Date Issued: 9/8/06
IS-1822-U
S
P
LX
M
N
W
31)
Turn off power.
2) A
ttach chain to fixture. Fixture loop has one chain link factory installed.
Chain has one locking link at each end. U
nscrew coupling on locking
link and slip over link attached to loop. Screw
coupling closed.3)
Slip threaded ring (N
) then canopy (M) onto chain (W
)4)
Attach chain (w
ith fixture connected) to bottom of screw
collar loop follow
ing the same procedure as in step 1.
5) W
eave electrical wire, ground w
ire and safety cable through chain links no m
ore than 3 inches apart.6)
Pass electrical w
ire ground wire and safety cable
through threaded ring (N), canopy (M
), one of the slots in screw
collar loop (L) and into outlet box.7)
Pass safety cable through hole (S
ee sec. 1)8)
In area above outlet box wrap cable around one
of the 2 x 4’s erected in section 1 and pull cable taut..9)
Secure cable w
ith (2) clamps provided.
NO
TE
: Cab
le is not to
be used
as the only m
eans of
fixture supp
ort. P
lease follo
w ind
epend
ent mo
unting
instructions co
mp
letely.10) C
onnect fixture ground wire and ground w
ire attached to threaded rod (B
or P) to outlet box ground
wire w
ith wire connector (not provided).
Never connect ground w
ire to black or w
hite power supply w
ires.11)
Make w
ire connections (connectors not provided). R
eference chart below
for correct connections and wire
accordingly.
12) Raise canopy (M
) to ceiling.13) S
ecure canopy (M) in place by screw
ing threaded ring (N) onto screw
collar loop (L)
NO
TE
:NE
C C
OD
E (314.24) requires that ceiling outlet boxes in the U
nited States support up
to 50 lbs. This fixture exceeds 50 lbs. and m
ust be installed using an outlet box approved forup to 100 lbs. or independently of the existing outlet box. Installation hardw
are and instruc-tions are provided for both.
MO
UN
TIN
G T
O A
100 lb. M
AX
. AP
PR
OV
ED
OU
TLE
T B
OX
1)S
upport cable from fixture (see sec. 3) m
ust pass through outlet box. Drill 3/16” diam
eterhole in outlet box if no other holes are available.
2) S
crew threaded rod (B
) from parts bag into pipe coupling (A
) until threaded rod is flush w
ith top of pipe coupling. Secure in place by tightening allen head screw
(C) w
ith providedw
rench.3)
Pass threaded pipe (B
) through mounting strap (D
).4)
Screw
hexnut (H) onto threaded rod (B
).5)
Slip ground lug (F
) and lockwasher (J) onto threaded rod (B
).6)
Thread screw
collar loop (L) onto threaded rod (B) until threaded
rod is flush with hole on low
er side of screw collar loop.
7) S
ecure screw collar loop (L) in place by tightening
hexnut (H) dow
n against groundlug (F),
lockwasher (J) and screw
collar loop.8)
Assem
ble mounting strap (D
) and assembled
parts to outlet box using screws provided
with outlet box.
9) Trial fit canopy (M
) over screw collar loop.
Approxim
ately one half of the screw collar
loop exterior threads should be exposed below
canopy. To increase length of assembly loosen
hexnut (H) and unscrew
screw collar loop no
more then tw
o complete turns. To shorten,
loosen allen head screw (C
). Screw
threaded pipe into coupling until desired height is m
et.10)
After desired position is found, rem
ove canopy and tighten allen head screw
(C)
and anti-rotational screw located next to
center hole inside mounting strap (D
).
NO
TA:
El C
ÓD
IGO
ELÉ
CTR
ICO
NA
CIO
NA
L (NE
C, p
or sus siglas en inglés) (314.24) req
uiere que las cajas d
e salida p
ara techo que se utilizan en los E
stados U
nidos
soporten una carga de hasta 50 lb (22.7 kg). Este artefacto tiene un peso superior a 50 lb,
por lo tanto d
ebe instalarse usand
o una caja de salid
a que esté ap
robad
a para usarse
con cargas de hasta 100 lb
(45.4 kg) o indep
endientem
ente de la caja d
e salida existente.
A continuación se le p
roporcionan el eq
uipo e instrucciones d
e instalación para las d
iferentescajas d
e salida.
MO
NTA
JE A
UN
A C
AJA
DE
SA
LIDA
AP
RO
BA
DA
PAR
A U
N P
ES
O M
ÁX
IMO
DE
100 lb (45.4 kg)1)
El cab
le de ap
oyo del artefacto (vea la S
ección 3) deb
e pasar a través d
e la caja de
conexiones. Perfore un agujero de 3/16" de diám
etro en la caja de conexiones si no tieneotros agujeros disponibles.
2) A
tornille la varilla roscada (B) que se sum
inistra en la bolsa de las partes, en el cople para tubo(A
)hasta que la varilla esté al ras d
e la parte sup
erior del cop
le. Asegúrela ap
retando el
tornillo de cab
eza allen (C) con las llaves q
ue se le prop
orcionan para este fin.
3) P
ase la varilla roscada (B
) por la b
arra o soporte d
e montaje (D
).4)
Atornille la tuerca hexagonal (H
) en la varilla roscada (B
).5)
Deslice la rond
ana plana con el cab
le para tierra (F) y la rond
ana de
seguridad
(J) en la varilla roscada (B
).6)
Atornille la argolla con rosca en la varilla roscad
a (B) hasta q
ue esté la varilla al ras del orificio que se encuentra en la parte inferior de la argolla con rosca.
7) A
segure la argolla con rosca (L) en su lugar apretando la tuerca hexagonal (H
) presionand
o contra la rondana p
lana con el cable p
ara tierra (F), la rond
ana de segurid
ad (J) y la argolla con rosca.
8)E
nsamb
le la barra d
e montaje (D
) y las partes ensam
blad
as a la caja de salid
a usando
los tornillos que se p
roporcionan con la caja.
9) H
aga la prueb
a de ajuste colocand
o el escudete d
e techo (M) sob
re la argolla con roscad
o.Ap
roximad
amente la m
itad d
e las roscas exteriores de la argolla d
eberán estar
expuestas p
or deb
ajo del escud
ete. Para alargar el ensam
ble, afloje la tuerca hexagonal
(H) y gire p
ara destornillar la argolla con rosca, no m
ás de d
os vueltas comp
letas. Para
acortar, afloje el tornillo de cab
eza allen (C). A
tornille la varilla roscada en el cop
le hastaalcanzar la altura d
eseada.
10) U
na vez que se tiene la p
osición desead
a, quite el escud
ete y apriete el tornillo d
e cabeza allen (C
) y el tornillo contra la rotación localizado junto al orificio central al interior d
e la barra d
e montaje (D
).
A
DF
B
H
J
L
M
1A
U.L. A
PP
RO
VE
D 100LB
. MA
X.
OU
TLET B
OX
AN
D H
AR
DW
AR
E
(SO
LD S
EPA
RATE
LY)
CA
JA D
E S
ALID
A Y
EQ
UIP
OA
PR
OB
AD
OS
PO
R U
L PAR
A U
NP
ES
O M
ÁX
IMO
DE
100 LB (45.4 K
G)
CConnect Black or
Red Supply Wire to:
Connect W
hite Supply Wire to:
BlackW
hite
*Parallel cord (round & sm
ooth)*Parallel cord (square &
ridged)
Clear, Brown, Gold or Black
without tracer
Clear, Brown, Gold or Black
with tracer
Insulated wire (other than green)
with copper conductor
Insulated wire (other than green)
with silver conductor
*Note: W
hen parallel wires (SPT I &
SPT II) are used. The neutral w
ire is square shaped or ridged and the other w
ire will be round in
shape or smooth (see illus.)
Neutral W
ire
1)A
paq
ue el suminitro d
e potencia.
2) U
na la cadena (W
) al artefacto. La argolla del artefacto tiene un eslab
ón de cad
ena instalado
de fáb
rica. La cadena tiene un eslab
ón de cierre (X
) en cada extrem
o. Desatornille el
acoplam
iento en el eslabón d
e cierre y deslícelo sob
re el eslabón unid
o a la argolla. Atornille
el cople p
ara cierre.3)
Deslice el anillo roscad
o (N), luego el escud
ete (M) en la cad
ena (W).
4) U
na la cadena (con el artefacto conectado) a la parte inferior de la argolla con rosca (L), siguiendoel m
ismo procedim
iento que en el paso 1.5)
Intercale el alambre de corriente eléctrica y el de conexión a tierra por los eslabones a una distancia
de sep
aración
no mayor a 3 p
ulgadas (7.6 cm
).6)
Pase el alam
bre de conexión a la corriente y el de conexión a tierra a través del anilloroscad
o (N),
el escudete (M
), la varilla roscada (B) dentro de la argolla con rosca (L) y dentro de la caja de salida.
7)P
ase el cable d
e soporte a través d
el orificio (Vea la sección 1.)8)
En
la zon
a arriba d
e la caja de salid
a hag
a enred
e el cable alred
edo
r de u
na d
e las vigas
de 2
x4´in
staladas
en la secció
n 1
y jale el cable ten
sion
ánd
olo
.9)
Fije el cable con d
os (2) abrazad
eras mism
as que se p
roporcionan.
NO
TA: N
o d
eberá u
sar el cable co
mo
ún
ico m
edio
de so
po
rte de
l arte
fac
to. P
or fa
vor
siga
las in
struc
cio
ne
s de
mo
nta
je in
de
pe
nd
ien
tep
or co
mp
leto.
10) Conecte el alam
bre de conexión a tierra del artefacto y el alambre de conexión a tierra de la varil-
laroscada (B
), al alambre de tierra de la caja de salida con el conector (no se proporciona). N
unca conecte el alam
bred
e tierra a los alamb
res blanco o negro d
el suministro d
e corriente11)
Haga las conexiones de los alam
bres (no se suministran los conectores).R
efiérase a la tabla d
e ab
ajo para realizar las conexiones correctas d
e los cables.
12) Sub
a el escudete (M
) hasta el techo.13) Fije el escud
ete (M) en su lugar atornilland
o el anillo roscado (N
) en la argolla con rosca (L).
Conectar el alambre de
suministro negro o rojo al
Conectar el alambre de
suministro blanco al
Negro
Blanco
*Cordon paralelo (redondo y liso)*Cordon paralelo (cuadrado y estriado)
Claro, marrón, am
arillio o negro sin hebra identificadora
Claro, marrón, am
arillio o negro con hebra identificadora
Alambre aislado (diferente del verde)
con conductor de cobreAlam
bre aislado (diferente delverde) con conductor de plata
*Nota: Cuando se utiliza alam
bre paralelo (SPT I y SPT II). El alam
bre neutro es de forma
cuadrada o estriada y el otro alambre será de
forma redonda o lisa. (Vea la ilustracíón).
HiloN
eutral
SA
FETY
CA
BLE
CA
BLE
DE
AP
OY
O
STR
UC
TUR
AL B
RID
GIN
G
ME
MB
ER
MIE
MB
RO
DE
CO
NE
XIÓ
N
ES
TRU
CTU
RA
L
CLA
MP
GR
AM
PA
M
S
P
CE
ILING
JOIS
TV
IGA
DE
TEC
HO
2 X 4
1B
N
D
L
AC
MO
UN
TIN
G T
O A
STA
ND
AR
D O
UT
LET
BO
X
ME
AN
S O
F SU
PP
OR
T M
US
T B
E E
RE
CT
ED
AB
OV
E O
UT
LET
BO
X. B
ELO
W IS
ON
E S
UG
-G
ES
TE
D M
ET
HO
D.
1) S
crew threaded rod (P
) from parts bag into pipe coupling (A
) until threaded pipe is flush with
top of pipe coupling. Secure in place by tightening allen head screw
(C) w
ith providedw
rench.2)
Slip m
ounting strap (D) over provided 1/2-13U
NC
threaded rod (P).
3) R
emove knockout in top of outlet box.
4)S
upport cable from fixture (see sec. 3) m
ust pass through outlet box. D
rill 3/16” diameter hole in outlet box if no other holes are available.
5) In area above outlet box pass threaded rod (P
) through hole in center of outlet box.
6) Lay a 2x4 across ceiling joist on either side of threaded rod (P
).7)
Secure 2x4’s in place by toe-nailing or other m
eans.8)
Screw
hexnut (H) onto threaded rod (P
).9)
Slip ground lug (F
) and lockwasher (J) onto threaded
rod (P).
10) T
hread screw collar loop (L) onto threaded rod (P
) until threaded pipe is flush w
ith hole on lower side of screw
collar loop. 11)
Secure screw
collar loop (L) in place by tightening hexnut (H) dow
n against ground lug (F
), lockwasher (J)
and screw collar loop.
12) Temporarily slip canopy (M
) over screw collar loop (L).
Approxim
ately one half of the screw collar loop exterior
threads should be exposed below canopy.
13) Tem
porarily screw threaded ring (N
) onto screw collar loop (L).
14) In area above outlet box pull up on threaded rod (P
) until canopy is snug against ceiling.
15) S
lide mounting strap (D
) down threaded rod (P
) and against 2x4’s.16)
Screw
pipe coupling (A) dow
n threaded rod (P) until pipe coupling
is snug against mounting strap (D
) and canopy (M) is snug against
ceiling. 17)
Tighten allen head screw (C
).18) S
ecure mounting strap (D
) in place by laying diagonally across both 2x4’s and driving tw
o #10 x 1" sheet metal or equivalent screw
s (not provided) through holes at ends of m
ounting strap. Tighten anti-rotational hex screw
located next to center hole inside m
ounting strap (D) w
ith provided allen wrench..
NO
TE
:M
ounting strap (D) m
ust be secured to prevent rotation.19)
Rem
ove threaded ring (N) and canopy (M
).
LOS
AD
ITAM
EN
TO
S D
E S
OP
OR
TE
DE
BE
N IN
STA
LAR
SE
SO
BR
E
LA C
AJA
DE
SA
LIDA
. A C
ON
TIN
UA
CIÓ
N S
E S
UG
IER
E U
N
MÉ
TO
DO
DE
INS
TALA
CIÓ
N1)
Atornille la varilla roscad
a (P) q
ue se suministra en la b
olsa de las
partes, en el cop
le para tub
o (A) hasta q
ue el tubo roscad
o esté al ras d
e la parte sup
erior del cop
le. Asegúrelo en su lugar ap
retando
el tornillo de cab
eza allen (C) con la llave q
ue se prop
orciona para
tal prop
ósito.2)
Deslice la b
arra de m
ontaje (D) sob
re la varilla roscada (P
) tip
o 1/2 -13 UN
C.
3) R
etire el agujero ciego localizado arrib
a de la caja d
e salida.
4)E
l cable de apoyo del artefacto (vea la Sección 3) debe pasar a
través de la caja de conexiones. Perfore un agujero de 3/16"
de diámetro en la caja de conexiones si no tiene otros agujeros
disponibles.5)
Pase la varilla roscad
a (P) p
or arriba d
e la caja de salid
a a través del orificio central d
e la cajad
e salida.
6) C
oloque una viga d
e techo de 2 x 4´ a cad
a lado d
e la varilla roscada (P
).7)
Fije las vigas con clavos colocados ob
licuamente o p
or otros med
ios de fijación.
8) A
tornille la tuerca hexagonal (H) en la varilla roscad
a (P).
9) D
eslice la rond
ana plana co
n el cable p
ara tierra (F) y la ro
ndana d
e segurid
ad (J) en la
varillaroscad
a (P).
10) A
tornille la argolla con rosca (L) en la varilla roscada (P
) hasta que el tub
o roscado esté al
ras del orificio en la p
arte inferior de la argolla roscad
a. 11)
Asegure en su lugar la argolla con rosca (L) ap
retando la tuerca hexagonal (H
) contra la rond
ana plana con el cab
le de tierra (F), la rond
ana de segurid
ad (J) y la argolla con rosca.
12) Deslice tem
poralm
ente el escudete (M
) sobre la argolla con rosca (L). A
proxim
adam
ente la m
itad de las roscas exteriores de la argolla deberán estar expuestas por debajo del escudete.13)
Atornille tem
poralm
ente el anillo roscado (N
) en la argolla con rosca (L).14)
En el área arrib
a de la caja d
e salida, jale hacia arrib
a sobre la varilla roscad
a (P) hasta q
ueel escud
ete tope contra el techo..
15) Introd
uzca la barra d
e montaje (D
) en la varilla roscada y contra la p
arte superior d
e las vigasd
e 2 x 4´.16)
Atornille el cop
le para tub
o (A) hacia ab
ajo de la varilla roscad
a (P) hasta q
ue el cople top
e contra la b
arra de m
ontaje (D) y q
ue el escudete (M
) tope contra el techo.
17) A
priete el tornillo d
e cabeza allen (C
).18) Fije la b
arra de m
ontaje (D) en su lugar d
ejando en p
osición diagonal cruzad
a amb
as vigas de
2 x 4
´ y lleva
nd
o d
os p
lac
as m
etá
lica
s de
# 1
0 x 1
" o to
rnillo
s eq
uiva
len
tes (n
osu
min
istrad
os) a través de los orificios en los extrem
os de la barra de montaje. A
priete con eltornillo hexagonalcontra la rotación localizad
o junto al orificio central dentro d
e la barra d
e m
ontaje (D) con las llaves allen q
ue se prop
orcionan.N
OTA
. La barra d
e montaje (D
) deb
e fijarse para evitar q
ue gire.19)
Retire el anillo roscad
o (N) y el escud
ete (M).
F
J
H
IS-1822-U
S
FIXT
UR
E A
SS
EM
BLY
1)S
crew loop
to top of center stem
.2)
Screw
center stem to coup
ling on top of fixture b
ody.
3)A
lign hole in bottom
of scroll piece w
ith hole in top of arm
. 4)
Secure scroll to arm
with thread
ed b
all knob.
5)A
lign hole in top of scroll w
ith hole in top of center stem
.6)
Secure scroll to center stem
with thread
ed b
all knob.
7)S
crew thread
ed p
ipe into coup
ling on bottom
of fixture bod
y.8)
Slip
trim over thread
ed p
ipe.
9)S
crew finial on to end
of threaded
pip
e.
For ease in assem
bly, p
roceed
to sectio
n 3. Re
ma
inin
g ste
ps in
fixture
asse
mb
ly ca
n b
e c
om
ple
ted
easier with fixture hang
ing.
10)S
lip glass over sockets.
11)S
ecure glass in place w
ith socket rings.(D
O N
OT over tighten.)
MO
NTA
JE D
EL A
RT
EFA
CT
O1)
Atornille el vástago central al acop
lamiento
en el tope d
el cuerpo d
el artefacto.2)
Atornille el lazo al tub
o roscado en el top
e d
el vástago central.3)
Alinee el agujero en la p
arte inferior de la p
ieza esp
iral con el agujero en el tope d
el brazo.
4)S
ujete el espiral al b
razo con la perilla
redond
a roscada.
5)A
linee el agujero en el tope d
el espiral con el
agujero en el tope d
el vástago central.6)
Sujete el esp
iral al vástago central con la perilla
redond
a roscada.
7)A
tornille un extremo d
el tubo roscad
o al acop
lamiento en la p
arte inferior del artefacto.
8)R
esbale la guarnición encim
a del tub
o roscado.
9)A
tornille el capuchón al extrem
o del tub
o roscado.
Para facilitar el m
ontaje, p
rosig
a a la sección 3.
Los p
asos restantes en el m
ontaje d
el artefacto
se pued
en com
pletar m
ás fácilmente co
n el artefacto
colg
ando
.
10)R
esbale el vid
rio encima d
e los casquillos.
11)S
ujete el vidrio en el lugar con los anillos d
el casquillo.
(NO
apriete excesivam
ente.)
2LO
OP
LAZ
O
GLA
SS
VID
RIO
SO
CK
ET R
ING
AN
ILLO D
EL
CA
SQ
UILLO
SO
CK
ET
CA
SQ
UILLOA
RM
BR
AZ
O
CE
NTE
R S
TEM
VÁ
STA
GO
CE
NTR
AL
FIXTU
RE
BO
DY
CU
ER
PO
DE
LA
RTE
FAC
TO
THR
EA
DE
D B
ALL K
NO
BP
ER
ILLA R
ED
ON
DA
RO
SC
AD
A
THR
EA
DE
D P
IPE
TUB
O R
OS
CA
DO
TRIM
GU
AR
NIC
IÓN
FINIA
LC
AP
UC
HÓ
N
SC
RO
LLES
PIR
AL
THR
EA
DE
D B
ALL
KN
OB
PE
RILLA
RE
DO
ND
AR
OS
CA
DA
CO
UP
LING
AC
OP
LAM
IEN
TO