Page 1: Investor site visit to Mahan, September 2011

September 2011

Page 2: Investor site visit to Mahan, September 2011

• Project Details

• Project timeline

• Project progress

• Challenges Faced

• Project Success factors

Mahan’s domain

of operation

Page 3: Investor site visit to Mahan, September 2011

• Smelter : 360 no.s of 360kA pots (AP36S)

3,59,000 tpy

• CPP : 6 x 150 MW Units

• Location : NH-75-E, Bargawn

• Land : 2025 ha (~ 5000 acres)

• Water sourcing : Gopad River (35 kms)

• Coal sourcing : Mahan Coal Limited

50:50 JV between HIL & ESSAR

• Alumina : Utkal / Muri

• 220kv connectivity : Siddhi S.S. of MPSEB (50MVA), 77kms

Page 4: Investor site visit to Mahan, September 2011

• Safety• Best work environment

• Technological Superiority

• Economies of scale

Higher kA

Higher pots/line

High per pot prod

Scalable to higher kA

New generation ALPSYS

Energy efficient

High degree of automation (550T/Man yr)

Electrical insulation systems

Less of human exposure

Use of technology equipments

Building ventilation

Clustra wall design

Less of fluoride emissions

Zero discharge

Page 6: Investor site visit to Mahan, September 2011

• MoU with GoMP : 23 May 2006

• LOI to EIL (Smelter) : 13 Jun 2008

• MoEF clearance : 18 Mar 2009

• LOI on BHEL (CPP) : 19 Mar 2009

• Earth work start : 09 Jul 2009

• 1st Unit & Metal Tgt. : Dec 2011

• Ramp-up : During 2012

Page 7: Investor site visit to Mahan, September 2011
Page 8: Investor site visit to Mahan, September 2011

CPP

SMELTER

Page 9: Investor site visit to Mahan, September 2011

• Phase-I – 40 pots start-up

– First pot start-up target Dec 2011

• Phase-II – 140 pots start-up

– 41st pot start-up 1st Apr 2012, 180th pot – 10th Jul 2012

• Phase-III – 140 pots start-up

– 181st pot start-up 15th Sep 2012, 320th pot – 12th Dec 2012

• Phase-IV – Balance 40 pots start-up

– 321st pot start-up 16th Dec 2012, completion – 7th Jan 2013

0

50

100

150

200

250

300

350

400

15Oct'11 10Dec'11 01Apr'12 10Jul'12 15Sept'12 12Dec'12 16Dec'12 7Jan'13

Pots

Nos. of Pots

180

360

15Dec

40 10Feb

Page 10: Investor site visit to Mahan, September 2011

5

204

350 359

0

50

100

150

200

250

300

350

400

FY12 FY13 FY14 FY15

Hot Metal Production- ‘000 T

Page 11: Investor site visit to Mahan, September 2011

• Captive Refineries in Orissa & JharkhandAlumina

• Captive Power PlantPower

• Mahan Coal LimitedCoal

• Indegenous / Imported Coke CalcinersCP Coke

• Indegenous Tar Distillors (in liquid form)CT Pitch

• Indegenous/ Imported Suppliers like TANFAC etc.Al. Fluoride

Page 12: Investor site visit to Mahan, September 2011

HSSPB

kA

AP36S

Hirakud

Renukoot

Mahan- 360kA

1959

2011

Page 13: Investor site visit to Mahan, September 2011

III.On the Job Training by HIL trainers & OEM experts before

shopfloordeployment

II.Trainingby OEM

experts at Mahan

Site

I.Exposureat

Renukoot/ Renusagar

III. Technology assimilation

through association with

OEM site experts at the time of startup

II. Overseas training by RTA

I. Site exposure

with OEMs

Experienced Laterals Freshers

Page 14: Investor site visit to Mahan, September 2011

Mahan’s Successful

Project Execution &

Startup

Resource support

from R’koot/ R’sagar

Laterals with 10-25 years of Al.

& Power Exp.

Overseas trained

Employees

RTA’s Site Experts

Page 15: Investor site visit to Mahan, September 2011

555 538585

814

1187

1342

0

200

400

600

800

1000

1200

1400

1600

FY 10 FY 11 FY 12 FY 13 FY 14 FY 15

Aluminium Smelting Capacity-KT

Mahan

Aditya

Page 16: Investor site visit to Mahan, September 2011
Page 17: Investor site visit to Mahan, September 2011

Village Covered : 04

Total House Holds : 1628

Total Population : 5880

Literacy rate : 33%

Total land acquired :1299.44 Hec.

Area Background

Page 18: Investor site visit to Mahan, September 2011

• Rural Medical Camp ------ Feb. ’09

• Film Show ------ April ‘09

• Puppet Show ------ Feb. – March ’09

• Ram Katha (Discourse) ------ Feb. ’09

• Complete Sanitation Prog. --- July ’09 – Sept. ’09

• SHG basic Awareness Prog. --- July ’09

• Training on Cooperative Formation Nov. ’09

• AIDS Awareness Programme --- Dec. ’09

• First SHG Formation ---- Sept. ’09

• First Aid Center started --- Oct. ‘09

• First Cooperative formed ---- Dec. ’09

Major Milestone in CSR/ R&R

Page 19: Investor site visit to Mahan, September 2011

Headline | Subheading

R & R agreement with District Collector – May ’09

Application move for R & R Land ---- July ‘09

R & R Land acquired ---- Oct. ’09

Transect House constructed ---- Dec. ’09

PDFs shifting process started ---- Dec. ’09

R & R Colony construction started ---- Oct. ’09

R & R Colony inauguration and Puja ---- Feb. ‘10

First Family shifted in R & R Colony ---- Mar ’10

Anganwadi started at R&R Colony ---- Apr’ 10

Jan Sunwai for Grievance Handling ---- Sep’ 10

Major Milestone in CSR/ R&R

Page 20: Investor site visit to Mahan, September 2011

R & R agreement with District Collector – May ’09

Application move for R & R Land ---- July ‘09

R & R Land acquired ---- Oct. ’09

Transect House constructed ---- Dec. ’09

PDFs shifting process started ---- Dec. ’09

R & R Colony construction started ---- Oct. ’09

R & R Colony inauguration and Puja ---- Feb. ‘10

First Family shifted in R & R Colony ---- Mar ’10

Anganwadi started at R&R Colony ---- Apr’ 10

Jan Sunwai for Grievance Handling ---- Sep’ 10

Major Milestone in CSR/ R&R

Page 21: Investor site visit to Mahan, September 2011

ITI Training for PAPs ---- Oct 10

Participation in District level Family Welfare camp --Nov. 10

Milk Cooperative formed ---- Nov. 10

Village Development Committee formed Mar. 11

School started at R&R Colony ---- Jun 11

Animal Husbandry camp ---- Aug 11

PDS Shop open at R&R Colony ---- Aug 11

Constitution of Village Security committee Aug 11

Adult Education center ---- Sep 11

Major Milestone in CSR/ R&R

Page 22: Investor site visit to Mahan, September 2011

ENGAGEMENT OF 60 PAPs IN THE INDUSTRIAL TRAINING AT HINDALCO INDUSTRIES LTD. RENUKOOT

Skill development initiatives:-

1. All these candidatesaccomplished 6 month ITItraining

2. Undergone throughscreening test conducted byTMI Network, Hyderabad

3. Pursuing 3 monthindustrial training atHindalco Industries Ltd.Renukoot

Page 23: Investor site visit to Mahan, September 2011

SAFETY SHOES MAKING TRAINING : ENGAGING PAPs TOWARDS SELF EMPLOYMENT

1. Organization of Safety Shoes making training

2. Identification of PAPs whose conventional business is Shoes Making

3. Engagement of 8 PAPs

4. Visit of Participants of this training at Agra and Kanpur for identify source of raw material on optimal cost

5. To start commercial production by Nov/Dec 2011

Page 24: Investor site visit to Mahan, September 2011

COMMENCEMENT OF SARASWATI SHISHU MANDIR AT R & R COLONY

1. Commencement from 15th

June Onwards

2. Collaboration with SaraswatiShiksha Parishad Jabalpur

3. Classes from 1st to 5th

Standard is going on

4. Total 232 PAPs wardsenrollment accomplished till15 Aug 2011 viz. 86 in 1st

Class, 37 in 2nd Class, 28 in 3rd

Class, 35 in 4th Class and 46 in5th class

5. Celebration of Independenceday.

Page 25: Investor site visit to Mahan, September 2011

GRAND CELEBRATION OF

15TH AUGUST AT R&R COLONY

Program Conducted: -

1. Prabhat Pheri, Musical Chair Game, Jalebi Race, Songs and Group Dance did by school children of Saraswati Shishu Mandir at R & R colony.

2. VDC and Slow Cycle race, Volleyball Game

3. SHG members Musical Chair and Matka Race.

Page 26: Investor site visit to Mahan, September 2011

DEVELOPMENT OF DAIRY COOPERATIVE SOCIETY AT R & R COLONY

1. Registration of Milk Cooperative namely “ Madhav Dairy Cooperative Society” at R & R Colony

2. Membership of 22 PAPs

3. Exposure Visit of member at Village level SanchI Milk Cooperative by collaboration with Jabalpur Dugdh Sangh

4. Upcoming Efforts Linkages with NABARD Schemes, Cattle Induction, Milk Collection and market Linkages.

Page 27: Investor site visit to Mahan, September 2011

VETERINARY CAMP AT R & R COLONY AND BARANIYA

1. Vaccination

2. De-worming

3. Treatment of Veterinary disease

Page 28: Investor site visit to Mahan, September 2011

NATUECO FARMING AT R & R COLONY

1. Mobilization of PAPs for Natueco Farming at R & R Colony

2. Organizing 15 Days Training

3. 18 Women PAPs engage with training

4. Steps Forwarded

a. layout Making layoutb. Preparing Amrit Mitti &

Amrit Jalc. Process of making bed with

the help of Amrit Mittid. Process of Seed Sowing

Page 29: Investor site visit to Mahan, September 2011

VAN MAHOTSAV AT R & R COLONY

1. Rally on the theme of Nature and our Service

2. Duration one Week

3. 50 tree plantation at common place like Balbadi and Anganwadi

4. 200 Tree Plantation in the 70 Houses of R & R Colony in second phase

5. Theme based Drawing Competition in school at R & R Colony

Page 30: Investor site visit to Mahan, September 2011

Inauguration of PDS AT R & R COLONY AND BARANIYA

• Inauguration of Public Distribution Shop by SDM-Devsor.

• Tahsildar, TI- Barganwa, Food inspector were present.

• PAPs appreciated the steps.

Page 31: Investor site visit to Mahan, September 2011

Thank You