    ap

    pendixA

    44

    SampleofInspectionandTestPlan(ITP)

    Project:

    Scope

    ofWork:InstallationofExternalPrecastWalls

    Activity

    Responsibility

    S/No

    Inspection

    Method

    Requirement

    Reference

    Acceptance

    Criteria

    Stage/Freque

    ncy

    Records

    SUBMISSION

    1

    INCOMINGMATERIALSINSPECTION

    2 LE

    GEND

    Submitshopdrawingsandassociatedca

    lculations,method

    statements,materialsamplesforappro

    val

    MC/ADO

    1.1

    Review

    Specifications

    Conformto

    specifications

    Priortostartw

    ork

    Approved

    submissions

    Submitdesignmixofconcreteandcon

    stituentmaterials

    forapproval

    MC/ADO

    1.2

    Review

    Specifications

    Conformto

    specifications

    Priortostartw

    ork

    Approved

    submissions

    Pr

    eparedby

    Date

    Verifiedby

    Date

    Approvedby

    Date

    MCMaincontra

    ctor/Installer

    ADOArchitect/Designer/Owner

    AppendixA

    Carryoutinspectionofprecastwallpane

    ls(goodcondition,

    liftingpoints,connections)

    MC/ADO

    2.1

    Visual

    Section4

    Conformto

    specifications

    Eachdeliver

    y

    Deliverydocket

    Carryoutinspectionofgroutingmaterialsandprepacked

    skimmingmortar(confirmtypeandquantity)

    MC/ADO

    2.2

    Visual

    Section3and4

    Asperapproved

    samples

    Eachdeliver

    y

    Deliverydocket

    PRE-ERECTION

    3

    Settingout

    MC/ADO

    3.1

    Visual

    Drawings

    Conformtodrawings

    Foreachlocation

    Checklist

    Temporarysupports

    MC

    3.2

    Visual

    Specifications/

    Methodstatement

    Conformto

    specifications/

    methodstatement

    Foreachlocation

    Checklist

    Jointsandconnections(surfacecondition,starterbars,

    shimplatelevel,waterproofingstrip,etc)

    MC

    3.3

    Visual/Measure

    Specifications/

    Methodstatement

    Conformto

    specifications/

    methodstatement

    Foreachlocation

    Checklist

    INSTALLATION

    4

    Connectiondetails/interfacerequirem

    ents/jointseals

    (includingwaterproofingtreatmenteg,backerrod,sealant,

    waterproofingstrip,grouting)

    MC/ADO

    4.1

    Visual

    Specifications/

    Methodstatement

    Conformto

    specifications/

    methodstatement

    Foreachlocation

    Checklist

    Installedpanelverticality,levelandalignment

    MC/ADO

    4.2

    Visual/Measure

    Specifications

    Conformto

    specifications

    Foreachlocation

    Checklist

    Wetjointsexposedsurface

    MC

    4.3

    Visual

    Section5

    Conformto

    specifications

    Foreachlocation

    Checklist

  • 8/3/2019 .._Iquas_gpgs_WEWall_WEWAppendix

    2/11

    45

    ap

    pendixA

    SampleofInspectionandTestPlan(contd)

    Project:

    Scope

    ofWork:InstallationofExternalPrecastWalls

    Activity

    Responsibility

    S/No

    Inspection

    Method

    Requirement

    Reference

    Acceptance

    Criteria

    Stage/Freque

    ncy

    Records

    PREPARATIONFORSKIMMING

    5

    APPLICATIONOFSKIMCOAT

    6 LE

    GEND

    Handoverprecastworkstofinishingw

    orks,including

    clearancefromothertrades

    MC

    5.1

    Visual

    Section5

    Conformto

    specifications

    Foreachlocation

    Checklist

    Checkpreparationofsubstratetoreceive

    finishing,including

    M&Eservices

    MC/ADO

    5.2

    Visual

    Section5

    Conformto

    specifications/

    methodstatement

    Foreachlocation

    Checklist

    Pr

    eparedby

    Date

    Verifiedby

    Date

    Approvedby

    Date

    MCMaincontra

    ctor/Installer

    ADOArchitect/Designer/Owner

    Skimmingmortarmixing

    MC/ADO

    6.1

    Visual

    Section5

    Conformto

    specifications/

    methodstatement

    Inprocess

    Checklist

    Checkapplicationofskimcoat(finishedsurfacefor

    evenness,squarenessandplumb).Allrectificationworks

    shouldbecompletedbeforepaintingw

    orks.

    MC/ADO

    6.2

    Visual

    Section5

    Conformto

    specifications/

    methodstatement

    Foreachlocation

    Checklist

    FINALINSPECTION

    7

    Checkforanycracksonfinishedsurface

    MC/ADO

    7.1

    Visual

    Specifications

    Conformto

    specifications

    Perlocation

    Checklist

    Carryoutwatertightnessteston

    -

    Externalwallpanels

    -

    Jointsbetweenexternalwallandwindowframe

    MC/ADO

    7.2

    Visual

    Section6

    -Nodampness

    -Noleakage

    Asperrequired

    Testrecords

    AppendixA

  • 8/3/2019 .._Iquas_gpgs_WEWall_WEWAppendix

    3/11

    ap

    pendixA

    46

    SampleofInspectionandTestPlan(ITP)

    Project:

    Scope

    ofWork:ExternalCastIn-SituReinforcedConcreteWalls

    Activity

    Responsibility

    S/No

    Inspection

    Method

    Requirement

    Reference

    Acceptance

    Criteria

    Stage/Freque

    ncy

    Records

    SUBMISSION

    1

    INCOMINGMATERIALSINSPE

    CTION

    2 LE

    GEND

    Submitdesignmixofconcreteandcon

    stituentmaterials

    forapproval

    MC/ADO

    1.1

    Review

    Specifications

    Conformto

    specifications

    Priortostartw

    ork

    Approved

    submission

    Submitshopdrawingsandmethodstate

    mentsforapproval

    MC/ADO

    1.2

    Review

    Specifications

    Conformto

    specifications

    Priortostartw

    ork

    Approved

    submission

    Pr

    eparedby

    Date

    Verifiedby

    Date

    Approvedby

    Date

    MCMaincontra

    ctor/Contractor

    ADOArchitect/

    Designer/Owner

    Carryoutinspectionofrebar

    MC/ADO

    2.1

    Visual

    MillCerts

    MillCerts

    Eachdeliver

    y

    Deliverydocket

    Carryoutinspectionofgroutingmater

    ialsforformtie

    holesandjointrepair

    MC/ADO

    2.2

    Visual

    Specifications

    Asperapproved

    samples

    Eachdeliver

    y

    Deliverydocket

    Carryoutconcretereceivinginspection

    (checkslump&

    concretecubesampling)

    MC

    2.3

    Visual/Measure

    Approved

    designmix

    Conformto

    specifications

    Eachtruckload

    Deliverydocket

    Carryoutinspectionofprepackedmortarmixesforfinishing

    works(confirmtypeandquantity).

    -Foron-sitemixingofcement/sand,inspectplastering

    sand(siltcontent),cementandadm

    ixtures

    MC/ADO

    2.4

    Visual/Measure

    Section3and4

    Asperapproved

    samples

    S

    iltcontentofplastering

    sand5

    %bymass

    Eachdeliver

    y

    Onesamplep

    er

    delivery

    Deliverydocket

    and

    Testrecords

    PREPARATIONANDCONCRET

    ING

    3

    Carryoutinspectionpriortoclosingfo

    rmwork

    MC/ADO

    3.1

    Visual

    Drawings

    Conformtodrawings

    Foreachcasting

    area

    Checklist

    Monitorconcreteplacement(confirmthatvibration,spread,

    dischargeratecomplieswithspecs,monitordeliveryinterval,

    waste&cumulativequantity)

    MC

    3.2

    Visual

    Specifications/

    Methodstatement

    Conformto

    specifications/

    methodstatement

    Everycasting

    Checklist

    INSPECTIONOFCASTIN-SITU

    CONCRETEWALL

    4

    Post-pourinspection(formworkstrippin

    g,finishedconcrete

    surface,verticality,concretecuring)

    MC

    4.1

    Visual

    Drawings

    Specifications/

    Methodstatement

    Aftercasting

    /

    Everystorey

    Checklist

    Concretestrength(analysisofcubetestresults)

    MC/ADO

    4.2

    Visual

    Drawings

    Specifications

    Aftercasting

    /

    Everystorey

    Testrecords

    Sealformtieholesandrepairjoints/cracks

    MC

    4.3

    Visual

    Drawings

    Methodstatement

    Priortowallfinishing

    Checklist

    AppendixA

  • 8/3/2019 .._Iquas_gpgs_WEWall_WEWAppendix

    4/11

    47

    ap

    pendixA

    AppendixA

    SampleofInspectionandTestPlan(contd)

    Project:

    Scope

    ofWork:ExternalCastIn-SituReinforcedConcreteWalls

    Activity

    Responsibility

    S/No

    Inspection

    Method

    Requirement

    Reference

    Acceptance

    Criteria

    Stage/Freque

    ncy

    Records

    PREPARATIONFORFINISHING

    WORKS

    5

    FINISHINGWORKS(IN-PROCESSINSPECTION)

    6 LE

    GEND

    HandoverRCworkstofinishingworks

    -

    Checkverticality/horizontalityofoff-formRCsurface

    anddecidethicknessofplaster/skim

    coat

    -

    Checkclearancefromothertrades

    MC/ADO

    5.1

    Visual/

    Measure

    Section5

    Conformto

    specifications/drawings

    Perlocation

    Checklist

    Checkpreparationofsubstratetoreceivefinishing

    -

    Ifplasteringisrequired,checkapplicationofspatterdash

    coat,settingoutandlevelpacks,an

    glebeads,groove

    line,etc

    MC/ADO

    5.2

    Visual

    Section5

    Conformto

    specifications/

    methodstatement

    Perlocation

    Checklist

    Pr

    eparedby

    Date

    Verifiedby

    Date

    Approvedby

    Date

    MCMaincontra

    ctor/Contractor

    ADOArchitect/

    Designer/Owner

    Cementmortarmixing

    MC/ADO

    6.1

    Visual

    Section5

    Conformto

    specifications/

    methodstatement

    Inprocess

    Checklist

    Checkapplicationofskimcoat(orplas

    tering,ifrequired).

    Forplastering,checkundercoat(scratch

    edandsufficiently

    cured),secondandfinalcoat.

    Inspectfinishedsurfaceforevenness,squareness,plumb

    andhollowness(forplasteredsurface).Allrectification

    worksshouldbecompletedbeforepaintingworks.

    6.2

    FINALINSPECTION

    7

    Checkforanycracksonfinishedsurface

    MC/ADO

    7.1

    Visual

    Section5

    Conformto

    specifications

    Perlocation

    Checklist

    Forplasteredsurfaces,carryoutpull-outtestoncompleted

    plasterworkandcheckforhollowness

    MC/ADO

    7.2

    Measure

    Section6

    Conformto

    specifications

    Asperrequired

    Testrecords

    Carryoutwatertightnessteston

    -

    Externalwallpanels

    -

    Jointsbetweenexternalwallandwi

    ndowframe

    MC/ADO

    7.3

    Visual

    Section6

    -Nodampness

    -Noleakage

    Asperrequired

    Testrecords

    MC/ADO

    Visual

    Section5

    Conformto

    specifications/

    methodstatement

    Perlocation

    Checklist

  • 8/3/2019 .._Iquas_gpgs_WEWall_WEWAppendix

    5/11

    ap

    pendixA

    48

    AppendixA

    SampleofInspectionandTestPlan(ITP)

    Project:

    Scope

    ofWork:ExternalBrickwalls

    Activity

    Responsibility

    S/No

    Inspection

    Method

    Requirement

    Reference

    Acceptance

    Criteria

    Stage/Freque

    ncy

    Records

    SUBMISSION

    1

    INCOMINGMATERIALSINSPE

    CTION

    2 LE

    GEND

    Submitmaterialsamples,shopdrawings,methodstatements

    forapproval

    MC/ADO

    1.1

    Review

    Specifications/

    drawings

    Conformto

    specifications/drawings

    Priortostartwork/

    eachsample

    Approved

    submissions

    Pr

    eparedby

    Date

    Verifiedby

    Date

    Approvedby

    Date

    MCMaincontra

    ctor/Contractor

    ADOArchitect/

    Designer/Owner

    Carryoutinspectionofbrick,sand&cementforbrickwork

    (confirmgrade,type&quantity)

    MC

    2.1

    Visual

    Section4

    Asperapproved

    sample

    Eachdeliver

    y

    Delivery

    dockets

    Carryoutinspectionofjointingmaterials(bondingbars,

    lintels,etc)anddamp-proofmaterials

    MC

    2.2

    Visual

    Section4

    Asperapproved

    sample

    Eachdeliver

    y

    Delivery

    dockets

    Carryoutinspectionofprepackedmortarmixesfor

    plastering(confirmtypeandquantity)

    -Foron-sitemixingofcement/sand,inspectplastering

    sand(siltcontent),cementandadm

    ixtures

    MC/ADO

    2.3

    Visual/

    Measure

    Section3and4

    Asperapproved

    sample

    S

    iltcontentofplastering

    sand5

    %bymass

    Eachdeliver

    y

    Onesample

    perdelivery

    Delivery

    docketsand

    TestRegister

    PREPARATIONANDINSTALLATION

    3

    Structuralclearanceandsettingout

    MC/ADO

    3.1

    Visual

    Section5

    Conformtoshop

    drawings

    Perunit/

    Priortostartw

    ork

    Checklist

    Cementmortarmixing

    MC/ADO

    3.2

    Visual

    Section5

    Conformtomethod

    statement

    Inprocess

    Checklist

    Checkcompleted1stcoursebrickwall

    MC/ADO

    3.3

    Visual

    Section5

    Conformtoshop

    drawings/method

    statement

    Perunit

    Checklist

    Buildremainingbrickwallsto1/2heigh

    tandthen

    fullheight

    MC/ADO

    3.4

    Visual

    Section5

    Conformtoshop

    drawings/method

    statement

    Perunit

    Checklist

    INSPECTIONOFBRICKWORK

    4

    Carryoutinspectionofcompletedbric

    kwork

    -properpackingupofallgapsabovelastcourseofbricks

    -Openingfordoor/window/otherser

    vices

    MC/ADO

    4.1

    Visual

    Section5

    Conformtoshop

    drawings

    Perunit

    Checklist

  • 8/3/2019 .._Iquas_gpgs_WEWall_WEWAppendix

    6/11

    49

    ap

    pendixA

    AppendixA

    SampleofInspectionandTestPlan(contd)

    Project:

    Scope

    ofWork:ExternalBrickwalls

    Activity

    Responsibility

    S/No

    Inspection

    Method

    Requirement

    Reference

    Acceptance

    Criteria

    Stage/Freque

    ncy

    Records

    PREPARATIONFORPLASTERIN

    GWORK

    5

    PLASTERINGWORKS(IN-PROCESSINSPECTION)

    6 LE

    GEND

    Handoverareasfrombrickworkstoplasteringworks

    includingclearancefromothertrades

    MC

    5.1

    Visual

    Section5

    Conformto

    specifications/drawings

    Perlocation

    Checklist

    Pr

    eparedby

    Date

    Verifiedby

    Date

    Approvedby

    Date

    MCMaincontra

    ctor/Contractor

    ADOArchitect/

    Designer/Owner

    Checkpreparationofbricksubstrateto

    receiveplastering.

    Checksettingoutandlevelpacks,anglebeads,metallath,

    grooveline,movementjoints,etc

    MC/ADO

    5.2

    Visual

    Section5

    Conformto

    specifications/method

    statement

    Perlocation

    Checklist

    Cementmortarmixing

    MC/ADO

    6.1

    Visual

    Section5

    Conformto

    specifications/method

    statement

    Inprocess

    Checklist

    Checkapplicationofundercoat(scratch

    edandsufficiently

    cured),secondandfinalcoat.Inspectfinishedsurface

    forevenness,squareness,plumband

    hollowness.

    Allrectificationworksshouldbecom

    pletedbefore

    paintingworks.

    MC/ADO

    6.2

    Visual

    Section5

    Conformto

    specifications/method

    statement

    Perlocation

    Checklist

    FINALINSPECTION

    7

    Checkforanycracksonfinishedsurface

    MC/ADO

    7.1

    Visual

    Section5

    Conformto

    specifications

    Perlocation

    Checklist

    Carryoutpull-outtestoncompletedpla

    sterworkandcheck

    forhollowness

    MC/ADO

    7.2

    Measure

    Section6

    Conformto

    specifications

    Asperrequired

    Testrecords

    Carryoutwatertightnessteston

    -Externalwallpanels

    -Jointsbetweenexternalwallandwin

    dowframe

    MC/ADO

    7.3

    Visual

    Section6

    -Nodampness

    -Noleakage

    Asperrequired

    Testrecords

  • 8/3/2019 .._Iquas_gpgs_WEWall_WEWAppendix

    7/11

    ap

    pendixB

    50

    Appendix B

    Sample Checklist for Installation of External Precast Walls

    Project:

    Location:

    Checklist

    Dimensions ( within tolerance)

    Overall cond itions- No chipped/ cracked sections- Flatness- Clean lin ess

    Lifting points/inserts (position, physical condition)

    Sleeve system/con nections- Starter bars (length, size, spacing)- Loop and lapping bars (length, size)- Corrugated sleeve (position, cleanliness)

    M&E services present, if any ( po sition, p hysical cond ition )

    RECEIVING INSPECTION

    Inspection Remarks

    CHECKS PRIOR TO HOISTING

    Date Result/#

    Signature

    Gridline p osition ( setting ou t lines and level)

    Temporary supports (adequate propping bracing)

    Surface condition of joint (cleanliness from dust, debris)

    Starter bars from lower floor (n um ber, spacing, size, length)

    Shim plate level

    Backer Rod / Waterproofing strip po sition

    Standby grout materials

    INSTALLATION OF PRECAST WALLS

    Connection details (including proper grouting at horizontal joints)

    Interface requirements/ loop bars/continuity bars/backerrod/formwork

    Verticality of installed p anel

    Alignment between panels

    Level of in stalled pan el

    Joint and seal

    Wet joints exposed surface

    PREPARATION FOR SKIMMING

    Clearance from precast works (includ ing oth er related trades)

    Wash surface thoroughly with high pressure water jet

    Check cleanliness and dampening of substrate

    APPLICATION OF SKIM COAT

    Mixing of skimming mortar (mixing proportion , use of mechanicalmixer, consistency of mix)

    App lication of skim coat (th ickness, evenn ess, curing)

    FINAL INSPECTION

    Surface condition/evenness

    No visible cracks or d amages

    Watertightn ess Test (no leakage or dam pn ess)- External wall panels- Joints between external wall and window frame

  • 8/3/2019 .._Iquas_gpgs_WEWall_WEWAppendix

    8/11

    51

    ap

    pendixB

    Appendix B

    Sample Checklist for Construction of External Cast In-Situ Reinforced Concrete Walls

    Project:

    Location:

    Checklist

    Setting ou t / level

    Formwork condition

    Dimension

    Alignm ent and plum b

    Bracing and struttin g

    Service opening, etc

    Construction join tNo. of rebars

    Rebar size (diam eter)

    Rebar cover

    Position and spacing

    Ancho rage / lap length

    Links / stirrups / starter bars

    Rebar cond ition

    Installation

    Secured prop erly

    Bent properly

    No visual damage

    Check quality of concrete before placing e.g. water-cemen t ratio,slump test, etc.

    PREPARATION

    Inspection Remarks

    Date Result/#

    Signature

    CONCRETING STAGE

    Concrete placing (en sure thorou gh comp action)

    PREPARATION FOR FINISHING WORK

    Clearance from RC works (including rectification o f RC alignment,brickworks and oth er related trades)

    Wash surface thoroughly with high pressure water jet

    FORMWORK

    REBAR

    M&E

    SERVICES

    INSPECTION ( FINISHED CONCRETE)

    Dimension

    Alignm ent / plum b / level

    Exposed surface

    Concrete joints

    Sealing of form tie h oles

    FINISHING WORKS (IN-PROCESS)

    App lication of skim coat

    For plastered RC walls, check:- settin g out- application of spatterdash coat- reinforcement lathing (where applicable)- application and thickness of undercoat (compactness and

    scratched), second an d final coat, includin g proper surfacepreparation and adequate curing for every coat

  • 8/3/2019 .._Iquas_gpgs_WEWall_WEWAppendix

    9/11

    ap

    pendixB

    52

    Sample Checklist for Con struction of External Cast In-Situ Reinforced Con crete Walls (con td)

    Project:

    Location:

    Checklist

    Plumb

    Straightness of corners/join ts

    Surface condition/evenness

    No visible cracks or d amages

    No h ollowness and good adh esion of plaster on RC walls

    Watertightn ess Test (no leakage or dam pn ess)

    - External wall panels- Joints between external wall and window frame

    FINAL INSPECTION OF FINISHING

    Inspection Remarks

    Date Result/#

    Signature

    Appendix B

  • 8/3/2019 .._Iquas_gpgs_WEWall_WEWAppendix

    10/11

    53

    ap

    pendixB

    Appendix B

    Samp le Checklist for Constru ction of Plastered Brickwalls

    Project:

    Location:

    Checklist

    Cond ition o f brick un its (no physical damage)

    RC surface receiving bricks

    Moisten bricks

    Structural clearance and set reference lines

    Mixing of beddin g mortar and mixing proportion

    PREPARATION

    Inspection Remarks

    Date Result/#

    Signature

    FIRST COURSE

    Type of bricks

    Type of bon d

    Wall thickness

    Brick joint width

    First course setting out

    Provision of stiffener

    ERECTION OF BRICKWALL

    Damp-proof course (if any)

    Bond ing bars

    Reinforcement lathingJoint width

    Lintels

    Laid in two operations in half heights

    Gap between top course of brickwork and beam soffit properlygrouted

    INSPECTION OF COMPLETED BRICKWORK

    Surface and edge are plain an d vertical

    No cracked and chipped bricks

    Joints properly filled with mortar

    PREPARATION FOR PLASTERING WORK

    Clearance from brickwork and oth er related trades

    Wash surface by h igh p ressure water jet ( loose particles, o rganicgrowth etc, removed thoroughly)

    Check:- setting out / level pack- cleanliness and dampening of substrate- Angle beads, groove line, etc- reinforcement lathing (where applicable)

    PLASTERING WORK (IN-PROCESS)

    Plastering mo rtar (Mixing proportion , use of mechanical mixer,consistency of mix)

    Application and thickness of undercoat (compactness and

    scratched), second an d final coat, includin g proper surfacepreparation and adequate curing for every coat

  • 8/3/2019 .._Iquas_gpgs_WEWall_WEWAppendix

    11/11

    ap

    pendixB

    54

    Samp le Checklist for Constru ction of Plastered Brickwalls (con td)

    Project:

    Location:

    Checklist

    Plumb

    Straightness of corners/join ts

    Surface con dition /eveness

    No visible cracks or d amages

    No h ollowness

    Good Adhesion

    Watertightn ess Test (no leakage or dam pn ess)- External wall panels- Joints between external wall and window frame

    FINAL INSPECTION

    Inspection Remarks

    Date Result/#

    Signature

    Appendix B