BON EstatesProject Reference
Client : Kerjaya Prospek Group Berhad
Structures Type:
Reinforced Concrete
BIM Services:
- Car park and typical floor concrete modeling completed.
- Ground floor beam reinforcement 80% completed.
- Transfer slab reinforcement completed.
- Lift core reinforcement 85% completed.
- Car park floor reinforcement 65% completed.
- Typical floor reinforcement 65% completed.
- Duplex floor shell drawing L41SD to L43ASD completed (pending consultant's confirmation)
3D modeling and shop drawings
Status: Y3
G
H
3 42Y2
5
X9
1Y1
X10
3B85
(200
x575
)3B
30 (1
50x1
040)
3B70
(200
x700
)
3B80 (150x1040)
3B84
(200
x575
)3B
72 (2
00x6
00)
3B10
0 (1
50x8
50)
3B59
(200
x104
0)
3B3 (150x1040)
TYPE C
3B27 (225x675)
3B10
8 (1
75x1
040)
3B32 (150x1040)3B1
03 (1
75x8
50)
3B44 (100x690)
3B87 (150x850)
1230
0
3B60 (175x850)
3B11
2 (1
50x8
50)
4875
3B11
3 (1
50x8
50)
7400
3B78
(175
x104
0)
3B24 (150x675)
3B10
7 (1
75x1
040)
6650
3B67 (175x1040)
3B83 (225x675)
3B75 (150x1040)
3B11
0 (1
75x5
75)
3B19 (150x675)
3B11
1 (2
00x5
75)
3B63
(150
x104
0) 3B11 (100x675)
2625
5650
662524300
BON EstatesProject Reference
Client : Kerjaya Prospek Group Berhad
Ground Floor - Beam Details
Ground Floor - Beam Detail Drawings
Aspen Vertu ResortProject Reference
Structures Type:
Client :
Reinforced Concrete
Kerjaya Prospek Group Berhad
BIM Services:
- Car park concrete modeling completed; reinforcement modeling for beam, column and wall completed.
- Transfer floor reinforcement 80% completed.
- Block E typical concrete shell in progress.
Status:
3D modeling and shop drawings
Tekl
a St
ruct
ures
COPYRIGHT OF ALL CONTENTS IN THIS DRAWING IS RESTED UNDER BIM ENGINEERING SOLUTION AND TECHNOLOGY SDN. BHD. (1031260-M)
BLOCK A LEVEL 3, 8,13, 18, 23 - TYPICAL BEAM MARKING LAYOUT
F
E
D
3B42
(200
x600
)
3B87 (150x850)
3B49
(175
x104
0)
3B19 (150x675)
3B30
(150
x104
0)3B
20 (2
00x5
75)
3B48
(150
x104
0)
3B91
(175
x850
)
3B11 (100x675)
3B23
(200
x575
)
3B90
(150
x850
)
3B46 (175x1040)
3B96
(150
x850
)
3B38
(175
x104
0)
3B55
(200
x104
0)
1230
056
50
TYPE C1
3B22
(200
x575
)
3B21
(175
x575
) 3B24 (150x675)
3B27 (225x675)
3B32 (150x1040)
3B33 (150x1040)
6650
3B94
(150
x850
) 3B44 (100x690)
3B45
(200
x700
)3B5
0 (1
75x1
040)
3B41 (150x1040)
3B3 (150x1040)22
50
Level 8 Level 10
COPYRIGHT OF ALL CONTENTS IN THIS DRAWING IS RESTED UNDER BIM ENGINEERING SOLUTION AND TECHNOLOGY SDN. BHD. (1031260-M)
BLOCK A LEVEL 3, 8,13, 18, 23 - TYPICAL BEAM MARKING LAYOUT
Symphony Union Suites Project Reference
Client :
BIM Services:3D modeling of structure elements and M&E services.
Status:
Structure (Reinforced Concrete):- Zone 1 (B2, B1A/B1B) 100% completed.
- Zone 2 (Ground, 1A/1B, 2A/2B) 100% completed.
- Zone 3 (3A/3B - 5A/5B) 100% completed.
M&E Services:
- Zone 1 (B2, B1A/B1B) 50% completed.(M&E modeling on halt, pending shop drawings)
Symphony Union Suites Project Reference
Client :
M&E Model
3D Federated Model
B2 Carpark (Federated Model Perspective View)
ORION Tower Service SuiteProject Reference
Client :
BIM Services:3D modeling and collaboration via Trimble Connect
Status: - Basement B1 & B2: Completion of Modeling for ARC (geometry) - 90%, MEP - 95%, STR - 90%
- Typical Floor L13 to L43: Completion of Modeling for ARC (geometry) - 90%, MEP - 10%, STR - 5%
- Car park floor L1 to L9: Completion of Modeling for ARC (geometry) - 52%, MEP - 90%, STR - 16% (car park floors on hold)
Typical Floor L13 to L43 - ArchitecturalModel
Scope of works:
LOD 400 Constructible model for visualization, spatial co-ordination construction management
ORION TOWER SDN BHD
FORUM IIProject Reference
Client :
BIM Services:
Modeling of M&E services up to LOD 300
Currently on-hold until received revised consultant drawing from client.
Figure 1 Perspective view 1
Figure 2 Perspective view 2
Figure 3 Overall M&E View
Status:
Sub-Basement Floor (Carpark) – Completed
Ground Floor (Shopping Mall & Carpark) – Completed
Upper Ground Floor (Carpark) – Completed
Level 1 (Shopping Mall & Carpark) - 75% Completion
Upper Level 1 (Carpark) - 67% Completion
Level 2 (Carpark) - 71% Completion
FORUM IIProject Reference
Client :
Figure 4 Sub Basement M&E Services
Figure 5 Sub Basement M&E Navisworks Perspective
Factory in Petaling JayaProject Reference
Rendered Federated Model
Combined Services Model
BIM Services: Status:3D modeling of ACMV, Fire Protection and Electrical main services routing. M&E:
Project Zone: 1. Production floor 2. Office
M&E: (Completed in 6 days)
Factory in Petaling JayaProject Reference
M&E Model Perspective ViewEngineering Lab
Production Floor
Fire Protection
Toilet Exhaust
ACMV (Drain pipe)
Cable Tray (ELV)
Cable Tray (Power)
ACMV (Fresh Air)
Lighting Fixtures
BIM Engineering Solution & Technology Sdn. Bhd. (1031260-M)
No. 19, Jalan Meranti Permai 3, Meranti Permai Industrial Park Batu 15,Jalan Puchong, 47100 Puchong, Selangor, Malaysia.
+603 - 8061 2888 +603 - 8061 4888 [email protected]
www.plytecbest.com
UPCOMING EVENTS