PREFACE This document is one of a series of Interim Policy Advice (IPA) which is being made available for comment in association with the Gateshead's Re-Deposit Draft Replacement Unitary Development Plan (UDP). It emerges from the (UDP) and is intended to clarify and amplify policies contained in it. The IPA documents were originally produced as Draft Supplementary Planning Guidance (SPG) in support of the first Deposit Draft UDP. However, following changes to the development plan system emanating from the Planning and Compulsory Purchase Act 2004, the production of SPGs is no longer possible. Where appropriate, comments that were made in response to draft SPG have been incorporated into the IPA. Whilst not having the statutory status of SPG, the IPS documents are adopted Council Policy, and are material considerations in determining planning applications. If you would like any further information or assistance with IPA, or to purchase further copies, please contact the Spatial Strategy Team at the following address or by telephone on 0191 433 3000:
Spatial Strategy Team Planning and Environmental Strategy Development and Enterprise Gateshead Council Civic Centre Gateshead NE8 1HH
EXPLANATORY NOTE
Interim Policy Advice (IPA) documents are being prepared to amplify and clarify policies contained in Gateshead's Re-Deposit Draft Replacement Unitary Development Plan. The full list of documents intended to accompany the plan is as follows: IPA1 Crime Prevention in New Development IPA2 Children’s Play Area Standards IPA3 Provision of Open Space and Landscaping in New Developments IPA4 Tyne Gorge Study IPA5 Lifetime Homes and Wheelchair Housing IPA6 Public Open Space Needs and Standards IPA7 Affordable Housing IPA8 Northside, Birtley IPA9 Development Control Policy on Hot Food Take-away Shops IPA11 Car Parking in New Development IPA12 Chopwell, Heartlands IPA13 Kibblesworth North IPA14 West of Derwenthaugh Road IPA15 Derwent West Bank IPA16 North of MetroCentre IPA17 Conservation Area Character Statements
• The Cycling Strategy for Gateshead was prepared in consultation with the cycling organisations in 2002 and has been adopted as Council Policy. It is not intended to republish this as IPA.; and
• The Council intends to review existing adopted SPG on Areas of Special Character and the MetroCentre, which will be published as IPA documents.
• Additional items of IPA may be identified at a future date.
IPA 16 North of MetroCentre Development Brief
Gateshead UDP Re-Deposit Draft Replace20061
1. PURPOSE
1.1 The brief is intended to assist with securing the satisfactory overall
development of the site as efficiently and expeditiously as possible.
1.2 The requirements and guidance within the brief are both general and
specific but not necessarily exhaustive. Additional requirements may be
sought and further guidance given. It is recommended that prospective
developers have early discussions with the Development Control Manager
before finalising their proposals and submitting a planning application.
2. CONTEXT
The Site
2.1 The whole North of MetroCentre site has a gross area of 39 hectares, with
23.65 hectares undeveloped. It is located north of the MetroCentre,
between the River Tyne and Riverside Way/ Handy Drive. The confluence of
the Rivers Tyne and Derwent mark its western boundary and its eastern
boundary is the point at which Handy Drive passes very close to the River
Tyne.
2.2 Beyond the northern boundary of the site lies the Tidal Mud Flats Site of
Nature Conservation Importance (SNCI- GAT 87).
2.3 The site has been subject to considerable change over recent years.
Demolition has occurred of Dunston Power Station at its eastern end and the
Delta Ironworks at its western end.
2.4 Metro Riverside Business Park has been completed on part of the former
ironworks site, and incorporates eight large commercial units. City &
Northern are developing the remainder of the former ironworks site as “The
Watermark”. Phase 1 of the development comprises three office buildings,
IPA 16 North of MetroCentre Development Brief
Gateshead UDP Re-Deposit Draft Replace20062
providing a total of 9460m2 of office space which are occupied by
twenty4help, the Commission for Patient and Public Involvement in Health
(Regional Centre), EAGA Partnership and Tyne Tees TV. Phase 2, Keel Row,
was completed in October 2004. It is 3,300 m2 studio office development
comprising of thirteen units ranging from 160m2 to 539m2 , with occupiers
including J B Skillcare, Ian Bensham Associates, Lambert Laidlaw, City &
Northern, Easter Group, Russell Telecom and Gateshead LEAWatermark
Phases 3 and 4 are scheduled for completion in May 2006. Phase 3,
Bankside, will consist of 16 studio office units providing a total office
floorspace of 3306m2. Watermark Phase 4, Staiths, consists of six two
storey office units (four units of 434m2, one unit 383m2 and one unit 902m2)
that will provide 2984 m2 of office floorspace.
2.5 A Northern Electric compound, which accommodates a sub-station and main
overhead power supplies, is located off Handy Dive. Costco Warehouse Club
is located between the River and the Northern Electric compound. The
remainder of the site is vacant.
2.6 Development of MetroCentre and Riverside Way/ Handy Drive has
transformed the character and potential of the area. The site occupies a
highly marketable prime location, in a prominent riverside setting near to
the A1. It is highly accessible and has the potential to develop good
connections to public transport nodes, with a large labour catchment area.
The Derwenthaugh/MetroCentre employment area is a regionally significant
employment centre, which provides local employment and significant
numbers of workers from Tyne & Wear as well as districts in Durham. Parts of
the available employment site are within 500m of the MetroCentre Public
Transport Interchange and therefore in accordance with PPS6 office
development should be regarded as edge-of-centre locations for the purposes
of the sequential approach.
2.7 The site is one of only three employment sites in Gateshead larger than 10
hectares. It makes an important contribution to Gateshead’s employment
land portfolio and the amount of employment land Gateshead is required to
IPA 16 North of MetroCentre Development Brief
Gateshead UDP Re-Deposit Draft Replace20063
provide under the emerging Regional Spatial Strategy i.e. 100ha. It has
strategic potential, and is capable of being developed by several large users.
Economic development of the site will contribute to the regeneration of the
Tyne Corridor within the Tyne and Wear City Region within a core urban area
and within close proximity to a public transport node. These are spatial
priorities for economic growth within the emerging Regional Spatial Strategy,
the Tyne and Wear Economic Strategy (2005), City Region Development
Programmes for Tyne and Wear (2005) and the Draft Regional Economic
Strategy (2006). ONE Northeast, the Regional Development Agency, are a
statutory consultee who may need to be consulted about applications on this
site given the potential impact upon regional/sub-regional investment and
employment.
2.8 The site (or part of the site) may have the potential to accommodate
sustainable waste management facilities given its proximity to large
commercial and industrial waste sources, including the MetroCentre, and
the importance of communities to take responsibility for their own waste.
2.9 The attached plan illustrates the split of land uses on the site.
Planning History
2.10 There have been a number of planning applications on this site, from west
to east the available parcels of land are covered by the following
applications:
• The Watermark – planning permission for a mix of 2 and 3 storey offices
and studio office units (ref 920/00, 164/01, DC/03/00739/FUL,
DC/03/01339/FUL, DC/04/02059/REM & DC/05/01644/REM)
• Planning permission has been granted for some complementary
supporting uses including retail/café mixed use development
(DC/05/01645/FUL) and a change of use from office to a learning centre
(DC/05/01601/COU) within the Watermark.
• Land between Metro Riverside Park and Costco - planning permission was
refused in August 1998 for: “Reclamation and landraising works,
construction of access roads and development of 11.7 ha of land for
IPA 16 North of MetroCentre Development Brief
Gateshead UDP Re-Deposit Draft Replace20064
development of leisure and restaurant facilities (use classes D2 and A3)
and associated car parking, servicing and landscaping together with the
re-alignment of Mandela Way.”
• Land to the east of Costco – Reserved matters planning permission was
granted on 12 August 1996 (ref 159/96) for a mixed use development on
the Wing Hong land towards the east of the site. The scheme was for a
Chinese village and incorporates a cash and carry warehouse,
restaurants, offices, commercial units and security flats.
• A number of planning applications have been withdrawn on the land
east of Costco:
-DC/03/00409/FUL (erection of one single and one two-storey building)
in October 2003;
- DC/04/01545/OUT (new build development of 3 storey office buildings
and car parking) in October 2004;
-DC/04/01546/FUL (new build development of 13 single storey trade
units with associated service road/ yard and car parking and 2 storey
speculative office building with undercraft parking and separate visitor
parking site signage) in September 2004;
-DC/04/01826/FUL (Erection of 13 single-storey trade units (use classes
B1, B2, B8) with associated service road and car parking (Phase 1 -
detailed application) and outline permission sought for Phases 2 and 3
(use classes B1, B2, B8) in January 2005;
-DC/04/01823/OUT (new build development of 3 storey office buildings
and car parking) in November 2004.
Ownership
2.11 The site is in private ownership. The main property owners of the vacant
land (from west to east) are:
• Church Commissioners
• UK Land Estates
• Mr Cheng (Wing Hong)
• T J Thompson
IPA 16 North of MetroCentre Development Brief
Gateshead UDP Re-Deposit Draft Replace20065
Services
2.12 It is understood that all services (water, drainage, electricity, gas and
telephone) are available, but developers should satisfy themselves that this
is so.
Ground Conditions/ Methane
2.13 The western end of the site is within the 250 metre consultation zone of a
former landfill site. Site investigations have revealed the presence of
methane. Further advice can be obtained from the Environment Agency.
3. DEVELOPMENT PLAN
3.1 The Re-Deposit Draft Replacement Gateshead UDP provides the policy
context for the preparation of an acceptable development scheme.
Developers should consult the UDP Written Statement to identify relevant
policies and to note proposals for the area surrounding the site.
3.2 General policies on new employment development are contained in Chapter
7, “Jobs and Employment”. These policies aim to improve employment
opportunities in the Borough but also recognise that the long term economic
future of the area depends on continuing and strengthening environmental
protection and enhancement. The following policies will be particularly
relevant in the consideration of any planning application for the
development of the site:
• General Development Control Policy (DC1, DC2, DC3, DC4, DC5)
• Planning Obligations (PO1 and PO2)
• Primary Employment Areas (JE1)
• Sustainable Economic Development (JE4)
• Transport Network (T1)
• River Tyne Corridor(T6)
• Character and Design (ENV3)
• Green Corridors (ENV28)
• Open Space in Retail and Employment Uses Developments (ENV29)
IPA 16 North of MetroCentre Development Brief
Gateshead UDP Re-Deposit Draft Replace20066
• Crime Prevention (ENV30)
• Creating an Accessible and Inclusive Environment (ENV32)
• The Durham Biodiversity Action Plan (ENV6)
• Wildlife Habitats (ENV47)
• Sites of Nature Conservation Importance (ENV49)
• Wildlife Corridors (ENV51)
• Flood Risk (ENV 57)
• Micro-renewables, energy efficiency and sustainable design (MWR36)
• Appendix 1 – Employment Sites
Land Allocation
3.3 Within the Re-Deposit Draft Replacement UDP the site is allocated for
employment uses and lies within the Dunston Primary Employment Area.
The site could, subject to detailed considerations, be developed for any
type of employment uses falling within use classes B1, B2 and B8 (Policy
JE1). Exceptions may be made for complementary supporting uses A1, A2,
A3, A5 and D1 (less than 200 sq m) where the uses would meet the needs of
the employment area’s workers (Policy JE1). Provision of these small scale
community facilities should reduce the need to travel, develop linkages
between uses, improve the vitality of the employment area and should not
undermine the vitality and viability of existing centres.
4. GENERAL REQUIREMENTS
4.1 A number of requirements apply to all sites:
• IPA 1 Crime Prevention in New Development
• IPA 3 Provision of Open Space and Landscaping on New Developments
• IPA 11Parking Standards
5. SPECIFIC REQUIREMENTS
IPA 16 North of MetroCentre Development Brief
Gateshead UDP Re-Deposit Draft Replace20067
Design
5.1 The design should reflect the site’s prominent location on the river frontage
and its relationship with the MetroCentre.
5.2 For any large portion of the site it is essential that its overall layout will be
decided upon at the outset by a planning application showing roads,
footpaths, landscaping and other infrastructure. The forthcoming
amendment to the Town and Country Planning (General Development
Procedure) Order is anticipated to come into force in April 2006. Design and
Access Statements will then be required be submitted with most planning
applications and should be in accordance with Government guidance.
5.3 Development will need to meet the policy requirements of Policy MWR36 in
order to minimise energy and resource consumption and reduce carbon
emissions. All development should achieve BREEAM very good or excellent
rating through the incorporation of sustainable building design measures. In
addition, development with a floorspace of 1,000m2 should, wherever
feasible, incorporate renewable energy production equipment to provide at
least 10% of the predicted energy requirements.
Access/ Highway Implications
5.4 Three vehicular access points have been constructed into the site off
Riverside Way and Handy Drive. There is the potential for a fourth at the
eastern end of the site.
5.5 Increasing levels of congestion on the A1 through Tyneside are a major
concern for the Council and the Highways Agency. This concern has led the
Highways Agency to direct refusal for a number of planning applications for
developments where the Agency felt that the traffic generated by the
proposals would have an adverse impact on the trunk road.
5.7 In order to try to ease this situation, the Council and Highways Agency have
jointly commissioned a study to determine the likely traffic generations of
IPA 16 North of MetroCentre Development Brief
Gateshead UDP Re-Deposit Draft Replace20068
development sites in the MetroCentre area and look at how this generated
traffic can be managed to minimise impact on the trunk road.
5.8 Potential developers should be aware that a stringent approach to demand
management must be employed in developing and subsequently managing
the use of the site. In addition, proposals for the site must take full account
of the outcomes of the above study.
5.9 Development on the site should take account of the operation of Centrelink,
a dedicated bus route from Gateshead Town Centre to the MetroCentre,
running along the southern edge of the site. The site must be integrated
with the local bus network and the potential for, and benefits of,
integration with the MetroCentre shuttle services must be fully investigated,
in order to provide a public transport link with the MetroCentre bus and rail
stations.
5.10 Development should also take account of the need to maintain an access
capable of carrying vehicles adjacent to the river’s edge for maintenance
purposes. Any works to the river should maintain or enhance the existing
areas of inter-tidal mud. The developers should be aware that the prior
consent from the Environment Agency is required for any development
within the main river bye-law distance (5m) in addition to planning
permission.
5.11 A Transport Assessment and Travel Plan will normally need to be submitted
as part of any planning application for the development of the site.
Recreational Riverside Route
5.12 The UDP requires the provision of a continuous recreational riverside route
of between 10-30 metres in width, within a landscaped setting linked with
any future development (Policy T6), this route is also identified as a Green
Corridor (Policy ENV28). The line of the recreational route and the width
and form of the landscape strip will largely be determined by their
IPA 16 North of MetroCentre Development Brief
Gateshead UDP Re-Deposit Draft Replace20069
relationship to the Tidal Mud Flats SNCI and adjoining open ground noted in
paragraph 5.12.
5.13 The recreational riverside route should link with the existing footpath that
runs along the eastern side of the River Derwent in order to ensure it is part
of the network of pedestrian routes and green corridors within the general
area. This may require the creation of a pedestrian and cycle route over/
under the railway line at the western end of the site.
5.14 Pedestrian links should be provided between each portion of the site and to
the bus and rail stations at the MetroCentre. These should include a fully
segregated footpath link from the recreational riverside route to the
MetroCentre. This will require a safe pedestrian link to the MetroCentre
public transport interchange.
5.15 Developers would be required to contribute towards the riverside
recreational route:
• Where the route crosses an application site, developers would be
required to construct that section of the riverside route.
• Where the route lies outside an application site, developers would be
required to provide suitable links to the riverside route from their
development.
Works would be required to be in accordance with the construction
standards detailed within the Council’s Cycle Strategy (IPA 10 ).
Nature Conservation
5.16 The Tidal Mud Flats SNCI adjacent to the site is an increasingly significant
habitat for birds of regional significance. This area, and the adjoining open
ground, will require sensitive handling to avoid disturbing the birds and to
provide opportunities to observe them, without prejudicing the use of the
riverside for informal recreation, including the recreational riverside route.
It should be possible to incorporate a “buffer” zone between development
and the mud flats, without prejudicing the development potential of the
IPA 16 North of MetroCentre Development Brief
Gateshead UDP Re-Deposit Draft Replace200610
riverside setting. This zone will provide opportunities for complementary
habitat creation in relation to birds feeding on the mud flats.
5.17 Otters are also known to use this section of the River Tyne. Otters and their
habitats are afforded statutory protection under European Law. This
species is also susceptible to disturbance, underlining the need for
sympathetic design of the river frontage. Developers will need to check for
the presence of otters and other protected species and extent of impact of
development before planning permission can be granted.
Landscaping
5.18 Full landscaping details should be submitted as part of any planning
application for this site. Landscaping proposals should have regard to the
site’s location within a wildlife corridor and its close proximity to the Tidal
Mud Flats SNCI.
Drainage
5.19 Surface water drainage into the Rivers Tyne and Derwent will need to be
controlled to ensure that there is no adverse effect on wildlife within the
Tidal Mud Flats SNCI. An assessment of the proposed drainage system should
be undertaken during various stages of flood as part of the Flood Risk
Assessment. It may be appropriate to utilise sustainable drainage system
(SuDS) within the landscape strips provided there would be no adverse
impact on the Tidal Mud Flats SNCI.
Flooding
5.20 Based upon the current Environment Agency Flood Zone Map the site is
within a high (3) and medium (2) risk flood risk zones1. As part of any
application for development in accordance with Policy ENV57 a satisfactory
Flood Risk Assessment should be submitted. This should have regard to the
Environment Agency’s technical guidance notes on Flood Risk Assessments
1 Flood Zone 3 covers all land where there is a 1 in 100 (1%) or greater chance of flooding from rivers in any one year or a 1 in 200 (0.5%) or greater chance of flooding from tidal/coastal sources in any one year. Flood Zone 2 covers all land where there is a between a 1 in 100 and 1 in 1000 (1%
IPA 16 North of MetroCentre Development Brief
Gateshead UDP Re-Deposit Draft Replace200611
and it is probable that the Council will require the applicant to submit with
FRA a Letter of Compliance from the Environment Agency. The land may
need to be raised but this would have to be in accordance with the advice
of the Environment Agency and the Flood Risk Assessment and there should
be no adverse impact upon Tidal Mud Flats SNCI. In relation to the Costco
Warehouse Club and other planning applications, the Environment Agency
advised a minimum floor level of 4.55 metres AOD.
Contamination
5.21 The ground conditions of the site are such that ground water and tidal
influence could result in an aqueous migration of contaminants. It is
therefore essential that developers address contamination in an integrated
and comprehensive manner and investigation and remediation may well
have to be undertaken in conjunction with adjoining landowners.
-0.1% ) chance of flooding from rivers in any one year and between a 1 in 200 and 1 in 1000 (0.5% - 0.1%) chance of flooding from the sea in any one year.
IPA 16 North of MetroCentre Development Brief
Gateshead UDP Re-Deposit Draft Replace200612
IPA 16 North of MetroCentre Development Brief
Gateshead UDP Re-Deposit Draft Replace200613
IPA
16 N
orth
of
Met
roCe
ntre