BackgroundBackground Specification DevelopmentSpecification Development Upcoming ProjectsUpcoming Projects
DOT
DNR
OSHA
IDED
1.1. Source requirementsSource requirements
2.2. Material requirementsMaterial requirements
3.3. End User requirementsEnd User requirements
Raw Shingle MaterialRaw Shingle Material Pre-processing = sorting, removal of wastePre-processing = sorting, removal of waste
Asbestos remediation (testing, rejection of Asbestos remediation (testing, rejection of loads)loads)
Processed RASProcessed RAS GradationGradation
Deleterious Content (<1.5%)Deleterious Content (<1.5%)
Moisture (for information only)Moisture (for information only)