About ISGEC Heavy Engineering
• A $ 400 Million multi-product, multi-location public
company providing engineering products to
customers across 76 countries.
• Business units - Process Equipment, EPC Power
Plants, Boilers, Sugar Plants & Machinery,
Mechanical & Hydraulic Presses, Steel & Iron
Castings, Contract Manufacturing, and Trading.
• major target sectors for the company are: Power, Oil
& Gas, Automobiles, Fertilizers, Sugar and Defense
• 4000 employees, including 700 qualified engineers
and over 450 designers spread across India
www.merinoservices.com
Background
• ISGEC was using Baan IV c4 system since 2001.
• Baan supported Business Growth
2001-2003
2012
Baseline > 5 times > 10
times
Growth
Business Volume
IT User Base
IT
Application
use
Application
Development
Staff
www.merinoservices.com
Baan IV c4 Base Implementation
Engg. & Design
Ven. /Cust Doc. Mgmt Element wise Sanction
Utilisation & Monitoring Payment Tracking
Engg Doc. Release &
Change Control
Material Despatch &
Receipt at Site Delivery Tracking
Design Automation Delivery Sequence
Control Order Placement Export Invoicing
Resource &
Productivity Mgmt
Historic Cost
Comparison Design Development
Planning Enquiry
Project Sanction Control
Customer Billing,
Schedule & Status MIS Creation
SAR/QFR Vendor Quality Tracking Cash Flow
Projects Procurement Accounts
Payments
Material Indenting
Planning Accounting
Domestic Invoicing
Partially Covered by
Baan Fully Covered by Baan Not Covered by Baan
www.merinoservices.com
Customizations to meet Business Demand
Engg. & Design
Ven. /Cust Doc. Mgmt Element wise Sanction
Utilisation & Monitoring Payment Tracking
Engg Doc. Release &
Change Control
Material Despatch &
Receipt at Site Delivery Tracking
Design Automation Delivery Sequence
Control Order Placement Export Invoicing
Resource &
Productivity Mgmt
Historic Cost
Comparison Design Development
Planning Enquiry
Project Sanction Control
Customer Billing,
Schedule & Status MIS Creation
SAR/QFR Vendor Quality Tracking Cash Flow
Projects Procurement Accounts
Payments
Material Indenting
Planning Accounting
Domestic Invoicing
Technology Drives
Operations Technology Support
Operations
Technology Not used/
No Automation
www.merinoservices.com
Some Business needs remain unaddressed
» Project Planning Module
» Vendor Approval Module
» Document Issue to Vendor/Customer
» Non Project Procurements Process
» Vendor Quality & Loading
» Material Receipt at site
» Payment Tracking Module
» Clubbing of Indents/ Multiple Orders
» Export Invoicing Module
» Payment Handling
» Management Dashboards and MIS
» Alerts and Workflows
» Historic Data Search
» Extend Baan to project site
Extend Coverage Adopt Controls
Enhance Efficiency Increase Usability
www.merinoservices.com
Vision & Expectation of Management from New Project.
• Stricter Implementation of Project in Baan
• Easy to use Interface
• Increased Granularity and Diversity of Data captured
• Role based Dashboards
• Resource Planning
• Minimum/ No Customization
• Push Driven system resulting in Pro Active decision support.
www.merinoservices.com
Solution options
• Business Demand for
• Create Systems to capture data
inputs in existing sessions provided
in Baan.
• Create new sessions to Fulfil MIS
reporting requirement or business
process which are currently being
handled using Excel, mail etc
• Change business process which
are different from what has been
implemented in Baan
Solution Options
Option 1 : Customize or Upgrade Baan
• Map new requirements in Baan’s new version i.e.
Infor ERP LN
• Customise Baan to capture all additional inputs
required
Option 2 : Develop Customized Application
• Create additional platform to develop Customised
application
• Study and Develop tailor-made application
Option 3: Use readymade Specialized Applications
• Evaluate commercial/open source alternatives
meeting new requirement
• Integrate with Baan and MIS system
www.merinoservices.com
Solution Footprint Implemented
Infor LN
96 CU Lic. with 400+
End Users
www.merinoservices.com
Challenges Addressed
• Migration of 100% Historic data including transactions of all
implemented modules from Baan IV to ERP LN.
• Customizations in Item Release and Drawing Release with
drawing release as a main event that tigress the Item Release
Process.
• Change in Company Structure from Multi Logistic Multi Finance
to Single Logistic Multi Finance.
• Sanction Control built integrated with Consumption of budgets
and Control of budgeted amounts with actual material
transactions.
www.merinoservices.com
Challenges Addressed
• Integration of PLM with ODM, the document release process in
PLM is resulting in Document upload in ODM and
simultaneously releasing of Items for Purchase request.
• Purchase Order Approval Work Flow configured with Multilevel
Approval Authorities based on value of Purchase Order by
writing custom BODs in ION.
• Alerts were required for set of Users on Certain Events for
which standard BODs were not available and few alerts were
even required on the customized Functionalities.
www.merinoservices.com
Thank you
USA INDIA HONGKONG SINGAPORE UAE NETHERLANDS
Merino Services Ltd. 70,KLJ Complex , Moti Nagar, New Delhi- 110015 | Phone : +91 11 4506 8300