+ All Categories
Home > Documents > Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5...

Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5...

Date post: 21-Aug-2020
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
42
Iraq
Transcript
Page 1: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

Iraq

Page 2: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

Acknowledgments

The (I)NDC Content Briefs were produced by the Climate Policy

Team of the World Bank Climate Change Group. The team was led

by Sebastian Wienges and Ana Bucher under the supervision of

Stephen Alan Hammer. Detail analysis of country (I)NDC was

provided by Tom Witt, Jiawei Song, Karan Chouksey (mitigation

components), Yin Qiu, Yunziyi Lang, and Prajwal Baral (adaptation

components). The team is grateful for all comments and

suggestions received from regional and sector specialists

regarding the presentation and synthesis of relevant information.

© 2016 International Bank for Reconstruction and Development/The World Bank 1818 H Street NW Washington DC 20433, U.S.A. Internet: www.worldbank.org

Climate Policy Team | World Bank Group

Page 3: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

Introduction      In response to a growing interest in understanding (Intended) Nationally DeterminedContributions ((I)NDCs) and with regard to the ultimate goal of supporting countries'implementation of their national climate targets, the World Bank Climate Policy Team (WB­CPT) has

reviewed all developing countries (I)NDCs' submitted to the UNFCCC. The (I)NDC Content Brief

aims to provide a summary analysis of existing and instead country mitigation and adaptation

policies and plans, commitments and targets, implementation strategies and sector priorities,

associated costs and conditionalities, and stated gaps and needs, among other issues. 

      The (I)NDC content briefs are created solely on the basis of information from submitted(I)NDCs and makes no inferences about robustness, quality, or viability of intended policiesor actions. 

The (I)NDCs review will help implementing organizations like the World Bank Group (WBG) identify

and familiarize with a range of country priorities in terms of sectoral engagement, and needs in

terms of capacity building, technology transfer, and financing. Based on this comprehensive

mapping exercise, the WBG will develop a useful, easy­to­use, and interactive database and briefs

of all (I)NDCs to inform a wide range of WBG initiatives and client engagement processes, including

the development of Systematic Country Diagnostics (SCDs) and Country Partnership Frameworks

(CPFs), and at a later stage respond to the more specific requests from all WBG Global Practices

(GPs), regions, and country units for the identification of potential development opportunities,

analytical studies and technical assistance to support countries' implementation of planned policies

and actions. In­depth summaries of (I)NDCs by sectors and regions will be prepared at a later stage. 

      In regards to Adaptation, although no global adaptation mechanism is established, the ParisAgreement parties are required to engage in adaptation planning and implementation of actions

which include preparation of adaptation plans. The Adaptation section of a large number of

submitted (I)NDCs, aims to increase development planning and scale the ability of countries to

adapt to the adverse impacts of climate change and foster climate resilience and low greenhouse

gas emissions development, in a manner that does not threaten sustainable development. In

addition to requested finance, the implementation of country commitments is largely tied to

significant amounts of external assistance to support development and execution of adaptation

plans. Although subsequent (I)NDCs are not explicitly required to have an adaptation component,

the process will ensure increased resilience is recognized under the UNFCCC and climate finance

mobilization is enhanced with an aim to achieve a balance between adaptation and mitigation flows.

Climate Policy Team | World Bank Group

Page 4: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

Table of Contents

I Overall Planning and Preparation Process 

II  Mitigation

  Economy­wide Targets

  Economy­wide Policies

  Mitigation Actions and Policies

III  Adaptation

  Adaptation Targets

  Adaptation Context

  Adaptation Actions and Policies

Acronyms

BAU Business as Usual NAMA Nationally Appropriate MitigationActions

CIF­PPCR Climate Investment Funds ­ PilotProgram for Climate Resilience

NAP National Adaptation Plan

DRM Disaster Risk Management NAPA National Adaptation Programmesof Action

INDC Intended Nationally DeterminedContributions

REDD+ Reducing emissions fromdeforestation and forestdegradation and the role ofconservation, sustainablemanagement of forests andenhancement of forest carbonstocks in developing countries

LEDS Low Emission DevelopmentStrategy

LULUCF Land Use and Land Use Changeand Forestry

|

|

|

Climate Policy Team | World Bank Group

Page 5: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

Overall Planning and

Preparation Process

How reliable is the prioritization of the (I)NDC? How serious is thegovernment about implementing policies and actions to achieve the (I)NDCtargets?

Political decision of adoption of INDC at:Head of state level

Interministerial level

Parliament

Ministry LevelMINISTRY OFENVIRONMENT

Technical development of INDC through a participatory processStakeholder involvement

Multisector commision

Have development benefits been assessed and considered in the planningprocess?

YES

Are there climate policies and actions already in place/under development?

LEDS

NAMAS

NAPA

Climate Policy Team | World Bank Group

$N/A

(in Billion USD)

TOTAL COST OF

IMPLEMENTATION (mitigation and adaptation)

Page 6: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

Existing policies:

Has the INDC development been supported by a development partner?Technical support

Financial support GEF THROUGH UNDP

Implementation Plans and Needs

Specific requests for international provision of means of implementation:

Technology Transfer

Financial support

Capacity Building

Does the INDC intend the private sector to be involved in theimplementation of the NDC?

Are carbon pricing/international market mechanisms intended?

Are there any barriers identified?

Link list:• Iraq INDC Factsheet (projected per capita emissions): http://www.climate­energy­college.net/files/site1/factsheets/Iraq_INDCFactsheet_UoM­PRIMAP_GWPAR4.pdf 

Climate Policy Team | World Bank Group

Page 7: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

-1%

n/a

additional -13%

n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

Mitigation

ECONOMY-WIDE TARGETS

Conditionality: INDC page link

Unconditional part of mitigation target:Estimated costs for implementation:

Conditional part of mitigation target:Estimated costs for implementation:

Coverage of Gases: CO

Other Targets:

POLICIES:

Standards for imported vehicles

Recycling law

Green building codes

TARGET YEAR

2035TARGET TYPE

-14%Relative Emission Reduction

Compared to BAU (%)

N/A(in Billion USD)

COST OFIMPLEMENTATION

2

Climate Policy Team | World Bank Group

Page 8: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

n/a

n/a

n/a

Reduce transmission and distribution losses

n/a

n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

SUPPLY-SIDE

EFFICIENCY:

GRID/ENERGY LOSS

REDUCTION

Plans: INDC page link

Reduce transmission and distribution losses P. 9

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 9: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

n/a

n/a

n/a

CCS

n/a

n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

CCSPlans: INDC page link

CCS P. 8

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 10: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

n/a

n/a

n/a

Upgrade refineries, LPG fuel for vehicles

n/a

n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

GASPlans: INDC page link

Upgrade refineries, LPG fuel for vehicles P. 7

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 11: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

n/a

Efficiency improvement in thermal powerplants

n/a

n/a

n/a

n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

SUPPLY-SIDE

EFFICIENCY:

POWER

GENERATION

EFFICIENCY

IMPROVEMENT:

FUEL SWITCHING

Plans: INDC page link

Efficiency improvement in thermal power plants P. 8

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 12: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

n/a

n/a

n/a

3.3% increase in hydro-electric power plantsinstalled capacity (Dam)

n/a

n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

RENEWABLE

ENERGY: HYDROTargets: INDC page link

3.3% increase in hydro-electric power plants installed capacity (Dam)

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 13: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

SUPPLY-SIDE

EFFICIENCY:

POWER

GENERATION

EFFICIENCY

IMPROVEMENT

Plans: INDC page link

Thermal power plants efficiency P. 8

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 14: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

DEMAND-SIDE

EFFICIENCY:

INDUSTRIES

Plans: INDC page link

Industrial processes efficiency P. 8

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 15: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

RENEWABLE

ENERGY: SOLARPlans: INDC page link

Solar powered appliances and equipment

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 16: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

GAS FLARINGPlans: INDC page link

Associated gas (reduce gas flaring) P. 7

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 17: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIESWASTE Plans:

Waste-to-Energy   P. 9

Recycling, Reuse, Reduce

Waste: General   P. 9

Climate Policy Team | World Bank Group

Page 18: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

n/a

n/a

n/a

Use plasma-technology for waste-to-energy

n/a

n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

WASTE-TO-ENERGYPlans: INDC page link

Use plasma-technology for waste-to-energy P. 9

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 19: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

n/a

Recycling law

n/a

n/a

n/a

n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

RECYCLING, REUSE,

REDUCEPolicies: INDC page link

Recycling law P. 9

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 20: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIESTRANSPORT Plans:

Public Transport   P. 7

Aviation

Rail   P. 7

Vehicle Fleet   P. 7

Transport: General   P. 7

Inter-Urban Transport   P. 7

Climate Policy Team | World Bank Group

Page 21: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

n/a

n/a

n/a

Rail, modal shift to mass transport

n/a

n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

PUBLIC

TRANSPORTPlans: INDC page link

Rail, modal shift to mass transport P. 7

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 22: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

n/a

n/a

n/a

Aviation efficiency

n/a

n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

AVIATIONPlans: INDC page link

Aviation efficiency

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 23: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

n/a

n/a

n/a

Rail

n/a

n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

RAILPlans: INDC page link

Rail P. 7

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 24: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

n/a

n/a

n/a

Standards for imported vehicles

n/a

n/a

n/a

n/a

n/a

Vehicle inspection

n/a

n/a

n/a

n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

VEHICLE FLEETPolicies: INDC page link

Standards for imported vehicles P. 8

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Plans: INDC page link

Vehicle inspection P. 7

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 25: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

INTER-URBAN

TRANSPORTPlans: INDC page link

Vehicle inspection P. 7

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 26: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIESAGRICULTURE Plans:

Agriculture: General

Fertilizers   P. 9

Climate Policy Team | World Bank Group

Page 27: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

n/a

n/a

n/a

Natural fertilizers

n/a

n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

FERTILIZERSPlans: INDC page link

Natural fertilizers P. 9

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 28: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

n/a

n/a

n/a

Sustainable land management

n/a

n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

SUSTAINABLE

LAND

MANAGEMENT

Plans: INDC page link

Sustainable land management P. 9

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 29: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

n/a

Forest protection

n/a

n/a

n/a

n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

CONSERVATIONPlans: INDC page link

Forest protection P. 9

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 30: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

Efficient lighting, insulation, building design

n/a

PV built in buildings, smart meters inbuildings, low emission building materials

n/a

n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

BUILDINGSPolicies: INDC page link

Green building codes P. 9

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Plans: INDC page link

Efficient lighting, insulation, building designPV built in buildings, smart meters in buildings, low emission buildingmaterials

P. 7

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 31: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

n/a

n/a

n/a

n/a

n/a

n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

MITIGATION ACTIONS AND POLICIES

CHEMICALSPlans: INDC page link

Fertilizers production

Estimated total costs for implementation:

Capacity building needs:

Technology needs:

Unconditional part of mitigation target:

Estimated costs for implementation:

Conditional part of mitigation target:

Estimated costs for implementation:

Emission reduction potential:

Climate Policy Team | World Bank Group

Page 32: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

N/A

N/A

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

Adaptation

ADAPTATION TARGETS

ADAPTATION CONTEXT

Existing National Development/Resilience Policies and Plans

National Communications

NAPs

NAPAS

CIF-PPCRs

Sectoral Strategies

Cross-cutting

Conditionality:

Unconditional part of adaptation implementation

Conditional part of adaptation implementation

Conditional upon international provision of meansof implementation

TARGET YEAR

N/AN/A

(in Billion USD)

COST OFIMPLEMENTATION

Climate Policy Team | World Bank Group

Page 33: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: usd 11000.00 million

Technology Transfer:

Capacity Building: n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

WATER

WATER

MANAGEMENT

Target: INDC page link

P. 11

6.4 billion m3 per day by 2035 water provided

Actions:

CONDITIONAL ACTIONS: INDC page link

Mosul dam, flood control system, water treatment

P. 11

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 34: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: usd 80000.00 million

Technology Transfer:

Capacity Building: n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

WASTEWATER

TREATMENTTarget: INDC page link

P. 11

2.1 billion m3 per year by 2035 wastewater treatment

Actions:

CONDITIONAL ACTIONS: INDC page link

Wastewater treatment plants

P. 11

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 35: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

WATER

CONSERVATION

AND REUSE

Target: INDC page link

P. 11

Increase of reuse of water in industries by 25% by 2035Reuse drainage water of 3.5 billion m3 per year by 2035

Actions:

CONDITIONAL ACTIONS: INDC page link

Water use efficiency in distribution network and water consumptionmetersWater monitoring, reuse of drainage water in green belts againstdesertification

P. 11

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 36: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

usd 45 billionn/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: usd 45000.00 million

Technology Transfer:

Capacity Building: n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

AGRICULTURE

IRRIGATION

Actions:

CONDITIONAL ACTIONS: INDC page link

Irrigation methodsIrrigation efficiency, drought-resistent crops, digging water wells

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 37: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

CLIMATE SMART

AGRICULTUREActions:

CONDITIONAL ACTIONS: INDC page link

Agriculture management, early warning systemCattle herding, reducing pesticides, resistant plants, R&D on climateimpacts

P. 13

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 38: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

LULUCF/FORESTRY

SUSTAINABLE

LAND

MANAGEMENT

Target: INDC page link

P. 13

17% areas protected by 2035

Policy: INDC page link

P. 14

Framework law for wildlife protectionUpdating legislative framework for protected areas

Actions:

CONDITIONAL ACTIONS: INDC page link

Wetlands, protection of natural vegetation cover, buffer zones aroundprotected areas

P. 13 - 14

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 39: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

HEALTH

HEALTH SERVICES

AND ASSESSMENT

Actions:

CONDITIONAL ACTIONS: INDC page link

Enhancing health services

P. 14

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 40: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

DISEASE

SURVEILLANCE

AND CONTROL

Actions:

CONDITIONAL ACTIONS: INDC page link

Provision of potable water, monitoring of infectious diseases

P. 14

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group

Page 41: Iraq - World Bankspappssecext.worldbank.org/sites/indc/PDF_Library/IQ.pdf · eD _!Þ! Þg Þgs AÞ5 D ÞÞD=Ê

n/a

n/a

Total Implementation Cost for UnconditionalActions: n/a

Total Implementation Cost for ConditionalActions: n/a

Technology Transfer:

Capacity Building: n/a

MIDDLE EAST AND NORTH AFRICA | Iraq | (Intended) Nationally Determined Contribution

ADAPTATION ACTIONS AND POLICIES

TOURISM

TOURISM:

GENERAL

Actions:

CONDITIONAL ACTIONS: INDC page link

Shift of tourism to areas not affected by sea level rise.

P. 15

Funder

Implementing Agency

Cost Estimation

Total Implementation Cost per Subsector:

Implementation Needs:

Climate Policy Team | World Bank Group