+ All Categories
Home > Documents > ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... •...

ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... •...

Date post: 18-Jun-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
28
ISAM October Updates
Transcript
Page 1: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

ISAM October Updates

Page 2: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

ISAM- Resources Page

• Resources are displayed based on level of intervention • Resources can be downloaded all at once or individually Note: Ex of 1st Year resources, FIR and 2nd Year resources vary

Page 3: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

ISAM- Review Summary Page

• All reviews default to Awaiting Review • Submission Due Date 11/21/2014 PBM • 10/31/2014 State Accountability is a roll-up date • Submission Status is Pending until a submission is received • TEA/TCDSS Contact(s) are listed in the Review Contacts box

Page 4: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

ISAM- Review Contacts

• Review contacts are displayed on the right-hand side of the Review Summary Page

• Review contacts information (phone and e-mail) is displayed once a person “clicks” on the link

Page 5: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

ISAM- Submissions Page

• Required Submissions are marked with an orange asterisk • Submission Status defaults to Pending until a submission is received • DCSI Qualifications (if applicable) due 10/10/2014 • Targeted Improvement Plan due 10/31/2014 IR 11/21/2014 PBM Note: Ex of 1st Year Submissions, FIR and 2nd Year submissions vary

Page 6: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

ISAM- Indicators Page

• Indicators page shows a copy of the LEA/campus Accountability Report

• Click the link under available reports to view Note: This is the masked report on the public Accountability site

Page 7: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

ISAM- Feedback/Follow-Ups Page

• Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between submissions to the feedback/follow-ups • Status will default to “Not Started” until a support specialist enters data • Click “View” to read all entered data Note: Ex of 1st Year Feedback/Follow-Ups, FIR and 2nd Year Feedback/Follow-Ups vary

Page 8: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

At least one contact must be assigned for each review before submissions are accepted by the system.

If no contact is assigned, an error indicating that

“no contact is assigned” will appear on the page.

One program contact must be identified before

documents may be submitted to the ISAM system.

Assigning Program Contacts

Page 9: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

Current Contacts are listed on the Events Summary Page on the right-hand side of the webpage under “Program Contacts: 2014-2015.”

To add a contact from the Events Summary page, select “Contacts” to view a current

contact or add a new contact.

Assigning Program Contacts

Page 10: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

Enter all new contacts at the LEA level, then assign the contact to specific campus(es) and specific LEA program(s).

All contacts that are expected to receive automated emails must have a profile setup in ISAM.

Select “Create New” on the “Contacts” page to add a new contact. The page will refresh to a form to be completed.

Assigning Program Contacts

Page 11: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

Enter all contact information for the new program contact and click “Save.” Select the organization(s) associated with the contact. Select the appropriate position(s). Select the current to present year. Select the program area(s) assigned to the contact.

Assigning Program Contacts

Page 12: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

For previously-added contacts: Assign the contact to the review (“Review Contacts”

link). Two-step process for new contacts: Add the contact to the list (“Contacts” link located on

the Events Summary Page). Assign the contact to a review (“Review Contacts”

link).

Assigning Program Contacts

Page 13: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

Assigning Program Contacts

While viewing an LEA or campus review, “select ‘Review Contacts” from the left-hand navigation bar

Then, click “Edit” to add an individual as a contact.

Page 14: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

It is important that information in the “Review Contacts” box is correct in order to receive automated emails

Automated emails are sent to contacts

once changes are made within ISAM. Contacts assigned to specific program

areas will receive automated emails regarding only those program(s).

Updating Contact Information

Page 15: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

Updating Contact Information

From the Events Summary page, select the Contacts link. Select the View link of the profile being edited.

Page 16: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

ISAM November Updates

Page 17: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

PBM data • Live in ISAM on 10/17/2014 • Always check the “What’s new section?” and the “Staging

Dates” section • Customized resources, submissions, follow-ups

Page 18: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

Federal Requirements data • Live in ISAM on last Wednesday (10/29/2014) • Always check the “What’s new section?” and the “Staging

Dates” section • Customized resources, submissions, follow-ups

Page 19: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

Coming Soon • TAIS Requirements

Document • Sustainability Plan • Principal Retention

Summary • Teacher Retention

Summary • Targeted Improvement

Plan FAQ

Page 20: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

ISAM- Resources Pages

• All ISAM resources pages have a direct relationship with the program area in which an LEA or campus is identified.

• TAIS related resources are included on most

of the Program pages (State Accountability, Federal Requirements and PBM.)

Page 21: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

ISAM- Submissions Page • All ISAM review pages have a direct relationship

with the program area in which an LEA or campus is identified.

• Most submission requirements are the same. • The agency has worked hard to align submission

requirements across program areas. • There may be additional submissions as

requested from the support specialist assigned.

Page 22: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

ISAM- Submissions Page-Priority

• Required Submissions are marked with an orange asterisk • Submission Status defaults to Pending until a submission is received • DCSI Qualifications (if applicable) due 10/31/2014 Note: Priority Review

Page 23: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

ISAM- Indicators Page

• Indicators page shows a copy of the LEA/campus Accountability Report, PBMAS Report, ICA Report and/or RF Rubric if applicable

• Click the link under available reports to view

Page 24: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

ISAM- Feedback/Follow-Ups Page

• Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between submissions to the feedback/follow-ups • Status will default to “Not Started” until a support specialist enters data • Click “View” to read all entered data Note: Ex of 1st Year Feedback/Follow-Ups, FIR and 2nd Year Feedback/Follow-Ups vary

Page 25: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

Assigning Program Contacts At least one contact must be assigned

for each review before submissions are accepted by the system.

If no contact is assigned, an error

indicating that “no contact is assigned” will appear on the page.

One program contact must be identified

before documents may be submitted to the ISAM system.

A PowerPoint Presentation containing updating and assigning contacts e-mails was posted to our website and sent via e-mail, listserv and to support specialists as guidance.

Page 26: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

E-mailing Review Contacts • ISAM will e-mail review contacts regarding the following:

– submissions received – submissions complete – upcoming submissions – overdue submissions

• ISAM e-mail notifications will come from the ISAM inbox. • Please remember in order to receive these e-mail

notifications LEA, campus and ESC contacts must be assigned to the reviews.

Page 27: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

What’s Next?!?! • SPP Data load • TTIPS Cycle 3 • DVM-L Data load • DVM-D Data load • DVM-SA Data load • Web-based Improvement

Plan integration • Communication log

enhancement

Note: The order may change based on the agency’s priority

Page 28: ISAM October Updates · • DCSI Qualifications (if applicable) due 10/31/2014 ... • Feedback/Follow-Ups for all submissions are new for 2014-2015 • There is a 1:1 Ratio between

Additional Resources

Helpful links are posted in the “Intervention Links” section on the Event Summary page. See the step-by step guide in ISAM. Links

For TEASE Access

http://www.tea.state.tx.us/index2.aspx?id=2728

For TEAL Access

https://pryor.tea.state.tx.us/TSP/TEASecurePortal/Access/LogonServlet

• Questions/Feedback related to ISAM

[email protected]

• Questions/Feedback related to documents

[email protected]

• Questions/Feedback related to TEASE/TEAL

[email protected]

ISAM


Recommended