Zagreb,04-05th of February 2014
Project funded bythe European Union
Involvement of public &transparency of the planning process in
IWWs infrastructure project
Zagreb,04-05th of February 2014
Project funded bythe European Union
Ivan Mitrovic, Project ManagerDirectorate for Inland Waterways (Plovput), Republic of Serbia
Joint Statement5th workshop
Zagreb,04-05th of February 2014
Project funded bythe European Union
Content
Project area
Application of JS
Instead of conclusion
Summary
Current navigation conditions
Zagreb,04-05th of February 2014
Project funded bythe European Union
Project area
Zagreb,04-05th of February 2014
Project funded bythe European Union
01. Application of JS
JS: …supporting a dynamic equilibrium and adequate connectivity conditions…
• Adopted design approach:• Preserving connectivity
conditions
Zagreb,04-05th of February 2014
Project funded bythe European Union
02. Application of JS
JS: …undisturbed longitudinal and lateral migration of all fish species and other water-related species to ensure their natural and self-sustaining development…
• Adopted design approach:• Preferring detached
structures
Zagreb,04-05th of February 2014
Project funded bythe European Union
03. Application of JS
JS: …a balanced sediment budget…
• Adopted design approach:• Preserving sediment
equilibrium
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0 6 12 18 24 30 36 42 48 54 60 66 72
Sedi
men
tatio
n [%
]
Months
Transverse [%]
Longitudinal [%]
Combined [%]
Zagreb,04-05th of February 2014
Project funded bythe European Union
04. Application of JS
JS: …Establish interdisciplinary planning teams involving key stakeholders…
• Stakeholders’ Forum established
Zagreb,04-05th of February 2014
Project funded bythe European Union
Public participation matrix
Stage of the project when public participation is enabled
Repr
esen
tativ
enes
s of
rele
vant
st
akeh
olde
rs
Favorable position –
precondition for integrated
project planning
Early Late
Low
Hig
h
MITROVIC Ivan, MUSKATIROVIC Jasna, CURCIC Milica, OSTOJIC BARJAKTAREVIC Zaneta, ZANETTI Roberto: Integrated project planning in inland waterway project, Smart Rivers 2013
Zagreb,04-05th of February 2014
Project funded bythe European Union
Integrated project planning matrix
Representativeness of relevant stakeholders
Div
ersi
ficati
on o
f pro
ject
ob
jecti
ves
Favorable position - Integrated
projectplanning
Low
Hig
h
Low HighMITROVIC Ivan, MUSKATIROVIC Jasna, CURCIC Milica, OSTOJIC BARJAKTAREVIC Zaneta, ZANETTI Roberto: Integrated project planning in inland waterway project, Smart Rivers 2013
Zagreb,04-05th of February 2014
Project funded bythe European Union
05. Application of JS
JS: …Set-up a transparent planning process (information/ participation)…
• Stakeholders’ Forum established• Web site, no restrictions
(2.000 hits monthly)• Serbian and English language• 9 Forum meetings• 2 site visits• 26 presentations on events• 24 articles• 1 movie
Zagreb,04-05th of February 2014
Project funded bythe European Union
Stakeholders’ Forum evaluation results
Zagreb,04-05th of February 2014
Project funded bythe European Union
06. Application of JS
JS: …Ensure the comparability of alternatives…
• Multi-Criteria Analysis• Navigation• Environment• Technical feasibility• Costs
Zagreb,04-05th of February 2014
Project funded bythe European Union
07. Application of JS
JS: …Inform and consult the international river commissions in the Danube River Basin…
• Stakeholders’ Forum
Zagreb,04-05th of February 2014
Project funded bythe European Union
08. Application of JS
JS: …Seek to avoid or, if this is not possible, to minimize the impacts of structural/ hydraulic engineering interventions…
• For each of 6 sectors, at least 5 conceptual alternatives
• For conceptual alternatives, up to 35 simulations
Zagreb,04-05th of February 2014
Project funded bythe European Union
09. Application of JS
Use of best practice measures to improve navigation…
• Using all available practice, to identify the most suitable solution for each sector, by case-by-case approach
0 100 200 300 400 500 600 700 800 900 100062
64
66
68
70
72
74
76
78
80
82
84
86EP_163.0_km_1262.825
distance from reference point left bank (m)
bed
leve
l (m
.a.s
.l.)
1987
1997
20042007
2011
Zagreb,04-05th of February 2014
Project funded bythe European Union
10. Application of JS
JS: …Ensure flexible funding … to enable integrated planning and adaptive implementation & monitoring…
Zagreb,04-05th of February 2014
Project funded bythe European Union
11. Application of JS
JS: …Monitor the effects of measures…
• Environmental monitoring ensured: before, during and after works• Hydro-morphology• Water and sediment quality• Biology
Zagreb,04-05th of February 2014
Project funded bythe European Union
12. Application of JS
JS: …Use a case-by-case approach…
• Every critical sector analyzed by case-by-case approach
Zagreb,04-05th of February 2014
Project funded bythe European Union
13. Application of JS
JS: …“working with nature” … following the principle of minimum or temporary engineering intervention…
• Mostly applied solution is dredging, with refilling the sediment back into the river
• Minimum structural interventions by application of different pilot solutions
• All structures detached
Zagreb,04-05th of February 2014
Project funded bythe European Union
14. Application of JS
JS: …Integrated design of regulation structures, equally regarding hydraulic, morphological and ecological criteria…
• Multi-Criteria Analysis• Navigation• Environment• Technical feasibility• Costs
Model 1: BP-NS
Model 2 : NS-SK
#24: Preliv
#18: Susek #19: Futog
#21: Arankina Ada
#22: Cortanovci #23: Beska
Model 3 : SK-ZM
X-coordinate (m)
Y-c
oo
rdin
ate
(m
)
Zagreb,04-05th of February 2014
Project funded bythe European Union
15. Application of JS
JS: …implementation of measures in an adaptive form (e.g. river bed stabilization by granulometric bed improvement, low water regulation by groynes)…
• All structures design to have impact only during low water periods
Zagreb,04-05th of February 2014
Project funded bythe European Union
16. Application of JS
JS: …Optimal use of the potential for river restoration (e.g. river banks restoration) and side channel reconnection…
• Budget for (during monitoring programme) identified additional environmental compensation measures insured
Zagreb,04-05th of February 2014
Project funded bythe European Union
17. Application of JS
JS: …Ensuring that flood water levels are not exacerbated and, ideally, are reduced…
• No long-term impact on water levels
Zagreb,04-05th of February 2014
Project funded bythe European Union
Current navigation conditionsCritical sector FUTOG – available depth, August 2012
19
Zagreb,04-05th of February 2014
Project funded bythe European Union
Current navigation conditionsCritical sector FUTOG – available depth, August and December 2013
19
Zagreb,04-05th of February 2014
Project funded bythe European Union
Instead of conclusion
• Acknowledging each others• Respecting each others• Building trust• Asking each others• Listening each others• Understanding each others• Learning from each others• Common understanding• Planning together• Working together
Zagreb,04-05th of February 2014
Project funded bythe European Union
For more info
www.plovput.rs
Zagreb,04-05th of February 2014
Project funded bythe European Union
Summary
Project area
Application of JS
Instead of conclusion
Summary
Current navigation conditions
Zagreb,04-05th of February 2014
Project funded bythe European Union
Thank youfor your kind attention
Project funded bythe European Union
Ivan Mitrovic, Project ManagerDirectorate for Inland Waterways (Plovput), Republic of Serbia
Zagreb,04-05th of February 2014
Joint Statement5th workshop