    SN DESCRIPTION OF ITEMS UNIT QTY RATEA-1 FOUNDATION Piles & Pilecaps

    A.1.1 Providing and installing bored cast-in-situ vertical piles of 1000 mm diameter in M-35 grade of Reinforced Cement concrete usingOrdinary Portland Cement of grade 53 all complete (including cost of allmaterials labour etc except reinforcement steel, which will be paid as peritem A 1.4), as per specifications

    A.1.1.1 In all types of soil except hard rock.i) 1000mm dia piles. Meter 2,000.00 10,883.00

    A.1.1.2 Empty boring from working platform to cut off level includingprovision of Temporary guide casing if necessary at contractors own

    cost and extra cutting and taking away the same after the casting of pile.

    i) 1000mm dia piles. Meter 160.00 652.00

    A.1.1.3 Manufacturing, bending, welding supplying and driving in position 6mmthick M.S. Liner (permanent) including the cost of M.S. Plate. Rate

    includes cost of all labour and materials.

    i) 1000mm mm dia piles. MT 36.00 59,926.00

    Note: This item A 1.1.3 shall be operated only where the MS Liners arerequired as per site condition, to be left permanently in the work.Payment will be made from the cut off level to bottom of Liner.

    A)The scope of work in the above items include:1)The cost of all initial layout of piles and setting out, initial excavation, if any.2)The cost of boring through all types of soils/existing road/pavement,removal of all obstruction like boulders, old foundation concrete by chiseling or any other method as approved by the Engineer-in-Charge.If a bore is abandoned for any reason no payment shall be made for suchincomplete boring and shifting of the equipment's. The cost of filling up of the empty bore, if required. will be borne by contractor

    3)The cost of preparation, circulation and handling of bentonite slurry is included in this rate.4)The cost of disposal of all spoils, bentonite waste to keep the work areaneat.5)The cost of providing temporary liner and its withdrawal, if required below adjoining ground level (irrespective of the R.L. of theadjoining ground level) for vertical piles.

    6)The cost of providing and mixing all ingredients of cement concrete(except reinforcement steel) including admixtures, with batchingplant, transportation, placement of concrete by tremie pipe for therequired lengths of pile including providing cover blocks, stiffeners,handling bars etc. for safe handling of reinforcement cage.

    7) The cost of breaking of pile head not earlier than 3 days after concretingand to remove spoil concrete to bring the pile head to the socketing levelincluding cleaning and arranging the extended reinforcement barsas per drawings.

    8)The cost of working for all leads, lifts, pumping / bailing out of water,labour, material and equipment etc.

  • 7/28/2019 Ircon Boq 2 a Final

    2/36

  • 7/28/2019 Ircon Boq 2 a Final

    3/36

    AMOUNT (in Rs)

    21,766,000.00

    104,320.00

    2,157,336.00

  • 7/28/2019 Ircon Boq 2 a Final

    4/36

  • 7/28/2019 Ircon Boq 2 a Final

    5/36

    10)The cost of identification, protection and maintenance of existingservices, if any, which in the opinion of Engineer-in-charge are likely to be affected by piling operation incl. temporary shifting of suchservices to facilitate piling job shall also have to be done, if sorequired by the Engineer-in-Charge and the cost for the same asassessed by the Engineer-in-Charge shall be reimbursable.

    11)The contractor has to be made baricadding with G.I. Sheet / steel sheetwith vertical post by suitable section of steel angle/ pipe at minimumheight of 1.5m from the existing road level during the execution of the work. The contractor has to be manage the all traffic safety requirementsduring the execution period.

    12)The cost of all incidentals, labour, material, equipment and worksrequired to execute the job. The item also includes any other incidentalexpenditures for completing the job as per the direction of the engineer-in-charge.

    13)The item includes the cost of testing of all the materials involvedin the execution of the item as per QAP.

    14) Temperory diversion road if any constructed shall be paid seperately asper Non scheduled items.

    B) Mode of Measurement :1) Length of pile shall be measured from cut off level to the tip of the pilecorrect to a cm in case where the pile is terminated.

    2) Reinforcement steel shall be measured & paid separately underrelevant schedule item A 1.4.

    A.1.2 Load test of pilesA.1.2.1 Initial vertical Load testing of test piles as per the specifications duly

    supplemented with IS: 2911 (Part IV) with latest amendments thereto allcomplete. .

    i) 1000 mm dia piles. Nos. 2.00 306,690.00

    A1.2.2 Horizontal Load testing of test piles as per the specifications duly supplemented with IS: 2911 (Part IV) with latest amendments thereto allcomplete.

    Nos. 2.00 101,687.07

    i) 1000 mm dia piles.A)The scope of work in the item includes:1) The cost of making of pile head ready for testing at the desired level.

    2) The cost of mobilizing, fabrication / making of test set up, itsdismantling, removal and making good, if any, after the test is over.

    3) The cost of supplying all labour, materials, equipment, instrumentationetc. including its transportation complete.

    4) The cost of Recording and presentation of data as required by theEngineer-in-Charge. (Refer Appendix D IS:2911 (Part I/Sec I) for sample Data Sheet).

    5)The cost of supporting / reaction arrangement (including reaction piles,if any) for the kentledge load (kentledge load shall be 1.25 times the testload).

    6) No working pile shall be used as a reaction pile.B) Mode of Measurement :1) Measurement shall be made for each complete set of testing andreporting.

  • 7/28/2019 Ircon Boq 2 a Final

    6/36

    2) Initial test piles also shall be measured for payment like normal piles.

    A.1.2.3 Routine vertical testing of working piles as per the specifications duly supplemented with IS: 2911 (Part IV) with latest amendments thereto allcomplete.

    i) 1000mm dia piles. Nos. 2.00 113,000.00

    A)The scope of work in the item includes:1) The cost of making of pile head ready for testing at the desired level.

    2) The cost of mobilizing, fabrication / making of test set up, itsdismantling, removal and making good, if any, after the test is over.

  • 7/28/2019 Ircon Boq 2 a Final

    7/36

    613,380.00

    203,374.14

  • 7/28/2019 Ircon Boq 2 a Final

    8/36

    226,000.00

  • 7/28/2019 Ircon Boq 2 a Final

    9/36

    3) The cost of supplying all labour, materials, equipment, instrumentationetc. including its transportation complete.

    4) The cost of Recording and presentation of data as required by theEngineer-in-Charge. (Refer Appendix D IS:2911 (Part I/Sec I) for sample Data Sheet).

    5) The cost of supporting / reaction arrangement (including reaction piles,if any) for the kentledge load (kentledge load shall be 1.25 times the testload).

    6) No working pile shall be used as a reaction pile.B) Mode of Measurement :1) Measurement shall be made for each complete set of testing andreporting.Mode of Measurement:Measurement shall be made for each successfully complete set of testing and reporting per pile.

    A.1.3 Pile capA.1.3.1 Earth work in excavation for casting pile cap in all type of soils, weathered

    rock, existing footings, removal of boulders, concrete, ballast, stoneetc including protecting the excavated sides, if required, till concreting,bailing out water to keep the area clean and dry during placement of reinforcement and concrete till the concrete sets finally. The itemincludes the cost of disposal of all spoils, dismantled materials,surplus earth for all leads and lifts, and to keep the work area neat andtidy during the work and thereafter. Payment shall be made based onapproved plan dimensions for PCC below pile cap. The cost of backfilling around the pile cap and restoration of road, if required shall beincluded.

    CUM 1,092.00 41.00

    A.1.3.2 Providing and laying plain cement concrete M15 (aggregate 20mmnominal size) under the pile cap / foundations and below approachslab. The rate shall include the cost of all labour, material etc complete

    job including bailing out water to keep the area dry as per instruction of Engineer in charge. Payment shall be made based on approved plandimensions for PCC.

    CUM 77.00 6,646.00

    A.1.3.3 Providing and laying reinforced cement concrete for construction of pilecaps and foundations in M-35 grade concrete using Ordinary PortlandCement of grade 53, appropriate sand, aggregate, water, admixtures insuitable proportions as per approved mix design (proposed by contractor), as per approved drawings supplied by the Engineer-in-charge, including all types of shuttering, centering, necessary tools, plants,machinery, and all related operations as required to complete the workwith all leads, lifts and depths true to line, level and position all complete(excluding the cost of reinforcement steel, which will be paid as per itemnumber A 1.4).

    CUM 706.00 8,856.00

    A)The scope of work in the item includes.

    1)The cost of all initial layout and setting out work includingidentification of existing services, if any.2)The cost of all pumping/Bailing out of water, including its labour,material and equipment's.

  • 7/28/2019 Ircon Boq 2 a Final

    10/36

    3)The cost of providing centering and shuttering including its erection,dismantling and removal of formwork including all leads and lifts with allrequired tools and plants to the required line and level..

    4)The cost of providing and mixing all ingredients (except reinforcementsteel) including admixtures etc., with batching plant, transportation,placement, finishing and curing of concrete.

  • 7/28/2019 Ircon Boq 2 a Final

    11/36

    44,772.00

    511,742.00

    6,252,336.00

  • 7/28/2019 Ircon Boq 2 a Final

    12/36

  • 7/28/2019 Ircon Boq 2 a Final

    13/36

    5)The cost of maintenance and protection of existing services, if any which in the opinion of Engineer-in-charge are likely to be affected by any related activities including temporary shifting of such services tofacilitate construction of pile cap work shall also have to be done, if sorequired by the Engineer-in-charge, and the cost for the same as assessedby the Engineer-in-Charge shall be reimbursable.

    6)The cost of installation of any fixture into the pile cap(cost of only fixture to be paid separately).7)The contractor has to be made baricadding with G.I. Sheet / steel sheetwith vertical post by suitable section of steel angle/ pipe at minimumheight of 1.5m from the existing road level during the execution of the work. The contractor has to be mange the all traffic safety requirementsduring the execution period.

    8)The cost of testing of all the materials involved in the execution of itemsas per QAP.9)The cost of all incidental labour, materials, equipment and worksrequired to execute the job as per directions of engineer-in-charge.

    B) Mode of Measurement:1) Measurements shall be made for the finished volume of reinforcedcement concrete restricted to volume as per approved drawing (excludingcost of reinforcement steel only). Quantity of concrete of piles, which hasgone into the pile caps shall be deducted. Reinforcement shall bemeasured & paid separately as per item A 1.4.

    A 1.4 Reinforcement: Supply, cutting, bending, with all leads, lifts and depths,fixing in position reinforcement of any diameter, HYSD or TMT as perrelevant BIS specification and drawing in all RCC/PSC works of thisschedule A-1. The rate shall include cost of all material including laps,tying wire, binding wire, cover block, provision of stools, chairs, spacerbars, support bars , labour, transportation, storing and all other incidentalcharges, tools & plants etc complete. Payment shall be made as pertheoretical requirement and no wastage shall be paid. Rate shallinclude all costs.

    MT 249.00 57,379.00

    SUB TOTAL - A-1A-2 SUBSTRUCTURE Piers, Abutments and bearings

    A.2.1 Providing and laying reinforced cement concrete for construction of piers, pier caps, abutment, abutment caps, and dirt wall in M-35 gradeconcrete using Ordinary Portland Cement of grade 53 , appropriatesand, aggregate, water, admixtures in suitable proportions as perapproved mix design (proposed by contractor), as per approved drawingssupplied by the Engineer-in-charge, including all types of shuttering,staging, centering scaffolding, necessary tools, plants, machinery, and allrelated operations as required to complete the work with all leads, lifts anddepths true to line, level and position all complete (excluding the cost of reinforcement steel, which will be paid as per item number A 2.5).

    CUM 623.00 9,615.00

    A) The scope of work in the item includes

  • 7/28/2019 Ircon Boq 2 a Final

    14/36

    1)The cost of all incidental work required including providing,placement and removal, shifting of shuttering, cleaning, oiling &maintenance, erection & removal of staging, scaffolding and form lineretc, for piers, pier caps, bearing pedestals and other works as stated inother parts of the tender document.

    2)The cost of casting of a mock pier at casting yard true to line, level andshape as per the direction of the Engineer- in-Charge.

  • 7/28/2019 Ircon Boq 2 a Final

    15/36

    14,287,371.00

    46,166,631.14

    5,990,145.00

  • 7/28/2019 Ircon Boq 2 a Final

    16/36

  • 7/28/2019 Ircon Boq 2 a Final

    17/36

    3)The cost of casting of pier, pier caps, abutment, abutment capsetc. including providing and mixing all ingredients and admixturesetc. in Batching plant, transportation, placement, compaction,finishing and curing, placing in position inserts with pier/pedestals as perspecification and the direction of the Engineer-in- charge.

    4)The cost of disposal of all spoils and to keep the work area neat and tidy during the work and thereafter.

    5)The cost of Barricading and all safety requirements as mentionedelsewhere in the tender document.

    6)Installation of any fixtures into pier/pier cap etc (cost of onlyfixtures if any, to be paid separately).7)The cost of all incidentals, labour, mater ial, equipment and worksrequired for the executions of the job as per the direction of Engineer-in-charge.

    8)The cost of testing all materials involved in the execution of theitem as per QAP.9)The cost of working for all leads, lifts, pumping / bailing out water,labour`, material and equipment etc.

    B) Mode of Measurement :1) Measurement shall be made for the finished volume of concrete only and will be restricted to the dimensions shown in the approveddrawings.

    2) Reinforcement steel shall be measured & paid separately as peritem A 2.5.

    A.2.2 Providing and laying reinforced cement concrete for construction of bearing pedestal in M-40 grade concrete using Ordinary Portland Cementof grade 53 , appropriate sand, aggregate, water, admixtures insuitable proportions as per approved mix design (proposed by contractor),inculding placing & fixing of Bearings in position as per drawings(Bearings shall be supplied by IRCON free of Cost at its store at Patna orelsewher in Bihar, the contractor has to transport the same to the worksite from IRCONs Store at its own cost) the as per approved drawingssupplied by the Engineer-in-charge, including all types of shuttering,staging, centering scaffolding, necessary tools, plants, machinery, and allrelated operations as required to complete the work with all leads, lifts anddepths true to line, level and position all complete (excluding the cost of reinforcement steel, which will be paid as per item number A 2.5).

    CUM 50.00 9,831.00

    A) The scope of work in the item includes1) Scope of work in this include the scope of work as mentioned in itemno. 2.1 above except clause (2) of A.2.1.(A) above.

    B) Mode of Measurement :1) Measurement shall be made for the finished volume of concrete and willbe restricted to the quantity as per approved drawings.Reinforcement steel shall be measured & paid separately as per itemA 2.5.

  • 7/28/2019 Ircon Boq 2 a Final

    18/36

    A.2.3 Painting below GL: Providing anticorrosive treatment to the parts of substructure in contact with earth upto GL with one coat of primer andtwo coats of Anticorrosive Coal Tar Epoxy Paint below the ground level onPile caps, Piers, abutments etc with all labour material tools and plantscomplete job.

    SQM 870.00 39.00

    A.2.4 Painting over exposed surfaces: Painting the surfaces withAnticarbonation/Anticorrosive Acrylic Paint above the ground level onPiers, pier caps, etc. with all labour material tools and plants complete

    job including surface preparation at joints in approved colour.

    SQM 1,414.00 132.00

  • 7/28/2019 Ircon Boq 2 a Final

    19/36

    491,550.00

  • 7/28/2019 Ircon Boq 2 a Final

    20/36

    33,930.00

    186,648.00

  • 7/28/2019 Ircon Boq 2 a Final

    21/36

    A.2.5 Reinforcement: Supply, cutting, Bending, fixing in positionreinforcement of any diameter, HYSD or TMT as per relevant BISspecification and drawing in all RCC/PSC works of this schedule A-2. Therate shall include cost of all material including tying wire, labour,transportation, storing and all other incidental charges, tools & plants etc.Payment shall be made as per theoretical requirement and no wastage shallbe paid. Rate shall include all costs.

    MT 188.00 58,455.00

    SUB TOTAL - A-2A-3 SUPERSTRUCTURE

    Providing and laying reinforced cement concrete for construction of precast Prestressed super structure girders / prestressed solid slab /diaphragm in position in M-45 grade concrete using Ordinary PortlandCement of grade 53, appropriate sand, aggregate, water, admixtures insuitable proportions as per approved mix design (proposed by contractor), as per approved drawings supplied by the Engineer-in-charge,including all types of shuttering, staging, centering scaffolding, necessary tools, plants, machinery, and all related operations as required to completethe work with all leads, lifts and depths true to line, level and position allcomplete (excluding the cost of reinforcement steel & HT Steel, which willbe paid as per relevent items respectively).

    CUM 1,021.00 10,548.00

    A) The scope of work in the item includes1)The cost of initial layout ensuring correct levels.2)The cost of all incidental works required including providing casting

    yard, casting bed, providing, placement and removal or shifting of shuttering, staging, scaffolding etc. and other works as stated in otherparts of the tender documents.

    3)The cost of design of the job mix.4)The cost of providing and mixing all ingredients includingadmixtures etc. with batching plant, transportation, placement,compaction, steam curing and finishing etc., which shall also involvepreparation of surface, placing in position with anchorages as perspecification and the direction of the Engineer in charge, complete job.

    5) The item includes the cost of disposal of all spoils and to keep the workarea neat and tidy during the work and there after.

    6)The item includes the cost of barricading and all safety measuresincluding management of traffic as desired by the Engineer-in-Charge andas specified elsewhere in the tender document.

    7) The item includes the cost of foundation preparation for staging of solid slab staging and making casting bed to take care of loads andsettlements.

    8)The cost of all incidentals, labour, mater ial, equipment and worksrequired for the executions of the job as per the direction of Engineer-in-charge.

    9) The cost of testing all materials involved in the execution of theitem as per QAP.10)The cost of working for all leads, lifts, pumping /bailing out water, labour, material and equipment etc.

    A.3.1.1

  • 7/28/2019 Ircon Boq 2 a Final

    22/36

    B) Mode of Measurement :1) Measurement shall be made for the volume of finished concrete only andwill be restricted to the quantities as per the dimensions shown in theapproved drawings. The reinforcement steel shall be measured & paidseparately which will be paid as per relevent item .

  • 7/28/2019 Ircon Boq 2 a Final

    23/36

    10,989,540.00

    17,691,813.00

    10,769,508.00

  • 7/28/2019 Ircon Boq 2 a Final

    24/36

  • 7/28/2019 Ircon Boq 2 a Final

    25/36

    A.3.1.2 Launching (by Crane), Side Shifting & placing, temporary restraining of precast girder in position true to line and level including pulling, pushing,lateral shifting, loading, unloading, complete in all respect as perdrg & specification observing all safety measure, obtaining block of trainmovement/ road traffic movement from appropriate authority,providing suitable diversion if required etc complete job. Rate shallinclude cost of all labour ,lead, lift ascent, decent, crossing of tracks.

    CUM 1,021.00 3,500.00

    A.3.1.3 Supplying, making into cables and fixing in position H.T. steel cables madefrom high tensile low relaxation strands (any dia) in PSC girder includingcutting making into cables with necessary spacers encasing inHDPE sheathing placing of cable as per drawing provision of anchorage's end blocks stressing, cutting blocking, grouting etccomplete job. Payment shall be made for the weight of HTS wire consumedfrom end to end . However rate shall include cost of all prestressingmaterial, tools for stressing, grouting etc. Nothing extra shall be paid for

    jacking length .

    MT 73.00 85,388.59

    A.3.2 Providing and laying reinforced cement concrete for construction of deckslabs, diaphragms, cross beams, cantilever footpath / slab etc in M-45grade concrete using Ordinary Portland Cement of grade 53, appropriatesand, aggregate, water, admixtures in suitable proportions as perapproved mix design (proposed by contractor), as per approved drawingssupplied by the Engineer-in-charge, including all types of shuttering,staging, centering scaffolding, necessary tools, plants, machinery, and allrelated operations as required to complete the work with all leads, lifts anddepths true to line, level and position all complete (excluding the cost of

    reinforcement steel, which will be paid as per relevent item ).

    CUM 438.00 11,328.00

    A.3.3 Crash barrier: Providing & laying reinforced cement concrete for theconstruction of crash barrier including supplying & fixing of the 65 NB G Ipipe steel railing, providing 150 mm dia PVC Pipe along with 12 dia mesharound it as detailed in the sketch enclosed in tender document in M-40grade concrete using 53 grade cement and appropriate sand, aggregate,water, admixtures in suitable proportions as per approved mixdesign (proposed by contractor), as per approved drawings suppliedby Engineer in charge, including all types of shuttering,scaffoldings/staging, necessary tools, plants, machinery and all relatedoperations as required to complete the work with all lead, lifts, depths,true to line, level and position but excluding the cost of reinforcement steel(which shall be paid as per relevant item under this schedule) allcomplete. The item includes supplying, fabricating and fixing Metallicrailing on top of the concrete crash barriers, conforming to IS standards.

    RM 434.00 4,822.00

    A) The scope of work in the item includes1)The item includes the cost of preparation and submission of detailed shop drawings, fabrication, casting fixtures, placing and fixingin position using required fasteners and pickling.

  • 7/28/2019 Ircon Boq 2 a Final

    26/36

    2)The item includes the cost of two coats of painting along with one coatof anticorrosive primer for steel portion only.

    3)The item includes the cost of testing of all the materials involved in theexecution of the item as per QAP.

    4)The item includes all other incidental expenditure for completing the jobsas per the directions of Engineer-in- charge.

    B) Mode of Measurement :1) The measurements shall be made in Running Meters of the completedrailing.

  • 7/28/2019 Ircon Boq 2 a Final

    27/36

    3,573,500.00

    6,233,366.82

    4,961,664.00

    2,092,748.00

  • 7/28/2019 Ircon Boq 2 a Final

    28/36

  • 7/28/2019 Ircon Boq 2 a Final

    29/36

    A.3.4 Painting over exposed surfaces: Painting the exposed surfaces of superstructure with Anticarbonation / Anticorrosive Acrylic Paint withall labour material tools and plants complete job including surfacepreparation at joints in approved colour.

    SQM 434.00 132.00

    A.3.5 Providing and installing Single strip seal expansion joints as per Clause2607 of MORTH specifications for Road and Bridge Works (FourthRevision) 2001 supplemented with manufacturers recommendations.Entire installation is to be carried out strictly in the presence of manufacturer's representative only, at all times. The seal of the expansion

    joint shall be such as not to permit any dust collection at all times.

    (i) with a total allowable movement upto 140 mm RM 96.00 7,508.00

    A) The scope of work in the item includes:1)Cost of all materials, labour, equipment and other incidental

    charges for execution of this item. Superv ision during installation by themanufacturer is also included.

    2)Installation & fixing of expansion joints as per manufacturersspecifications and design / drawing approved by the engineer-in-charge including chipping of concrete, cleaning of concrete andreinforcement bars, leveling, necessary shuttering, pre-setting, welding etc.

    3)Item to include necessary provision and f illing of recess for the expansion joints at no extra cost.4)The item includes the cost of testing of all the materials involved in theexecution of the item as per QAP and testing of completed andinstalled joints as per the acceptance criteria of MORTH.

    B) Mode of Measurement :1) The expansion joints shall be measured in running meters. Thelength payable is the actual length provided at site including vertical partsof kerbs / crash barriers, footpath etc.

    A.3.6 Drainage System: Providing and laying G.I drain pipes, spouts, GI steelgratings over formed holes in deck slab, fixing 100 mm dia G.I runner pipesand 100 mm dia G I downtake pipes of approved quality at every pier etc.as per approved drawings including bends, collars, clamps, fasteners,threading etc., complete.

    a) 100 mm dia water spout with GI grating. Nos. 73.00 910.00

    b) 100 mm dia P.V.C runner pipes / downtake pipes. M 599.00 1,212.00

    A)The scope of work in the item includes:1)The providing, placing, joining and fixing the drainage pipes with allnecessary fittings, tools and tackles, bends,clamps, screws etc.,complete as per the approved drawing.

    2)The cost of works to make taping all points to be leak proof, tested etc.including all couplers, materials, manpower and tool and tackle etc.complete as per the d irection of Engineer-in-charge.

    B) Mode of Measurement :1) The measurement shall be made in numbers for the drainage portsupplied and installed at site. The payment for the pipes will be madein Running meters. The quantity will be restricted to the length asshown in the approved drawings.

  • 7/28/2019 Ircon Boq 2 a Final

    30/36

    A 3.7 Reinforcement: Supply, cutting, Bending, fixing in positionreinforcement of any diameter, HYSD or TMT as per relevant BISspecification and drawing in all RCC/PSC works of this schedule A-3. Therate shall include cost of all material including tying wire, labour,transportation, storing and all other incidental charges, tools & plants etc.Payment shall be made as per theoretical requirement and no wastage shallbe paid. Rate shall include all costs.

    MT 145.00 59,064.00

    SUB TOTAL - A-3A.4 STAIRCASE IN RAILWAY SPAN

  • 7/28/2019 Ircon Boq 2 a Final

    31/36

    57,288.00

    720,768.00

    66,430.00

    725,988.00

  • 7/28/2019 Ircon Boq 2 a Final

    32/36

    8,564,280.00

    17,189,166.00

  • 7/28/2019 Ircon Boq 2 a Final

    33/36

    A.4.1 Earth work in excavation for casting foundation of stair case in all type of soils, weathered rock, existing footings, removal of boulders, concrete,ballast, stone etc including protecting the excavated sides, if required, tillconcreting, bailing out water to keep the area clean and dry duringplacement of reinforcement and concrete till the concrete sets finally. Theitem includes the cost of disposal of all spoils, dismantled materials,surplus earth for all leads and lifts, and to keep the work area neat andtidy during the work and thereafter. Payment shall be made based onapproved plan dimensions for PCC below pile cap/foundation.

    The cost of backfilling around the pile cap/foundation and restoration of road, if required shall be included.

    CUM 875.00 54.00

    A.4.2 Providing and laying plain cement concrete M15 (aggregate 20mmnominal size) under foundations. The rate shall include the cost of all

    labour, material etc complete job including bailing out water to keep thearea dry as per instruction of Engineer in charger. Payment shall be madebased on approved plan dimensions for PCC.

    CUM 58.00 6,912.00

    A.4.3 Providing and laying reinforced cement concrete for construction of staircase in M-35 grade concrete using Ordinary Portland Cement of grade43 or 53, appropriate sand, aggregate, water, admixtures insuitable proportions as per approved mix design (proposed by contractor),as per approved drawings supplied by the Engineer-in-charge,including all types of shuttering, centering, necessary tools, plants,machinery, and all related operations as required to complete the workwith all leads, lifts and depths true to line, level and position all complete(excluding the cost of reinforcement steel, which will be paid as per itemnumber A 4.4).

    CUM 448.00 8,787.00

    A 4.4 Reinforcement: Supply, cutting, bending, with all leads, lifts and depths,fixing in position reinforcement of any diameter, HYSD or TMT as perrelevant BIS specification and drawing in all RCC/PSC works of thisschedule A-4. The rate shall include cost of all material including tyingwire, binding wire, cover block, provision of stools, chairs, spacer bars,support bars , labour, transportation, storing and all other incidentalcharges, tools & plants etc complete. Payment shall be made asper theoretical requirement and no wastage shall be paid. Rate shallinclude all costs.

    MT 54.00 58,455.00

    A.4.5 Supplying and fixing non-skid tiles/ chequered tiles (25mm thick) on thesteps of staircase as per drawings and specification complete as directedby engineer

    SQM 568.00 903.00

    Total of A-4 schedule =

  • 7/28/2019 Ircon Boq 2 a Final

    34/36

    47,250

    400,896

    3,936,576

    3,156,570

    512,904.00

    8,054,196.00

  • 7/28/2019 Ircon Boq 2 a Final

    35/36

    A-5 FOOT OVER BRIDGEA.5.1 Earth work in excavation for casting foundation of stair case in all type of

    soils, weathered rock, existing footings, removal of boulders, concrete,ballast, stone etc including protecting the excavated sides, if required, tillconcreting, bailing out water to keep the area clean and dry duringplacement of reinforcement and concrete till the concrete sets finally. Theitem includes the cost of disposal of all spoils, dismantled materials,surplus earth for all leads and lifts, and to keep the work area neat andtidy during the work and thereafter. Payment shall be made based onapproved plan dimensions for PCC below pile cap/foundation.

    The cost of backfilling around the pile cap/foundation and restoration of road, if required shall be included.

    CUM 660 54.00

    A.5.2 Providing and laying plain cement concrete M15 (aggregate 20mm

    nominal size) under foundations. The rate shall include the cost of alllabour, material etc complete job including bailing out water to keep thearea dry as per instruction of Engineer in charger. Payment shall be madebased on approved plan dimensions for PCC.

    CUM 40 6,912.00

    A.5.3 Providing and laying reinforced cement concrete for construction of staircase in M-35 grade concrete using Ordinary Portland Cement of grade43 or 53, appropriate sand, aggregate, water, admixtures insuitable proportions as per approved mix design (proposed by contractor),as per approved drawings supplied by the Engineer-in-charge,including all types of shuttering, centering, necessary tools, plants,machinery, and all related operations as required to complete the workwith all leads, lifts and depths true to line, level and position all complete(excluding the cost of reinforcement steel, which will be paid as per itemnumber A.5.4.

    CUM 341 8,787.00

    A 5.4 Reinforcement: Supply, cutting, bending, with all leads, lifts and depths,fixing in position reinforcement of any diameter, HYSD or TMT as perrelevant BIS specification and drawing in all RCC/PSC works of thisschedule A-5. The rate shall include cost of all material including tyingwire, binding wire, cover block, provision of stools, chairs, spacer bars,support bars , labour, transportation, storing and all other incidentalcharges, tools & plants etc complete. Payment shall be made asper theoretical requirement and no wastage shall be paid. Rate shallinclude all costs.

    MT 45 58,455.00

    A.5.5 Supplying and fixing non-skid tiles / chequered tiles (25mm) on the stepsof staircase as per drawings and specification complete as directed by engineer

    SQM 952 903.00

    Total of A-5 Schedule = TOTAL SCHEDULE A1+A2+A3+A4+A5 (RS)

  • 7/28/2019 Ircon Boq 2 a Final

    36/36

    35,640

    276,480

    2,996,367

    2,630,475

    859,656

    6,798,618.00

    95,900,424.14