PRELIMINARY INTEGRATED RAINWATER MANAGEMENT PLAN (IRMP)
1065 HARWOOD ST & 1332 THURLOW ST (NORTH TOWER), VANCOUVER BC
BOSA BLUESKY PROPERTIES C/O HENRIQUEZ PARTNERS ARCHITECTS
VECTOR PROJECT NO.: 2513 REV. 0, MARCH 11, 2021
______________________________________________________________________________
Page 1 of 10
Preliminary Integrated Rainwater Management Report 1065 Harwood & 1332 Thurlow (North Tower), Vancouver BC
Rev. 0, March 11, 2021
CONTENTS PAGE NO.
1.0 INTRODUCTION ................................................................................... 2 2.0 EXISTING CONDITIONS .......................................................................... 2 3.0 PROPOSED DEVELOPMENT ..................................................................... 2 4.0 STORMWATER MANAGEMENT OBJECTIVES & BEST MANAGEMENT PRACTICES (BMPS) ................................................. 3 5.0 HYDROLOGIC MODEL AND ANALYSIS ........................................................ 7 6.0 MAINTENANCE GUIDELINES ................................................................... 8 7.0 CONCLUSION .................................................................................... 10 Appendix 1 – Preliminary IRMP Pre-Development Plan
Appendix 2 – Preliminary IRMP Post-Development Plan
Appendix 3 – Hydrographs Pre & Post Development Appendix 4 – Landscaping Design and Soil Loading Diagram
______________________________________________________________________________
Page 2 of 10
Preliminary Integrated Rainwater Management Report 1065 Harwood & 1332 Thurlow (North Tower), Vancouver BC
Rev. 0, March 11, 2021
1.0 INTRODUCTION Vector Engineering Services Ltd has been retained to provide civil engineering design and Preliminary Integrated Rainwater Management Plan design on behalf of Bosa BlueSky Properties, located at 1065 Harwood & 1332 Thurlow St (North Tower), in Vancouver, BC. The subject site is located at the North corner of the intersection of Thurlow Street with Harwood Street (see aerial photo in Appendix 1). As a condition of development, the City of Vancouver has requested a Preliminary Integrated Rainwater Management Plan for the site. In response to this requirement, Vector Engineering Services Ltd. was retained to provide analysis of the site drainage and establish a Preliminary Integrated Rainwater management strategy for the proposed new development. The hydrologic calculations and storm modeling of the site are summarized in this report and are hereby submitted to the City for review. 2.0 EXISTING CONDITIONS The subject site is approximately 0.1608 hectares in area, consisting of two 2-storey residential buildings. The current ground cover condition at the site is 88% impervious. The site currently slopes toward the south, south-west direction (see Appendix 1 for the preliminary IRMP pre-development plan). 3.0 PROPOSED DEVELOPMENT
The development plan calls for construction of a 34-storey high-rise residential building with 7 levels of underground parkade and storage. With the proposed development of the site, the total overall impervious site coverage will decrease to 72%. The impervious areas will consist of building roofs, pedestrian rest areas, parkade ramp and hard landscaped areas. The remainder of the site will consist of a variety of landscaped areas, above the parkade roof slab. Permanent intensive green areas with significant soil depths ranging from 450 mm to 1,200 mm are located on the building podium. These areas represent 28% of the total site area. Intensive green roofs will also be provided on the upper tower roofs (see Appendix 4 for landscaping plan). The weighted runoff coefficient for the proposed development was obtained using the following assumed coefficients based on CoV Engineering Design Manual (2018):
• Landscaped areas at 0.18
• Roof areas at 0.85
• Walkways and driveways at 0.88
______________________________________________________________________________
Page 3 of 10
Preliminary Integrated Rainwater Management Report 1065 Harwood & 1332 Thurlow (North Tower), Vancouver BC
Rev. 0, March 11, 2021
4.0 STORM WATER MANAGEMENT OBJECTIVES AND BMPS To improve the quality of rainwater runoff and improve health of natural water bodies, the City of Vancouver has adopted a City Wide Integrated Rainwater Management Plan and a Rezoning Policy for Sustainable Large Developments. This plan requires all new developments requiring rezoning to incorporate rainwater management measures to control post development runoff rates and to improve the quality of rainwater runoff using Best Management Practices. The rainwater management system for this site has been designed in accordance with the City Wide Integrated Rainwater Management Plan criteria and the Rezoning Policy for Sustainable Large Developments requirements. As per City of Vancouver Rainwater Management Bulletin dated July 2018, we have considered options to reduce stormwater discharge volume, reduce the flow rate of peak runoff, and treat surface runoff to reduce contaminants. The proposed measures shall meet the following targets:
• Capture the first 24mm of rainfall in 24 hours.
• Provide post-development 10-year storm (2100 IDF) runoff release rate of lower or equal rate to the pre-development peak runoff rate for the 10-year 24-hour duration storm (2014 IDF).
• Remove at least 80% of Total Suspended Solids (TSS) by mass from the first 48mm of rainfall over highly polluted areas including driveways and parking, and the first 24mm of all other areas including all walkways, landscaped and roof areas from all levels, before releasing the runoff to the municipal drainage system.
Additional references include the Metro Vancouver Stormwater Source Control Design Guidelines and the Land Development Guidelines for the Protection of Aquatic Habitat which was developed jointly by the Department of Fisheries and Oceans Canada and the British Columbia Ministry of Environment, Lands and Parks (M.O.E.). The source controls adopted for this development consist of several measures to be implemented onsite. The source controls are shown on the attached drawing, Preliminary Integrated Rainwater Management Plan and are summarized below.
4.1 Capture 24mm in 24 hours
To reduce the runoff generated from the site, the stormwater system will capture the first 24mm of rainfall from all areas on the site and retain it as much as possible, given site constraints.
______________________________________________________________________________
Page 4 of 10
Preliminary Integrated Rainwater Management Report 1065 Harwood & 1332 Thurlow (North Tower), Vancouver BC
Rev. 0, March 11, 2021
Remaining volume not retained will be detained, treated for quality and released to the city drainage system. The target for the proposed site is to capture and infiltrate, retain, or treat and detain the first 24mm of rainfall in 24 hours: (24mm x 1608m2) = 38.59m3 of runoff.
4.1.1 Tier 1 Priority Green Infrastructure Practices – Rainwater Harvesting for
Reuse
The primary purpose of rainwater harvesting is to reduce domestic water demand and runoff from impermeable surfaces. Rainwater harvesting involves collecting rainwater and storing it for non-potable uses. The City criteria for using rainwater harvesting is to use the harvested rainwater within a 96-hour period all year round. The use of harvested rainwater for irrigation, non-potable water use, cannot meet this criterion or is very costly at this design stage and therefore the rainwater harvesting source control option has been disregarded.
4.1.2 Tier 2 Priority Green Infrastructure Practices – Retention within Non-
Infiltrating Landscape
Proposed vegetated landscaped areas on all levels will be utilized to retain the required volume of rainfall. Redirection of rainwater surface run-off into the absorbent soil layers will increase the time of concentration and decrease peak storm runoff through evapotranspiration, storage within the soil voids and the holding capacity of the soil particle surface pores. For the purpose of this study, it is assumed that the growing medium has an absorption capacity equal to 20% of the total volume of the soil. The landscaping plan calls for absorbent landscaping areas with soil thickness varying from 450mm in shrub landscaped areas to 1,200mm in treed areas. Finally, any excess moisture in the soil will be collected with a perforated pipe and drained into the mechanical drainage system or overflowed into a drainage facility. Details will be provided at detail design stage.
______________________________________________________________________________
Page 5 of 10
Preliminary Integrated Rainwater Management Report 1065 Harwood & 1332 Thurlow (North Tower), Vancouver BC
Rev. 0, March 11, 2021
Soil retention capacities on each level are presented in the following table:
Level Soil
Depth Landscaped
Area (m2) Volume
(m3)
Soil Retention Capacity
Retention Capacity
(m3) Level 1 900 136.46 122.81 20% 24.56
Level 1 1,200 21.36 25.63 20% 5.13
Level 2 600 28.89 17.33 20% 3.47
Level 2 900 53.61 48.25 20% 9.65
Level 3 450 20.73 9.33 20% 1.87
Level 3 900 133.67 120.30 20% 24.06
Level 34 900 3.72 3.35 20% 0.67
Roof Level 450 10.43 4.69 20% 0.94
Roof Level 900 43.41 39.07 20% 7.81
Total 452.28 390.77 78.15
The total soil volume provided is 390.77 m3 which will have a rainfall volume retaining capacity of 78.15 m3. The hard landscaping such as walkways, pedestrian rest areas and other hard landscaping will be graded to drain towards the adjacent soft landscaped areas, which will be provided with an overflow catch basin tied into the site drainage system inside the underground parkade structure.
Rain Gardens & Infiltration Bulges
The primary purpose of the rain garden and infiltration bulges is to capture and filter runoff from adjacent impermeable surfaces. We propose that the existing bulge on Thurlow Street remain.
Green Roof
The proposed tower will have intensive green roof on the upper roof as detailed on the landscaping plan. The overhang and ground plan surfaces will incorporate significant areas of intensive green roofs. The significant volumes of absorbent soil will be placed on the intensive green roof areas which will provide the benefits outlined in section 4.1.2 above.
______________________________________________________________________________
Page 6 of 10
Preliminary Integrated Rainwater Management Report 1065 Harwood & 1332 Thurlow (North Tower), Vancouver BC
Rev. 0, March 11, 2021
4.1.3 Tier 3 Priority Green Infrastructure Practices – Mechanical Detention and treatment
Detention tanks collect and store stormwater runoff during a storm event, then release it at controlled rates to the downstream drainage system, thereby attenuating peak discharge rates from the site. The detention tank shall capture the amount of 24mm of rainfall in 24 hours falling over areas that are not graded to drain towards the adjacent soft landscaped areas.
Estimated area = 636.44 m2 Detention volume required = 15.3 m3 Required flow rate = 3.61 L/sec = 0.00361m3/sec
See Min. Detention Hydrograph and Storage Volume diagrams in Appendix 3. Details of the detention and treatment system will be provided at detailed design stage.
4.2 Stormwater Flowrate Reduction to Predevelopment Levels:
Detention volume required to meet the City of Vancouver peak runoff reduction to the ten-year 24-hour (2014 IDF Curve) pre-development level of 0.0289m3/sec is equal to 0.327 m3. However, since a slower flowrate of 0.00361m3/sec is needed to meet the detention requirement, this objective is met with the lower flowrate. The detention facility will be located at the north-east corner of lot, underneath the bike share area (location subject to change). The volume the tank must accommodate will be 15.3m3. The release rate will be controlled by a flow control system situated inside the tank outlet with an appropriately sized orifice. See post-development IRMP drawing in Appendix 2. The details of the detention tank and flow control system will be provided at detailed design stage. See Min. Detention Hydrograph and Storage Volume diagrams in Appendix 3. Details of the detention and treatment system will be provided at detailed design stage.
4.3 Water Quality
According to the City of Vancouver Rainwater Management Bulletin dated July 2018, landscaped planted areas with a minimum soil depth of 450mm are assumed to sufficiently treat runoff resulting from the first 48mm of rainfall over highly contaminated surfaces including driveways, parking and loading areas and the first 24mm of all other areas including walkways and roof. In addition, this plan includes the installation of a treatment system to remove at least 80% of total suspended solids (TSS) by mass from the runoff before releasing the flow into the municipal drainage system (CoV Rainwater Management Bulletin, 2018). The details of the treatment system will be provided at detailed design stage. See Post Development IRMP drawing for a general layout of the system.
______________________________________________________________________________
Page 7 of 10
Preliminary Integrated Rainwater Management Report 1065 Harwood & 1332 Thurlow (North Tower), Vancouver BC
Rev. 0, March 11, 2021
5.0 HYDROLOGIC MODEL AND ANALYSIS
The following drainage modeling and analysis was used for design of the Stormwater Management System for this project.
5.1 Rainfall Data
The rainfall data used in the hydrologic analysis was based on the ten-year return period rainfall, as per the City’s Stormwater Management Design Criteria and City of Vancouver Rainwater Management Bulletin dated July 2018. The City of Vancouver IDF curve (2014) rainfall data for pre-development conditions, and IDF curve (2100) rainfall data for post-development conditions were used for the analysis (Appendix 3).
5.2 Existing Runoff
To simulate the ten-year stormwater runoff for the existing condition, the Rational Method was used. An overall runoff coefficient of 0.70 was compiled based on assumed coefficients for various ground covers as provided by CoV Design Guidelines. The time of concentration was assumed to be 5 minutes as indicated in the CoV 2014 IDF. Finally, a 10-year storm was used for the analysis as required by CoV Rainwater Management Bulletin for systems in the downtown core (west of Main Street includes all of the West End peninsula).
Based on the described parameters above, the peak runoff value and volume for the ten-year storm event was calculated to be as follows: Five-year existing peak flow and total rain volume Existing Site Q10yr = 0.0289 m3/sec Total rain volume V10yr = 8.679m3 Allowable Release Rate In accordance with the City Vancouver Integrated Rainwater Management Design Criteria, allowable release rate = Existing Q10yr
Max. Q10yr, prop = 0.0289 m3/sec
______________________________________________________________________________
Page 8 of 10
Preliminary Integrated Rainwater Management Report 1065 Harwood & 1332 Thurlow (North Tower), Vancouver BC
Rev. 0, March 11, 2021
A copy of the modeling results for existing pre-development conditions has been attached in Appendix 3. 5.3 Post Development Runoff
The post development stormwater runoff was also analyzed and hydrologic models were computed using the Modified Rational Method. The following parameters were assumed for the analysis, based on the CoV Rainwater Management Bulletin and the CoV Engineering Design Manual:
• Overall Runoff coefficient = 0.66 (weighted average of all types of ground covers)
• The analysis was conducted using a 10-year 2100 IDF curve data
• A Time of Concentration of 5 minutes was assumed, as per the Rainwater Management Bulletin.
Based on the described parameters above, the peak runoff flowrate and volume for the ten-year rainfall event for the City of Vancouver IDF curve (2100) was calculated as follows: Ten-year 24-hour post development peak flow and volume Proposed Site Q10yr = 0.0300 m3/s Total rain volume V10yr = 9.006 m3 A copy of the post-development conditions results has been attached in Appendix 3.
6.0 MAINTENANCE GUIDELINES The absorbent landscaping is a key component of the proposed Stormwater Management Plan for this development. It has been designed as a permanent low-maintenance system requiring regular monitoring and periodic maintenance. Monitoring and maintenance of individual components of the system will consist of the following measures described below: Catchbasins and Oil-Water Separators
• Inspect oil-water separator and all catch basins for debris and sediment accumulation.
• Remove grate/lid.
• Remove debris as found.
• Remove accumulated sediment and oil using truck mounted suction pump equipment with storage tank when sediment reaches ½ of the sump depth.
• Sediment shall be disposed offsite at an approved landfill.
______________________________________________________________________________
Page 9 of 10
Preliminary Integrated Rainwater Management Report 1065 Harwood & 1332 Thurlow (North Tower), Vancouver BC
Rev. 0, March 11, 2021
• Replace grate/lid.
• All catchbasins to be recharged with clean water after silt/sediment removal. Landscaping
Monitoring (annually by Landscape Architect):
• Inspect plants for die-back, for growth and for general health.
• Observe extent of yearly dieback.
• Forward growing medium sample to laboratory for testing if general plant health in question.
• Inspect plants for signs of pests or diseases.
• Inspect plants for breakage or wind damage.
• Review lawn maintenance operations.
• Observe plant and planter maintenance, weed and debris removal.
• Observe growing medium settlement.
• Review planter edging, flashing, gravel borders.
• Inspect for standing water, saturation or other indications of poor drainage.
• Review irrigation system function and coverage where applicable.
• Prepare annual report.
Maintenance Operations (by maintenance contractor):
• Perform establishment maintenance operations to BCSLA/BCLNA BC Landscape Standard, latest edition for 55 days from Substantial Performance.
• Perform general maintenance operations to BCSLA/BCLNA BC Landscape Standard, latest edition after 55 days from Substantial Performance.
• Replace dead or dying plant materials regularly.
• Fertilize plant materials per plant requirements.
• Respond to laboratory soil test recommendations if indicated.
• Perform pest/disease management as required.
• Prune dead, diseased or broken branches, prune shrubs and trees for form and to optimize flowering yearly.
• Perform standard lawn maintenance operations regularly.
• Stabilize trees or shrubs where indicated.
• Remove weeds, debris and cultivate growing medium regularly.
• Add soil amendment where soil settlement has occurred yearly.
• Maintain and repair edging, flashing, and gravel borders as required.
• Observe, report and perform drainage improvements where indicated.
• Adjust irrigation system regularly for coverage.
• Repair irrigation system leaks immediately.
APPENDIX 1
PRELIMINARY IRMP – PRE-DEVELOPMENT PLAN
UE
PIPE
METAL FENCE
D/W
DO
OR
WA
Y
CO
NC
.
WALKCONC.
WA
LKC
ON
C.
CONCWALK
CONC.WALK
DOORWAY
CONC.WALK
HARWOOD STHARWOOD ST
MAXINE LANE
EOAEOA
EOAC
ON
C. S
/W
CO
NC
. S/W
CONC. D/WCONC. S/W CONC. S/W
CONC. S/WCONC. S/W
CONC. S/W
CO
NC
. S/W
CO
NC
. S/W
CO
NC
. S/W
CONC. S/W
CONC.RET.WALL
CO
NC
. RE
T. W
ALL
CO
NC
. WA
LK
CO
NC
RE
TE
#1100
#1050
#1030
#133
2
#1065
WA
LKC
ON
C.
CO
NC
. S/W
12 13
1110PLAN 92 PLAN 92
20
D
W 25' 8STRATAPLAN VR1437
BRICK
BR
ICK
CONC. RET. WALL
1Rem 8
B L O C K 13
TOP OF SLOPE
PLA
NT
ER
PLA
NT
ER
PLA
NT
ER
PLA
NT
ER
CO
NC
. RE
T. W
ALL
#1066
9 8
#1078
76
PLAN 92 PLAN 92
EB
EB
6.40
60 D
EA
D G
AS
6.40323 DEAD GAS
2.70
114
DE
AD
GA
S
114
DE
AD
GA
S
42m
m G
AS
21m
m G
AS
4.88
300m
m V
CP
ST
M
0.91200mm VCP STM
5.00
300m
m V
CP
ST
M
4.40
150m
m V
CP
SA
N
10.0
6
250m
m V
CP
ST
M8.
5020
0mm
VC
P S
AN
7.60TELUS
7.60TELUS
1x4"
HY
DR
O D
UC
T
TH
UR
LOW
ST
200mm VCP STM
1065 HARWOOD STREET / 1332THURLOW STREET (NORTH TOWER)
VANCOUVER, BC
1:250H (24"X34" PAPER) FEB 2021
AM AM
RU VS
0
DESIGN
IMPORTANT:CONTRACTOR IS RESPONSIBLE TO SCOPE AND EXPOSE EX. UTILITIES/SERVICES, ANDRECORD LOCATION, SIZE & INVERT ELEVATIONS AT PROP. OR POTENTIAL CROSSINGSPRIOR TO CONSTRUCTION. THE AS-BUILT UNDERGROUND INFORMATION SHOWN ONTHIS DRAWING IS DERIVED FROM THIRD PARTY RECORDS AND VECTOR ENGINEERINGIN NO WAY WARRANTS IT'S ACCURACY. REPORT ANY DISCREPANCIES AND/ORCONFLICTS TO CONTRACT ADMINISTRATOR PRIOR TO CONSTRUCTION.
2513 BOSA BLUE SKY PROPERTIES
REV NO REVISIONS DATE DRAWN DESIGN
0 ISSUED FOR REZONING APPLICATION 10 MAR 2021 AM AMvectoreng.ca
604 298-2333
ENGINEERING
PRELIMINARY IRMPPREDEVELOPMENT
THE SEAL ON THIS DRAWING SIGNIFIES CERTIFICATION OF
CIVIL ENGINEERING ASPECTS OF THIS SITE, BUT DOES NOT
SIGNIFY RESPONSIBILITY FOR GEOTECHNICAL OR
ENVIRONMENTAL ENGINEERING DESIGN. IN NO WAY DOES
VECTOR ENGINEERING SERVICES LTD. OR ITS EMPLOYEES
ACCEPT LIABILITY OR WARRANTY THE WORK WITH RESPECT
TO THE EFFECT OF SETTLEMENT ON THE CIVIL WORKS.
PRE-DEVELOPMENT 10 YEAR 24HOUR (2014 IDF) PEAK FLOW = 0.0289m3/secPRE-DEVELOPMENT 10 YEAR 24HOUR (2014 IDF) AVERAGE FLOW = 0.0145m3/secPRE-DEVELOPMENT 10 YEAR 24HOUR (2014 IDF) RAINFALL VOLUME = 8.679m3
SEE ARCHITECTURAL DRAWINGSFOR BUILDING DETAILS
SITE AREA =1608m² = 0.1608 ha.RUNOFF COEFFICIENT = 0.70Tc = 5min
PLOT DATE: March 9, 2021
SCALE START DATE
DRAWN BY DESIGN BY
CHECKED BY APPROVED BY
DWG. NO.
REV.
DESIGN NO.
DESTROY ALL PRINTS BEARING PREVIOUS NO.
VECTOR JOB NO. CLIENT
SWM2OF1
DATUM-GEODETICBENCHMARK: MON. V-3508 ATHARWOOD ST AND BUTE STELEV = 27.850m CVD28GVRD DATUM
SITE
APPENDIX 2
PRELIMINARY IRMP – POST-DEVELOPMENT PLAN
UE
PIPE
METAL FENCE
D/W
DO
OR
WA
Y
CO
NC
.
WALKCONC.
WA
LKC
ON
C.
CONCWALK
CONC.WALK
DOORWAY
CONC.WALK
HARWOOD STHARWOOD ST
MAXINE LANELANE
EOAEOA
EOA
EOA
EOA
CO
NC
. S/W
CO
NC
. S/W
CONC. D/WCONC. S/W CONC. S/W
CONC. S/WCONC. S/WCONC. S/W
CONC. S/W
CO
NC
. S/W
CO
NC
. S/W
CO
NC
. S/W
CONC. S/W
CONC.RET.WALL
CO
NC
. RE
T. W
ALL
CO
NC
. WA
LK
CO
NC
RE
TE
#1030
#133
2
#1065
WA
LKC
ON
C.
12
1110PLAN 92 PLAN 92
A
20
W 25' 8STRATAPLAN VR1437
BRICK
BR
ICK
CONC. RET. WALL
1Rem 8
PLA
NT
ER
PLA
NT
ER
6.40323 DEAD GAS
2.70
114
DE
AD
GA
S
2.70
114
DE
AD
GA
S
42m
m G
AS
21m
m G
AS
4.88
300m
m V
CP
ST
M
0.91200mm VCP STM
5.00
300m
m V
CP
ST
M
4.40
150m
m V
CP
SA
N
8.50
200m
m V
CP
SA
N
1x4"
HY
DR
O D
UC
T
TH
UR
LOW
ST
200mm VCP STM
1:250H (24"X34" PAPER) FEB 2021
AM AM
RU VS
0
DESIGN
IMPORTANT:CONTRACTOR IS RESPONSIBLE TO SCOPE AND EXPOSE EX. UTILITIES/SERVICES, ANDRECORD LOCATION, SIZE & INVERT ELEVATIONS AT PROP. OR POTENTIAL CROSSINGSPRIOR TO CONSTRUCTION. THE AS-BUILT UNDERGROUND INFORMATION SHOWN ONTHIS DRAWING IS DERIVED FROM THIRD PARTY RECORDS AND VECTOR ENGINEERINGIN NO WAY WARRANTS IT'S ACCURACY. REPORT ANY DISCREPANCIES AND/ORCONFLICTS TO CONTRACT ADMINISTRATOR PRIOR TO CONSTRUCTION.
2513 BOSA BLUESKY PROPERTIES
REV NO REVISIONS DATE DRAWN DESIGN
0 ISSUED FOR REZONING APPLICATION 10 MAR 2021 AM AMvectoreng.ca
604 298-2333
ENGINEERING
PRELIMINARY IRMPPOST DEVELOPMENT
THE SEAL ON THIS DRAWING SIGNIFIES CERTIFICATION OF
CIVIL ENGINEERING ASPECTS OF THIS SITE, BUT DOES NOT
SIGNIFY RESPONSIBILITY FOR GEOTECHNICAL OR
ENVIRONMENTAL ENGINEERING DESIGN. IN NO WAY DOES
VECTOR ENGINEERING SERVICES LTD. OR ITS EMPLOYEES
ACCEPT LIABILITY OR WARRANTY THE WORK WITH RESPECT
TO THE EFFECT OF SETTLEMENT ON THE CIVIL WORKS.
SEE ARCHITECTURAL DRAWINGSFOR BUILDING DETAILS
POST-DEVELOPMENT IRMP SOURCE CONTROL SUMMARY:IRMP CRITERIA:1. RUNOFF VOLUME REDUCTION : RETAIN THE FIRST 24mm OF RAINFALL IN
24-HOURS, AS PER CoV RAINWATER MANAGEMENT BULLETIN (JULY 2018)
TOTAL RAINFALL TARGET FOR CAPTURE = 1608m² x 24mm = 38.59m³
TIER 1 - ONSITE RAINWATER HARVESTING:
SINCE THE BUILDING FOUNDATION WILL COVER THE ENTIRE EXTENTS OF THESITE, INFILTRATION INTO IN SITU SOILS IS NOT POSSIBLE. THEREFORE, TIER 1STRATEGIES COULD NOT BE USED FOR THIS DEVELOPMENT.
TIER 2 - ONSITE RAINWATER RETENTION:
THE SITE HAS OPPORTUNITIES FOR ABSORBENT LANDSCAPED AREAS ONGROUND LEVEL, ROOF AND OVERHANG.
1) GROWING MEDIUM, ASSUMING 20% RETENTION CAPACITY: 390.77m³ x 20% = 78.15m³
WATER RETENTION CAPACITY:
2) TOTAL RAINFALL ON HARD LANDSCAPED AREA NOT DRAINED TO SOFT LANDSCAPE AREA (ROOF) = 636.44m² X 24mm RAIN = 15.27m³
THEREFORE, DETENTION TANK SIZE REQUIRED= 15.3m³REQUIRED FLOW RATE= 3.6 l/sec = 0.0036 m³/sec
2. RELEASE RATE: POST DEVELOPMENT PEAK RELEASE RATE MUST EQUAL ORBE LESS THAN THE PREDEVELOPMENT PEAK RUNOFF RATE
PREDEVELOPMENT 10-YEAR STORM (2014 IDF) RUNOFF RATE = 28.93 l/sec =0.02893m³/secPOST DEVELOPMENT 10-YEAR (2100 IDF) PEAK RUNOFF RATE = 30.02 l/sec =0.03002m³/secREQUIRED STORAGE TO PROVIDE A RELEASE RATE OF 28.93 l/sec = 0.33m³(MODIFIED RATIONAL METHOD)
DETENTION TANK WILL BE PROVIDED AT BASEMENT LEVEL. A FLOW CONTROLORIFICE SIZED TO RELEASE 0.0036m³/sec WILL BE INSTALLED TO ENSURE THEPROPER DETENTION VOLUME IS PROVIDED. DETAILS ON THE FLOW CONTROLMANHOLE WILL BE PROVIDED AT DETAILED DESIGN STAGE.
2. WATER QUALITY: REMOVE 80% TSS FROM THE FIRST 48mm OF RAINFALL OVERHIGHLY POLLUTED SURFACES INCLUDING DRIVEWAYS AND PARKING, AND24mm OVER ALL OTHER SITE SURFACES. SOME TREATMENT WILL BE PROVIDEDBY THE GROWING MEDIUM. THE REMAINING TREATMENT WILL BE PROVIDEDWITH A TREATMENT SYSTEM. DETAILS OF THE TREATMENT SYSTEM WILL BEPROVIDED AT DETAILED DESIGN STAGE.
PLOT DATE: March 9, 2021
SCALE START DATE
DRAWN BY DESIGN BY
CHECKED BY APPROVED BY
DWG. NO.
REV.
DESIGN NO.
DESTROY ALL PRINTS BEARING PREVIOUS NO.
VECTOR JOB NO. CLIENT
SWM2OF2
OUT LINE OF ROOFAREA = 688.3m²
PROPERTY LINESITE AREA = 1608m²
DETENTION TANK TOPROVIDE MIN 15.3m³DETENTION VOLUME.DETAILS WILL BEPROVIDED AT DETAILDESIGN STAGE.
STORM TREATMENTSYSTEM TO REMOVEMINIMUM 80% TSS.DETAILS WILL BEPROVIDED AT DETAILEDDESIGN STAGE.
FLOW CONTROLMANHOLE TO PROVIDE AMAX 3.608L/sec RELEASERATE. DETAILS WILL BEPROVIDED AT DETAILEDDESIGN STAGE
PROP. 5.3m 200Ø PVCSDR35 STM CONN AT 2%,C/W I.C. AT PL.INV. AT PL = 33.48m (CALCFROM GIS)TIE TO EX 200Ø STM SEWER
1065 HARWOOD STREET / 1332THURLOW STREET (NORTH TOWER)
VANCOUVER, BC
DATUM-GEODETICBENCHMARK: MON. V-3508 ATHARWOOD ST AND BUTE STELEV = 27.850m CVD28GVRD DATUM
SITE CATCHMENTAREAS
IMPERVIOUSRATIO
72%POST-DEVELOPMENT
78%PRE-DEVELOPMENT
PERVIOUSRATIO
28%
22%
SOFT LANDSCAPING - LEVEL 1
SOFT LANDSCAPING - ROOF
SITE CATCHMENT AREA BOUNDARY
DIRECTION OF FLOW
SOFT LANDSCAPING - OVERHANG
APPENDIX 3
HYDROGRAPHS PRE & POST DEVELOPMENT
VESL-2513 - Preliminary IRMP Location: 1065 Harwood 1332Thurlow (North Tower)
0.000
5.000
10.000
15.000
20.000
25.000
30.000
35.000
0 10 20 30 40
Flo
w R
ate
(LP
S)
Time Duration (min.)
Hydrograph
Tr=Tc Flow (LPS)
Peak Flow [Post] (LPS)
Max Release Rate Qrel (LPS)
-0.050
0.000
0.050
0.100
0.150
0.200
0.250
0.300
0.350
0.400
0 10 20 30 40 50 60 70
Vo
lum
e (
cub
ic m
ete
r)
Time (minutes)
Required Storage Volume
Required Storage Volume (cm)
2021-03-11
VESL-2513 - Preliminary IRMP Location: 1065 Harwood 1332Thurlow (North Tower)
Max Release Rate Qrel (LPS)
y = 23.56x-0.548
R² = 1
0.0
5.0
10.0
15.0
20.0
25.0
0 5 10 15 20 25 30
Rai
nfa
ll In
ten
sity
(m
m/h
r)
Duration (Hr)
CoV 2014 IDF-5 Yr Return (mm/hr)
Rainfall Intensity (mm/hr)
y = 26.43x-0.542
R² = 1
0.0
5.0
10.0
15.0
20.0
25.0
30.0
0 5 10 15 20 25 30
Rai
nfa
ll In
ten
sity
(m
m/h
r)
Duration (Hr)
CoV 2100 IDF-5 Yr Return (mm/hr)
Rainfall Intensity(mm/hr)
2021-03-11
APPENDIX 4
LANDSCAPING DESIGN AND SOIL LOADING DIAGRAM
THURLOW AND HARWOOD 2
Ground Level Plan
North Tower
CHILDREN’S
PLAY AREA
OUTDOOR
LOBBY
Resting bench
Stormwater infiltration
Water feature
Bike racks
Casual seating
Stormwater runnel water feature
Resting bench
LIN
EA
R G
AR
DE
N
STORMWATER GARDEN
N
THURLOW AND HARWOOD 10
Roof Plan
North Tower
N
N
CONSULTANT
DRAWING TITLE
JOB TITLE
DATE DRAWN
SCALE CHECKED
JOB NO.
ISSUED FOR: DATE
Copyright reserved. The documents and design as an instrumentof service are and at all times remain the exclusive property ofHENRIQUEZ PARTNERS ARCHITECTS and may not bereproduced without the express written consent of HENRIQUEZPARTNERS ARCHITECTS. All designs and related information inwhole or in part shown on these documents are for the express usefor the specified project only and shall not be used otherwisewithout the express written consent of HENRIQUEZ PARTNERSARCHITECTS.
The Contractor shall verify and be responsible for all dimensions onsite and shall inform HENRIQUEZ PARTNERS ARCHITECTS ofany variations from the dimensions and conditions shown on thedocuments. Shop drawings shall be submitted to HENRIQUEZPARTNERS ARCHITECTS for review and approval prior tofabrication.
HENRIQUEZ PARTNERS ARCHITECTS do not warrant that thedrawings are produced to scale. Dimensions may not be scaledfrom the documents.
44.80°
NO
T F
OR
CO
NS
TR
UC
TIO
N
C:\U
ser s
\Tom
asz K
raw
iec\D
ocum
ents
\1602 H
AR
WO
OD
NO
RT
H T
OW
ER
_C
entr
al_
tom
aszkra
wie
cR
CV
LF
.rvt
2/1
8/2
021 3
:07:1
1 P
M
1-SK-001
Soil Retained Volume
Thurlow and Harwood -
North Site1065 Harwood St/ 1332 Thurlow St
Vancouver, BC
1602
Author
Checker
02/18/21
Soil Volume
Level Type Depth Area Volume
LEVEL 1Generic SoilDepth 900
900 136.46 m² 122.81 m³
LEVEL 1Generic SoilDepth 1200
1,200 21.36 m² 25.63 m³
LEVEL 2Generic SoilDepth 600
600 28.99 m² 17.40 m³
LEVEL 2Generic SoilDepth 900
900 53.61 m² 48.25 m³
LEVEL 3Generic SoilDepth 450
450 20.73 m² 9.33 m³
LEVEL 3Generic SoilDepth 900
900 133.67 m² 120.31 m³
LEVEL 34Generic SoilDepth 900
900 3.72 m² 3.34 m³
ROOF LEVELGeneric SoilDepth 450
450 10.43 m² 4.69 m³
ROOF LEVELGeneric SoilDepth 900
900 43.41 m² 39.07 m³
Grand total: 14 452.38 m² 390.83 m³