Presentation Les Davis January 2008. ABN 38 108 779 782. ... any liability arising from fault or negligence on the part

3

Agenda

Overview

People

Projects

Summary

Page 4: Investor Presentation Les Davis January 2008€¦ · Investor Presentation Les Davis January 2008. ABN 38 108 779 782. ... any liability arising from fault or negligence on the part

4

Corporate Overview

Listing date 14 November 2007

IPO $30M @ $0.30

ASX Code SLR

Issued Securities 153.4M shares

Unlisted 24.2M options

Market Capitalisation $61.4M (@ 0.40 ps)

Cash $16.0M (December 2007)

Major Shareholders Directors 16.25 %

(as of 30 November 2007) Perilya 9.78 %

*Top 10 35.26 %

*Excludes Directors

Page 5: Investor Presentation Les Davis January 2008€¦ · Investor Presentation Les Davis January 2008. ABN 38 108 779 782. ... any liability arising from fault or negligence on the part

5

Silver Lake’s goal is to build a significant resource base and to become a high margin gold

producer. With this in mind, Silver Lake has acquired assets with certain attributes including:

near term production ability

dominant position in highly prospective regions

existing Inferred and Indicated resources with significant scope to extend these resources

sound economic indicators (relatively low entry cost, good widths/grades, close to existing

infrastructure, low discovery costs)

lack of previous systematic exploration (particularly at depth) with potential to discover new

deposits

We have focussed on gold projects because we believe the macro environment remains supportive

of the gold price. Gold has long held a role in financial markets as a reserve currency and an

inflation hedge.

Corporate Vision

Page 6: Investor Presentation Les Davis January 2008€¦ · Investor Presentation Les Davis January 2008. ABN 38 108 779 782. ... any liability arising from fault or negligence on the part

6

Company Overview

Gold producer with full upside exposure to gold price:

– 35,000 to 40,000 Au oz pa initial production rate

– 300,000 tpa processing facility

Strong and experienced management team

Quality assets in prolific gold fields

Significant exploration potential:

– 2.3 to 5.0 Moz

Targeted growth:

– aiming to be a 300,000 Au oz pa producer within five years

Page 7: Investor Presentation Les Davis January 2008€¦ · Investor Presentation Les Davis January 2008. ABN 38 108 779 782. ... any liability arising from fault or negligence on the part

7

Board - 150 Yrs Combined Experience

Les Davis M. Sc (Min Econs) – Managing Director30 years industry experience including 17 years hands on experience in mine development and narrow vein mining. 13 years senior management experience including roles as Mine Manager, Technical Services Manager, Concentrator Manager, Resident Manager and GM Expansion Projects. Positions held with WMC, Reliance Mining and Consolidated Minerals.

Chris Banasik B. App Sc (Physics), M. Sc (Econ Geol), Grad.Dip.Ed. – Director Exploration and Geology21 years industry experience including 10 years hands on experience with mine geology, resource & reserve calculations and exploration. 11 years senior management experience including roles as Geology Manager, Technical Services Manager and Chief Geologist. Positions held with WMC, Reliance Mining, Goldfields Mine Management and Consolidated Minerals.

Paul Chapman B.Comm, ACA, Grad. Dip. Tax, CFTP(Snr), MAICD, SA Fin – ChairmanChartered accountant with 20 years industry experience gained in Australia and USA. Currently Chairman of Encounter Resources and Rex Minerals.

Peter Johnston BA, FAICD, FAusIMM – Non Executive DirectorCurrently CEO of Minara Resources. Executive Council Member of CME, Director of Minerals Council of Australia and the Nickel Institute. Extensive 30 year management career.

Brian Kennedy Cert. Gen Eng – Non Executive Director25 years industry experience working in coal, iron ore, nickel, gold and fertilisers. Construction Manager for Munali Nickel Project in Zambia.

David Griffiths B. Bus – Non Executive Director30 years strategic communication experience in human resources and employee relations. Currently Managing Director of Gryphon Management – a communications strategy and public relations company.

Page 8: Investor Presentation Les Davis January 2008€¦ · Investor Presentation Les Davis January 2008. ABN 38 108 779 782. ... any liability arising from fault or negligence on the part

8

Senior Management

David Crockford Eng Mining (Hons) – Resident Manager (Mount Monger Operations)Mining Engineer with previous roles at MPI Mines Black Swan Nickel Mine and held the position of Underground Manager with Leviathan Resources in Coolgardie. Extensive experience in narrow vein mining methods and contract mining.

Noel Ong BSc (Hons) – Exploration Manager16 years experience in the mineral exploration industry working in gold, diamonds, tantalum, Pd-Zn and magnetite projects. Industry experience included roles as Exploration Geologist, GIS Spatial Analyst, Database Administrator, Senior Geologist, and Project Site Manager. Positions held with Great Central Mines, Ashton Mining, Australasian Gold Mines (Tantalum Australia/ABM Resources) and Golder and Associates.

Peter Armstrong ACIS, B.Bus (Acct) – Commercial Manager25 years industry experience including senior commercial management roles with Normandy Mining, WMC and Newcrest. Has experience across a range of commodity businesses including gold, nickel, copper, coal and iron ore.

Gavin Cooke ACMA, B.Comm, Grad.Dip CSP – Company Secretary13 years business management experience including senior commercial roles with WMC and in the property and telecommunications sectors. Recently established the business management practice of Manso Consulting, a boutique advisory firm that builds success from medium-sized businesses.

Tracey Caddis – Executive AdministratorHas an extensive background in office management and systems implementation. Has studied with the Institute of Chartered Accounts completing both Applied Corporate Law and Company Secretary Practice and Meetings. Previously worked for Mineral Securities Limited, a highly successful resource investment house that makes early stage equity investments in resource companies and projects.

Page 9: Investor Presentation Les Davis January 2008€¦ · Investor Presentation Les Davis January 2008. ABN 38 108 779 782. ... any liability arising from fault or negligence on the part

9

Projects Mount Monger - Background

50 kms south east of Kalgoorlie:– access to suppliers and personnel

Historic production >400,000 oz Au:– multiple shallow mines along 10 km of strike– unconsolidated gold field until 2003

Daisy Milano:– produced for 18 consecutive years

Near term production growth:– Rosemary, Caledonian and Haoma lodes

Daisy Milano Mine Site

Page 10: Investor Presentation Les Davis January 2008€¦ · Investor Presentation Les Davis January 2008. ABN 38 108 779 782. ... any liability arising from fault or negligence on the part

10

Projects Mount Monger - Current Status

Daisy Milano Resource:

– 218,000 t @ 33.5 g/t Au (235,000 oz)

– 176,000 oz Indicated, 59,000 oz Inferred

Infrastructure:

– Daisy Milano Mine

– decline development to 20 level

~ currently 420m below surface

~ currently drilled to 500m depth

– four fully developed ore drives

~ 12 months production in developed status

– surface infrastructure

– mobile equipment

Page 11: Investor Presentation Les Davis January 2008€¦ · Investor Presentation Les Davis January 2008. ABN 38 108 779 782. ... any liability arising from fault or negligence on the part

11

Projects Mount Monger - Production Status

Daisy Milano:– production commenced– infill drilling in progress– drill drive commencing January 2008

Base case production plan:– 35,000 to 40,000 oz Au per annum by June 2008

Page 12: Investor Presentation Les Davis January 2008€¦ · Investor Presentation Les Davis January 2008. ABN 38 108 779 782. ... any liability arising from fault or negligence on the part

12

ProjectsLakewood Mill

Located 45 km from Daisy Milano:and 5 km east of Kalgoorlie

Acquired December 2007:– $2.4M– Modifications ~$1.6M (Dec to Feb)– 6 month refurbishment ~$1.0M

+75% recovery via gravity circuit

Metallurgical modelling to determine throughput

Processing in March 08

Page 13: Investor Presentation Les Davis January 2008€¦ · Investor Presentation Les Davis January 2008. ABN 38 108 779 782. ... any liability arising from fault or negligence on the part

13

Projects Mount Monger - Exploration Status

Adjacent to Kanowna Shear:– major mineralised controlling structure– large land holding covering numerous high

grade historic gold mines

10 km strike zone:– grossly under explored– 3% of holes drilled below 100m depth– three year, $9.2M exploration programme

• U/G drilling commenced• surface drilling commencing January

2008

Page 14: Investor Presentation Les Davis January 2008€¦ · Investor Presentation Les Davis January 2008. ABN 38 108 779 782. ... any liability arising from fault or negligence on the part

14

Projects Mount Monger - Potential for increased production from multiple high grade lodes

Bul

lLe

slie

Fifty

Gra

nd

Pau

line

Nor

th

Cal

edon

ian

Din

nie

Reg

gio

Hao

ma

Dai

sy M

ilano

Ros

emar

y

Hob

bs

Spi

nife

x

Lorn

a D

oone

Cos

tello

Mirr

or

Mag

ic

Mag

ic S

outh

100m

200m

300m

400m

500m10 Km (Not to scale)North

Historic Mined Grades

Daisy Main 28.4 g/tMilano (Upper) 33.8 g/tMilano (Lower) 15.6 g/tRosemary 27.4 g/tHaoma 28.9 g/tDinnie Reggio 32.6 g/tCaledonian 7.9 g/tPauline 11.8 g/tLeslie 21.8 g/tBull 28.6 g/t

Page 15: Investor Presentation Les Davis January 2008€¦ · Investor Presentation Les Davis January 2008. ABN 38 108 779 782. ... any liability arising from fault or negligence on the part

15

2008 2009 2010 2011 2012

100

150

50Daisy

MilanoDaisy Milano

Daisy Milano

Daisy Deeps

Daisy Deeps

HaomaRosemary

Caledonian

HaomaRosemary

Caledonian

Other

HaomaRosemary

Caledonian

HaomaRosemary

Caledonian

Other Other

koz

+ 5 Years

Projects Mount Monger- Production Potential

Page 16: Investor Presentation Les Davis January 2008€¦ · Investor Presentation Les Davis January 2008. ABN 38 108 779 782. ... any liability arising from fault or negligence on the part

16

Projects Mount Monger - Summary

Producing from Daisy Milano:– selective mining method - grade

not tonnage drive– processing through Lakewood Mill

in March 08

Daisy Milano is only one part of Silver Lake’s high grade Mount Monger gold field:

– extremely high grade field

– under explored

– near term production growth

– potential for multiple production fronts

– 150,000 oz pa production goal

Daisy Milano Mine Site

Page 17: Investor Presentation Les Davis January 2008€¦ · Investor Presentation Les Davis January 2008. ABN 38 108 779 782. ... any liability arising from fault or negligence on the part

17

Projects Moyagee & Tuckabianna - Background

Resource - 463,000 oz:

– 147,000 oz Indicated

– 316,000 oz Inferred

40 km strike zone:

– 560 km2 lease holding

– covers prospective under explored lena and sub parallel shears

– gold field hosts several +1Moz deposits

Page 18: Investor Presentation Les Davis January 2008€¦ · Investor Presentation Les Davis January 2008. ABN 38 108 779 782. ... any liability arising from fault or negligence on the part

18

Projects Moyagee & Tuckabianna - Exploration Potential

26,872 drill holes in database 786 (3%) drill holes deeper than 100m

54m 2m at 38 g/t Au102m 5m at 57 g/t Au220m 2m at 81 g/t Au355m 6m at 31 g/t Au

Moyagee820,000 t at 8.5 g/t Au224,000 ozs

Tuckabianna2.25Mt at 3.3 g/t Au238,000 oz

Page 19: Investor Presentation Les Davis January 2008€¦ · Investor Presentation Les Davis January 2008. ABN 38 108 779 782. ... any liability arising from fault or negligence on the part

19

Projects Murchison - Summary

Large land holding

Surrounded by >1Moz deposits

Good continuity of high grade intercepts at Moyagee (shallow and at depth)

Significant exploration potential along strike and at depth:

– three year, $5.7M exploration programme

• surface drilling commencing Q1 2008

Production scenarios - potential 150,000 oz pa:

– open cut

– large scale underground

– copper potential

Page 20: Investor Presentation Les Davis January 2008€¦ · Investor Presentation Les Davis January 2008. ABN 38 108 779 782. ... any liability arising from fault or negligence on the part

20

Projects Rothsay - Exploration Potential

Inferred Resource:

– 219,000 t at 7.0 g/t Au (133,000 oz)

Four parallel mineralised shears:

– all with high grade intercepts

– historic gold and copper production

– surface drilling commencing Q3 2008

• production potential

– open cuts along strike

– re-open decline

~ narrow vein mining

Page 21: Investor Presentation Les Davis January 2008€¦ · Investor Presentation Les Davis January 2008. ABN 38 108 779 782. ... any liability arising from fault or negligence on the part

21

Projects Copper Lakes - Greenfields Exploration Project

520 km south east of Port Hedland

Large greenfields holding – 270 km2

Surface rock chip samples:

– Leons Find (Gossan)

~ 26.5% Cu

~ 5.2 g/t Au

– Copper Lakes

~ 0.6% Cu

– Echo

~ 10 g/t Au

~ 0.2% Cu

~ 0.15% Co

Page 22: Investor Presentation Les Davis January 2008€¦ · Investor Presentation Les Davis January 2008. ABN 38 108 779 782. ... any liability arising from fault or negligence on the part

22

Summary

Experienced and capable team (150 years combined experience)

Narrow vein mining expertise and access to resources

Quality gold projects:

– initial production at 35,000 to 40,000 oz pa

– 300,000 tpa processing facility

– 830,000 oz Au resource base

Operating cashflow:

– <3 year payback for all acquisitions

– no debt, full exposure to spot gold price

Significant exploration upside:

– 2.3 to 5.0 Moz

Growth:

– near mine development

– aiming to be 300,000 oz Au pa producer within five years

Page 23: Investor Presentation Les Davis January 2008€¦ · Investor Presentation Les Davis January 2008. ABN 38 108 779 782. ... any liability arising from fault or negligence on the part

23

Contacts

Silver Lake Resources Ltd31 Malcolm StreetWest Perth WA 6005Phone: (08) 6313 3800Fax: (08) 6313 3888

ContactLes DavisManaging DirectorMobile: 0428 273 [email protected]

Chris BanasikDirector of Exploration and GeologyMobile: 0428 956 [email protected]

Page 24: Investor Presentation Les Davis January 2008€¦ · Investor Presentation Les Davis January 2008. ABN 38 108 779 782. ... any liability arising from fault or negligence on the part

24

“Leadership determines the direction of the Company

Organisation determines the potential of the Company

People determine the success of the Company”

www.silverlakeresources.com.auABN 38 108 779 782