Isle of Wight Council
Corporate Plan2009 to 2013
8/7/2019 Isle of Wight Council: Corporate Plan 2009-13
2/17
2
Contents
Introduction to the corporate plan rom the leader 3
The vision 4
Achieving the vision 5
Plans or achieving consistent delivery and ocus 8
Links to key strategies 9
National picture 11
Local Area Agreement 2008 to 2011 (LAA2) 11
Reporting our progress 13
Appendix A strategies and plans 14
Appendix B strategic programme 15
Appendix C strategic priorities
and community strategy 17
8/7/2019 Isle of Wight Council: Corporate Plan 2009-13
3/17
3
Welcome to the Isle o Wight Councils corporate Plan, our main strategic planning document which sets
out the local authoritys ocus or the next our years. This updated version takes into account the clearly
stated political priorities o the majority group returned in the June 2009 elections, and places these
commitments at the heart o the Isle o Wight Councils corporate priorities or the our years o the current
council term.
As a returning majority group, the priorities are similar to those pursued during the 2005 to 2009 council
term, and this updated document recognises that by building on the content o previous corporate plans.
Inormation has been updated to reect the progress that has been made so ar in delivering those earlier
priorities, and what has been achieved or residents.
The current economic climate has signicantly impacted on the resources available to deliver local services.
Coupled with the need to curtail public spending to tackle the high level o national debt, the council
will have to work with increasingly limited resources in the coming years, as will all local authorities. It is
thereore more important than ever to ensure that public money is spent on those necessary services that
matter most to local residents, and that it is spent as eectively and efciently as possible.
This document sets out the key strategic priorities or the council over the coming our years. While thepriorities detailed in this plan do not amount to an exhaustive list, they should be taken as the denitive list
o where resources ultimately will be prioritised. Any programme, project or scheme which is not detailed
in this document will have to be careully considered as to whether it contributes to our wider stated
priorities, and also whether there are any statutory requirements or the local authority to deliver such
services. Failure to meet these tests will mean that resources will not be allocated. Only by adopting such a
rigorous approach can we ensure that we live within our means and provide a sustainable nancial model
or uture years.
Whilst our overall priorities have been dened by the commitments set out in the majority group
maniesto, we will continue to listen and respond to the views expressed by local residents, and will adjust
the implementation o these priorities to ensure we meet the Islands changing needs. This will be achieved
by continuing to consult and involve local people and communities in the decisions that aect them; this
will then help us to improve the quality o our services.
Working with partners is crucial in delivering our services, as we collectively seek to make best use o our
shared limited resources. We must recognise that, with our partner organisations, we have complementary,
but distinct, roles to play in improving the quality o lie enjoyed by Island residents, and each body must
ocus on their own core services those which they as individual organisations are best placed to deliver
eectively and efciently, and in partnership where considered appropriate.
Such joint working is underpinned by the Island Strategic Partnership, which the council chairs with
democratic accountability or the Islands public, private and third sector organisations. The shared priorities
o the ISPs Eco-Island vision our sustainable community strategy align closely with the stated priorities
o the political administration. Collectively these shared aims ensure that our thinking and working
together has maximum positive impact or the Island.
Part o the Island Strategic Partnership is the delivery o the Local Area Agreement (LAA) which is in its
second year. The LAA2 has demonstrated that partners together are committed to working closely or the
benet o the Island. These indicators are explained in more detail on pages 11 and 12.
We would like to thank all members and employees o the council who continue to work towards making
these priorities a reality. We look orward to continuing to work with you and our partners to achieve our
shared vision or the Island.
Councillor David Pugh
Leader o the council
Introduction to the corporate plan from the leader
8/7/2019 Isle of Wight Council: Corporate Plan 2009-13
4/17
4
The Isle o Wight Councils vision is to see high quality public services provided at minimal cost to the
taxpayer, and in doing so improve the quality o lie enjoyed by all Island residents, now and in the uture.
The local authority does not see itsel as the sole provider o such services, and recognises that its role
is increasingly moving to one o being a commissioner and enabler o much o this provision. In itsaspiration to see the highest possible quality o services made available to Island residents, as efciently
and eectively as possible, the council will always consider what model o service delivery is most likely
to achieve this outcome. The long-term interests o the Island and its residents will continue to be the key
determining actor in making any such decisions.
By assuming a more strategic commissioning and enabling role, we can ensure that the local authority
provides strong overall community leadership and greater accountability or the delivery o services locally,
through our democratic mandate. Our priorities or the Island will be delivered by members, council sta,
partners and through those organisations commissioned to provide services on our behal, all o whom will
be held closely to account.
Council priorities/major projects
The Isle o Wight Council has identied seven key priorities as its ocus or the next our years, which are
based on the political priorities outlined in the June 2009 elections. These are oten described as major
projects, as they all involve signicant transormational change:
Schoolreorganisation.
RoadsPFIscheme.
Transformingsocialcare.
Regenerationandtheeconomy.
Fireservicemodernisation.
Localhousing.
Deliveringbetterservices
These build on previous priorities and set the direction o the strategic programme.
Island Strategic Partnership (ISP) priorities
The specic projects listed above sit alongside a wider list o ambitions, which reect the shared priorities
o Island Strategic Partnership (ISP), which the Isle o Wight Council chairs to provide local democratic
accountability. The ISPs Sustainable Community Strategy Eco-Island was agreed as a shared vision in
2007, which the council remains committed to delivering.
The ISP is ocused on improving the Islands perormance against a set o 35 key indicators, through its
Local Area Agreement. Many o these improvements will be delivered predominately through the councilas the provider or commissioner o a wide range o local public services. These key indicators, as listed
in this document, remain the local authoritys wider set o priorities or the Island alongside the major
projects.
The vision
8/7/2019 Isle of Wight Council: Corporate Plan 2009-13
5/17
5
The councils perormance management ramework provides the components to measure, monitor and
manage how services deliver the outcomes within the corporate plan or the community. This enables the
council to take decisions and target activities to ensure resources are directed and services are working
towards achieving the vision.
Part o the perormance management ramework looks to continually challenge and improve the
quality o data that is used to monitor our service perormance. It is a crucial part o the councils current
Comprehensive Area Assessment (CAA) and other uture assessments to ensure our data is right the rst
time, is being used eectively to tell us what is and is not improving and to ensure decision makers are
condent in the data quality.
Delivering our priorities/major projects
School reorganisation
Part o the councils overall approach to regeneration is to raise the standards o educational attainment
and opportunity on the Island. The council has decided to change its schools system rom a three tier (withmiddle schools) to two tier (primary and secondary) model o education, to achieve this improvement. The
rst stage o this change will be implemented with eect rom September 2010 .
Roads PFI scheme
Recent surveys have shown that the condition o our local roads continue to be one o the top concerns
or Island residents. The council is looking to address this issue through a Highways PFI (Private Finance
Initiative) under which government derived unding will be used, together with contributions orm the
council, to bring our highways up to an appropriate standard and maintain them at that level over a 25 year
period.
In 2008, the council was one o three local authorities to secure the allocation o substantial government
unding. The outline business case or how this project will be delivered has now been submitted to the
government and the council is now awaiting the next stage o this process.
This programme o improvement represents not only a signicant investment which will dramatically
improve the Islands roads, but will also act as a catalyst or wholesale benets to the public realm, local
economy and community through regeneration and redevelopment.
The PFI investment programme will be an essential part o our ongoing delivery programme as set out
in our local transport plan, and will sit alongside other parallel schemes and initiatives outlined in that
document, which together will help make use o our local roads saer as well as improving travel choice by
making journeys by oot, cycle and public transport more efcient, eective and reliable. In the meantime,
the council will continue to invest in roads, pavements, ootpaths and cycle routes across the Island, and
continue to improve the Islands public realm.
Transorming social careTransorming social care (TSC) is an entirely new approach to the delivery o social care or adults. It is about
supporting people to make the right decisions about their own support and welare. A TSC board has been
set up with representation rom internal and external stakeholders including the primary care trust, third
sector and voluntary organisations. To ensure the work o the TSC board is carried out eectively, a number
o sub groups have been set up.
The central part o the project is the provision o a personal budget to people who have a support need.
They then manage the provision o their own care and support. This reects the commitment, set out
by the majority group, to work with the Isle o Wight NHS to tailor health and social care packages to
patients individual needs, and also to provide a wider range o support or those with learning and physical
disabilities.
Achieving the vision
8/7/2019 Isle of Wight Council: Corporate Plan 2009-13
6/17
6
Regeneration and the economy
The Isle o Wight Economic Strategy 2008 to 2020 sets a course or the Island economy, so that we can
address our challenges and improve economic well being or the community. The Island has made great
strides in economic growth, but since the strategy was adopted the recession and rapidly changing global
economy means we have to rethink what is needed to ensure that our economy can continue to prosper
and that the wealth created can be shared by everyone.
The council has recently commissioned a rereshed version o the strategy to be in place by March 2010,
with the ollowing ve economic commitments:
Supportingthedevelopmentofsuitablerenewableenergyschemes.
PromotingtheIslandasanaccessibleandaordabletouristdestination.
PromotingIslandproducedgoods,workingwiththefarmingindustrytochallengerestrictiveUKandEU
laws.
EncouragingIslandrmstobidforpublicsectorworkandemphasisingthecreationandretentionof
local jobs.
Supportingautomaticbusinessreliefforrms.
Fire service modernisation
Modernising the re and rescue service will improve public saety and enhance efciency and
eectiveness. The service is responsible or assessing risk and putting in place the right resources to ensure
the community remains sae.
Modernising means securing additional investment and using resources, such as reghters and stations,
dierently to provide a service which meets the needs o the community. Providing re stations which are
t or purpose, located in the right place, along with maintaining adequate re cover to meet the needs o
the community, are essential.
The re and rescue service and the re and rescue authority, recognise that continual improvement
requires a shit in the traditional emphasis o activities, and a exible workorce that is highly trained, well
equipped and prepared to embrace the requirements o an ever changing role.
Local housing
One o the clear political priorities o this administration is to help local residents onto the housing ladder
with a homes or Islanders scheme. The aordable housing project in Nettlestone meets this specication
and the Isle o Wight Council is committed to seeing similar schemes developed in towns and villages
across the Island.
General housing needs on the Island are being addressed through schemes to increase the availability o
aordable housing which will also bringing additional job opportunities to the local economy. The Pan
UrbanRegenerationprojectisanexemplardevelopmentofapproximately850newhomesontheoutskirts
o Newport. It will provide physical and social improvements through the provision o new sustainable
housing and employment opportunities, integrating with the current estate to create a shared centre
oering improvements or the whole community.
There is also a programme to generate up to 190 aordable homes, creating a balanced housing market
on the Island, ensuring we meet the needs o those who are unable to enter the housing market or are
recognised by the Isle o Wight Council as homeless.
This year the council has made excellent progress on the homelessness agenda. By working in partnership
with the private sector the council has signicantly reduced the number o people who have to be
housed in temporary accommodation, and made substantial reductions in the number o homelessness
applications it has had to take. The housing team also continues to perorm to a very high standard in
bringing empty homes back into use.
8/7/2019 Isle of Wight Council: Corporate Plan 2009-13
7/17
7
Delivering better services
The council has begun a process o transormation to ensure its services meet the needs o the Island in the
most efcient and cost eective manner. This process encapsulates many aspects, oering changes in the
way services are delivered, including:
servicedesign;
processimprovement;
workforcedevelopment;
resourcemanagement; informationmanagement;
useoftechnology;
buildingmanagement;
energymanagement.
Other activity includes delivery o the organisational development strategy, ocusing on making the
organisation a high per orming authority, and driving change through a diverse, skilled, exible and
motivated workorce.
Through this extensive programme, undamental improvements in the way the council does business
are expected, including; better needs-based service delivery, signicantly reduced costs through ewer
buildings and less sta, a reduction in bureaucracy, more agile use o assets and resources, more accessible
council locations, partnership co-location and increased value or money.
Resulting rom the overall transormation and improvement agenda, we will work more eectively with our
partners and improve perormance and value or money or residents.
At the same time we will keep council tax at the lowest practical level, and keep council ees and charges
as low as possible in the current economic climate.
8/7/2019 Isle of Wight Council: Corporate Plan 2009-13
8/17
8
Service development plans to help us plan or and meet the diverse needs o our community. They set out
the contribution each service makes toward delivering the outcomes and priorities in this corporate plan.
The perormance management ramework outlines how indicators are used to monitor the progress each
service makes in achieving those outcomes.
The service development plans highlight resources required (nancial, stafng, and ICT) to achieve those
outcomes and steps to secure additional resources required. The plans also identiy key risks involved in
delivering the outcomes.
Team plans provide a link between service development plans and personal development reviews. They
are crucial to the eective delivery o services, showing sta how their work contributes to the Eco Island
vision, and identiying personal development opportunities.
Service development plans or the period 2010/2011 to 2012/2013 will be available at
www.iwight.com/councilin April 2010.
Plans for achieving consistent delivery and focus
8/7/2019 Isle of Wight Council: Corporate Plan 2009-13
9/17
8/7/2019 Isle of Wight Council: Corporate Plan 2009-13
10/17
10
Organisational development strategy
Theorganisationaldevelopment(OD)strategyrecognisestheconnectionbetweenpeoplemanagement
anddevelopmentandorganisationaleectiveness,todeliverhighperformanceresults.TheODstrategy
has been developed in consultation with our sta and councillors, as a key driver or culture change,
capacity building and perormance improvement in the council. It supports the corporate plan and the
transormation programme, as well as ensuring Investors in People standards are established.
Keybenetsfromdeliveryofthestrategyinclude: anorganisationthatembraceschangeandmanagesitwell;
agoodplaceforpeopletowork;
anorganisationthatattractsandretainstalentedpeoplewhoarepassionateabouttheirjobs;
aframeworkforplanningforthefuture;
organisationalcapacitywithskilledsta,todeliverexcellentservicestothepeopleontheIsleofWight.
creativityandenergyharnessedtodeveloppotentialandachievement;
adevelopingandlearningorganisation;
anorganisationthatprovidescommunityleadership.
Organisational development will allow a exible and leaner 21st century organisation that delivers an
efcient value or money service which is ocused on continuous improvement.
Strategic asset management plan
The strategic asset management plan is an essential element in enabling the council to deliver its services
eectively in an efcient and cost eective way. It supports the achievement o the overall vision and
outcomes o the council. We have a large asset base and we spend signicant sums o money maintaining
and operating it. The plan is designed to ensure that we unlock the opportunities rom our assets, dispose
o those we dont need, minimise our running costs, ensure that the assets we do keep are suitable and
used eectively in service delivery.
To unlock the ull opportunities and value rom our asset base, the targets are:
toidentifyandeectivelydisposeofsurplusassets;
toensurethattheassetswekeeparesuitableandenableeectiveservicedelivery; toensurethattheassetswekeeparecosteectivelymanagedandoperationalcostsareminimised;
tounderstandandmonitorourcosts,demonstratingthatwearedeliveringvalueformoney.
Transormation strategy
The councils transormation strategy includes key activities to change the way the council operates so it
can deliver better, cost eective services to the community:
Designingservicesaroundtheneedsofthecommunity.
Workingmoreecientlysowecanspendmoretimedeliveringservices.
Makingsureeveryonehastherightlevelofskillsandsupporttodotheirjob.
Providingmorechoiceabouthowpeoplecanaccessservices. Bettermanagementofinformationtoenablemoreinformeddecisions.
Makingourworkmoreenjoyableandsatisfyingforsta.
Ensuringweuseournaturalresourceseectively.
Creatingcapacitywithinthecounciltodeliverourpriorities.
Becomingmoresustainablethroughmoreeectiveuseofourresources,includingenergyrenewables
and energy management.
8/7/2019 Isle of Wight Council: Corporate Plan 2009-13
11/17
11
The council and its partners in the Island Strategic Partnership are subject to an assessment by the Audit
Commission called the Comprehensive Area Assessment, which replaces the previous council judgement
called the Comprehensive Perormance Assessment.
This assessment ocuses on what matters to local people, what prospects the Island has or the uture andwhat residents think about the Island. It also ocuses on delivery o priorities and their results as eatured
in the Local Area Agreement (LAA2) and the National Indicator Set (a group o indicators set by the
government or partners to collect and report). Both will be part o the criteria towards the Island Strategic
Partnerships Comprehensive Area Assessment.
The council is accountable or the assessment, and working with partners to improve services or Island
residents. It is important thereore or the Island Strategic Partnership to ocus on Eco Island priorities,
including the Local Area Agreement so these improvements can be delivered.
The council, through its management structure, has responsibility to deliver its contribution to improving
services, through its own service development plans and strategies.
This is the mechanism or delivering national policy and locally determined priorities. LAA2 is also the
orum or delivering the key priorities o Eco Island and is where local and central government orm the
basis or their relationship. It is the joining together o public, private and voluntary organisations to pool
resources and eort, and result in the most eective way o providing services to the public, and increasing
resident satisaction.
The Island Strategic Partnership (ISP) is responsible or the delivery o the LAA2 on the Isle o Wight. The
ISPhasidentiedfourthemesand15prioritiesforLAA2.Underthesethemesandpriorities,69indicators,
mainlyfromtheNationalIndicatorSet(NIS),havebeenselectedtohighlightissuestofocuson.Ofthese69
indicators, 35 have been identied as key measures or which outcomes have been negotiated with central
government, through the Government Ofce South East (GOSE).
The monitoring o the LAA2 is through our key delivery partnerships the Health and Well-Being
Board,theCrimeandDisorderReductionPartnership,theChildrensTrustBoardandtheEconomyand
Environment Board. The members o these boards consist o service proessionals rom all partners (and
the council) together with key council members. The boards receive quarterly perormance reports on the
delivery o the LAA2, and monitor and agree actions so targets can be met.
DeliveryplanshavebeendevelopedforeachindicatorwithintheLAA2.Theseplanssetouttheactivity
that will be undertaken to meet the target, associated risks and resources. A perormance management
ramework or the LAA2 has also been developed which provides all partners a ramework or delivery.
KeyachievementsintherstyearoftheLAA2includedareductionintheamountofresidualhousehold
waste, due to increased awareness and participation in recycling schemes. Signicant improvement was
also seen in reducing the number o people living in temporary accommodation. This was due to the
adoption o a proactive approach towards preventing evictions, and working in partnership with private
landlords.
Improved perormance was seen across the year or the reduced number o criminal damage incidents
whichresultedin136fewerthanthetargetnumberofincidentsoccurring.
National picture
Local Area Agreement 2008 to 2011 (LAA2)
8/7/2019 Isle of Wight Council: Corporate Plan 2009-13
12/17
12
The 35 key indicators or LAA2
Thereare69indicatorsfortheLAA,ofwhichthe35keyindicators
cover the our themes o Eco Island, listed below:
A thriving Island
Planningtoadapttoclimatechange.
Residualhouseholdwasteperhousehold.
Localbusandlightrailpassengerjourneysoriginatingintheauthorityarea. Percapitareductionincarbondioxideemissionsinthecouncilarea
Overallemploymentrate.
Workingagepeopleonoutofworkbenet.
ProportionofworkingagepopulationqualiedtoatleastLevel2orhigher.
Medianearningsofemployeesinthearea.
A healthy and supportive Island
Adultparticipationinsportandactiverecreation.
Obesityinprimaryschoolagechildreninreceptionyear.
Rateofhospitaladmissionper100,000foralcoholrelatedharm.
Allage,allcausemortalityrate.
Stoppingsmoking. Peoplewithalong-termconditionsupportedtobeindependentandincontroloftheircondition.
Userreportedmeasureofrespectanddignityintheirtreatment.
Socialcareclientsreceivingselfdirectedsupportper100,000population.
Carersreceivingneedsassessmentorreviewandaspeciccarersservice,oradviceandinformation.
Peoplesupportedtoliveindependentlythroughsocialservices(alladults).
Percentageofvulnerablepeopleachievingindependentliving.
Numberofaordablehomesdelivered(gross).
A sae and well-kept Island
Assaultwithinjurycrimerate.
Percentageofpeoplewhofeeltheycaninuencedecisionsintheirlocality.
Perceptionsofanti-socialbehaviour.
Non-principalclassiedroadswheremaintenanceshouldbeconsidered. Environmentforathrivingthirdsector.
Drug-related(ClassA)oendingrate.
An Inspiring Island
Proportionofchildreninpoverty.
Percentageofcoreassessmentsforchildrenssocialcarethatwerecarried
out within 35 working days o their commencement.
Stabilityofplacementsoflookedafterchildren:lengthofplacement.
AchievementofaLevel2qualicationbytheageof19.
Youngpeopleaged16to18whoarenotineducation,trainingoremployment.
Emotionalhealthofchildren.
Under18conceptionrate.
Substancemisusebyyoungpeople. Firsttimeentrantstotheyouthjusticesystemagedtento17.
8/7/2019 Isle of Wight Council: Corporate Plan 2009-13
13/17
13
The council reports its progress on delivering the vision through many dierent publications and reports.
The ollowing list shows some o the reports. In addition many o the Councils strategies and plans have
bespoke reporting processes. More inormation can be ound on www.iwight.com
AnnualReportandSummaryStatementofAccounts
LAAEndofYearPerformanceReport
OneIslandmagazine
Quarterlycabinetperformancereports
Servicedevelopmentplans
Guidetouseofresources
Self-assessment
Reporting our progress
8/7/2019 Isle of Wight Council: Corporate Plan 2009-13
14/17
14
Appendix A strategies and plans
This is a list o strategies and plans that the council is delivering. For more inormation please see
www.iwight.com/council
Children and Young Peoples Plan 2009 to 2012
Community Strategy (Eco-Island) 2008 to 2020
Corporate Parenting Strategy 2001
Data Quality Strategy 2009
Economic Strategy 2008 to 2020
Homelessness Strategy 2008 to 2013
ICT Strategy 2009
Integrated Risk Management Plan 2007 to 2009
Isle o Wight Carers Strategy 2009 to 2013
Isle o Wight Council service development plans
Isle o Wight Cultural Strategy (to be updated in 2010)
Isle o Wight Housing Strategy 2007 to 2012
Isle o Wight Supporting People Commissioning Strategy 2005 to 2010
Learning Disability Services Strategy (to be updated in 2010)
Local Development Framework (Island Plan)
Local Transport Plan 2 2006 to 2011
Medium Term Financial Strategy 2009/2010 to 2011/2012
Organisational Development Strategy 2009-2011
Perormance Management Strategy 2008 and Framework 2008/2009
Policy Management Framework 2009/2010
Special Education Needs Strategy 2009
Strategy or Learning and Achievement 2009
Strategic Asset Management Plan 2009
Transormation Strategy 2009
Unitary Development Plan 1996 to 2011
Value or Money (VFM) Strategy 2009
8/7/2019 Isle of Wight Council: Corporate Plan 2009-13
15/17
15
Appendix B strategic programme
The ollowing table summarises the strategic programme, linking the project outcomes, council priorities
and corporate themes. This programme is derived rom the councils overall capital programme,
highlighting schemes and projects contributing to council priorities. This programme is reviewed in line
with the councils budget setting process. The next review is due in 2010/2011.
Corporate
theme
Programme/
project/scheme Outcome Council priority
A thriving
Island
Improving Island
roads (Highways
PFI)
Securing long term investment
and improvement in the highways
inrastructure.
PFIandroads
Regenerationand
the economy
A healthy and
supportive
Island
General needs
housing
Deliveryofschemestoincreasethe
availability o aordable housing and
bring additional job opportunities to
the local economy.
Housing
Leisure acilityimprovement Deliveryofdetaileddesignworkandassociated capital cost estimates
or the provision o reurbished
community leisure acilities that will
accommodate existing and uture
demands.
Deliveringbetterservices
Regenerationand
the economy
Generate up to 190
aordable homes
To deliver a balanced housing market
on the Isle o Wight and ensure that
we meet the needs o those who are
unable to enter the housing market
or are accepted by the Isle o Wight
Council as homeless.
Housing
Pan urban
regeneration
Physical and social improvements
through the provision o new housing
and employment opportunities.
Housing
Regenerationand
the economy
Transorm social
care
The transormation programme on
the Isle o Wight will develop an
entirely new approach in supporting
people to make the right decisions
about their own support and welare,
and to help them live independent
lives.
Transformingsocial
care
Deliveringbetter
services
8/7/2019 Isle of Wight Council: Corporate Plan 2009-13
16/17
16
Corporate
theme
Programme/
project/scheme Outcome Council priority
A sae and
well-kept
Island
Accessibility Improved acilities or pedestrians
and cyclists to aid accessibility to local
amenities and services.
PFIandroads
Regenerationand
the economy
Road saety
and trafcmanagement
Targeted improvements to ootways,
saety suracing, trafc signals,carriageway realignment and visibility
that will signicantly contribute to
the council's objective o making the
Island roads saer.
PFIandroads
CCTV UpgradedCCTVinfrastructure
and introduction o re-deployable
cameras, in place by March 2010.
PFIandroads
Fire and rescue
model or change
The delivery o a smaller, more exible,
responsive and eective workorce
which will demonstrate value or
money.
Fireservice
modernisation
Deliveringbetter
services
An inspiring
Island
One School
Pathnder
Work to secure a contracting partner
to deliver the new learning centre
in Cowes in preparation to start
construction in 2010.
Schools
School
reorganisation
Works on school inrastructure to
prepare or move to two-tier system,
ocused on primary school changes
or September 2010.
Schools
Delivering
better
services
Transormation Signicant improvements in the
way the council does business
including better needs-based servicedelivery, signicantly reduced costs, a
reduction in bureaucracy, better use
o assets and resources, and increased
value or money.
Deliveringbetter
services
Business systems
improvement
project
New integrated system in place
or nance, procurement, human
resources and payroll to improve
planning and rene processes and
realise revenue savings.
Deliveringbetter
services
8/7/2019 Isle of Wight Council: Corporate Plan 2009-13
17/17
Appendix C strategic priorities and community strategy
This appendix outlines how the councils strategic priorities are linked to the outcomes within the themes
o the Islands sustainable community strategy (commonly reerred to as Eco Island). The Eco Island strategy
sets out a number o key outcomes under our themes, which will enable the Island to achieve its vision o
becoming a world renowned Eco Island, with a thriving economy, a real sense o pride and where residents
and visitors enjoy healthy lives, eel sae and are treated with respect by 2020.
The council, in its role as community leader through its democratic accountability, is responsible or
providing a lead in the delivery o the sustainable community strategy. The table below shows how the
outcomes under the our themes in this strategy are linked to our strategic priorities.
Council strategic priorities Community strategy, themes outcomes
School reorganisation
Inspiring raise standards.
Inspiring keeping children and young people sae.
Healthy and supportive improve emotional health.
Roads PFI scheme
Thriving increase inward investment.
Thriving protect natural environment.
Sae and well-kept clean streets and open spaces.
Transorming social care
Inspiring keeping children and young people sae.
Healthy and supportive increase lie expectancy.
Healthy and supportive improve emotional health.
Economic developmentThriving increase inward investment.
Thriving protect natural environment.
Fire service modernisation
Healthy and supportive increase lie expectancy.
Healthy and supportive support vulnerable people.
Sae and well-kept reduce crime and ear o crime.
Local housingHealthy and supportive increase lie expectancy.
Healthy and supportive improve emotional health.
Delivering better servicesThriving reduce carbon oot print.
Sae and well-kept clean streets and open spaces.
As part o our perormance ramework, we will be identiying key objectives and measures which will
show our progress towards the delivery o our strategic priorities over the next three years, and how thesecontribute to the achievement o the outcomes in the sustainable community strategy. These objectives
with their measures and targets or a three-year period will be published in the spring o 2010.