+ All Categories
Home > Documents > ISENLO Rebuilding KwaraFOR ALL - AA Meter

ISENLO Rebuilding KwaraFOR ALL - AA Meter

Date post: 23-Mar-2022
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
76
ISENLO Rebuilding Kwara FOR ALL 1 #365daysafterotoge
Transcript

ISENLO

Rebuilding Kwara FOR ALL

1

#365daysafterotoge

“On may 29, 2019. I was sworn-in as the governor of kwara state, beginning a new chapter in the history of our state.

It’s the first year of the four years given to us by the good people of kwara state to rebuild our state and make it work for all irrespective of family, tribe and religion. And we are doing exactly that!” -Abdulrahman Abdulrazaq

2

Table of Content

MINISTRY OF WATER RESOURCES

KWARA NORTH•(1) Rehabilitation Of Pategi Waterworks

•Installation Of 2 Nos 11kw Submersible Pumps With Their Respective Control Panels•Installation Of 200kva Transformer

•Relaying Of Upvc Pipe Along Galadima And Makun Road•Repair Of Service Tank, Overhead Tank And Aeration Tanks

•Repair Of Pipe Burst On The Distribution Main Lines (100mm Ac Pipe)•Drilling Of A New Borehole And Installation Of Pump

•Installation Of Aeration Pump With Panels•Flushing Of Industrial Borehole

•Repair Of Generator

KWARA NORTH SENATORIAL ZONE

KWARA NORTH(2) Rehabilitation 7 Of Lafiagi Waterworks

•Flushing Of Industrial Borehole•Installation Of 7.5kw Submersible Pump And Its Corresponding Electrical Panel

•Electrical Connections For The High Lift Pump•Installation Of The 30kw High Lift Pump With Panels

•Replacement Of The 100mm And 200mm Sluice Valve On The Distribution Line Among Others.

KWARA NORTH SENATORIAL ZONE

KWARA NORTH(3) Rehabilitation Of Kaiama Waterworks

•Flushing Of Industrial Borehole•Installation Of 7.5kw Submersible Pumps Including Construction Of Their Control Panels•Servicing Of The Existing 75kva Generating Set With Purchase Of 2nos 200amp Battery

•Welding, Repair And Repainting Of The Existing Overhead Service Tank•Replacement And Relaying Of 2” And 3” Existing Distribution Line Along The Secretariat Office (210m)

Affected By Erosion•Relaying Of The Destroyed 6” Existing Distribution Line (320m)

•Expansion And Extension Of Pipeline To Tenebo Road, 3” And 6” Respectively (950m) With The Construction Of Stand Pipes

•Laying And Connection Of Water Supply To The Resident Doctor’s Quarters With Stand Pipes Among Other Works Done.

KWARA NORTH SENATORIAL ZONE

KWARA NORTHRehabilitation Of Gwanara Waterworks

•Drilling Of Industrial Borehole•Installation Of Pumps With Construction Of Panels And Relevant Devices•Repair And Replacement Of The Existing Control Panels And Accessories

•Repositioning Of The Exposed 3” D.I Rising Main Lines•Provision Of Pipe Line Extension Across The Teeming Growing Community

•Provision Of Standpipes Across Strategic Positions In The Community•Resuscitation Of Abandoned Overhead Tank And Connection To The Distribution Lines

•Provision And Installation Of New Uk 30kva Perkins Generator•Overhauling Of The Old Generator Set Including The Purchase Of Two (2) Batteries

KWARA NORTH SENATORIAL ZONE

KWARA NORTHDrilling Of Motorized Boreholes In Baruten Local Government

1) Yashikira2 )Gure

3 )Kosuboisu4) Geasoro

5) Okuta6) Taberu

7) Ngurume8) Ilesha Baruna

9) Shiya10) Boriya

KWARA NORTH SENATORIAL ZONE

KWARA CENTRAL SENATORIAL ZONE(5) Rehabilitation of Asa Dam Waterworks

• Cleaning of the sedimentation tanks

• Redesigning of the Lateral pipes

• Purchase and installation of a new chlorinating system

• Repair of the low lift pump

• Repair of the cooling system in the panel rooms of the low lift and high liftpump sections respectively

• Tiling of the inner walls of the alum tanks and

• Improvement on the security lightings of the Waterworks.

• Installation of Borehole In Shutta Community (AsaLocal Government)

• Repair of water infrastructure at Ilorin Teaching Hospital

• Connection of Sobi Waterworks to Sobi SpecialistsHospital

KWARA NORTH SENATORIAL ZONE

Rehabilitation of Igbaja Waterworks• Installation of 11kw sewage pump at the intake

• 15kw horizontal pump at the aeration

• Servicing and re-installation of the 11kw and 15kw horizontal pumps

• Installation of 45kw horizontal high lift pump

• Servicing 30kw horizontal high lift pumps respectively

• Repair of generator

• Installation of 2Nos 60bar dosing pumps among others

KWARA SOUTH SENATORIAL ZONE

Rehabilitation of Oro-Ago Waterworks• Drilling of Industrial Borehole and its installation

• Installation of Transformer and its relevant accessories

• Installation of Submersible and Horizontal Pumps with construction of panels and relevant devices

• Construction of Shed and concrete floors for Storex tank

• Provision and installation of piping network for Storex tank

• Fencing of Borehole site, pump house and Storex tanks with wired link

• Provision of pipe line extension across the teeming growing community

• Provision of Standpipes across strategic positions in the community

• Provision and Installation of New 100KVA Perkins Generator

KWARA SOUTH SENATORIAL ZONE

Other works on going are Motorized boreholes• Repair of Busted Pipe at Ita Elepa

• Repair of Busted Pipe at Audi road, Sango Area

• Ita Koko

• Adefalu

• Aliara village

• Rehabilitation of Alanamu borehole

• Fixing of burst pipe and reticulation work in igbaja and lafiagi

• Alagbado rehabilitation of ductile pipe at Alagbado bridge

KWARA SOUTH SENATORIAL ZONE

15

MINISTRY OF WORKS AND TRANSPORT

MINISTRY OF WORKSS/No. Projects Status

1. Town Hall/Station Road Erin-Ile, Oyun LGA (Oyun LGA) On-Going

2 Museum Road, Esie in (Irepodun LGA) On-Going

3 CAC Ogere road in Babanloma town in (Ifelodun LGA) (Asphalt Overlay)

On-Going

4 Oro-Ago to Oyate (Ifelodun LGA) On-Going

5 Osi township road (Ekiti LGA) On-Going

6 Tipper Garage Junction -Amuyo-Adesoye College (Offa LGA) On-Going

7 Ipata Market Internal Road (Ilorin East LGA) On-Going

8. Adeta Primary School Road linking Kuntu Road (Ilorin West) On-Going16

MINISTRY OF WORKSS/No. Projects Status

9 Construction of Sobi Specialist Hospital-Gaa-Osibi-Medina Road (Ilorin South LGA)

On-Going

10 Alore-Banni-Adabiyat (Ilorin West) On-Going

11College Of Education Road Ilorin, Ilorin West LGA

On-Going

12 Drainage along Yebumot-Al-hikmah-Adeta roundabout (Ilorin West LGA)

Not Started

13 Ipata –Oloje Market Internal Road (Ilorin West LGA) On-Going

14 Construction of Asa Dam (Lower Road) by Railway Flyover by Hon. Magaji (Ilorin West LGA)

On-Going

15 Ero Omo-Kilanko-Olorunsogo (Ilorin South) Not Started

16 Awolowo Road-Tanke Linking Danialu Primary School (Ilorin South)

On-Going17

MINISTRY OF WORKSS/No. Projects Status

17 Sango-Akerebiata road rehabilitation (Hydraulic Structure and 1.2km Asphalt Overlay) (Ilorin East LGA)

On-Going

18 Internal Road Queen Elizabeth School On-Going

19Shao Township road (Moro LGA)

On-Going

20 Market Junction-Emir Palace Road, Gwanara (Baruten LGA) On-Going

21 Kaiama Roundabout to General Hospital (Kaiama LGA) On-Going

22 Emir’s Road, Patigi (Patigi LGA) On-Going

23 Secretariat Road Lafiagi, (Edu LGA) On-Going

24 Tswata-Bodzo Road, Tsonga (Edu LGA) On-Going18

MINISTRY OF WORKSS/No. Projects Status

25 Tsaragi-Market-Batakpan Box Culvert Road (Edu LGA) On-Going

26 Gberia Township road (Kaiama LGA) On-Going

27Ita Ogunbo-Ita Elefun

Completed

28 Oke Apomu-Ile Eletu Banni Completed

29 Ode Adana-Singini linking Ile Kutu, Okekere Completed

30 Oke Ebo Primary Sch.-Ile Alaya Completed

31 Aibinu Street-Idigba Completed

32 Koro Afoju Completed19

MINISTRY OF WORKSS/No. Projects Status

33 Baboko linking Eruda Completed

34 Erubu Street Off Area Court Street Completed

35 Oke Apomu-Sarumi Completed

36 Alanamu Akeyede - Agaka Completed

37 Area Court Centre Gboro Completed

38 Popo Giwa Completed

39 Babakini-Ode Alausa Completed

40 Babakini – Agbaji Completed

41 Ita Ogunbo-Idilamosowo – Ita Elefun Completed20

MINISTRY OF WORKSS/No. Projects Status

42 Abata Asunkere-Ajibade linking Ita Merin 70% Completed

43 Abegunde Lanronkun linking Amule School 40% Completed

44 Oke Kura (Munabau Mosque)-Agbarere 40% Completed

45 Grading of Kaiama to Chainage 56km along Kaiama-Bode Saadu road

Completed

46 Grading of Ilesha Baruba to Oyo State Boundary Ogboro Completed

47 Patching of potholes and Sectional overlay on Offa Garage, Saw-Mill, Olorunshogo, Asa-Dam, Sanni Okin, Apalara/Al-Hikmah University, Atiku, Kaduna, Osere, Kokorokan, and Isale Aluko Roads, Ilorin

Completed

21

MINISTRY OF WORKSS/No. Projects Status

48 Patching of potholes and Sectional overlay on Adeta-Kuntu-Adebata, Hajj Camp, Challenge Junction, Dss Frontage, Unity Road, Lagos, Amuda Gobir, Pipe Line, Benin, Adewole Road, Kaduna Road

Completed

49 Patching of potholes and Sectional overlay on Adeta-Kuntu-Adabata, Ogidi-Oloje, Offa Garage, Dangote, Offa Road, pipeline Road, AdetaPakata Road

Completed

50 Patching of potholes and Sectional overlay on New Yidi, Abdul Azeez Attah, Emir’s Palace, Cemetary-Osere Road, Osere-SawMill Garage, Post Office, Flower Garden, Adeta-Pakata, Isale Oja, Kaduna Road

Completed

51 Patching of potholes and Sectional overlay , mending of Drainage, Desilting and Cart Away on Stadium Underpass

Completed

52 Construction of Road to Asphalt Level at Jengbe-Oloje Estate Project Completed

53 Box Culvert Construction at Jengbe-Oloje Estate River Completed

54Box Culvert Construction at Oke-Fomo

Completed

22

MINISTRY OF WORKSS/No. Projects Status55 Eroded portion of Federal road at Otte Completed56 Grading of some portion of Kaiama-Kishi Road. Completed

57 Retaining Wall and Asphalt work project at Eieyenkorin -Ogbomosho Road Otte

Completed

58 Completion of Taiwo Road, Omu-Aran Surface Dressing to Asphalt overlay

Completed

59 Rehabilitation of Popo Road Offa Completed60 Rehabilitation of Tanke Round About -Unilorin Main Gate Completed61 Rehabilitation of Saadu Alanamu, Pakata- Isale-Oja Road. Completed

62Repair of Tipper Garage to Judges Quarters-New GRA

Completed

63Repair of Taiwo road

Completed23

MINISTRY OF WORKSS/No. Projects Status64 Repair of Unity road Completed65 Repair of ItaAdu Junction to Jagun Junction road Completed

66 Repair of Jagun Junction to Sobi Specialist to Lanre Gada - Sobi road

Completed

67 Repair of Basin Taoheed road to Judges Quarters Completed

68 Rehabilitation of Niger road, Ilorin Completed69 Rehabilitation of Post Office to Garage Offa road, Ilorin (MICHEAL

IMODU)Completed

70 Repair of bridges/Culverts Egwa Bridge, Lafiagi Edu. Idofin OdoAse Bridge, Oke Ero. Buka Adena Bridge Moro/Kaiama and Bokungi Culvert, Edu LGA

Completed

71Construction of Idofin OdoAse Bridge, Oke Ero

Completed24

MINISTRY OF WORKSS/No. Projects Status72 Construction of Tsaragi Market Drainage and Culvert. Edu LGA Completed73 Kwara Master plan Completed

74 Rehabilitation of Dada- Alawonla road Completed

75 Construction of Asadam - Egbejila- Airport road Completed76

Dualization of Kulende-UITH Road ProjectCompleted

77Kishi – Kaiama Road

Completed

25

MINISTRY OF WORKSOther Projects Include:1. Ita Ogunbo-Ita Elefun

2. Oke Apomu-Ile Eletu Banni

3. Ode Adana-Singini linking Ile Kutu,

Okekere

4. Oke Ebo Primary Sch.-Ile Alaya

5. Aibinu Street-Idigba

6. Koro Afoju

7. Baboko linking Eruda

8. Erubu Street Off Area Court Street

9. Oke Apomu-Sarumi

10. Alanamu Akeyede - Agaka 26

MINISTRY OF WORKSOther Projects Include:16. Grading of Kaiama to Chainage 56km along Kaiama-Bode Saadu road

17. Grading of Ilesha Baruba to Oyo State Boundary Ogboro

18. Rehabilitation of Moro Bailey Bridge

19. Patching of potholes and Sectional overlay on Offa Garage, Saw-Mill,

Olorunshogo, Asa-Dam, Sanni Okin, Apalara/Al-Hikmah University, Atiku,

Kaduna, Osere, Kokorokan, and Isale Aluko Roads, Ilorin

27

MINISTRY OF WORKSOther Projects Include:20. Patching of potholes and Sectional overlay on Adeta-Kuntu-Adebata, Hajj Camp, Challege Junction, Dss

Frontage, Unity Road, Lagos, Amuda Gobir, Pipe Line, Benin, Adewole Road, Kaduna Road

21. Patching of potholes and Sectional overlay on New Yidi, Abdul Azeez Attah, Emir’s Palace, Cemetary-

Osere Road, Osere-SawMill Garage, Post Office, Flower Garden, Adeta-Pakata, Isale Oja, Kaduna Road

22.Construction of Road to Asphalt Level at Jengbe-Oloje Estate Project

23. Box Culvert Construction at Jengbe-Oloje Estate River

24. Box Culvert Construction at Oke-Fomo

28

MINISTRY OF WORKSOther Projects Include:25. Eroded portion of Federal road at Otte

26. Grading of some portion of Kaiama-Kishi Road.

27 Retaining Wall and Asphalt work project at Eieyenkorin -Ogbomosho Road Otte

28. Completion of Taiwo Road, Omu-Aran Surface Dressing to Asphalt overlay

29. Rehabilitation of Popo Road Offa

30. Rehabilitation of Tanke Round About -Unilorin Main Gate

31. Rehabilitation of Saadu Alanamu, Pakata- Isale-Oja Road.

32. Repair of Tipper Garage to Judges Quarters-New GRA

33. Repair of Taiwo road

29

MINISTRY OF WORKSOther Projects Include:34. Repair of Unity road

35. Repair of ItaAdu Junction to Jagun Junction road

36. Repair of Basin Taoheed road to Judges Quarters

37. Rehabilitation of Niger road, Ilorin

38. Rehabilitation of Post Office to Garage Offa road, Ilorin (MICHEAL IMODU)

39. Construction of Coca-Cola Bridge

40. Rehabilitation of Dada- Alawonla road

30

MINISTRY OF TERTIARY INSTITUTIONS

31

1. Payment of over 700M, seven months salary arears owed by the pastadministration to the Colleges of Education.

2. N123,137,802 was released for the accreditation exercise for three institutionsnamely C.O.E. (Technical), Lafiagi, College of Nursing and midwifery, Ilorin andCAILS, Ilorin.

3. Scholarship of N100,000 was given to 179 students of Kwara origin in law schoolsacross the country. Total sum of N17.9M.

4. Disbursed N5,000 each to 8,304 final year students of Kwara State indigene acrossvarious Tertiary Institutions in the country. Total expended, NGN41,520,000.

5. Monthly subvention has been restored in the state- owned Colleges of Education.6. Approval of 19,560,000. for Aircraft Insurance and salaries.7. N17.562M was released for the college of law accreditation exercise by the councilof legal education. 32

8. NGN19,573,363.54 outstanding salary arears was released to IVTEC, Ajasse Ipo.

9. Approval of N40 Million to College of Health Technology Offa for accreditation.

10.N4,540,030 was released to College of nursing, Oke-Ode for repair of leakingroofs of four major buildings in the college.

11.Funds released for the purchase of DA42 propeller, ELT batteries and other ITequipment for flight operation in International Aviation College, Ilorin.

12.Ambulance was purchased in the College of health tech. Offa

13.N1,800,000 was approved to support entrepreneurship program 2019 (workshop),which was organized by MOTEST

33

34

Subtitle

S/NO Project Name Location/LGAs Senatorial District

1 Construction of Isolation Center at the Sobi Specialist Hospital Ilorin East Kwara Central

2 Renovation and reconstruction of leprosarium at Oke-Igbal Ifelodun Kwara South

3 Renovation of PHC Kpada Patigi Kwara North

4 Renovation of Sobi Specialist Hospital Ilorin East Kwara Central

5 Equipping of Isolation Centre with state of the art equipment Ilorin East Kwara Central

6 Equipping of Sobi Specialist Hospital with beds and beddings Ilorin East Kwara Central

7 Renovation and re-activation of the Oxygen Plant Ilorin East Kwara Central

8 Renovation of 15 units 3 bedroom staff quarters at Sobi Specialist

Hospital.

Ilorin East Kwara Central

9 Procurement of 2 Hilux truck for immunization activities Ilorin South MOH, Headquarter

10 Renovation of Eyes Center at Civil Service Hospital and

Conversion into Ultramodern Eyes Center.

Ilorin South Kwara Central

35

Subtitle

S/No. Project Name

1 Payment of Counterpart funds for Basic Health Care Provision Fund2 Payment of Counterpart fund for Accelerated Nutrition Results in Nigeria.3 Conduct of Polio Eradication Campaign 4 Conduct of Medical Outreaches in the 16 LGAs, 2500 patients were treated for various ailments. Also 138 Eye Surgeries

and 146 Other Surgeries were carried out while 250 Eye Glasses were issued to patients free of charged.

5 Launch of Malaria Free Kwara which include;

a. Procurement & distribution of Malaria Commodities (Arthermeter/ Lumefantrine, Artesunate Injections, Long Lasing

Insecticidal Nets, Net Hangers, SP for Pregnant women

b. Provision of free Malaria services to 450 Functional Public Health facilities both primary & secondary, 7 tertiary

institutions and military and police health facilities.

c. Capacity building of health professionals in Public & Private sectors on malaria case management.

d. Launch & domestication of RMNCAH-N integration with malaria services.

e. Effective coordination frame work for malaria services.36

Subtitle

S/No. Project Name6 Funding of HIV/AIDS activities;

a. Procurement & distribution of HIV test kits

b. Training of Health care workers

c. Commencement of HIV services at General Hospital Ilorin, General Hospital Okuta and Comprehensive Health centers

Ilesa Baruba.

7 Funding of Hepatitis Control Activities, 856 students were screened in COET Lafiagi, College of Education ORO and Kwara

State Polytechnic Ilorin.

8 Fund was released for free Medical screening for civil servants for which 1,397 civil servants from 16 MDAs benefited.

9 The distribution of medications for the prevention of neglected tropical diseases: Soil Transmitted Helminthes,Onchocerciasis etc, in all the 16 LGAs of the State.

10 Successful conduct of review and resupply of free family planning commodities to 16 LGAs.11 16 Surgeries were carried out free of charge on Vesico Vaginal Fistula patients at the Sobi Specialist Hospital12 Production of IEC Materials, Jiggles and Radio Programmes on Cancer Awareness 37

1. Revamping of College of Midwifery, Ilorin.

2. 4 Blocks of Classrooms in College of Health Technology, Offa

3. 1. 6km road at the College of Health Technology, Offa

4. 300-Capacity ICT Centre at the College of Health Technology, Offa

5. Items purchased for accreditation purpose in the College.

38

39

MINISTRY OF ENERGY

ENERGYS/No. Name of Project Status

1. Supply and installation of 20 Nos of All-in-one Solar street light at Ipata Market, Ilorin

Completed

2. Electricity metering of New Kwara State Secretariat complex, Ahmadu Bello Way, Ilorin.

Completed

3. Supply and Installation of All-in-one solar street light at Ipata Oloje Market Ilorin. Completed

4. Rehabilitation of High Tension Networks along Ogboro/Agbonle-Ilesha Baruba, Gwanara, Gobo Gwanara and Ningurume via Gwanara Axis in Baruten LGA

OnGoing/DL

5. Procurement and Installation of 1 No. 300KVA, 11/0.415KV transformer at Oyatedo Town, Oro-Ago Kingdom, Ifelodun LGA

Completed

6. Procurement and Installation of 1 No. 300KVA, 11/0.415KV transformer at Oganyin Town, Oro-Ago Kingdom, Ifelodun LGA

98% Completed

7. Procurement and Installation of 1 No. 300KVA, 11/0.415KV transformer at IsaleAraromi (Oyatedo II) Community, Oro-Ago Kingdom Isin LGA.

Completed

40

ENERGYS/No. Name of Project Status

8. Procurement and Installation of 1 No. 300kva, 33/0.415kv at Ajegunle Town, Ifelodun LGA.

Completed

9. Replacement of faulty transformer at Igbaja Water works Completed/DL

10. Completion of abandoned eletrification works and the project from camp to Banisula

98% Completed

11. Electrification of Suuru village along Ilesha Baruba-Gwanara High Tension Network in Baruten LGA

90% Completed

12. Completion of Iwonte Electrification project (REB) On-Going/DL

13. Completion of electrification project at Kanmonu, Alayin, Ajegunle, Kafinta and Pandoro communities in Offa LGA

95% Completed

14. Purchase and Installation of 500KVA by 33/0.415KVA Transformer at Oke-FomaCommunity in Ilorin West LGA

Completed41

ENERGYS/No. Name of Project Status

15 Procurement of 500KVA, 33/0.415KV Transformer to Kemanji Bye-Pass Community in Kiama L.G.A

Completed

16 Purchase and Installation of 300KVA , 33/0.415KVA Transformer to ShirigweriaCommunity in Kaiama LGA

Completed

17 Procurement and installation of 500KVA, 33/0.415kv transformer at Ora AyokaCommunity Off Iloffa Road, Omu-aran.

Completed

18 Procurement and installation of 300KVA, 33/0.415kv transformer at Liberty Water, along Fire Service Road, Omu-aran.

Completed

19 Procurement and installation of 300KVA, 33/0.415kv transformer at ECWA Church, Egbe Garage Road, Omu-aran.

95% Completed

20 Procurement and installation of 300kva, 33/0.415kv transformer at Alakaka road, Towards Landmark University , Omu-Aran.

95% Completed

21 Procurement and Installation of 500KVA Transformer at Ita-Amodu/Niger Junction Oke-Aluko Ilorin.

Completed42

ENERGYS/No. Name of Project Status

22 Installation of the Donated Transformer Dropped at Upper Alagbado Community Ilorin.

Completed

23 Electrification of Gaa Oke, Share District in Ifelodun LGA On-Going

24 Procurement and Installation of 2nos 500KVA Transformer at Share Water Works and Police Intelligent College in Share Township

On-Going

25 Rehabilitation of 33Kv Line TEE off at Echwada to Koro Axis With Replacement of damaged Transformer at Shiyangi and Koro Axis

On-Going

26 The Rehabilitation of 33KV Line from Patigi to kpada with replacement of damaged transformer and other equipment at key company

On-Going

27 Jani Close by Government House Roundabout, Ilorin Completed

28 Rehabilitation of 33KV Feeder to Ora-Ayetoro, Ejiu Community, Ekiti LGA On-Going

29 Procurement and Installation of 1No 500KVA, 33/0.415KV at ObanisuwaEgbejila, Il/West LGA

On-Going43

ENERGYS/No. Name of Project Status

30 Procurement and Installation of 1No 500KVA, 11/0.415KV at AdewoleCommunity, Il/West LGA

On-Going

31 Installation of 1No Donated 300KVA, 11/0.415KV at Aleniboro/AgbedeCommunity, Tanke, Oke-Odo, Il/South LGA

Completed

32 Construction of 11KV Dedicated Line from Sawmill Control Room to General Hospital, Ilorin

On-Going

33 Procurement and Installation of 1No 500KVA, 11/0.415KV at Specialist Hospital, Sobi, Ilorin

Completed

34 Connection of more than 12 border communities to National Grid Completed

44

MINISTRY OF EDUCATION

45

EDUCATIONS/No. INTANGIBLES1. Printing and Production of Free Exercise Books to all Pupils/Students of all public

Primary and Secondary Schools in the State.2. Prompt approval of training for teachers

3. Settlement of outstanding arrears of N55,077,000.00 feeding allowance of exchange students.

4. Sponsorship of 2019 common entrance at the sum of N14,365,700.00

5. Sponsorship of 1000 brilliant indigent students of the State for 2020 UTME/JAMB at a cost of N5million

6. Payment of N30.5million fine imposed by WAEC for examination malpractices recorded in the April 8-May 30, 2019 exams in some public secondary schools in the State 46

EDUCATIONS/No. INTANGIBLES7. Enabling environment for teachers to participate in UNESCO programme at

Owerri, Imo State

8. Prompt and regular monthly release of the sum of N16,404,500.00 for feeding of exchange students

9. Ongoing Rehabilitation of Blocks of Classrooms in Thirty-One (31) Secondary Schools across the state at a total cost of N1,751,105,049.33

47

EDUCATIONS/No. Project Status1. Comprehensive Rehabilitation of Government High School,

IlorinOn-Going

2. Comprehensive Rehabilitation of Government (Unity) Secondary School, Kaiama

On-Going

3. Comprehensive Rehabilitation of Oro Grammar School, Oro On-Going

4. Comprehensive Rehabilitation of Offa Grammar School, Offa On-Going

5. Comprehensive Rehabilitation of Government Secondary School, Lafiagi

On-Going

6. Comprehensive Rehabilitation of Government Secondary School, Share

On-Going

7. Comprehensive Rehabilitation of Patigi Secondary School, Patigi

80% Completed48

EDUCATIONS/No. Project Status8. Rehabilitation of Blocks of Classrooms at Government

Secondary School, AlapaOn-Going

9. Rehabilitation of a Block of Classrooms at Ansarul Islam Secondary School, Laduba

On-Going

10. Rehabilitation of a Block of Classrooms at College Arabic & Islamic Studies, Ilorin

On-Going

11. Rehabilitation of Blocks of Classrooms at Community Secondary School, Baboko, Ilorin

On-Going

12. Rehabilitation of a Block of Classrooms at Senor Secondary School, Okelele, Ilorin

Completed

13. Rehabilitation of a Block of Classrooms at Govt. Day Secondary School, Omode

On-Going

14. Rehabilitation of a Block of Classrooms at Govt. Day Secondary School, Ilorin

On-Going49

EDUCATIONS/No. Project Status15. Rehabilitation of a Block of Classrooms at govt. Arabic

College, JebbaOn-Going

16. Rehabilitation of a Block of Classrooms at Government Secondary School, Molete

On-Going

17. Rehabilitation of a Block of Classrooms at Ansarul Islam Secondary School, Ikotun

On-Going

18. Rehabilitation of a Block of Classrooms at Ojoku Grammar School, Ojoku

90% Completed

19. Rehabilitation of a Block of Classrooms at Ijara Isin High School, Ijara Isin

On-Going

20. Rehabilitation of a Block of Classrooms at Victory Commercial College, Edidi

On-Going

21. Rehabilitation of a Block of Classrooms at OyelagbawoGovernment School, Ilala

On-Going50

EDUCATIONS/No. Project Status22. Rehabilitation of a Block of Classrooms at Government

Secondary School, Omun-Aran80% Completed

23. Rehabilitation of a Block of Classrooms at Osi Central School, Osi

On-Going

24. Rehabilitation of a Block of Classrooms at Senior Secondary School, Isolo Opin

70% Completed

25. Rehabilitation of a Block of Classrooms at Comprehensive High School, Ajase-Ipo

On-Going

26. Rehabilitation of a Block of Classrooms at Tsaragi Secondary School, Tsaragi

On-Going

27. Rehabilitation of a Block of Classrooms at Govt. Day Secondary School, Okuta

Completed

28. Rehabilitation of a Block of Classrooms at Government Secondary School, Ilesha Baruba

On-Going51

EDUCATIONS/No. Project Status29. Rehabilitation of a Block of Classrooms at Government

Secondary School, Yashikira

On-Going

30. Rehabilitation of a Block of Classrooms at Govt. Day

Secondary School Jamaat Nasr Islam Community Grammar

School, Odo – Owa

On-Going

31. Comprehensive Rehabilitation of Ilorin Grammar School,

Ilorin

Awarded

32 Rehabilitation of a Block of Classrooms at Baptist Grammar

School, Igbaja

On-Going

33. Rehabilitation of a Block of Classrooms at Playfair Memorial

College, Oro-Ago

On-Going

34. Rehabilitation of a Block of Classrooms at Playfair Memorial

College, Oro-Ago

Awarded

35. Rehabilitation of a Block of Classrooms at Playfair Memorial

College, Oro-Ago

On-Going 52

EDUCATIONS/No. Project Status36. Rehabilitation of structures for the proposed Police Secondary

School, BallahCompleted

37. Construction of classrooms at the new site for Government Secondary School, Ballah

Completed

38. Provision pf teaching aids and equipment for School for Special Needs, Ilorin

Completed

39. Provision of special software, computer and Internet for School for Special Needs, Ilorin

Completed

40. Prompt payment for transportation of Students on Exchange Programme

Done

41. Sponsorship of Students for Debate and Quiz Competitions Done

42. Printing of free exercise books distributed to pupils/students of public Primary and Secondary Schools in the State

Completed53

EDUCATIONS/No. Project Status

43. Employment of 10Nos. staff to School for Special Needs, Ilorin

Done

44. Absorption of 26Nos. staff of College of Education Model Primary School owed 30 months salary by the College to SUBEB

Done

45. Media tutorials/floatation of media tutorials for SS3 students in the State during CONVID-19 Pandemic

On-Going

54

MINISTRY OF ENVIRONMENT

55

MINISTRY OF ENVIRONMENTS/No. Project Location Status1. Construction of 3 Modern Integrated

Public Toilets Opposite College of Education Ilorin, Amberi, Offa Garage Park (Road)

Completed

2. Evacuation of waste from major rivers Amilegbe under bridge, Edun/ Opolmalu under bridge & Post office/Emir’s road

On-Going

3. Public sensitization on predicted flooding as predicted by NEMA

Lafiagi, Songa, PatigiBacita, Jebba, Oro-Agor , Ilorin East

Completed

4. Social Assessment Vulnerability Indicator Committee (KW-SAVI) Committee and White Paper Committee on KW-SAVI Committee to reposition Waste Management and water supply in the State

Appointed Committee On-Going

5. Desilting of silted drainages Ilorin metropolis Completed56

MINISTRY OF ENVIRONMENTS/No. Project Location Status6. Repositioning of Waste Management

Scheme Throughout the State Completed

7. Relocation of traders and motor park @ to Soludero park

Post office Underpass & Challenge

On-Going

8 Dredging and desilting of Asa River ASa River ( UBA unity – IsaleKoko)

On-Going

9 Procurement 50 containers of waste containers

For waste collection within Ilorin metropolis

10. Road maintenance ( road median ) Ilorin metropolis On-Going

11. 12,000 tree plant Seedling raising in preparation for aforestationprogramme

For 2020 forestation programme

On-Going

12. Desilting of some silted drainages Within Ilorin metropolis On-Going57

MINISTRY OF SPORTS AND YOUTH

DEVELOPMENT

58

MINISTRY OF SPORTS1. Youth holiday camping for selected schools prefects across the 16 LGA in the state 180 studentsAugust, 2019 Yikpata Youth Camp, Edu LGA.

2. Release of fund for 3-day sponsorship of Nigerian youth parliamentary representing Kwara State

to attend the young African 3 Youth October, 2019 Ghana.

3. Capacity building workshop organized for Youth Officer/Leader across the 16 LGA in the State.

250 November, 2019 Kwara State Library Complex.

4. Hosting of 2015, 2016 and 2017 Presidential NYSC award recipients from Kwara State 6 CorpsMembers November, 2019 Deputy Governor’s Office, Govt House Annex, Ilorin.

5. Educational Enlightment on Sexual Harassment 1000 Participants December 10th, 2019 StellaObasanjo Multipurpose Hall.

6. Official disbursement of 2019 Government assistance to VYOs across the 16 LGA in the State 50

VYOs December 13th 2019 MSYD Conference room.

59

MINISTRY OF SPORTS7. Capacity Building on Sustainable live hood skill acquisition in vocational, agriculture and

entrepreneurship development programme for vulnerable and unemployed youth organized byFederal Ministry of Youth and Sports, Abuja. 5 Participants 1st – 14th December, 2019 Jos,Katsina and Ode Omu.

8. Training of NYSC Corps members as peer educators, counsellors and Tester/Formation of anti-HIV/AIDs CDS group 180 Corps Members November, 2019 NYSC Orientation Camp, EduLGA.

9. Hosting of 2015, 2016 and 2017 Presidential NYSC award recipients from Kwara State 6 CorpsMembers November, 2019 Deputy Governor’s Office, Govt House Annex, Ilorin.

10. Renovation of hostels, camp clinic 95% completed Yipata Youths’ Camp, Edu LGA.

11. Provision of meal subsidy Two Thousand and Five Hundred Corps Members per OrientationDuring each orientation NYSC Orientation Camp.

12. Fumigation of Camp During every Camp NYSC Orientation Camp.60

MINISTRY OF SPORTS• Renovation of the State Baseball Court Adewole, Ilorin

• Renovation of the State NYSC camp’s hostels and provision of water

• Delivery of 400 New Mattresses, 200 double trunk beds, 90 and several

consumable drugs to the NYSC camp

• Successful Revival and Hosting of Kwara Sports Festival

61

MINISTRY OF JUSTICE

62

INTERVENTIONS• Complete rehabilitation/repair of the Area Court at 'Centre Igboro' and

completion of the ongoing one which had been there for over 30 years

• Reconstruction of Sango Magistrate Court gutted by fire four years ago.

• Re-roofing of the High Court complex Ilorin, the first time since it was done in the military era.

• Approval and payment of all outstanding allowances of judicial officers, law officers of the ministry of justice, and magistrates and area court judges. Some of these arears dated back to 2014.

• Approval of 400m naira for the commencement of the construction of ministry of justice’s building.

63

MINISTRY OF AGRICULTURE

64

MINISTRY OF AGRICULTURE

65

PROJECTSPPR State Wide Vaccination Exercise in Small Ruminants (Sheep and Goats)

. Veterinary Drugs Revolving Scheme, for the provision and availability of genuine veterinary

drugs to Livestock and poultry farmers at affordable rates.

Fadama III’s Social Intervention Fund for Promotion of sugarcane, cashew and sheabutter

value chain

Rural Access and Agricultural Marketing Project (RAAMP)

Cocoa Development Project

Tree Crops Development Project

MINISTRY OF COMMUNICATION

66

COMMUNICATION1. Resuscitation of Radio Kwara (FM and AM Channels)

2. Restoration of Subvention to state owned media houses

3. Procurement of 6 nos Motor Cycle to the Ministry and KWASAA to ease their operation.

4. Strengthening of Human Capacity of KWASAA for effective Service delivery.

5. Purchase of Printing Materials for Graphic Division for effective performance and revenue

generation to the State.

6. Staff Capacity Building through in-house training

7. Prompt release of funds for the attendance of Seminars and Workshops by Officers of the

Ministry e.g. National Council on Information, ANAN and ICAN etc. 67

COMMUNICATION8. Grant releases for Advocacy and Sensitization on Print and Electronic Media documents on

Food and Nutrition.

9. Set of Computer distribution across MDAs

10. Production of 2020 Calendar and Dairies to document Government activities and serve as

archival record.

11. Purchase of Tools for Arts & Culture to improve their activities

12. Capital Grant releases to Tourism Board

13. Release of fund for Annual Special Day Celebrations i.e World Tourism Day.

14. Participation in Cultural/ Carnival activities in the State e.g Shao Annual Mass Wedding.

15. Organized 2019 Kwara State Cultural Quiz Competition for Secondary Schools. 68

COMMUNICATION16. Release of fund to participate in 2019 International Arts and Culture Festival in Abuja and

National Festival of Arts and Culture in Benin.

17. Purchase of Spear Parts for 3DX50AM Transmitter for Kwara State Broadcasting Corporation(Radio Kwara)

18. Purchase of 30 KW uninterrupted Power Supply (UPS) to power the Elenos FM Transmitter atApata Yakuba

19. Purchase of very essential Spare Parts for the Old Harris FM Transmitter at Apata Yakuba tobring it back on air.

20. Repair of Exciter for the Elenos Transmitter that is in use at Apata Yakuba.

21. Purchase of spoilt spare parts of the AM Harris Transmitter at Budo - Efo for itsrefurbishment. 69

COMMUNICATION22. Purchase of Basic Spare Parts for AM Harris Transmitter to sustain its clarity (i.e Audio

Processor and External input/output board)

23. Installation of Studio Console for AM Transmitter at Broadcasting House (Headquarters’)

24. Purchase of New Studio Transmitter Link (STL) at Broadcasting House (Headquarters)

25. Purchase of New Uninterrupted Power Supply (UPS) at Budo-Efo Station

26. Purchase of 2 nos of Generator sets (220KW) for both AM&FM Stations to serve as back up

for the existing ones.

27. Provision of fund for the establishment of FM Radio Transmission Station in Baruten LGA70

COMMUNICATION28. Regular production of three editions per week of the Herald Newspapers.

29. Resuscitation and consistent release of Monthly Running Cost for effective operation for the

Ministry and its Agencies.

71

SOCIAL DEVELOPMENT

72

SOCIAL DEVELOPMENTWork Done so far...

• Conceived/assented to the Kwara State Social Investment Programme (Law)

which seeks to take care of the poorest of the poor.

• Paid N60 Million Counterpart fund to World Bank-funded Community and Social

Development Projects(CSDP) for Community projects.

• Renovated Children Reception Centre at Gaa Akanbi

• Renovated juvenile Correctional Home, Oko Erin, Ilorin

73

STATE CIVIL SERVICE

74

STATE CIVIL SERVICE• Restoration of monthly subventions to ministries, department and agencies

(MDAs)

• Purchase of 27 operational vehicles for civil servants, fire service and kwara

united

• Distribution of computers and other office tools to various ministries,

department and agencies (mdas)

• Historic stabilization of the civil service through refusal to Summarily Dismiss

Inherited Officials

75

ISENLO

76


Recommended