+ All Categories
Home > Documents > ISSUE 18/2019 NEWS LETTER E-BULLETIN...2019/02/18  · Figure 5 Sub Basement M&E Navisworks...

ISSUE 18/2019 NEWS LETTER E-BULLETIN...2019/02/18  · Figure 5 Sub Basement M&E Navisworks...

Date post: 08-Feb-2021
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
12
ISSUE 18/2019 NEWSLETTER E-BULLETIN www.plytecbest.com BUILD SMARTER. BUILD FASTER. A Member of Sudut Swasta Group
Transcript
  • ISSUE 18/2019 NEWSLETTER

    E-BULLETIN

    www.plytecbest.com

    BUILD SMARTER. BUILD FASTER.

    A Member of Sudut Swasta Group

  • BON EstatesProject Reference

    Client : Kerjaya Prospek Group Berhad

    Structures Type:

    Reinforced Concrete

    BIM Services:

    - Car park and typical floor concrete modeling completed.

    - Ground floor beam reinforcement 80% completed.

    - Transfer slab reinforcement completed.

    - Lift core reinforcement 85% completed.

    - Car park floor reinforcement 65% completed.

    - Typical floor reinforcement 65% completed.

    - Duplex floor shell drawing L41SD to L43ASD completed (pending consultant's confirmation)

    3D modeling and shop drawings

    Status: Y3

    G

    H

    3 42Y2

    5

    X9

    1Y1

    X10

    3B85

    (200

    x575

    )3B

    30 (1

    50x1

    040)

    3B70

    (200

    x700

    )

    3B80 (150x1040)

    3B84

    (200

    x575

    )3B

    72 (2

    00x6

    00)

    3B10

    0 (1

    50x8

    50)

    3B59

    (200

    x104

    0)

    3B3 (150x1040)

    TYPE C

    3B27 (225x675)

    3B10

    8 (1

    75x1

    040)

    3B32 (150x1040)3B1

    03 (1

    75x8

    50)

    3B44 (100x690)

    3B87 (150x850)

    1230

    0

    3B60 (175x850)

    3B11

    2 (1

    50x8

    50)

    4875

    3B11

    3 (1

    50x8

    50)

    7400

    3B78

    (175

    x104

    0)

    3B24 (150x675)

    3B10

    7 (1

    75x1

    040)

    6650

    3B67 (175x1040)

    3B83 (225x675)

    3B75 (150x1040)

    3B11

    0 (1

    75x5

    75)

    3B19 (150x675)

    3B11

    1 (2

    00x5

    75)

    3B63

    (150

    x104

    0) 3B11 (100x675)

    2625

    5650

    662524300

  • BON EstatesProject Reference

    Client : Kerjaya Prospek Group Berhad

    Ground Floor - Beam Details

    Ground Floor - Beam Detail Drawings

  • Aspen Vertu ResortProject Reference

    Structures Type:

    Client :

    Reinforced Concrete

    Kerjaya Prospek Group Berhad

    BIM Services:

    - Car park concrete modeling completed; reinforcement modeling for beam, column and wall completed.

    - Transfer floor reinforcement 80% completed.

    - Block E typical concrete shell in progress.

    Status:

    3D modeling and shop drawings

    Tekl

    a St

    ruct

    ures

    COPYRIGHT OF ALL CONTENTS IN THIS DRAWING IS RESTED UNDER BIM ENGINEERING SOLUTION AND TECHNOLOGY SDN. BHD. (1031260-M)

    BLOCK A LEVEL 3, 8,13, 18, 23 - TYPICAL BEAM MARKING LAYOUT

    F

    E

    D

    3B42

    (200

    x600

    )

    3B87 (150x850)

    3B49

    (175

    x104

    0)

    3B19 (150x675)

    3B30

    (150

    x104

    0)3B

    20 (2

    00x5

    75)

    3B48

    (150

    x104

    0)

    3B91

    (175

    x850

    )

    3B11 (100x675)

    3B23

    (200

    x575

    )

    3B90

    (150

    x850

    )

    3B46 (175x1040)

    3B96

    (150

    x850

    )

    3B38

    (175

    x104

    0)

    3B55

    (200

    x104

    0)

    1230

    056

    50

    TYPE C1

    3B22

    (200

    x575

    )

    3B21

    (175

    x575

    ) 3B24 (150x675)

    3B27 (225x675)

    3B32 (150x1040)

    3B33 (150x1040)

    6650

    3B94

    (150

    x850

    ) 3B44 (100x690)

    3B45

    (200

    x700

    )3B5

    0 (1

    75x1

    040)

    3B41 (150x1040)

    3B3 (150x1040)22

    50

    Level 8 Level 10

  • COPYRIGHT OF ALL CONTENTS IN THIS DRAWING IS RESTED UNDER BIM ENGINEERING SOLUTION AND TECHNOLOGY SDN. BHD. (1031260-M)

    BLOCK A LEVEL 3, 8,13, 18, 23 - TYPICAL BEAM MARKING LAYOUT

    Symphony Union Suites Project Reference

    Client :

    BIM Services:3D modeling of structure elements and M&E services.

    Status:

    Structure (Reinforced Concrete):- Zone 1 (B2, B1A/B1B) 100% completed.

    - Zone 2 (Ground, 1A/1B, 2A/2B) 100% completed.

    - Zone 3 (3A/3B - 5A/5B) 100% completed.

    M&E Services:

    - Zone 1 (B2, B1A/B1B) 50% completed.(M&E modeling on halt, pending shop drawings)

  • Symphony Union Suites Project Reference

    Client :

    M&E Model

    3D Federated Model

    B2 Carpark (Federated Model Perspective View)

  • ORION Tower Service SuiteProject Reference

    Client :

    BIM Services:3D modeling and collaboration via Trimble Connect

    Status: - Basement B1 & B2: Completion of Modeling for ARC (geometry) - 90%, MEP - 95%, STR - 90%

    - Typical Floor L13 to L43: Completion of Modeling for ARC (geometry) - 90%, MEP - 10%, STR - 5%

    - Car park floor L1 to L9: Completion of Modeling for ARC (geometry) - 52%, MEP - 90%, STR - 16% (car park floors on hold)

    Typical Floor L13 to L43 - ArchitecturalModel

    Scope of works:

    LOD 400 Constructible model for visualization, spatial co-ordination construction management

    ORION TOWER SDN BHD

  • FORUM IIProject Reference

    Client :

    BIM Services:

    Modeling of M&E services up to LOD 300

    Currently on-hold until received revised consultant drawing from client.

    Figure 1 Perspective view 1

    Figure 2 Perspective view 2

    Figure 3 Overall M&E View

    Status:

    Sub-Basement Floor (Carpark) – Completed

    Ground Floor (Shopping Mall & Carpark) – Completed

    Upper Ground Floor (Carpark) – Completed

    Level 1 (Shopping Mall & Carpark) - 75% Completion

    Upper Level 1 (Carpark) - 67% Completion

    Level 2 (Carpark) - 71% Completion

  • FORUM IIProject Reference

    Client :

    Figure 4 Sub Basement M&E Services

    Figure 5 Sub Basement M&E Navisworks Perspective

  • Factory in Petaling JayaProject Reference

    Rendered Federated Model

    Combined Services Model

    BIM Services: Status:3D modeling of ACMV, Fire Protection and Electrical main services routing. M&E:

    Project Zone: 1. Production floor 2. Office

    M&E: (Completed in 6 days)

  • Factory in Petaling JayaProject Reference

    M&E Model Perspective ViewEngineering Lab

    Production Floor

    Fire Protection

    Toilet Exhaust

    ACMV (Drain pipe)

    Cable Tray (ELV)

    Cable Tray (Power)

    ACMV (Fresh Air)

    Lighting Fixtures

  • BIM Engineering Solution & Technology Sdn. Bhd. (1031260-M)

    No. 19, Jalan Meranti Permai 3, Meranti Permai Industrial Park Batu 15,Jalan Puchong, 47100 Puchong, Selangor, Malaysia.

    +603 - 8061 2888 +603 - 8061 4888 [email protected]

    www.plytecbest.com

    UPCOMING EVENTS


Recommended