ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND NUCLEAR PHYSICS Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada
Transcript
Page 1: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

ISAC II OPERATION and

FUTURE PLANS

Marco Marchetto

CANADA’S NATIONAL LABORATORY FOR PARTICLE AND NUCLEAR PHYSICS

Owned and operated as a joint venture by aconsortium of Canadian universities via a contributionthrough the National Research Council Canada

Page 2: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

Outline

• Radioactive Ion Beam• Radioactive Ion Beam• Production method

• ISAC facility

• ISAC II operation

• ISAC II linac upgrade

• Future plans• Future plans

Page 3: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

RIB production

ISOL

Transfertube

Ion sourceIsotope/Isobar

separator

Driver

IN FLIGHT

Production beam Thick,

hot target

Post-accelerator

acceleratorFragmentseparator

RadioactiveI b

ExperimentRadioactive

ion beam

Ion beam

Experiment

ThinProduction target

Heavy ionaccelerator

Courtesy of EURISOLCourtesy of EURISOL

Page 4: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

RIB in the WORLD

Page 5: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

ISAC at TRIUMF

• ISOL facility for rare isotope

beam (RIB) production

Hi h t d i b• Highest power driver beam

(50 kW )

• Most intense radioactive• Most intense radioactive

beam of certain species (11Li

halo nucleus)halo nucleus)

Page 6: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

ISAC driver

• H- cyclotron as proton driver;

• ISAC proton accelerated to 500 MeV

t 100 Aup to 100 μA;

• Five Year Plan 2010-2015: one more

proton line for RIB productionproton line for RIB production.

Page 7: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

Target station and Mass separator• Two underground target stations;• Two underground target stations;

• Proton beam sent to one target station while servicing the other

• Pre-separator inside the shielded areaPre separator inside the shielded area

• Mass separator on bias platform

• Charge breeder option availableg p

Presentation on Thursday

morning TH201 by F. Ames

Page 8: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

ISAC overview

SC LINAC

DTLDTL

RFQ

Page 9: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

ISAC I Linac

RFQ• RFQ

• 8m long CW machine

• 150 keV/u 3≤A/Q≤30• 150 keV/u, 3≤A/Q≤30

• high quality longitudinal emittance

• DTLDTL

• Separated functions

• Five IH interdigital RF cavities• Five IH interdigital RF cavities

• Three split-ring bunchers

V i bl hi• Variable energy machine

• 150 keV/u≤E≤1.8 MeV/u, 2≤A/Q≤6

• ISAC II injector 1.5 MeV/u

Page 10: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

ISAC II Linac

Fi d l• Five cryomodules:

• Four bulk niobium superconducting

cavities per cryomodule (20 cavities)cavities per cryomodule (20 cavities)

• One superconducting solenoid

Page 11: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

Medium Beta SC cavity• Quarter wave resonator at 106 08 MHz;Quarter wave resonator at 106.08 MHz;

• CW operation: Epeak=35 MV/m (Ea=7 MV/m)

@ 7W (spec. 6MV/m @ 7W);@ ( p @ )

• Medium beta section total voltage of 20 MV;

• Unique LLRF controls (Poster THP100 by ISAC specification

K. Fong);

• No degradation in gradient performance.

Page 12: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

Outline

• Radiactive Ion Beam• Radiactive Ion Beam• Production method

• ISAC facility

• ISAC II operation

• ISAC II linac upgrade

• Future plans• Future plans

Page 13: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

• Delivery of RIB is challenging Delivering chain:

Beam delivery groupDelivery of RIB is challenging. Delivering chain:

• Driver (three simultaneous extracted beam in CW, 90%

availability);

• Target (high power target, 90% availaibility);

• Post accelerators (three linacs in series, 98%

availability);

• Beam Delivery Group formed by experts:

B d i d l t t i• Beam dynamics and accelerator tuning;

• Sources and Targets;

• Diagnostics (Poster TUP071 by A Mitra);Diagnostics (Poster TUP071 by A. Mitra);

• High level application (Poster MOP052 by M. Marchetto);

• Purpose: minimize downtime and maximize integrated beam

current for an experiment.

Page 14: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

Beam delivery

• RIB are very low

intensity beam

103-106 particle/s;

• Pilot beam of

bl istable ions

matching RIB A/Q;

• Low intensity• Low intensity

diagnostic.

Page 15: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

Beam delivery success

• Linac accelerators operate with

high reliability >98%;

Several key experiments completed• Several key experiments completed

successfully :

• Maya experiment (GANIL) using• Maya experiment (GANIL) using 11Li most intense in the world:

Courtesy of R. Kanungo

Courtesy of R. Kanungo

Page 16: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

Outline

• Radiactive Ion Beam• Radiactive Ion Beam• Production method

• ISAC facility

• ISAC II operation

• ISAC II linac upgrade

• Future plans• Future plans

Page 17: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

• Add 20 more cavities housed in three

ISAC II linac upgrade• Add 20 more cavities housed in three

cryomodules;

• 141 MHz bulk niobium quarter wave;141 MHz bulk niobium quarter wave;

• High beta section commissioned at the

end of 2009.

Poster MOP018 by R. Laxdal

Poster MOP109 by R. Keitel

Poster THP004 by A. Mitra

Page 18: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

First Frequency Tuning

141 MHz QWR fabrication• TRIUMF is collaborating with a local First Frequency Tuning• TRIUMF is collaborating with a local

company, PAVAC Industries, to fabricate

the cavities (Poster THP003 by R. Laxdal)( y )

• First step was building two copper

models

• Then two bulk niobium prototypes

• Etching done at TRIUMF

Pre-weld Etching - TRIUMFEB WeldingForming and Machining

Page 19: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

Two prototypes are already completed

141 MHz QWR test

• Two prototypes are already completed

and tested

• Both cavities achieve ISAC-II• Both cavities achieve ISAC-II

specifications; Ea=6MV/m for Pcav≤7W

(Cavity R0~15nΩ)ISAC specification

(Ca ty 0 5 )

Page 20: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

Outline

• Radiactive Ion Beam• Radiactive Ion Beam• Production method

• ISAC facility

• ISAC II operation

• ISAC II linac upgrade

• Future plans• Future plans

Page 21: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

TRIUMF i f d d i 5 l (j t i t d th FYP 2010 2015)

FIVE YEAR PLAN

• TRIUMF is funded in 5 years cycle (just printed the FYP 2010-2015);

• TRIUMF is not just RIB: nuclear medicine, isotope production,

material science tecnology transfer;material science, tecnology transfer;

• Motivation: TRIUMF wants to further expand its global roles;

• ISAC wants to be the leading ISOL RIB facility:ISAC wants to be the leading ISOL RIB facility:

• Issues:

• Single operating target station (2900 hours RIB delivered over

4500 driver availablity);

• 12 experimental stations and 1 available RIB at the time;

• Development of new RIB shares time with running experiment;

• Solution: Three RIB available at the same time one for each

experimental area.

Page 22: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

FUTURE PLANSISAC II • Goal: three simultaneous

radioactive beams

N l t

ISAC II

ISAC III • New complementary

driver (e-linac): electron

driver for Photo-Fission

ISAC III

ISAC INew

Front End

NewAccelerators

driver for Photo-Fission

• New target stations and

mass separatorsNew Targets

New MassSeparators

Front End

mass separators

• New front end and post

accelerators

Targets

• Staged installation

e-linac

Cyclotron

Page 23: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

• Target B - The e-linac turns on in 2013, the new proton line starts delivering

Estimated RIB Productiong , p g

in 2014; more than doubles RIBs delivered by the end of the first five year plan

• Target C - RIB hours more than triple over the course of the full ten year plan

10000

12000

starting in 2018

p+ C

8000

10000

r Del

iver

ed

p+ B

e- C

4000

6000

Hou

rs/y

ear

p+ A

e- B

0

2000RIB

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Year

Page 24: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

e-LINAC• Electron driver for photofission:Electron driver for photofission:

independent and complementary;

• Elliptical cavities at 1.3 GHz ;

Courtesy of JLAB

p ;

• Operation mode CW (limited

gradient at 10 MV/m);

• Final energy 50 MeV;

• Iaverage=10 mA ;

• ½ MW beam power.

50kW10kW

10MeVGun

25MeV50kW 50kW 50kW 50kW 50MeV

50kW50kW10kW

Injector Driver201350kW 50kW50kW

2017

Page 25: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

Photofission

e-LINAC

Converter

Photofission Proton production

Page 26: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

SCRF at TRIUMF

ISAC II Phase I106 MHzβ =0.057, 0.071 ISAC II Phase IIEp=35 MV/m 141 MHz

β =0.11Ep= 35 MV/m

E-linac/VECC1.3 GHzβ = 1 SPLβEp= 20 MV/m 704 MHz

β = 0.65, 1Ep= 50 MV/m

ILC1.3 GHzβ = 1β 1Ep= 63 MV/m

Page 27: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

New SCRF activities

• New single cavity cryostat for 2K

operation of 1.3 GHz elliptical cavity

RRR t t• RRR measurement setup

• Single cell elliptical cavity test

• Elliptical cavity fabrication (PAVAC• Elliptical cavity fabrication (PAVAC

industries)

• New collaborations:

Courtesy of FERMILAB

New collaborations:

• Fermilab

• University of Toronto y

• VECC laboratory

Poster THP002 byPoster THP002 by A. Grassellino

Page 28: ISAC II OPERATION and FUTURE PLANSepaper.kek.jp/LINAC08/talks/mo101_talk.pdf · ISAC II OPERATION and FUTURE PLANS Marco Marchetto CANADA’S NATIONAL LABORATORY FOR PARTICLE AND

Conclusion

• Medium beta section of the ISAC II linac is

operating for two years with no degradation

in performance

• Upgrade of the ISAC II linac is underwayUpgrade of the ISAC II linac is underway

increasing the voltage capability to 40MV

• 1.3 GHz SCRF program started at TRIUMF

• Future plan to expand the facility

published in the Five Year Plan

T lk FR204 b N L kTalk FR204 by N. Lockyer