Disclosure to Promote the Right To Information Whereas the Parliament of India has set out to provide a practical regime of right to information for citizens to secure access to information under the control of public authorities, in order to promote transparency and accountability in the working of every public authority, and whereas the attached publication of the Bureau of Indian Standards is of particular interest to the public, particularly disadvantaged communities and those engaged in the pursuit of education and knowledge, the attached public safety standard is made available to promote the timely dissemination of this information in an accurate manner to the public. इंटरनेट मानक !ान $ एक न’ भारत का +नम-णSatyanarayan Gangaram Pitroda “Invent a New India Using Knowledge” प0रा1 को छोड न’ 5 तरफJawaharlal Nehru “Step Out From the Old to the New” जान1 का अ+धकार, जी1 का अ+धकारMazdoor Kisan Shakti Sangathan “The Right to Information, The Right to Live” !ान एक ऐसा खजाना > जो कभी च0राया नहB जा सकता ह Bharthari—Nītiśatakam “Knowledge is such a treasure which cannot be stolen” IS 7357 (1974): Code of practice for structural design of surge tanks [WRD 14: Water Conductor Systems]
Transcript
Page 1: IS 7357 (1974): Code of practice for structural design of surge tanks · 2018-11-15 · IS : 7357 - 1974 Indian Standard CODE OF PRACTICE FOR STRUCTURAL DESIGN OF SURGE TANKS 0. FOREWORD

Disclosure to Promote the Right To Information

Whereas the Parliament of India has set out to provide a practical regime of right to information for citizens to secure access to information under the control of public authorities, in order to promote transparency and accountability in the working of every public authority, and whereas the attached publication of the Bureau of Indian Standards is of particular interest to the public, particularly disadvantaged communities and those engaged in the pursuit of education and knowledge, the attached public safety standard is made available to promote the timely dissemination of this information in an accurate manner to the public.

इंटरनेट मानक

“!ान $ एक न' भारत का +नम-ण”Satyanarayan Gangaram Pitroda

“Invent a New India Using Knowledge”

“प0रा1 को छोड न' 5 तरफ”Jawaharlal Nehru

“Step Out From the Old to the New”

“जान1 का अ+धकार, जी1 का अ+धकार”Mazdoor Kisan Shakti Sangathan

“The Right to Information, The Right to Live”

“!ान एक ऐसा खजाना > जो कभी च0राया नहB जा सकता है”Bhartṛhari—Nītiśatakam

“Knowledge is such a treasure which cannot be stolen”

“Invent a New India Using Knowledge”

है”ह”ह

IS 7357 (1974): Code of practice for structural design ofsurge tanks [WRD 14: Water Conductor Systems]

Page 2: IS 7357 (1974): Code of practice for structural design of surge tanks · 2018-11-15 · IS : 7357 - 1974 Indian Standard CODE OF PRACTICE FOR STRUCTURAL DESIGN OF SURGE TANKS 0. FOREWORD
Page 3: IS 7357 (1974): Code of practice for structural design of surge tanks · 2018-11-15 · IS : 7357 - 1974 Indian Standard CODE OF PRACTICE FOR STRUCTURAL DESIGN OF SURGE TANKS 0. FOREWORD
Page 4: IS 7357 (1974): Code of practice for structural design of surge tanks · 2018-11-15 · IS : 7357 - 1974 Indian Standard CODE OF PRACTICE FOR STRUCTURAL DESIGN OF SURGE TANKS 0. FOREWORD

IS : 7357 - xl74

Indian Standard CODE :OF P-RACTICE FOR

STRUCTURAL DESIGN OF SURGE TANKS

( First Reprint MARCH 1

UDC 627.846:624.0

988 )

4

0 Cop?‘right 1975

BUREAU OF INDIAN STANDARDS MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG

NEW DELHI 110002

E

Gr 3 January I975

Page 5: IS 7357 (1974): Code of practice for structural design of surge tanks · 2018-11-15 · IS : 7357 - 1974 Indian Standard CODE OF PRACTICE FOR STRUCTURAL DESIGN OF SURGE TANKS 0. FOREWORD

fst7357-1374

Indian Standard CODE OF PRACTICE FOR

STRUCTURAL DESIGN OF SURGE TANKS

Water Conductor Systems Sectional Committee, BDC 58

Chairman

SHRI P. M. MANE Ramilayam, Pcddar Road,

Bombay 400026

Members Reprrsrnlind

&IRK S. P. BHAT Public Works Department, Government of Karnataka, Bangalore

CHIEF CONSTRUCTION ENGINEER Tamil Nadu Electricity Board, Madras SUPERXNTENDINO ENGINEER

( TECHNICAL/CIVIL ) ( Alternate ) CHIEF ENGINEER ( CIVIL ) Andhra Pradesh State Electricity Board, Hyderabad

SUPERINTENDING E N G I N E E R ( DESIGN & PLANNING ) ( Alternate )

CHIEF ENGINEER (CIVIL) Kcrala State Electricity Board, Trivandrum CznEF ENGINEER ( IRRITATION ) Public Works Drpartmcnt, Government of Tamil

Nadu, Madras SUPERINTENDING E N o I N E E R

( DMWC ) ( Alternote ) DIRECTOR ( HCD ) Central Water & Power Commission, New Delhi

DEPUTY DIRECTOR ( PH.1 ) ( Ahmzts) DIRECTOR, LRIPRI Irrigation & Power Department, Government of

SHRI H. L. SHARMA I Altonate 1 Punjab, Chandigarh

SHRI 0. P. DANA ’ SARI J. S. S~NGHOTA ( Alternate )

Beas Designs Organization, Nangal Township

SHRI D. N. DUTTA Assam State Electricity Board, Shillong SHRI R. G. GANDHI Hinduatan Construction Co Ltd, Bombay

SHRI M. S. DIVAN (Al&mate) SHRI K. C. GHOSAL Alokudyog Services Ltd, New Delhi

SHRI A. K. Brsw~s ( Altcmutc) SHRI M. S. JAIN JOINT DIRECTOR RESEARCH ( FE ),

Geological Survey of India, Calcutta Ministry of Railways, New Delhi

RDSO, LUCKNOW DEPUTY DIRE~T~R STANDARDS

( B & S )-1, RDSO, LUCKNOW ( Alternate )

( Continued on page 2 )

@ CopyrigL 1975

BUREAU OF INDIAN STANDARDS

This publication is protected under the In&n Co#right Act (XIV of 1957 ) and reproduction in whole or in part by any means except with written permissionof the pubEsher shall be deemed to be an infringement of copyright under the said Act.

Page 6: IS 7357 (1974): Code of practice for structural design of surge tanks · 2018-11-15 · IS : 7357 - 1974 Indian Standard CODE OF PRACTICE FOR STRUCTURAL DESIGN OF SURGE TANKS 0. FOREWORD

I s t 7357 - 1974

( Confinzudfrom page 1 )

Members Refiresenting

SHRI L. N. KABIRAJ SHRI B.~S. KAPRE

Damodar Valley Corporation, Dhanbad Irrigation & Power Department, Government of

SHRI S. M. BHALERAO ( Alternate ) Maharashtra, Bombay

SHRI Y. G. PATEL SHRI C. K. CHOKSHI ( Alternate )

Pate1 Engineering Co Ltd, Bombay

SHRI A. R. RAICI-RB R. J. Shah and Co Ltd, Bombay SHRX S. RAMACHANDRAN National -Projects Construction Corporation Ltd,

New Delhi SHRI K. N. TANEJA ( Alternate )

SECRETARY Central Board of Irrination Rr Power. New Delhi DEPUTY SECRETARY ( 1.0. ) ( Alternate )

SHRI G. N. TANDON Irrigation Department, Government of Uttar Pradesh, Lucknow

SHRI D. AJITHA SIMHA, Director General, BIS ( Ex-oficio Member ) Director ( Civ Engg )

Secretary

SHRI K. K. SHARMA

Assistant Director ( Civ Engg ), BIS

Panel for Surge Tanks, BDC 58 : P4

Convener

DR S. P. GARB Irrigation Department, Government of Uttar Pradesh, Lucknow

Members

SHRI B. M. BA~AVARAJ Mysore Power Corporation Ltd, Bangalore CHXEP ENGINEER ( CXVIL ) Kerala State Electricity Board, Trivandrum SARI 0. P. DA~TA Beas Designs Organization, Nangal Township

SHRI J. M. MEHRA ( Alternate ) DIRECTOR ( HCD ) Central Water & Power Commission, New Delhi

DEPUTY DIREIXOR ( P&l ) ( Alternate ) EX~GUTIVE ENGINEER Irrigation Research Station, PWL), Poondi ( Tamil

Nadu ) SSRI HARBANS SIN~H Irrigation 8c Power Department, Government of

Punjab, Chandigarh SHRI H. L. SHARMA ( Alternate )

SHRI B. S. KAPRE Irrigation 8x Power Department, Government of Maharashtra, Bombay

SHRI R. K. MUNDIWALE ( Alternate ) DR S. K. ROY Central Water & Power Research Station, Pune

SHRI Y. S. KELKAR ( Alternate ) DR V. SETHURAMAN Indian Institute of Technology, Madras SHRI S. N. SHARMA Heavy Electricals ( India ) Ltd. Bhopal

SHRI J. L. K~OEA (Alternate )

Page 7: IS 7357 (1974): Code of practice for structural design of surge tanks · 2018-11-15 · IS : 7357 - 1974 Indian Standard CODE OF PRACTICE FOR STRUCTURAL DESIGN OF SURGE TANKS 0. FOREWORD

IS : 7357 - 1974

Indian Standard CODE OF PRACTICE FOR

STRUCTURAL DESIGN OF SURGE TANKS

0. FOREWORD

0.1 This Indian Standard was adopted by the Indian Standards Institution on 4 May 1974, after the draft finalized by the Water Conductor Systems Sectional Committee had been approved by the Civil Engineering Division Council.

0.2 The function of a surge tank is to limit the propagation of water- hammer waves generated as a result of changes in load in a hydropower generating complex. Structurally the surge tank consists essentially of a large diameter tank, normally provided underground ( Fig. 1 ). DJferent approaches for the structural design of underground surge tanks have been covered in this. standard.

0.3 For the purpose of deciding whether a particular requirement Of this standard is complied with, the final value, observed or calculated, express- ing the result of a test or analysis, shall be rounded off in accordance with IS : 2-1960’. The number of significant places retained in the rounded off value should be the same as that of the specified value in this standard.

i. SCOPE

1.1 This standard covers the structural design of underground surge tanks.

1.2 The provisions in this standard do not cover design of prestre5sed concrete lining.

2. TERMINOLOGY

2.1 For the purpose of this standard, the definitions given in IS : 4410 ( Part X )-1969t_ and IS : 7396 ( Part I )-1974$ shall apply.

*Rules for rounding off numerical values ( ret&d). tGlossary of terms relating to river valley projects: Part X Civil works of hydra-electric

generation system including water conductor system. $Criteria for hydraulic design of surge tanks:

differential rurge tanks. Part I Simple, restricted, orifice and

3

Page 8: IS 7357 (1974): Code of practice for structural design of surge tanks · 2018-11-15 · IS : 7357 - 1974 Indian Standard CODE OF PRACTICE FOR STRUCTURAL DESIGN OF SURGE TANKS 0. FOREWORD

Is : 7357 - 1974

SECTION XX

FIG. 1 IDEALIZED SURQE TANK

4

Page 9: IS 7357 (1974): Code of practice for structural design of surge tanks · 2018-11-15 · IS : 7357 - 1974 Indian Standard CODE OF PRACTICE FOR STRUCTURAL DESIGN OF SURGE TANKS 0. FOREWORD

I5 I 7357 - 1974

3. NOTATIONS

3.1 For the purpose of this standard the following notations shall have the meaning indicated against each:

A rt = Hoop reinforcement in ems per cm length of surge tank

12 = Internal radius of shaft ( cm )

b = External radius of shaft ( cm )

& = Modulus of elasticity of concrete E R = Modulus of elasticity of rock

P = Design pressure ( kgf/cm* )

P - External pressure ( kgf/cm2 ) o- P, = Total internal pressure ( kgf/cm* )

P , = Internal pressure taken up by the rock ( kgf/cm* )

9c = Permissible compressive stress in concrete ( kgf/cm* )

Q,t = Permissible stress in steel ( kg&/cm2 )

Qt = Permissible tensile stress in concrete ( kgf/cms )

P, = Poisson’s ratio of concrete

WR = Poisson’s ratio of rock

M c = vJ% M, = l/lrR

4. TYPES OF LINING

4.0 The different types of lining which are used in surge tanks and design considerations for each -type of lining are outlined in 4.1 to 4.5.

4.1 Pneumatically Applied Lining- This type of lining generally consists of cement-sand mortar pneumatically shot against the rock surface with or without reinforcement mesh. This is recommended where the type of rock is sound and its joint pattern including dip, strike and shears, if any, are such that slips are not anticipated due to saturation of surround- ing rocks and also when side rock cover equal to at least twice the -maximum design head, subject to a minimum of 15 m, is available.

4.1.1 An average thickness of 10 cm should be adopted for pneumatically applied concrete lining. Wherever rock pattern is such as to give f%llouts into the shaft, a suitable wire mesh of prefabricated fabric conforming to IS : 1566-1967’ may be used. The mesh shall be tied to mild steel bars of at least 25 mm diameter anchored at least 1 metre into the rock. The

*Specification for hard-drawn steel wire fabric for concrete reinforcement.

5

Page 10: IS 7357 (1974): Code of practice for structural design of surge tanks · 2018-11-15 · IS : 7357 - 1974 Indian Standard CODE OF PRACTICE FOR STRUCTURAL DESIGN OF SURGE TANKS 0. FOREWORD

IS : 7357 - 1974

reinforcement shall be covered by 2.5 cm of pneumatically shot concrete. Reinforcing mesh and guniting should follow the rock contour as far as possible by suitably adjusting centre-to-centre distance of the anchors;

4.2 Cement Concrete Lining - Plain concrete may be used only when hard self-supporting rock, but not as good as in 4.1 nor the cover so adequate as required in 4.1, are available.

4.3 Reinforced Concrete Lining - This type of lining shall be adopted in rock of inadequate strength and stability. The design criteria shall be based on the considerations given in 9.2 and 9.3.

4.4 Steel Lining - Where the surrounding rock is not good or there are several openings of various sizes and shapes piercing the periphery of the surge shaft lining thus introducing concentrations of stresses around such openings, there are chances of even reinforced concrete lining cracking due to concentration of stresses and providing chances for sizable seepage of water into the hill mass around. In such cases, specially if the dips and strikes are unfavourable including soft material along such strikes thereby inducing slides of hill mass, steel lining shall be provided. ( Such steel lining can be either at inner skin surface or sandwiched. )

4.4.1 In cases where velocity of flow is too high and there are chances of excessive turbulence and probable cavitation, provision of steel lining of suitable thickness to the exposed surface suitably anchored into the concrete mass against differential pressure has some advantages.

4.5 Sandwiched Steel Lining - Provision of a steel liner on the inner surface becomes costly due to provisions required for anchoring it to withstand differential internal pressure and where prevention of leakage through probable cracks in plain and reinforced cement concrete is appre- hended, sandwiched steel plate lining ( see Fig. 2 ) ( within the otherwise required thickness of concrete ) is economical and advantageous. The minimum thickness of concrete between the sandwiched steel plate and the minimum excavation line should be 15 cm. The concrete lining in front of the sandwiched steel plate shall. be either reinforced or plain, the thick- ness being adequate to withstand external water pressure at the plate surface. Similar sandwiched steel lining may also be provided around openings where water-tightness is considered necessary. The thickness of the steel plate in sandwiched lining shall not be less than 12 mm.

5. DATA REQUIRED

5.1 The foilowing data are needed for structural design of surge tank: a) Exploratory 3-D geological logs of the site for analysis of physical

conditions and geomechanical properities of rock discontinuity for geotechnical and engineering evaluation,

1)) Side rock cover ( contour plans ),

6

Page 11: IS 7357 (1974): Code of practice for structural design of surge tanks · 2018-11-15 · IS : 7357 - 1974 Indian Standard CODE OF PRACTICE FOR STRUCTURAL DESIGN OF SURGE TANKS 0. FOREWORD

4 In situ value-of modulus of elasticity of the rock and horizontal and vertical in situ stresses at different representative depths and data on dilation of rock am! development of loads by instrumentation,

4 Water table and/or spring seepage,

e) Groutability of rock encountered at different depths, and

f > Data required for evaluation of design loads as enumerated in 6.

IS : 7357 - 1974

I-4 INTERNAL DIAMETER I

REINFORCEMENT

L

FIG. 2 SANDWICHED STEEL LINER FOR SURGE SHAFT

6. DESIGN LOADS

6.0 The concrete Iining of the underground surge tank shall be designed to withstand the loads as given in 6.1 to 6.7.

6.1 Internal Water Pressnre- Maximum dynamic water level in the surge tank.

6.2 External Water Pressure - Design should be safe against external water pressure in the tank empty condition. External water pressure shall

7

Page 12: IS 7357 (1974): Code of practice for structural design of surge tanks · 2018-11-15 · IS : 7357 - 1974 Indian Standard CODE OF PRACTICE FOR STRUCTURAL DESIGN OF SURGE TANKS 0. FOREWORD

IS : 7357 - 1974

be either the existing water table or the saturation level in~rock around the surge tank corresponding to maximum static water level in the tank whichever is higher.

6.3 External Grout Pressnre- Contact grouting ( to fill the gaps between rock and lining ) is mandatory. Consolidation grouting of rock around the lining depends on the nature of the rock specially its behaviour during excavation and no two cases are alike.

6.4 External Rock Pressure - The lining is not generally designed to take any appreciable external rock load. However, some rock loads may develop in the lining due to water seepage into the rock during actual operations. Normally lining safe against external water or grout pressure is found to be able to withstand these loads.

63 Seismic Stress - In underground surge tanks, seismic factors are of no practical importance when lining is in contact with rock and may not be considered in design. Elements not in contact with rock and those in overburden should be checked against seismic forces.

6.6 Dead Loads- Dead loads shall be calculated on the basis of unit weight in accordance with IS : 191 l-1967*.

6.7 Live Loads -There are usually no live loads to be considered. However, if there be any, these shall be taken into account depending on the nature of the live load concerned.

7. STRESSES

7.1 Stresses in Reinforcement - Maximum permissible tensile stress, direct tension and bond stresses for reinforcement bars shall be as given in IS: 456-1964t. Permissible stress in steel shall not normally exceed the value specihed in IS : 456-1964t. However, for emergency zonditions as specified in Appendix A of IS : 4880 ( Part V )-1972$ the stresses specifiedin IS : 456-1964t can be exceeded up to a limit of 33.3 percent.

7.2 Stresses in Concrete - The permissible stresses for various grades of concrete shall be as given in IS : 456-1964t.

7.3 Shrinkage and Temperature Effect - Shrinkage and gap between rock and concrete cause tensile stresses in lining. Variation in tempera- ture of flowing water will cause periodic tensile and compressive stresses

*Schedule of unit weights of building materials (&I re&ion).

tCode of practice for plain and reinforced concrete ( second rcuist’on ).

$Code of practice for design of tunnels conveying water: Part V Structural desigo of concrete lining in soft strata and soils.

8

Page 13: IS 7357 (1974): Code of practice for structural design of surge tanks · 2018-11-15 · IS : 7357 - 1974 Indian Standard CODE OF PRACTICE FOR STRUCTURAL DESIGN OF SURGE TANKS 0. FOREWORD

IS : 7357 - 1974

in lining. In order to reduce this effect, an allowance for shrinkage shall be made for a suitable temperature variation limited to a maximum of 15% in concrete.

8. MATERIALS

8.0 The materials used for concrete shall generally conform to the relevant Indian Standards, as given in 8.1 to 8.3.

8.1 Cement - The cement used shall be ordinary Portland cement con- forming to TS : 269-1967*. Generally the use of low heat cement is not found essential.

~8.2 Aggregates -All aggregates shall conform to IS : 383-1970t.

8.3 Reinforcement - All steel bars used for reinforcement shall conform to IS : 432 ( Part I )-1966 $, IS : 432 ( Part II )-19665, IS : 1139-196611 or IS : 1786-19661.

9. STRUCTURAL DESIGN

9.0 The general principles of design of underground surge tanks curres- pond to those adopted for vertical pressure shafts. The magnitude of the Internal and external horizontal pressure depends on the rock cover and quality of rock. Thiciness of lining shall be designed on the basis of Lame’s thick cylinder theory. Hydrostatic forces act on all three directions for various openings and the analysis of the three-dimensional non- symmetric condition is complicated for routine design. Therefore, in exceptional cases, depending upon the geology of the surrounding strata and the number and geometry of openings, three-dimensional photo-elastic tests and mathematical analysis should be correlated to the extent that the structure is safe. In other important cases it would be desirable to provide steel lining.

9.1 Supporting Action of Rock - Reinforced concrete lining transmits pressure to the surrounding rock under ideal condition of no void and

*Specification for ordinary, rapid-hardening and low heat Portland cement (second wvision ).

tSpecification for coarse and fine aggregates from natural sources for concrete ( second revision ) .

$Spccification for mild steel and medium tensile steel bars and hard-drawn steel wire for concrete reinforcement: Part I Mild steel and medium tensile steel bars (rrrend r&on~.

@pccification for mild steel and medium tensile steel ban and hard-drawn steel wire for concrete reinforcement: Part II Hard-drawn steel wire ( second retin ).

IlSpecification for hot rolled mild steel, medium tensile steel and high yield strength steel deformed bara for concrete reinforcement ( retieed ).

~Speci6cation~for cold-twisted steel bars for concrete reinforcement (ret&cd ).

9

Page 14: IS 7357 (1974): Code of practice for structural design of surge tanks · 2018-11-15 · IS : 7357 - 1974 Indian Standard CODE OF PRACTICE FOR STRUCTURAL DESIGN OF SURGE TANKS 0. FOREWORD

IS I 7357 - 1974

infinite elastic rock mass. The load shared by the rock can be determined by the following-formula by equating the displacements of outer circum- ference of the concrete ring with the extension of rock boundary- ( see Fig. 3):

The resultant pressure, after deducting the load shared by the rock, shall be resisted by the lining.

ROCK

4,

FIG. 3 HORIZONTAL SLICE THROUGH SURGE TANK

9.1.1 It is quite usual that near the top ihe surge shaft passes through soil and decomposed rock of varying degree. The concrete lining in such cases shall be designed to cater for these conditions specially depending on the extent of resistance for the support to be expected from such material.

9.1.2 The lining shall be adequate to withstand anticipated external pressure. No specific criteria can be laid down for either the extent of support or the external pressure which shall be assessed as field investiga- tion in each case.

9.1.3 In some cases, part of the lining may assume the form of a water container to be destgned against internal water pressure. It is not uncommon to find cases where part of the periphery is in free air and part against soil or rock, Such cases shall be dealt with individually.

Page 15: IS 7357 (1974): Code of practice for structural design of surge tanks · 2018-11-15 · IS : 7357 - 1974 Indian Standard CODE OF PRACTICE FOR STRUCTURAL DESIGN OF SURGE TANKS 0. FOREWORD

9.2 Lining Thickness - Considering surge shaft as a thick wdlled pipe, the circumferential stress in the lining can be de<ermined by the following

IS I 7357 - 1334

formula:

The above formula is applicable for external hydrostatic pressure acting on the lining. The concrete thickness of the lining as provided at any point should be the greater of the fullowing:

a) Minimum thickness of 0.3 m, ani b) Thickness required to resist maximum external pressure.

9.3 Reinforcement in the Liniag- The hoop reinforcement for the circular tank shall be able to withstand the total hoop force due to net maximum internal water pressure and shall be given by the following formula:

A 8t= (P_PF).O

%t The hoop reinforcement to be provided shall be the greater of the

following:

a) b)

4

0.3 percent of the concrete area of lining; Hoop reinforcement required for the net normal design head taking permissible tensile stress in steel; and Depending upon the geology and rock caver, hoop reinforcement worked out for the maximum design head neglecting the support- ing action of the rock, with higher stresses in steel.

9.3.1 About 60 percent of the steel rib area used for rock support during excavation should be treated as part of the hoop reinforcement, provided they are made effective as reinforcement by use of high tensile bolts at the joints or by welding of the joints or both. Precaution shall be taken to ensure that the rib is completely encased in concrete by suitable means such as by providing holes in webs for pouring concrete, vibration or grouting and for allowing air to escape.

9.3.2 Longitudinal Reinforcement - The percentage of main reinforcement to be provided in the longitudinal direction shall be as specified in IS : 456-1964*.

9.3.3 Openings and Base Fixity - Necessary additional reinforcement to cater for additional stresses due to openings and the restraint at the base shall be provided on the basis of three-dimensional photo-elastic test results.

*Co& of practice for plain and reinforced concrete ( smond revision ) .

11

Page 16: IS 7357 (1974): Code of practice for structural design of surge tanks · 2018-11-15 · IS : 7357 - 1974 Indian Standard CODE OF PRACTICE FOR STRUCTURAL DESIGN OF SURGE TANKS 0. FOREWORD

IS : 7357 - 1974

9.4 Special types of structural members like orifice slabs, riser in a differential surge tank shall be so designed as to take into account dynamic loading.

10. ANCHORAGE

PO.1 To prevent failure due to local bulging and for safety during CON- truction, anchors shall be provided along the periphery with suitable horizontal and vertical spacing depending upon the rock encountered during construction.

11. GROUTING

11.1 Contact grouting shall be done first. Consolidation grouting where considered necessary shall follow. Where grout consumption in contact grouting is heavy, a second contact grouting after a suitable time interval is beneficial to fill up the gaps caused by shrinkage of grout, shall be done in accordance with IS : 5878 ( Part VII )-1972*.

Grouting

11.1.1 Contact Gmhg -Holes for contact grouting in the concrete lining shall be 30” apart circumferentially, extending @3 m into the rock. Vertically the adjacent ring of holes shall be 3-O m apart but shall be staggered as compared to the holes in the adjacent rings. Grouting pressure to be used shall be, in general, equal to the external water pressure, subject to a minimum of 2.5 kgf/cma.

11.X .2 Consolidation Grouting - The same holes used for contact grouting shall be used for consolidation grouting, but redrilled in similar fashion as to extend into the rock up to 6.0 m or to a depth as dictated by geological conditions. Grouting pressure may range from 2<5 to 7 kgf/cm2 depending upon the depth of the section and its geological formation.

*Code of practice for construction of tunnel: Part VII Grouting,

12

Page 17: IS 7357 (1974): Code of practice for structural design of surge tanks · 2018-11-15 · IS : 7357 - 1974 Indian Standard CODE OF PRACTICE FOR STRUCTURAL DESIGN OF SURGE TANKS 0. FOREWORD

BUREAU OF INDIAN STANDARDS

Headquarters :

Manak Bhavan, 9 Bahadur Shah iafar Marg, NEW DELHI 110002

Telephones : 3 31 01 31,3 31 13 75 Telegrams : Manaksanstha

( Common to aCI Offices ) Regional Offices : Telephone

*Western ; Manakalaya, E9 MIDC, Marol, Andheri ( East ), 6 32 92 95 BOMBAY 400093

tEastern : l/14 C. I. T. Scheme VII M, V. I. P. Road, Maniktola, CALCUTTA 700054

36 24 99

Northern : SC0 445-446, Sector 35-C CHANDIGARH 160036

Southern : C. I. T. Campus, MADRAS 600113

Branch Offices :

{ 21843 31641

I 41 24 42 41 25 19

141 2916

Pushpak.’ Nurmohamed Shaikh Marg, Khanpur, AHMADABAD 380001

2 63 48 2 63 49

‘F’ Block. Unity Bldg, Narasimharaja Square, BANGALORE 560002

;2 48 05

Gangotri COmPkW 5th Floor, Bhadbhada Road, T. T. Nagar, 6 27 16 BHOPAL 462003

Plot No. 82/83, Lewis Road, BHUBANESHWAR 751002 -5315 Ward No. 29, R. G. Barua Road,

5th Byelane. GUWAHATI 781003 5-8-56C L N. Gupta Marg. (Nampally Station Road),

HYDERABAD 500001 R14 Yudhister Marg. C Scheme, JAIPUR 302005

117/4186 Sarvodaya Nagar. KANPUR 208005

Patliputra Industrial Estate, PATNA 800013 Hantex Bldg ( 2nd Floor ), Rly Station Road,

TRIVANDRUM 695001

lnspecfion Office ( With Sale Point ):

5 36 27

-

22 10 83

=C 6 34 71 6 98 32

21 68 76 21 82 92

6 23 05 52 27

Institution of Engineers ( India) Building, 1332 Shivaji Nagar, 5 24 35 PUNE 410005

*Sales Office in Bombay is at Novelty Chambers, Grant Road, Bombay 400007

89 66 28

tSales Office in Calcutta is et 5 Chowringhee Approach. P. 0. Princep Street, Calcutta

27 68 700072

00

Reprography Unit, BIS, New Delhi, India


Recommended