8/10/2019 Iocl Tank Spec F-601 Rev 0
1/18
THISDOCUMENT/DRAWINGISTHEPROPERTYO
FABBLUMMUSGLOBALB.V.
INCLUDINGALLPATENTEDANDPATENTABLE
FEATURESAND/ORCONFIDENTIALINFORMATIONANDITSUSEISCONDITIONEDUPONTHEUSERSAGREEMENTNOTTOREPRODUCE
THEDOCUMENT/DRAWING,
INWHOLEORINPA
RT,
NORTHEMATERIALDESCRIBEDTHEREON,
NORTOUSETHEDOCUMENT
/DRAWINGFORANYPURPOSEOTHERTHANASSPECIFICALLYPERMITTEDINWRITINGBYABBLUMMUSGLOBALB.V.
Indian Oil Corporation LTD. (IOCL)
SPECIFICATION
Plant Naphtha Cracker Unit 211 04184 !"01
Location Panipat# $ar%ana# India Dept.&'ect. Proect 'peciication
Doc. No. 04184!120211!!"01 *e+. 0
Specification For:
T,N-'
!"01
Pae 1 o 1/
! ! *56. D,T5 D5'C*IPTION P*5P,*5D C$5C-5D ,PP*O65D
8/10/2019 Iocl Tank Spec F-601 Rev 0
2/18
Indian Oil Corporation LTD. (IOCL)
SPECIFICATION
Plant Naphtha Cracker Unit 5rror7 5rror7 5rror7 *eerence o9rce
Location Panipat# $ar%ana# India Dept.&'ect. Proect 'peciication
Doc. No. 5rror7 *eerence o9rce *e+.
IND5:
'5CTION P,;5
1. 'COP5 4
2. 'UPPL55NT,*< 'P5CIIC,TION'# COD5' ,ND 'T,ND,*D' 4
. '5LL5*=' O>LI;,TION'&*5'PON'I>ILITI5'
4. DOCU5NT,TION
. D5'I;N CONDITION' "
". ,T5*I,L' /
/. INIU T$IC-N5'' 8
8. >OTTO' 8
?. '$5LL' 8
10. *OO' 8
11. ,PPU*T5N,NC5' ?
12. L,N;5D CONN5CTION' 12
1. INT5*N,L' 1
14. T,N- ,TT,C$5NT' 1
1. N,5PL,T5' 1
1". 5LDIN; 14
Pae 2 o 18
8/10/2019 Iocl Tank Spec F-601 Rev 0
3/18
Indian Oil Corporation LTD. (IOCL)
SPECIFICATION
Plant Naphtha Cracker Unit 5rror7 5rror7 5rror7 *eerence o9rce
Location Panipat# $ar%ana# India Dept.&'ect. Proect 'peciication
Doc. No. 5rror7 *eerence o9rce *e+.
IND5:
'5CTION P,;5
1/. $5,T T*5,T5NT 14
18. TOL5*,NC5' 1
1?. IN'P5CTION ,ND T5'TIN; 1
20. P,INTIN; 1/
21. P*5P,*,TION O* '$IP5NT 18
22. 'P,*5 P,*T' 18
2. LO,DIN; 18
24. 'T,ND,*D D*,IN;' 18
Pae o 18
8/10/2019 Iocl Tank Spec F-601 Rev 0
4/18
Indian Oil Corporation LTD. (IOCL)
SPECIFICATION
Plant Naphtha Cracker Proect 5rror7 5rror7 5rror7 *eerence o9rce
Location Panipat# India Dept.&'ect. Proect 'peciication
Doc. No. 5rror7 *eerence o9rce *e+.
1. 'COP5
1.1 Thi peciication co+er the @ini@9@ reA9ire@ent or the dein# ield&hop aBrication#inpection# tetin and doc9@entation o tank and 9pple@ent the peciication andreA9ire@ent o the code 9nder hich the tank are to Be deined.
1.2 The ter@ code 9ed in thi peciication co+er an% code or tandard lited 9nder ection 2.
1. Thi peciication i applicaBle to tank ith the olloin characteritic7
6ertical B9tt!elded c%lindrical hell.
,ll elded teel.
iEed&loatin roo and open top.
Internal loatin co+er.
'torae o nonrerierated liA9id.
aEi@9@ dein pre9re at 1 k&c@F.
Tank can ha+e a torae or a proce 9nction and can Be hop or ield aBricated.
1.4 D5INITION'
or thi peciication the olloin deinition are applicaBle
*eA9iition @ean the *eA9iition incl9din all [email protected] Indian Oil Co@pan% Li@ited (IOCL)or hi repreentati+e.Contractor carrie o9t all or part o the dein# enineerin# proc9re@ent#
contr9ction and co@@iionin or the proect.>9%er i either Client or Contractor.'eller i the part% reponiBle or the deli+erin the ood in accordance ith the
reA9iition. Thi hall alo @ean renderin all er+ice or@in part o thedeli+er%.
2. 'UPPL55NT,*< 'P5CIIC,TION'# COD5' ,ND 'T,ND,*D'
2.1 Dein and contr9ction code and national and&or local re9lation a peciied in the
reA9iition.
The tandard drain attached to thi peciication.
Oner= peciication reerred to in the reA9iition.
'eller= peciication reerred to in the reA9iition.
8/10/2019 Iocl Tank Spec F-601 Rev 0
5/18
Indian Oil Corporation LTD. (IOCL)
SPECIFICATION
Plant Naphtha Cracker Proect 5rror7 5rror7 5rror7 *eerence o9rce
Location Panipat# India Dept.&'ect. Proect 'peciication
Doc. No. 5rror7 *eerence o9rce *e+.
. '5LL5*=' O>LI;,TION'&*5'PON'I>ILITI5'
.1 'eller hall dein# aBricate ield&hop# ae@Ble# tet# prepare doc9@entation and deli+er alltank and acceorie to co@plete the ork.
.2 'eller hall en9re co@pliance ith the code and a9thorit% re9lation and hall oBtain locala9thorit% appro+al. Thi incl9de deli+er% o all doc9@ent reA9ired to ati% the code.
. ,n% de+iation ro@ B9%er= reA9iition# peciication or tandard @9t Be 9B@itted to B9%erin ritin or appro+al prior to tart the related ork.
.4 'eller hall eEec9te hi er+ice to ood enineerin practice and ork@anhip A9alit% nor@.
. 9rther oBliation&reponiBilitie are contained in 9BeA9ent ection o thi peciication.
." >9%er= appro+al o eller= doc9@ent doe not relie+e eller o hi reponiBilitie or the er+ice aco+ered in the reA9iition.
./ >eore tartin co@pletel% hop!aBricated tank# eller hall acertain that hip@ent o the tankto the ite i eaiBle.
.8 or additional technical reA9ire@ent# reer to applicaBle part o the 9Bcontract.
4. DOCU5NT,TION
4.1 Copie o properl% certiied eller doc9@ent a peciied on the reA9ire@ent or doc9@entheet are to Be 9B@itted to B9%er or re+ie# appro+al and reerence in accordance ith thereA9iition.
4.2 5ach doc9@ent hall ha+e Been checked B% eller= A9aliied enineer and @arked and inedto that eect.
4. , a @ini@9@# the doc9@ent hall co+er the olloin a ar a applicaBle7
a. ;eneral arrane@ent drain ith all contr9ction detail.
B. >9%er= p9rchae order n9@Ber and rele+ant eA9ip@ent ite@ n9@Ber.
c. ,pplicaBle code()# tandard and peciication# incl9din date and re+iion.
d. aterial o contr9ction# incl9din @aterial tandard and t%pe o certiicate.
e. Location# iGe# t%pe# ratin# acin and ched9le o all connection.
. Dein pre9re and te@perat9re# corroion alloance# oint eicienc%# h%drotatic tetpre9re and haGard cateor%.
. Poition o lonit9dinal and circ9@erential elded oint.
h. eldin detail and reerence to eldin proced9re.
i. aterial inih peciication.
. ,ct9al eiht and +ol9@e.
8/10/2019 Iocl Tank Spec F-601 Rev 0
6/18
Indian Oil Corporation LTD. (IOCL)
SPECIFICATION
Plant Naphtha Cracker Proect 5rror7 5rror7 5rror7 *eerence o9rce
Location Panipat# India Dept.&'ect. Proect 'peciication
Doc. No. 5rror7 *eerence o9rce *e+.
k. Di@enion# incl9din all thickne.
l. Tolerance.
@. an9act9rer= erial n9@Ber.
n. *eerence to all detail drain.
o. Detail o na@eplate.
p. 5Etent o heat treat@ent# radioraph% and other nondetr9cti+e&detr9cti+e tet.
A. ;aket @ake# t%pe and di@enion.
r. 'ealin t%pe# @ake and @aterial o loatin roo.
. Inor@ation @arked a to Be conir@ed B% eller in the reA9iition.
4.4 *e+iion hall Be clearl% indicated ith a re+iion @ark a cloe a poiBle to the @odiication.
4. eld detail hall identi% hich eld are hop and hich are ield applied.
4." ,ll drain and doc9@ent @9t Be preented in the 5nlih lan9ae and in the @etric%te@ (-') o @ea9re@ent# eEcept a peciied in the reA9iition.
. D5'I;N CONDITION'
.1 P*5''U*5
.1.1 ini@9@ operatin condition are peciied on the indi+id9al tank data heet. 'eller halldein the tank or the dein pre9re a peciied in the reA9iition.
.1.2 The @ini@9@ h%drotatic tet pre9re hall Be etaBlihed in accordance ith the code.
.1. The ter@ tet pre9re hall appl% to the pre9re @ea9red at the hihet point o the tank init operatin poition and hall Be applied to the hihet point in it tet poition.
.1.4 The dein denit% hall enerall% Be eA9al to 1. hen the prod9ct to Be tored ha a denit%hiher than 1# the act9al denit% o the prod9ct hall Be 9ed.
.2 T5P5*,TU*5
.2.1 The dein te@perat9re i peciied in the reA9iition.
. CO**O'ION ,LLO,NC5
..1 The corroion alloance i peciied in the reA9iition.
..2 Corroion alloance# a peciied in the reA9iition# hall Be added to the calc9lated thicknee
o Botto@# hell and roo# and noGGle neck and lane o connection. No additional corroionalloance ill Be pro+ided on lane acin. I Blind lane are 9ed or co+er plate# corroionalloance i reA9ired to Be added to the tandard thickne onl% in the a@o9nt that the peciiedtank corroion alloance eEceed " @@.
8/10/2019 Iocl Tank Spec F-601 Rev 0
7/18
Indian Oil Corporation LTD. (IOCL)
SPECIFICATION
Plant Naphtha Cracker Proect 5rror7 5rror7 5rror7 *eerence o9rce
Location Panipat# India Dept.&'ect. Proect 'peciication
Doc. No. 5rror7 *eerence o9rce *e+.
.. Corroion alloance hall Be added to the co+er plate and lane plate o plate!t%peinpection openin.
..4 elded!in nonpre9re internal co@ponent hall Be deined to incl9de the peciied corroionalloance on each 9race eEpoed to tank content and to per@it the co@ponent to 9nction inthe corroded condition.
.. Dein o re@o+aBle nonpre9re internal co@ponent hall incl9de one hal o the peciiedcorroion alloance on each 9race eEpoed to tank content.
.4 IND ,ND 5,*T$HU,-5
.4.1 Dein ind load hall Be conidered to act on the proected tank area and hall Be inaccordance ith local la and re9lation. aEi@9@ ind +elocit% i 1"8 k@&ho9r at a heiht o0@ and 12 k@&ho9r at a heiht o 10@.'ei@ic load hall Be calc9lated B% Indian code and tandard. Panipat lie in the ei@icGone I6 a per I' 18?
.4.2 ind and earthA9ake condition hall not Be conidered to appl% at the a@e ti@e.
.4. ,lloaBle anchor Bolt tre7
Tenion 120 N&@@F.
'hear 80 N&@@F.
,lloaBle Bearin tre on concrete7 4 N&@@F.
. ,DDITION,L 'TI5NIN;
..1 or hop!aBricated tank# eller hall @ake a dein check and# i necear%# pro+ide additionaltienin to pre+ent hell Botto@ or co+er ditortion d9rin aBrication# hip@ent or erection.
." OP5NIN;'
.".1 Openin hall# a reA9ired# Be reinorced to ithtand the dein load to hich the% ill BeeEpoed# incl9din load deri+ed ro@ pipin tre anal%i.
". ,T5*I,L'
".1 ,ll @aterial 9ed in the aBrication o torae tank hall ha+e a @ini@9@ A9alit% a peciied inthe reA9iition and hall Be in accordance ith related code&@aterial peciication andtandard.
".2 '9Btit9te @aterial are per@itted hen appro+ed in ritin B% B9%er.
". ,ll @aterial identiication n9@Ber hall Be leiBl% ta@ped or tenciled preeraBl% on the lonede o each co@ponent. hen ta@pin i reA9ired on rolled 9race# a lo tre ta@p ito Be 9ed.
".4 The carBon content o all @aterial to Be elded hall not eEceed 0.2.
". ,n% nonpre9re part elded to the tank# 9ch a clip# hall Be o i@ilar @aterial a the tank@aterial# or Be pro+ided ith a pad o i@ilar @aterial a the tank co@ponent it i attached to.
"." *einorce@ent pad hall Be @ade o the a@e @aterial a the tank.
8/10/2019 Iocl Tank Spec F-601 Rev 0
8/18
8/10/2019 Iocl Tank Spec F-601 Rev 0
9/18
Indian Oil Corporation LTD. (IOCL)
SPECIFICATION
Plant Naphtha Cracker Proect 5rror7 5rror7 5rror7 *eerence o9rce
Location Panipat# India Dept.&'ect. Proect 'peciication
Doc. No. 5rror7 *eerence o9rce *e+.
10. LO,TIN; *OO'
10..1 T%pe o loatin roo hall Be either do9Ble deck or pontoon t%pe and contin9o9 eld ointedand liA9id tiht. ,lternati+e dein are 9Bect to B9%er= appro+al.
10..2 The dein o the roo# plator@ and app9rtenance hall per@it illin to the o+erlo le+elitho9t da@ain the roo# eal or an% part o the tank.
10.. The centerin de+ice# top hell eEtenion# eal and o+erlo drainae openin hall Bedeined to enaBle the tank to o+erlo hile per@ittin the roo to Be 9ided don itho9tda@ae to the ann9lar eal.
10..4 The roo hall Be pro+ided ith ad9taBle 9pport le to 9pport the roo in it loet poition.The loet poition hall take into acco9nt clearance or app9rtenance (e.. @iEer# int. pipe#etc.) , econd# hiher poition# hall per@it the cre to alk in Beteen the Botto@ and theroo. >otto@ plate hall Be pro+ided ith pad at each le poition.
11. ,PPU*T5N,NC5'
Tank hall Be pro+ided ith all app9rtenance peciied on the indi+id9al data heet or thepeciic tank and co@pl% ith the reA9ire@ent a @entioned in thi ection.
11.1 ,N$OL5'
11.1.1 5Ecept a otherie peciied# the n9@Ber o @anhole hall Be a hon Belo7
Tank Dia@eter 'hell *oo
Dia. J 8 @ 1 18 K dia. J " @ 2 2Dia. K " @ 4 2
loatin roo# pontoon or do9Ble deck hall Be pro+ided ith @anhole to inpect the entireinterior o the roo.
11.1.2 , clean!o9t door @a% Be intalled intead o a @anhole i 9tiied B% the neceit% or reA9entcleanin (e.. cr9de!oil tank). Thi hall Be peciied on the tank data heet.
11.1. The inide dia@eter o a @anhole in a iEed roo o a torae tank itho9t loatin co+er @9t Be
00 @@ the inide dia@eter o all other @anhole @9t Be "00 @@.
11.2 D*,!O 'UP'
11.2.1 hen peciied in tank data heet# tank Botto@ hall Be pro+ided ith dra!o 9@p# inaccordance ith the code.
11.2.2 Dra!o 9@p hall ha+e their nearet o9ter ede one @eter ro@ the hell and hall Be at anadeA9ate ditance ro@ the prod9ct inlet and o9tlet noGGle.
8/10/2019 Iocl Tank Spec F-601 Rev 0
10/18
Indian Oil Corporation LTD. (IOCL)
SPECIFICATION
Plant Naphtha Cracker Proect 5rror7 5rror7 5rror7 *eerence o9rce
Location Panipat# India Dept.&'ect. Proect 'peciication
Doc. No. 5rror7 *eerence o9rce *e+.
11. 65NT'
11..1 6ent itho9t la@e arreter hall Be pro+ided on all tank torin prod9ct o hich the lahpoint i aBo+e MC. Their o+erall capacit% hall Be deter@ined in accordance ith the pro+iiono the code and ,PI 2000.
11..2 Tank containin prod9ct o hich the lah point i Belo MC hall Be pro+ided ithre@o+aBle# @etallic cloth +ent actin a la@e arreter.
11.. loatin roo tank hall Be pro+ided ith a9to@atic +ent alloin air inlet and eEha9t d9rine@pt%in and illin o the tank# ith the roo in lo poition. '9ch +ent() hall a9to@aticall%h9t hen the roo i @ade to loat.
11..4 ,ll open roo and hell openin hall Be protected ith tainle teel creen aaint Bird.
11.4 *OO D*,IN'
11.4.1 Drain o leEiBle hoe or ointed riid pipe!t%pe dicharin at the tank Botto@ hall Be pro+idedor e+ac9atin rainater ro@ loatin roo tank.
11.4.2 '9ch drain hall Be di@enioned Baed on the @aEi@9@ orecat rainall.
11.4. The drain clearance hall Be deined o that the drain @o+e@ent hall not interere ith an%internal. It @a% Be 9ided# i appropriate.
11. 'T,I*,
8/10/2019 Iocl Tank Spec F-601 Rev 0
11/18
Indian Oil Corporation LTD. (IOCL)
SPECIFICATION
Plant Naphtha Cracker Proect 5rror7 5rror7 5rror7 *eerence o9rce
Location Panipat# India Dept.&'ect. Proect 'peciication
Doc. No. 5rror7 *eerence o9rce *e+.
11." ;*OUNDIN;'
11.".1 The hell hall Be pro+ided ith ro9ndin l9 co@pl%in ith the tandard drain.
11.".2 loatin roo tank hall Be eA9ipped ith a link Beteen the hell and the iEed and @o+ineA9ip@ent# 9ch a loatin roo and ecalator.
11.". H9antit% o l9 i peciied in the tank data heet.
11./ LO,TIN; *OO P5*IP$5*,L '5,L
11./.1 The roo peripheral eal hall preeraBl% Be o the dr% t%pe# illed ith pol%9rethane oa@. 'teel hoe
are not alloed.
11./.2 hate+er the t%pe o eal 9ed# the en+elope aBric hall Be o a @aterial reitin# at 0MC#h%drocarBon ith an aro@atic content o ?8 and a 9l9r content o 2.
11./. The eal hall Be protected B% a rin o iper conitin o o+erlappin hined teel caler9BBin aaint the hell.
11./.4 5ach protectin cale hall ha+e a lo9+er!haped c9to9t to allo or ire oa@ i ire oa@protection i peciied.
11./. The intake area o the lo9+er hall Be o approEi@atel% 200 c@F.
11./." 6apor!@o9nted eal hall ha+e a @ini@9@ o to +ent to e+ac9ate a +apor or air pocketro@ 9nderneath the eal o the loatin roo in accordance ith ,PI tandard 2000.
11.8 O, OUTL5T 'T,TION'
11.8.1 oa@ o9tlet tation# i reA9ired# hall Be located near the top o the hell the% hall incl9delateral and eir in the cae o iEed roo tank and delector and eir aBo+e the top co9rein the cae o loatin roo tank. The n9@Ber o eir hall Be peciied B% eller.
11.8.2 , oa@ da@ deined to retain the oa@ aBo+e the roo eal hall conit o a teel plate200 @@ hiher than the iper# intalled 1 @ ro@ the hell inard and attached to the top parto the loatin roo cha@Ber B% an inter@ittent eld. The oa@ da@ hall Be pro+ided ith lotted
drain hole. 'iGe and n9@Ber hall Be ad+ied B% eller.
11.? $5,TIN; '
8/10/2019 Iocl Tank Spec F-601 Rev 0
12/18
Indian Oil Corporation LTD. (IOCL)
SPECIFICATION
Plant Naphtha Cracker Proect 5rror7 5rror7 5rror7 *eerence o9rce
Location Panipat# India Dept.&'ect. Proect 'peciication
Doc. No. 5rror7 *eerence o9rce *e+.
11.?." The 9pport hall Be contin9o9l% elded to the Botto@.
11.?./ The coil hall Be paced not o+er "00 @@ apart. The heatin coil hall Be intalled onl% aterthe Botto@ ha Been teted.
11.10 CONT*OL ,ND 5,'U*IN; IN'T*U5NT'
Control and @ea9rin intr9@ent hall Be pro+ided a peciied in the reA9iition.
12. L,N;5D CONN5CTION'
12.1 The di@enional peciication and the pre9re te@perat9re ratin o lane in the iGe 9p toand incl9din 24 hall Be in accordance ith ,N'I >1".# Pipe lane and laned ittin.anhole lane and clean!o9t openin @a% Be plate t%pe.
,lternati+el%# i peciied in the reA9iition# lane hall Be in accordance ith DIN tandard.
12.2 ,ll noGGle connection hall Be laned. laned connection @aller than 1 hall Be red9cedro@ 2 hell connection a per tandard drain.
12. >olted lane in iGe larer than 24 hall Be peciied to ,PI "0 or >'!2?. , calc9lation othee lane accordin to the code hall Be @ade# i reA9ired.
12.4 ,ll pecial iGe&deined lane hall Be deined 9in @an9act9rer= @ini@9@ aketeatin tre or the code +al9e# hiche+er i reater.
12. 'lip!on lane @a% Be 9ed or cla 10 ratin and at dein te@perat9re in the rane o 0MCto 2"0MC.
12." Lap oint lane hall onl% Be 9ed i peciied in the reA9iition.
12./ Unle internal proection are peciied# noGGle are to Be c9t o l9h ith the inide o thehell# Botto@ or roo and the inide harp ede hall Be Broken.
12.8 eldin neck lane hall Be Bored to a@e di@enion a inide dia@eter o pipe or plateneck.
12.? >olt hole hall traddle the north&o9th and&or +ertical tank aEi# 9nle peciicall% notedotherie.
12.10 NoGGle lane hall Be 9rnihed ith aket 9race @achined to the inih peciied in thereA9iition.
,ll t%pe o inih hall Be prod9ced B% ace t9rnin.
12.11 >LIND L,N;5'
12.11.1 >lind lane or carBon!teel tank @a% Be either carBon!teel orin or plate# 9rniheddi@enionall% in accordance ith the lane tandard peciied.
12.11.2 >lind lane or allo% tank hall Be o the a@e allo% in iGe 9p to DN 80. or larer iGe#the% @a% Be carBon!teel orin or plate aced ith allo%# a hon on tandard drain.
8/10/2019 Iocl Tank Spec F-601 Rev 0
13/18
Indian Oil Corporation LTD. (IOCL)
SPECIFICATION
Plant Naphtha Cracker Proect 5rror7 5rror7 5rror7 *eerence o9rce
Location Panipat# India Dept.&'ect. Proect 'peciication
Doc. No. 5rror7 *eerence o9rce *e+.
12.11. 5ach connection peciied a Blinded in the reA9iition and each @anhole hall Be pro+idedith a Blind lane# pre9re Boltin and a er+ice aket.
12.12 >OLTIN;
12.12.1 Thread o Boltin or ,N'I lane hall Be in accordance ith ,N'I >I.1# cla 2, it. 'iGe 1and @aller hall Be coare thread erie and iGe 1!1&8 and larer 8 pitch thread erie. 't9dBolt to Be pro+ided ith to hea+% heEaonal n9t.
12.12.2 Thread o Boltin or DIN lane hall Be @etric to DIN 210.
12.1 ;,'-5T'
12.1.1 5Eternal aket hall Be a peciied in the reA9iition.
12.1.2 Internal aket hall Be raphite internall% reinorced# 9nle otherie peciied in reA9iition.
1. INT5*N,L'
1.1 ,ll re@o+aBle internal hall pa thro9h @anhole().
1.2 $eEaon headed Bolt# accordin to DIN ?1 or DIN ? ith one n9t accordin to DIN ?4#hall Be 9ed or internal connection. The @ini@9@ Bolt iGe i 12.
14. T,N- ,TT,C$5NT'
14.1 ,ll tank attach@ent 9ch a in9lation 9pport# pipin clip# ladder clip and plator@ clip#hall Be pro+ided B% eller in accordance ith the appropriate tandard and drain.
14.2 *einorcin pad or internal or eEternal tr9ct9ral attach@ent to tank hell hall Be pro+idedith a " @@ dia@eter +ent hole or the encloed pace Beteen eld.The internal +ent hole hall Be pl9 elded ater co@pletion o all eld o the pad.
1. N,5PL,T5'
1.1 Tank hall ha+e eparate tainle!teel code and eller= na@eplate per@anentl% attached tothe tank. Na@eplate data hall not Be ta@ped on hell.
1.2 Thee na@eplate hall Be @o9nted on a Bracket# a hon on the applicaBle tandarddrain.
1. The na@eplate hall Be located approEi@atel% 00 @@ aBo+e the loet @an a%# 9nleotherie peciied in the reA9iition.
8/10/2019 Iocl Tank Spec F-601 Rev 0
14/18
Indian Oil Corporation LTD. (IOCL)
SPECIFICATION
Plant Naphtha Cracker Proect 5rror7 5rror7 5rror7 *eerence o9rce
Location Panipat# India Dept.&'ect. Proect 'peciication
Doc. No. 5rror7 *eerence o9rce *e+.
1". 5LDIN;
1".1 'hell plate hall Be th9 laid o9t to @ini@iGe the n9@Ber o eld.
1".2 Openin and preeraBl% all attach@ent and reinorcin pad hall clear lonit9dinal andcirc9@erential ea@.
1". or loatin roo tank# the oint hall Be Back elded at the inide.
1".4 The +ertical oint o the irt hell co9re hall Be o located that the% do not interere ith theoint in the Botto@ plate.
1". hen it i necear% or eEternal attach@ent to cro tank ea@# the attach@ent eld hall Beo@itted at the ea@ 9Bected to B9%er= appro+al.
1"." here a noGGle or other attach@ent all ithin a ea@ hich cannot Be relocated# eller hallnoti% B9%er. >9%er ill either relocate the noGGle or attach@ent# or peci% additional inpectionor the aected ea@.
1"./ 'hell ea@ hall Be do9Ble!elded B9tt oint# eEcept at thoe location here do9Ble B9tteldin i not poiBle. 'inle!ided eld hall ha+e 9ll penetration.
1".8 >otto@ plate and roo plate hall Be either lap oint or B9tt oint.
1".? ,nn9lar plate oint hall Be inle!ided B9tt oint ith Backin trip.
1".10 The inide 9race o the hell hall Be or@ed and @atched to Be a l9h a poiBle at theeld ea@. ;enerall%# hen a dierence in thickne eEit Beteen hell plate# the inidedia@eter hall hold.The @aEi@9@ alloaBle oet o hell ection hall not eEceed code reA9ire@ent.
1".11 The tank hall Be deined to ha+e all co9re tr9l% +ertical. The ditance Beteen +ertical ointin adacent co9re ho9ld not Be le than one third o the plate lenth.
1".12 NoGGle hall Be attached to the tank B% 9ll penetration eld.
1".1 ,ttach@ent 9ch a l9# clip and eat hall Be deined to Be elded to the tank hell orroo B% contin9o9 illet eld# or dein te@perat9re aBo+e 0MC and B% contin9o9 9ll
penetration eld or dein te@perat9re Belo 0MC.
1".14 eldin @a% onl% Be eEec9ted B% A9aliied elder.
1".1 No eldin hall Be peror@ed on tank or part thereo ater tre relie+in itho9t peciicappro+al B% B9%er. Dein drain hall peci% that a note to thi eect Be painted on the tank.
1/. $5,T T*5,T5NT
1/.1 Tank or part thereo hall Be poteld heat treated# a reA9ired B% the code.
1/.2 Tank or part thereo that reA9ire additional heat treat@ent to enhance corroion reitance or
@echanical propertie# hall recei+e thee heat treat@ent hen called or in the reA9iition or@aterial peciication# or hen thee are a reA9ire@ent o the @aterial @an9act9rer.
1/. 'eller hall 9B@it to B9%er a part o a aBrication proced9re# an o9tline o the additionalheatin operation that tank part ill Be 9Bected to d9rin aBrication.
8/10/2019 Iocl Tank Spec F-601 Rev 0
15/18
Indian Oil Corporation LTD. (IOCL)
SPECIFICATION
Plant Naphtha Cracker Proect 5rror7 5rror7 5rror7 *eerence o9rce
Location Panipat# India Dept.&'ect. Proect 'peciication
Doc. No. 5rror7 *eerence o9rce *e+.
1/.4 'eller hall noti% B9%er o an% 9n99al coni9ration or co@ponent dein 9ch that hihtree @a% Be de+eloped in eld Beca9e o retraint. >9%er= appro+al to o@it trerelie+in i to Be oBtained.
1/. lane acin @9t Be protected aaint oEidation d9rin heat treat@ent.
18. TOL5*,NC5'
Tolerance are to Be in accordance ith the applicaBle tandard drain and code.
1?. IN'P5CTION ,ND T5'TIN;
1?.1 >9%er= and&or client= inpector @a% enae in the inpection o the tank a peciied in thecope o inpection heet attached to the reA9iition. The inpector hall ha+e ree acce toeller= and hi 9Bcontractor= ork at Both hop and erection ite at all reaonaBle ti@e andd9rin all tet.
1?.2 elded ea@ hall Be 9Bected to radioraphic eEa@ination# a reA9ired B% the code.
1?. Ultraonic eEa@ination# @anetic particle or d%e penetrant @a% Be 9ed a an alternati+e A9alit%a9rance @ethod to radioraph% onl% here code o per@it and here radioraph% i notpractical. Ue a a Back!9p tool or radioraph%# or to locate plate or eld deect# i not
retricted.
1?.4 ,ll heat n9@Ber hall Be @arked B% paint or other leiBle @ean in 9ch a a% that thee caneail% Be noted and read ater erection. or Botto@ plate thee hall Be on the inide# or allother part# on the o9tide.
1?. P*5''U*5 T5'T'
1?..1 ini@9@ tet ater te@perat9re or carBon or lo!allo% teel tank# hall Be /MC# or MC aBo+ee@Brittle@ent tranition te@perat9re# hen thi i hiher. ater @9t Be clean# itho9tconta@inant.
1?..2 5ach tank hall Be h%drotaticall% teted to the tet pre9re a per the code.
1?.. or ield tet# the illin rate# holdin ti@e and drainae hall Be a per code and oner=reA9ire@ent.
'eller hall# or all ield!aBricated tank# 9B@it a tet proced9re or appro+al B% B9%er.
1?..4 or ield!aBricated tank# the olloin proced9re i i+en a a 9ideline7
8/10/2019 Iocl Tank Spec F-601 Rev 0
16/18
Indian Oil Corporation LTD. (IOCL)
SPECIFICATION
Plant Naphtha Cracker Proect 5rror7 5rror7 5rror7 *eerence o9rce
Location Panipat# India Dept.&'ect. Proect 'peciication
Doc. No. 5rror7 *eerence o9rce *e+.
Prior to the tet @entioned Belo# e+eral le+el hall Be plotted on the tank Botto@# in order tocheck the ettle@ent ater the tank i e@ptied.
,ll hell noGGle hall Be pl9ed and the tank hall Be illed ith ater. ater!illin rate andoBer+ation ti@e can Be a ollo7
illin to 1& o the tank at a rate o 4 c@&h.
OBer+in or 24 ho9r.
illin to 2& o the tank at a rate o 0 c@&h.
OBer+in or 24 ho9r.
illin 9p the tank at a rate o 2 c@&h.
OBer+in or 24 ho9r# then e@pt%in.
1?.. ,9tenitic tainle!teel tank hall Be teted ith ater ha+in a @aEi@9@ chloride content o lethan 0 pp@. ,ter tetin# the tank hall Be thoro9hl% dried. ,lternate tet @edia @a% Be 9edonl% ith the appro+al o B9%er.
1?.." The tet pre9re hall Be @aintained or the period peciied B% the code# B9t not le than halan ho9r.
1?../ >lind lane# pipin co@ponent# etc.# hich eller ha to pro+ide# hall Be Bolted 9p andh%droteted toether ith tank.
1?..8 Tet aket hall Be the a@e t%pe a the er+ice aket# B9t do not need to Be o the a@e@aterial i the eatin characteritic are i@ilar. Ue o a heet tet aket in lie9 o a piral!o9nd# @etal!acketed or i@ilar aket# i per@itted in li@ited cae# ith the prior appro+al oB9%er.
1?..? or hop!aBricated tank the tet aket @a% Be let in place# B9t to acilitate entr% in the ield#onl% o9r Bolt hall Be intalled on @anhole lane to hold co+er in place.
5ach oint that ha Been Bolted 9p prior to hip@ent ro@ the hop# @9t Be pro+ided ith air@l% attached ta# litin the t%pe o aket that ha Been intalled.
1?..10 NoGGle reinorcin pad eld hall Be teted ith @aEi@9@ 0. k&c@F air and oap 9dol9tion.
1?." here additional tet are reA9ired# 9ch a air or halide tihtne tet# liA9id penetrant or@anetic particle inpection# thee hall Be peror@ed in accordance ith intr9ction i+en inthe reA9iition and the @ethod o inpection precriBed in the code.
1?./ T5'TIN; >OTTO TI;$TN5''
The Botto@ hall Be teted in accordance ith the @ethod reco@@ended in the code.
Preerence i i+en to the +ac99@ @ethod ith tetin BoE and oap ol9tion.
1?.8 T5'TIN; T,N- *OO
8/10/2019 Iocl Tank Spec F-601 Rev 0
17/18
Indian Oil Corporation LTD. (IOCL)
SPECIFICATION
Plant Naphtha Cracker Proect 5rror7 5rror7 5rror7 *eerence o9rce
Location Panipat# India Dept.&'ect. Proect 'peciication
Doc. No. 5rror7 *eerence o9rce *e+.
1?.8.1 Fixed Roof Tanks
iEed roo tihtne tetin hall Be done in trict accordance ith the reA9ire@ent o the code.
The pre9re hall Be trictl% controlled 9in a +er% acc9rate pre9re a9e d9rin the entireperiod o the tet.
The roo tihtne hall Be teted B% appl%in a oap ol9tion on all the eld.
The +ac99@ pre9re tet hall Be peror@ed ater e@pt%in the tank don to a lo le+el oaBo9t 1 @.
D9rin e@pt%in# all roo openin hall @andatoril% Be open. Then# eEcept or the relie de+ice#the openin hall Be cloed and e@pt%in hall proceed ith care 9ntil a neati+e pre9re o2. &c@F or nonpre9re tank or " &c@F or pre9re tank i reached. The pre9re hall Becare9ll% @ea9red ith a pre9re a9e.
1?.8.2 Floating Roof Tanks
loatin roo hall Be teted in trict accordance ith the reA9ire@ent o the code.The roo operation hall Be teted# a ell a the tihtne o the eal Beteen the hell and theroo.
1?.? LO,TIN; *OO D*,IN'
,ter intallation# hoe or ointed drain hall Be 9Bected to h%dra9lic tet at a pre9re o. k&c@F# ith the tank e@pt%.
olloin the tet the drain hall Be cleaned and checked or correct operation.
1?.10 ,ter the initial ill# the Botto@ ditortion hall Be approEi@atel% a deined (theoreticaleti@ation o the oil ettle@ent) and hall in no e+ent ha+e a here lare A9antitie o liA9idcan Be trapped i 9ch i the cae# repair hall Be conidered.
20. P,INTIN;
20.1 The t%pe o protecti+e internal and eEternal coatin or a partic9lar tank hall Be a peciied thereA9iition.
20.2 The tank hall Be cleaned inide and o9tide o eld patter# eld la# l9E depoit# B9rr andplinter# looe @ill cale and all other orein @atter.
20. 'pecial care hall Be taken that a9tenitic tainle!teel 9race do not co@e into contact iththe pri@er o carBon!teel part.
20.4 'teel plate tored pendin erection hall Be 9itaBl% protected aaint oEidation.
20. or ield!erected tank# it i reco@@ended to pri@e all plate prior to deli+er% to erection ite.
$eat n9@Ber hall in thi cae Be let 9npainted.
20." >eore erection# the o9tide 9race o Botto@ plate hall Be Br9hed# dereaed# then coatedith hot applied Bit9@en paint.
8/10/2019 Iocl Tank Spec F-601 Rev 0
18/18
Indian Oil Corporation LTD. (IOCL)
SPECIFICATION
Plant Naphtha Cracker Proect 5rror7 5rror7 5rror7 *eerence o9rce
Location Panipat# India Dept.&'ect. Proect 'peciication
Doc. No. 5rror7 *eerence o9rce *e+.
20./ or loatin roo tank eller hall indicate hich t%pe o protection he conider or the inide ocha@Ber.
21. P*5P,*,TION O* '$IP5NT
21.1 ,ter co@pletion o aBrication and tetin# the hop!aBricated tank hall Be thoro9hl% drainedo ater and dried.
21.2 ,ll part and preaBricated part o ield!aBricated tank hall Be thoro9hl% cleaned# @atch@arked and Be+eled or eldin prior to hip@ent.
21. CarBon!teel lane acin (eEcept on noGGle hipped ith aket in place)# hall Be coatedith an eail% re@o+aBle r9t pre+entati+e. ,ll lane acin @9t Be protected ith te@porar%hippin co+er. 'creed openin hall Be protected ith a platic pipe thread pl9.
22. 'P,*5 P,*T'
22.1 'eller hall 9ppl% 10 pare Boltin ith a @ini@9@ o 2 Bolt o each iGe and t%pe.
22.2 'eller hall 9ppl% 2 pare aket or each Blinded noGGle and Bolted connection.
2. LO,DIN;
2.1 'eller @9t en9re that eA9ip@ent and&or all part thereo i properl% loaded and ec9red to thecarrier# pre+entin da@ae ro@ or cradle# hold!don de+ice or otherie# and that clearancereA9ire@ent are @et.
24. 'T,ND,*D D*,IN;'
The olloin tandard drain or@ a part o thi peciication7
DRAWIN NO! RE"!NO!
S#EET DESCRIPTION
04!20!01.002 1 o icellaneo9 noGGle arrane@ent
04!20!01.00 2 o icellaneo9 noGGle arrane@ent04!20!01.004 o icellaneo9 noGGle arrane@ent
04!20!01.00 1 o 1 C' internal plate lane# nonpre9re
04!20!01.02" 4 1 o 1 Na@eplate Bracket
04!20!01.0"0 4 1 o 1 In9lation 9pport or torae tank
04!20!01.02? 1 o 1 5arthin Connection
04!20!01.0 4 1 o 1 Tolerance or torae tank
04!20!01.0/ / 1 o 2 ,llo% liner detail
04!20!01.08 / 2 o 2 ,llo% liner detail
04!20!01.0"8 0 1 o 1 Na@eplate or 'torae Tank
04!20!01.0"? 0 1 o 1 'tando9t or NoGGle ana%
Note7 Di@enion on tandard drain in+ol+in pipe and lane are Baed on ,N'I
tandard. or DIN pipe and lane +endor i to ad9t thee di@enion herereA9ired.