Awali Estate Complete
Construction of 1255-Palm Ridge ongoing
03
04
Vipingo development Sea water Desalination Plant InstallationComplete.
Testing Ongoing
Construction ofVipingo LeisureCentre ongoing
YOUR FAMILYHOME AWAITS
AWALI ESTATECompleted Project
No of units
Construction duration
Construction duration to date
Progress status
Show Houses
74
Complete
Complete
Complete
Complete
AWALI ESTATE PROJECT PROGRESS FACT SHEET
AMENITIES AND UTILITIES PROGRESS
INFRASTRUCTURERoads
Permanent power connection
Gate house
ICT
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Children’s play area
Perimeter fence
CCTV
Complete
Complete
Complete
Complete
Complete
Complete
COMPONENT STATUS TARGET COMPLETION DATE
LANDSCAPING
Grassing
Trees and Flowers
Complete
Complete
Complete
Complete
PROJECTFACT SHEET
No of units
Construction duration
Construction duration to date
Progress status
Show Houses
74
Complete
Complete
Complete
Complete
AWALI ESTATE PROJECT PROGRESS FACT SHEET
AMENITIES AND UTILITIES PROGRESS
INFRASTRUCTURERoads
Permanent power connection
Gate house
ICT
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Children’s play area
Perimeter fence
CCTV
Complete
Complete
Complete
Complete
Complete
Complete
COMPONENT STATUS TARGET COMPLETION DATE
LANDSCAPING
Grassing
Trees and Flowers
Complete
Complete
Complete
Complete
Move In...
AWALISITE OVERVIEW
1255 PALMRIDGE
PROJECTFACT SHEET
1255-PALM RIDGEPROJECT PROGRESS FACT SHEET
AMENITIES AND UTILITIES PROGRESS
INFRASTRUCTURERoads
Permanent power connection
Gate house
CCTV
Ongoing
Complete
Ongoing
Scheduled
March 2021
Complete
January 2021
March 2021
Swimming pool
Children’s play area
Parks
Perimeter fence
Scheduled
Scheduled
Ongoing
Complete
March 2021
March 2021
March 2021
Complete
COMPONENT STATUS TARGET COMPLETION DATE
LANDSCAPING
Grassing
Trees and Flowers
Ongoing
Ongoing
February 2021
February 2021
No of units
Construction duration
Construction duration to date
Construction duration to completion
Progress status
Show Houses
330 (Phase 1)
90 Weeks
90 Weeks
12 Weeks
Complete
JANUARY ACTIVITIES
Block A1
Block B1
Block C1
Block A2
Block B2
Block C2
Block A3
Block B3
Block C3
Block D1
Block D2
Block D3
Internal Finishes Ongoing
Internal Finishes Ongoing
Internal Finishes Ongoing
Internal Finishes Ongoing
Internal Finishes Ongoing
Internal Finishes Ongoing
Internal Finishes Ongoing
Internal Finishes Ongoing
Internal Finishes Ongoing
Fourth floor walling ongoing
Fourth floor walling ongoing
Fourth floor walling 90% complete
PHASE 1
PHASE 2
CONSTRUCTIONPROGRESS
A1
A3A2
B1
B2 B3
C1 C2
C3
D1 D2
D3
INTERNAL FINISHES ONGOING
INFRASTRUCTURE & AMENITIES
Infrastructure
Landscaping
Landscaping
Parking
Perimeter Fence
Swimming Pool
KINGSWOODPARK
Build your dream home within the serene Vipingo Development’s Kingswood Park. The controlled gated estate offers four unique typologies to choose from.
Your coastal home is now within reach.
KINGSWOOD MIRABELLAExcellent design for 1/4 acre plot
KINGSWOOD MAISONETTE
KINGSWOOD BUNGALOW
KINGSWOOD RIVIERA
Excellent design for 1/8 acre plot
Excellent design for 1/8 acre plot
Excellent design for 1/8 acre plot
PROGRESS STATUSSite roads clearance complete.
PLANT
VIPINGO DEVELOPMENTSEA WATER DESALINATION
Testing of the 3 million litre capacity sea water desalination plant is ongoing following the successful installation of the plant. We look forward to supplying you with clean and reliable water.
UTILITIES
PROGRESS STATUS
VIPINGO INVESTMENTPARK
Vipingo Investment Park offers serviced plots for light to medium industries in a controlled development with unrivalled amenities and infrastructure.
The park which is conveniently located along the Mombasa Malindi highway is:
35KM from Mombasa CBD
45KM from Moi International Airport & the Port of Mombasa
PROGRESS STATUSConstruction of industries is ongoing.
VIPINGOLEISURE CENTRE
Shop and Work in Style
Contact Jane via [email protected]
Your shopping experience will never be the same again. Vipingo Leisure Centre mall is set to host a wide variety of brands to meet all your needs. Looking to set up shop within Kenya’s most exquisite mall?
PROGRESS STATUS
VIPINGO DEVELOPMENT LIMITED
1st Floor, Vipingo Ridge Conference CentreP. O. Box 117 – 80119 Vipingo Website: www.vipingodevelopment.com Email: [email protected] Mobile: +254 740 400 215 Tel: +254 4400 215
WE ARE ON SOCIAL MEDIA
Vipingo Development LTD
@VipingoLTD
Vipingodevelopmentlimited
Vipingo Development