Flying with Data Link PRESENTED BY: Sean Sheldon Gulfstream Aerospace International Operators Conference | Tampa, FL | March 17 20, 2014 Tuesday, March 18, 2014 │4:00 p.m. – 5:30 p.m.)
Transcript
  • Flying with Data Link

    PRESENTED BY:

    Sean Sheldon

    Gulfstream Aerospace

    International Operators Conference | Tampa, FL | March 17 20, 2014

    Tuesday, March 18, 2014 4:00 p.m. 5:30 p.m.)

  • Flying with Data Link

    Connectivity

    AOC Aircraft Operational Communication

    ATS Air Traffic Services

    FANS1/A+ CPDLC/ADS-C

    ATN B1 CPDLC (Link 2000+)

    Operating Lessons Learned

    Operational Overview

    2

  • Flying with Data Link

    VHF Data

    Mode 2 coverage growing globally

    INMARSAT

    I-4 mature

    I-4 Alphasat replacing I-4F2 for EMEA

    Beijing Satellite Access Station

    ORT update

    I-5 in deployment phase

    Iridium

    FANS 1/A approved

    Iridium Next in deployment phase

    3

    Connectivity

  • Flying with Data Link

    Service providers continue to add value driven products

    4

    AOC Aeronautical Operational Communication

  • Flying with Data Link

    Started with Oceanic Route Clearance Authorization

    Expanding DCL Departure Clearance access, Auto D-ATIS

    5

    ATS Air Traffic Services

  • Flying with Data Link

    Near global oceanic coverage

    Continental domestic coverage's expanding

    United States

    30/30 RNP4 with CPDLC/ADS-C Anchorage

    Initiated ground clearance via CPDLC at some Towers

    Canada implemented domestic CPDLC

    Nav Canada AIC 38/12

    Australia

    Melbourne

    Brisbane

    Africa

    6

    FANS 1/A

  • Flying with Data Link

    Gulfstream 450/550/650 FANS 1/A+ in service: March 1, 2014

    G450: 170

    G550: 266

    G650: 60

    7

    FANS 1/A+ CPDLC/ADS-C

  • 8

  • Flying with Data Link

    G450/G550 LOGON G650 LOGON

    9

    FANS 1/A+ CPDLC/ADS-C

  • Flying with Data Link

    ADS Contracts

    10

    FANS 1/A+ CPDLC/ADS-C

  • Flying with Data Link

    Altitude Request

    11

    FANS 1/A+ CPDLC/ADS-C

  • Flying with Data Link

    Available 2014 for G450/G550/G650

    Most business jet FMSs providing dual stack interface differences

    Must be accepted by Eurocontrol Included in White List

    Link 2000+ Flight Crew Data Link Operational Guidance Version 5

    Currently available

    Geneva LSAG

    London EGTT

    Maastricht EDYY

    Rhein EDUU

    Scottish EGPX

    Zurich LSAZ

    12

    Link 2000+ ATN B1 CPDLC

  • Flying with Data Link

    ATN B1 pages

    13

    Link 2000+ ATN B1 CPDLC

  • Flying with Data Link

    Procedures do differ and you must be prepared

    Pacific

    Wants CPDLC position report after FIR entry to confirm CDA

    Atlantic

    Gander and Shanwick maintain nearly identical procedures

    If aircraft is tagged for Reduced Longitudinal

    Gander sends NDA 80 min prior to 30 West for eastbound

    Prestwick sends NDA 60 min prior to 30 West for westbound

    Preparing for RNP 4 and Reduced Lateral Separation

    14

    Pacific versus Atlantic

  • Flying with Data Link

    Be prepared Training and Knowledge

    Uncertainty or inattention lead to errors

    Operational errors are reported by ATC to the Central Reporting Agency

    ATC will want answers as to why there were errors

    ATC or Network failures

    Fire in Gander Center

    Power failure at Arinc

    SITA GES failure

    Iridium outage/degrade

    15

    Operating Lessons Learned

  • Flying with Data Link

    Do not include CPDLC/ADS-C codes unless you are authorized and intend to use it!

    FANS Block 10a/b J4J5/D1

    ATN Block 10a J1

    ATC Response Expectation

    Required Surveillance Performance

    Required Communication Performance

    Crew expected to respond within 60 seconds

    Human factors in managing processing of uplinks and downlinks

    16

    Operating Lessons Learned

  • Flying with Data Link

    Crew failed to respond to uplinks

    Pilot clearance: "Maintain FL340, At 0807 Climb To And Maintain FL360, Report Level at FL360". At 0746 the pilot WILCO'd the

    climb. At 0747 they advised "Level FL360". Pilot reported that the

    clearance was not displayed with the restriction to climb at 0807

    Pilot was issued a restricted clearance: "Maintain FL350, At 1810 Climb To And Maintain FL370, Report Level at FL370". At 1749

    the pilot WILCO'd the climb. At 1751 they advised "Level FL370".

    Pilot reported that the clearance was not displayed with the

    restriction to climb at 1810

    17

    Problem Reports


Recommended