Thomas Jefferson National Accelerator Facility Page 1 ISM Core Function Teams Kickoff Meeting January 8, 2008 Defin e Work P e r f o r m W o r k F e e d b a c k & I mp ro v e m e n t A n a l y z e H a z a r d s Develop Controls
Transcript
Page 1: ISM Core Function Teams Kickoff Meeting

Thomas Jefferson National Accelerator Facility

Page 1

ISM Core Function Teams Kickoff Meeting

January 8, 2008

Define Work

Perform

Work

Feed

back

&

Impr

ovem

ent

Analyz e

Haz ar ds

Develop

Controls

Page 2: ISM Core Function Teams Kickoff Meeting

Thomas Jefferson National Accelerator Facility

Page 2

Meeting Outline

• Opening Remarks

• ISM Core Function Teams

• Review of Integrated Safety Management

• Review of JLab ISM Program Elements

• HSS ES&H Inspection of JLab

• HSS ES&H Inspection of BNL

• ISM Core Function Teams Assessment

• Review of Assessment Techniques

Page 3: ISM Core Function Teams Kickoff Meeting

Thomas Jefferson National Accelerator Facility

Page 3

ISM Core Function Teams

What is the Objective of the ISM Core Function Teams?

• The objective is to have a constant presence throughout the Lab to continue to assess ISMS effectiveness and identify opportunities for additional system improvement

Page 4: ISM Core Function Teams Kickoff Meeting

Thomas Jefferson National Accelerator Facility

Page 4

ISM Core Function TeamsCo-Chair/

Mgr Sup/

Team Lead

Co-Chair/

WSC

Team Member

Team Member

Team Member

Team Member

CF#1 Kelly Trembley

John Riesbeck

Byron Golden

Debra Brand

Howard Fenker

NA

CF#2 Bill Vulcan Joe Beaufait

Harry Fanning

Manny Nevarez

Dave Hamlette

NA

CF#3 Phil Mutton William Berkley

Brad Cumbia

Kevin Jordon

John Kelly NA

CF#4 Tom Briggs Derrick Dail

Tom Hassler

John LeRose

James Coleman

Ned Walker

CF#5 Neil Wilson Brian Bevins

Tina Menefee

Richard Williams

Cindy Saban

Brian Kross

Page 5: ISM Core Function Teams Kickoff Meeting

Thomas Jefferson National Accelerator Facility

Page 5

Facilitator Contact Information

Bill Rainey• Office (757) 269-7898• Mobile (757) 636-0611• [email protected]• CEBAF Center, Room B210

Rick Dion• Office (720) 496-4675• Mobile (303) 717-2025• [email protected]

Page 6: ISM Core Function Teams Kickoff Meeting

Thomas Jefferson National Accelerator Facility

Page 6

ISM Core Function TeamsSchedule

Cycle I• 7-11 January - team training & assessment preps• 14 January through 8 February (4 weeks) – conduct assessment activities• 11 February - teams brief Director’s Safety Committee• 19 February – teams submit Cycle I final report for review and approval

Cycle II• 3 - 7 March - assessment preps• 10 March - 4 April (4 weeks) – conduct assessment activities• 14 April - teams brief Director’s Safety Committee• 15 April – teams submit Cycle II final report for review and approval

• 19 – 23 May – HSS Team Planning Visit• 2 – 12 June – HSS Team Inspection of JLab

Page 7: ISM Core Function Teams Kickoff Meeting

Thomas Jefferson National Accelerator Facility

Page 7

Review of ISM

What is Integrated Safety Management?

• Systematic integration of safety into management and work practices at all levels so that missions are accomplished while protecting the public, the worker, and the environment

• This is accomplished through effective integration of safety management into all facets of activities conducted at JLab

• Safety is an integral part of each job -- not a stand-alone program

• Terms– Integrated Safety Management (ISM) – Concept– Integrated Safety Management System (ISMS) - Process

Page 8: ISM Core Function Teams Kickoff Meeting

Thomas Jefferson National Accelerator Facility

Page 8

Review of ISM

7 Guiding Principles

• The guiding principles are the fundamental policies that guide actions, from development of directives to performance of work– Line Management Responsible for Safety– Clear Roles and Responsibilities– Competence Commensurate with Responsibility– Balanced Priorities– Identification of Safety Standard and Requirements– Hazard Controls Tailored to Work Being Performed– Operations Authorization

Page 9: ISM Core Function Teams Kickoff Meeting

Thomas Jefferson National Accelerator Facility

Page 9

Review of ISM

5 Core Functions

• These five core safety management functions provide the necessary structure for any work activity that could potentially affect the public, the workers, and the environment.

– Define the Scope of Work– Analyze the Hazards– Develop and Implement Hazard Controls– Perform Work Within Controls– Provide Feedback and Continuous Improvement

• The functions are applied as a continuous cycle with the degree of rigor appropriate to address the type of work activity and the hazards involved

Define Work

Perform

Work

Feed

back &

Impr

ovem

ent

Ana

lyze H

azards

Develop

Controls

Page 10: ISM Core Function Teams Kickoff Meeting

Thomas Jefferson National Accelerator Facility

Page 10

Review of ISMCore Function #1

Define the Scope of Work

• Identify the nature of the required work• Identify the schedule• Determine the cost• Review associated lessons learned

• JLab contract work scope• Work planning process for each JLab organization• Task descriptions• Subcontractor work orders

Page 11: ISM Core Function Teams Kickoff Meeting

Thomas Jefferson National Accelerator Facility

Page 11

Review of ISMCore Function #2

Analyze the Hazards

• Identify work related hazards• Analyze identified hazards

• Hazard ID checklists• Experiment safety approval form• ES&H 3210 – Hazard Identification and Characterization• ES&H 3410 – ESH&Q Aspects of Material Acquisitions• Safety SMEs (ESH&Q and Divisional)• Utilize Project Knowledge and Lessons Learned

Page 12: ISM Core Function Teams Kickoff Meeting

Thomas Jefferson National Accelerator Facility

Page 12

Review of ISMCore Function #3

Develop and Implement Hazard Controls

• Select/design engineering & administrative controls• Select/design pollution prevention/waste minimization controls• Identify appropriate personal protective equipment• Apply associated lessons learned into controls• Implement controls

• Include controls in JLab work procedures (SOPs, OSPs, TOSPs)• Conduct training• Subcontractor safety plan• Prepare Task Hazard Analysis Worksheet

Page 13: ISM Core Function Teams Kickoff Meeting

Thomas Jefferson National Accelerator Facility

Page 13

Review of ISMCore Function #4

Perform Work Within Controls

• Obtain authorization• Ensure personnel have appropriate qualifications/training as

identified in work control documents• Conduct pre-job briefing• Perform work and follow controls as identified in the appropriate

work control document

• Shift plan approval & implementation• FEL operations plan approval & implementation• Daily work plan approval• Implementation of Technical Work Documents• ATLis Implementation

Page 14: ISM Core Function Teams Kickoff Meeting

Thomas Jefferson National Accelerator Facility

Page 14

Review of ISMCore Function #5

Provide Feedback and Continuous Improvement

• Conduct post job reviews (worker feedback)• Collect and distribute lessons learned• Conduct independent, management, and self-assessments

• Worker Safety Committee• Contractor Assurance System• Issues management identification, tracking, trending and closeout• Corrective Action Tracking System (CATS)

Page 15: ISM Core Function Teams Kickoff Meeting

Thomas Jefferson National Accelerator Facility

Page 15

JLab ISM Program Elements

What Documents are Part of the JLab ISM Program?

Integrated Safety Management System Program Description

Quality Assurance Plan

Environment, Safety, and Health Manual

Contractor Assurance System Program Description

Environmental

Management System Plan

Worker Safety and

Health Protection

Program

Radiation Protection Program

Operational Safety Procedures

QA Procedures

Standard Operating Procedures

Final Safety Assessment

DocumentEnvironmental Management Procedures

Page 16: ISM Core Function Teams Kickoff Meeting

Thomas Jefferson National Accelerator Facility

Page 16

JLab ISM Program Elements

Organization FEL ACCELERATOR PHYSICS F&L

Activity / Work Planning Process FEList

Experiment Review Process (ES&H Manual

Chapter 3130)Operations Maintenance (ATLis) SRF (TATLs)

Experiment Review Process (ES&H Manual Chapter 3120)

Subcontractor / Materials Procurement

Balance of Lab

(1) Define the Scope of Work

FEList Task DescriptionIndependent Investigator

ProposalProgram Advisory Committee / Experimental Schedule

ATLis Task Entry TATLs Task DescriptionProgram Advisory Committee / Experimental Schedule

Work Order or Subcontractor Specifications

Worker Health and Safety Protection Program, Radiation Protection Program, Contractual Compliance Documents, Subcontractor Specifications

↓ ↓ ↓ ↓ ↓ ↓ ↓ ↓

(2) Analyze the Hazard

FEList Hazard ID Checklist / ES&H 3210

Laser Operations Directives, Experiment Safety Approval Form

Accelerator Operations Directives (AOD)

ATLis Hazard ID Checklist / ES&H 3210

TATLs Hazard ID Checklist / ES&H 3210

Conduct of Operations, Experiment Safety

Assessment Document, Radiation Safety Assessment

Document

ES&H 3410 and 3420 ES&H 3210, 3410 and 3420

↓ ↓ ↓ ↓ ↓ ↓ ↓ ↓(3) Develop and Implement Hazard Controls

Develop Controls - ES&H 3210 Implement Controls - SOPs, OSPs, TOSPs, training

Develop Controls - LOD, ESAF, ES&H 3210 Implement Controls - ESAF, SOPs, OSPs, TOSPs, training

Develop Controls - AOD Implement Controls - SOPs, training

Develop Controls - ES&H 3210 Implement Controls - SOPs, OSPs, TOSPs, training

Develop Controls - ES&H 3210 Implement Controls - SOPs, OSPs, TOSPs, training

Develop Controls - COO, ESAD, RSAD, ES&H 3210 Implement Controls - SOPs, OSPs, TOSPs, training

Develop Controls - Subcontractor Safety Plan (SSP) Implement Controls - SSP, SOPs, OSPs, TOSPs

Develop Controls - ES&H 3210, Subcontractor Safety Plan Implement Controls - SSP, SOPs, OSPs, TOSPs

↓ ↓ ↓ ↓ ↓ ↓ ↓ ↓(4) Perform Work Within Controls

FEList File Approval and Implementation;

FEL Operation Plan Approval and Implementation

Shift Plan Approval and SOP Implementation

ATLis File Approval and Implementation

TATLs File Approval and Implementation

Experiment Readiness Clearance and SOP

Implementation

Task Hazard Analysis/SSP Approval and Implementation

Daily Work Plan Approval

↓ ↓ ↓ ↓ ↓ ↓ ↓ ↓(5) Provide Feedback and Continuous Improvement (Activity Level)

Daily Planning Meeting, Peer Reviews, FEList Comments, FLOG

Daily Planning Meeting, Peer Reviews, FEList Comments, FLOG

Daily Planning Meeting, Weekly Meeting, On-line Forum, Various e-logs

Daily Planning Meeting, Weekly Meeting, On-line Forum, Various e-logs

Daily Planning Meeting, Weekly Meeting, On-line Forum, Various e-logs

Daily Planning Meeting, Weekly Meeting, On-line Forum, Various e-logs

Pre-job Meetings, Daily Planning Meetings, Post-job Closeout

Pre-job Meetings, Daily Planning Meetings, Post-job Closeout

↕ ↕ ↕ ↕ ↕ ↕ ↕ ↕

(5) Provide Feedback and Continuous Improvement (Lab Wide)

Safety Warden Area Inspections, ESH&Q self-assessments, STOP, CATS, ORPS, Work Observations, Workers Safety Committee, Director's Safety Council, INSIGHT Webpage, DOE Corporate Lessons Learned Database

Safety Warden Area Inspections, ESH&Q self-assessments, STOP, CATS, ORPS, Work Observations, Workers Safety Committee, Director's Safety Council, INSIGHT Webpage, DOE Corporate Lessons Learned Database

Safety Warden Area Inspections, ESH&Q self-assessments, STOP, CATS, ORPS, Work Observations, Workers Safety Committee, Director's Safety Council, INSIGHT Webpage, DOE Corporate Lessons Learned Database

Safety Warden Area Inspections, ESH&Q self-assessments, STOP, CATS, ORPS, Work Observations, Workers Safety Committee, Director's Safety Council, INSIGHT Webpage, DOE Corporate Lessons Learned Database

Safety Warden Area Inspections, ESH&Q self-assessments, STOP, CATS, ORPS, Work Observations, Workers Safety Committee, Director's Safety Council, INSIGHT Webpage, DOE Corporate Lessons Learned Database

Safety Warden Area Inspections, ESH&Q self-assessments, STOP, CATS, ORPS, Work Observations, Workers Safety Committee, Director's Safety Council, INSIGHT Webpage, DOE Corporate Lessons Learned Database

Safety Warden Area Inspections, ESH&Q self-assessments, STOP, CATS, ORPS, Work Observations, Workers Safety Committee, Director's Safety Council, INSIGHT Webpage, DOE Corporate Lessons Learned Database

Safety Warden Area Inspections, ESH&Q self-assessments, STOP, CATS, ORPS, Work Observations, Workers Safety Committee, Director's Safety Council, INSIGHT Webpage, DOE Corporate Lessons Learned Database

Page 17: ISM Core Function Teams Kickoff Meeting

Thomas Jefferson National Accelerator Facility

Page 17

JLab ISM Program Elements

ISMS Versus EMSISMS Core Functions EMS Applications EMS

Terminology

Define the Scope of Work

ID environmental aspects related to the process, activity, or service

Plan

Analyze the Hazards Review risks, hazards, and consider less environmentally harmful or wasteful alternatives

Plan

Develop and Implement Controls

Develop engineering/administrative controls to minimize or eliminate aspects & put in place

Plan

Perform Work Within Controls

Ensure controls remain in place as activity is performed. Monitor, measure, assess as you go.

Do

Provide Feedback and Continuous Improvement

Review…and improve practices as identified; share good practices

Check, Act, Improve

Page 18: ISM Core Function Teams Kickoff Meeting

Thomas Jefferson National Accelerator Facility

Page 18

HSS ES&H Inspection of JLab

Inspection Schedule

• By 1 May – Provide all materials needed for inspection to team• 19 – 23 May – HSS Team Planning Visit• 2 – 12 June – HSS Team Inspection of JLab

Who is Coming to do the Inspection?

• DOE Office of Independent Oversight (OIO) which is part of the DOE Office of Health, Safety, and Security (HSS)

• Up to 8 team members

Page 19: ISM Core Function Teams Kickoff Meeting

Thomas Jefferson National Accelerator Facility

Page 19

HSS ES&H Inspection of BNL• Occurred August – September 2007

• Objective – “Assess the effectiveness of ES&H programs at BNL…”

• Assessment Focus– Implementation of ISM Core Functions for selected BNL facilities

and activities focusing on work planning and control systems– Effectiveness of managing environmental management system

(EMS) implementation– Injury and illness investigation and reporting– Feedback and continuous improvement systems

Page 20: ISM Core Function Teams Kickoff Meeting

Thomas Jefferson National Accelerator Facility

Page 20

HSS ES&H Inspection of BNLIdentified Weaknesses (1)• Clear ES&H requirements are not being accurately

communicated through implementing procedures– Cite lockout tag out in compliance with Natl. Fire Protection

Assoc.– Requirements described using wrong terminology or optional

(should vs. shall)– Routine procedure review not being implemented

Page 21: ISM Core Function Teams Kickoff Meeting

Thomas Jefferson National Accelerator Facility

Page 21

HSS ES&H Inspection of BNLIdentified Weaknesses (2)• Established safety controls not always implemented

– Found most in experimental and research facilities– Chemical and cryogen handling safety requirements not followed– Managers and supervisors often aware of deficiencies and did

not act

Page 22: ISM Core Function Teams Kickoff Meeting

Thomas Jefferson National Accelerator Facility

Page 22

HSS ES&H Inspection of BNLIdentified Weaknesses (3)• Some workplace and construction hazards not

adequately analyzed– Lead solder, sharps, welding fumes and asphalt fumes

Page 23: ISM Core Function Teams Kickoff Meeting

Thomas Jefferson National Accelerator Facility

Page 23

HSS ES&H Inspection of BNLIdentified Weaknesses (4)• Contractor assurance system does not sufficiently

communicate expectations, requirements or drive improvement of safety performance– Self assessment, work observations, records review lacking or

insufficient– Issues management limited to events or outside assessments

and lack causal analysis– Similar findings for occupational injury and illness investigations,

lessons learned program

Page 24: ISM Core Function Teams Kickoff Meeting

Thomas Jefferson National Accelerator Facility

Page 24

ISM Core Function Teams AssessmentEach team is to assess how JLab work planning and execution processes are aligned with a specific ISM Core Function:

1. Are we doing a good job defining the SCOPE OF WORK

2. Is the work HAZARD ANALYSIS being conducted consistent with ISMS

3. Are HAZARD CONTROLS being developed and implemented properly

4. Is our WORK PERFORMANCE process consistent with ISMS

5. Are we maximizing our LESSONS LEARNED and feedback opportunities

Page 25: ISM Core Function Teams Kickoff Meeting

Thomas Jefferson National Accelerator Facility

Page 25

ISM Core Function Teams Assessment

• (Review of ISM Core Function Teams Assessment Plan)

Page 26: ISM Core Function Teams Kickoff Meeting

Thomas Jefferson National Accelerator Facility

Page 26

Review of Assessment Techniques

• Document reviews

• Observation of activities

• Interviews

• Evaluation of information

• Documentation of results


Recommended